Ordinance No. 15,020 ORDINANCE NO, 15,020
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN,
TEXAS, AUTHORIZING CHANGE ORDER NO. 3, WHICH AMENDS THE
CONSTRUCTION MANAGER-AT-RISK CONTRACT FOR THE PUBLIC
SAFETY FACILITY PROJECT, WITH DUROTECH, INC., IN AN AMOUNT
NOT TO EXCEED FORTY-ONE MILLION EIGHT HUNDRED THIRTY
THOUSAND EIGHT HUNDRED FIFTY-NINE AND NO/100 DOLLARS
($41,830,859.00);AND PROVIDING FOR THE EFFECTIVE DATE THEREOF.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS:
Section 1: That the City Council of the City of Baytown,Texas, does hereby authorize
Change Order No. 3, which amends the Construction Manager-at-Risk Contract for the Public
Safety Facility Project, with Durotech, Inc., in an amount not to exceed FORTY-ONE MILLION
EIGHT HUNDRED THIRTY THOUSAND EIGHT HUNDRED FIFTY-NINE AND NO/100
DOLLARS ($41,830,859.00). A copy of said change order is attached hereto, marked Exhibit "A"
and made a part hereof for all intents and purposes.
Section 2: This ordinance shall take effect immediately from and after its passage by
the City Council of the City of Baytown.
INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the
City of Baytown this the 27t1' day of January, 2022.
BRANDON CAPETILLO, Ilayor
ATTEST:
yA09JOOLL+I
LL
«a YL
ANGELA CKSO , &ifyl_ co
c� �a
APPROVED AS TO
Iy
TRffVOR FANNING, Interim City Attorney
RAKaren AndersonlORDINANCESL02"212022.OL271ChangcOrderNo3-Durotecli-Puhlic5afetyfacility.docx
EXHIBIT °A° CITY OF BAYTOWN
PUBLIC WORKS & ENGINEERING
'9� 2123 Market
Baytown, Texas 7752020
BETTER
BAYTOWN CHANGE ORDER
For Public Safety Campus: Phase 2 and 3
Date of Issuance: 1/27/2022 Change Order No.: 3
Contractor: Durotech Inc. CoB Project No.: FA1901
Designer: BVG4 Architecture P.O. No.: 2103500
Explanation:
This change order encompasses the following:
The Guaranteed Maximum Price(GMP)for the construction of the Baytown Public Safety—Phase 2 and 3:
Administration Building in the amount of$41,830,859.00 and a duration of seven(20)months. These costs include
General Conditions, Bonds &Insurance; General Site Requirements; Existing Conditions, Foundations, Paving,Final
Grading, Masonry, Interior Finishes, Fire Protection Systems, HVAC,Electrical, Plumbing, Fencing and
Landscaping; and the Construction Manager at Risk Fee of 2.3%. Included in this Change Order are four(4)
alternates.
Description of Work Cost Time
1 General Conditions, Bonds&Insurance $2,593,272.00
2 General Site Requirements $2,023,178.00
3 Existing Conditions $463,160.00
4 Concrete(Building Foundation and Site Paving) $4,672,337.00
5 Masonry $522,586.00
6 Metals(Structural Steel, Rails,and Panels) $3,345,643.00
7 Woods (Rough Carpentry and Millwork) $612,279.00
8 Thermal and Moisture Protection $2,600,674.00
9 Openings(Doors and Glazing) $3,066,641.00
10 Finishes (Gypsum Board,Tiling,Resilient Flooring) $4,025,916.00
11 Specialties(Signage, Toilet Accessories,Protective Covers) $534,097.00
12 Equipment(Appliances) $7,695.00
13 Furnishings $122,187.00
14 Conveying Equipment $401,053.00
15 Fire Suppression Systems $404,500.00
16 Plumbing $1,810,214.00
17 HVAC $2,346,500.00
18 Electrical $5,454,879.00
19 Communications (Structured Cabling and AV System) $976,941.00
20 Electronic Safety and Security $592,660.00
21 Earthwork $815,014.00
22 Exterior Improvements (Fences, Gates, Irrigation, Landscaping) $907,215.00
23 Utilities $677,608.00
24 Construction Manager At Risk Fee 2.3% (Phase 1A) $896,454.00
25 Alternate#1 Courts Building Addition $640,793.00
26 Alternate#4D Air Cooled Split System AC Units from Daikin $304,984.00
27 Alternate#5AVRX DX Systems from Daikin AC $581,628.00
28 Alternate#6A DDC Systems by Automated Logic $430,751.00
$41,830,859.00 609 Days
Construction 1 of 2 D16 Revised 2020
The additional scope of work and the schedule associated with the same,are attached hereto as Exhibit "A"
dated December 17,2021 and incorporated herein for all intents and purposes.
Cost& Time Change Summary Cost Time
Original Contract: $ 89,000.00 Days
Previous Change Order(s): $ 18,589,551.00 365 Days
Contract prior to this change order: $ 18,678,551.00 Days
Net increase(decrease) from this change order $ 41,830,859.00 609 Days
Revised Contract: $ 60,509,140.00 974 Days
Finance Approval: Date:
RECOMMENDED: RECOMMENDED:
By _ Date: 1-13-2022 By: 7 / —� Date: 01/14/2022
—}I _
D6sign Architilct 11 Director of Public Works&Engineering
ACCEPTED*: APPROVED:
By: Date: 1-13-2022 By: Date:
Contractor City Manager
-Contractor agrees to perform change(s)included in this Change Order for the price and time indicated. The prices for changes included all costs associated with
this Change Order.
No work is to be done until this change order is executed.No payment to the Contractor(or Consultant)shall be made for work included in the change order until
the Contractors pay estimate is updated.
Revise the project plans and specifications as referenced and insofar as the original project drawings and specifications are inconsistent,this Change Order
governs.Upon execution by all parties,the following changes identified for the contract value and/or contract time shown,are made part of the contract.
Construction 2 of 2 D 16 Revised 2020
DUR®TECH
BUILDERS OF INTEGRITY
Date: January 12, 2022
Ms. Andrea Brinkley
Assistant Director—Capital Projects
City of Baytown - Public Works & Engineering
2123 Market Street
Baytown, TX 77522
Re: Guaranteed Maximum Price for Baytown Public Safety — Phases 2 & 3 — Public
Safety Building
Dear Ms. Brinkley:
We wish to inform you that after several months of working together with City of Baytown
and BVG4 Architecture LLC on this important facility, we have formally advertised and
solicited proposals for the development of the GMP for the Baytown Public Safety -
Phases 2 & 3 — Public Safety Building project. Over 200 proposals were received on
November 23rd, 2021. After careful review and compilation of these proposals, Durotech,
Inc. is pleased to present a Guaranteed Maximum Price for the construction of the
Baytown Public Safety— Phases 2 & 3 — Public Safety Building of$41,830,859.00.
It is our recommendation that we ask City of Baytown Council to approve the Guaranteed
Maximum Price of$41,830,869.00 and to execute the GMP Amendment No. 3 between
City of Baytown and Durotech, Inc.
We are excited about the potential of entering into the construction phase of this project
and want to thank you and your team, BVG4 Architecture and their consultants for a very
successful pre-construction phase. Durotech is committed to City of Baytown in the
successful delivery of the New Public Safety Building project.
Thank you and City of Baytown for selecting Durotech as its building partner. It is our
goal to meet and exceed your expectations. Should you have any questions please do
not hesitate to contact me.
Si erely,
" VV
avid Rowe
CEO
1
11931 Wickchester Lane • Suite 205 ® Houston, Texas 77043-4501
Phone: 281.558.6892 • Fax: 281.496.5637
DUROTECH
BUILDERS OF INTEGRITY
GMPSUMMARY
Project: Baytown Public Safety — Phases 2 & 3 — Public Safety Building
Location: 3200 N Main St., Baytown, TX 77522
Owner: City of Baytown
GMP Proposal Package:
The GMP proposal package consists of the following items:
1. Exhibit A — GMP Top Sheet —dated 12 January 2022
2. Exhibit B — Project Manual —dated 15 October 2021
3. Exhibit C — List of Drawings —dated 15 October 2021
4. Exhibit D — List of Addenda
5. Exhibit E — Qualifications & Assumptions
6. Exhibit F —Allowance Schedule
7. Exhibit G — Self Performed Work Items
8. Exhibit H — Unit Prices
9. Exhibit I — Cost Saving Items
Scope of Work:
A] The Project: The Project consists of the following:
Phase 2:
1. Demolition of existing Police Vehicle Maintenance buildings "H", "I", "J", "K", "P" &
„Q„
2. Demolition of existing site paving east and north of existing Police Staff parking.
3. Construction of 110,960 SF tilt-up concrete and brick, 3-story Building "M", with
VRF Air Conditioning system and full building UPS to meet risk category II
hurricane resistant requirements.
4. Construction of new 485 SF CMU masonry Pump House adjacent to building "M".
5. Construction of new 595 SF Sallyport integrated into the construction of building
,'M"
6. Construction of new central campus generator yard for Phases 1 & 2.
7. Sitework including required utilities, staff parking areas and drives, landscaping
and fencing.
8. Final grading and spread & grade spoils
9. All Masonry Work
10.All Rough Carpentry, Millwork and Solid Surfaces
11.All Thermal & Moisture Protection
12.All Openings and Doors
13.AII Interior Finishes
14.AII Fire Protection Systems
15.AII Plumbing Work
16.AII HVAC Systems
17.AII Electrical Work, including Site Electrical Work
2
11931 Wickchester Lane • Suite 205 • Houston, Texas 77043-4501
Phone: 281,558.6892 9 Fax: 281.496.5637
DUROTECH
BUILDERS OF INTEGRITY
18.AII Fences and Gates
19.AII Concrete Screen Walls
20.All Landscaping and Irrigation
Phase 3:
1. Demolition of existing Police Building "G".
2. Demolition of existing Police Staff Parking, including connection to North Main
Street.
3. Construction of air-conditioned, hurricane resistant 1,200 SF steel framed
addition to the existing Courts Building "B".
4. Sitework including required utilities, public plaza, public parking areas and drives,
landscaping and fencing.
Duration:
The construction duration for Phase 2 & 3 will be 20 months (606 days) from the date of
completion of Phase 1A & 1B.
3
11931 Wickchester Lane . Suite 205 . Houston, Texas 77043-4501
Phone: 281.558.6892 • Fax: 281.496.5637
EXHIBIT'A'
PROJECT: Baytown Public Safety-Phase 1 B
D U ROT E C H LOCATION: 3200 North Main St.,Baytown,TX 77521
OWNER: City of Baytown
BUILDERS OF INTEGRITY ARCHITECT: BV134 Architecture
DATE: 11/212022 -
BAYTOWN PUBLIC SAFETY- PHASE 2 &3
SECTION DESCRIPTION PHASE 2&3 REMARKS
LABOR MATERIAL SU&BIOS TOTAL
GENERAL CONDITIONS
011000 SUPERVISION 1,052,180 - - 1,052,180
011500 TEMPORARY/GENERAL CONDITIONS 12,624 432.196 - 444,820
011940 ADVERTISEMENTS - - 3,000 3,000
012000 EQUIPMENT - 74,640 - 74,640
014220 JAGC FEES - - 28,186 28,186
01 4225 BUILDER'S RISK INSURANCE - - 382,311 382,311
01 4230 GL INSURANCE - - 309,013 309,013
014240 IPAYMENT&PERFORMANCE BOND 299,121 299,191
SUBTOTAL-DIV 00 GENERAL CONDITIONS 1,064,804 506,836 1,021,631 2,593,272
GENERAL REQUIRE/'BENTS
01 21 00 QUANTITY ALLOWANCE - - 0 0 NONE
012105 CONSTRUCTION CONTINGENCY ALLOWANCE - - 1,000,000 1,000,000
012115 SITE ELECTRICAL CONDUIT ALLOWANCE - - 0 0 IN PHASE IA
0121 20 COURTS DRAINAGE ALLOWANCE - - 0 0 IN PHASE 1A
01 21 21 PHASE 1 B:BREAKROOM LOCKERS&APPLIANCES - - 0 0 BY OWNER
01 21 22 PHASE 1 B:VEHICLE LIFTS&FLUID DISTRIBUTION - - 0 01 BY OWNER
012123 PHASE I B:SHOP EQUIPMENT - - 0 0 BYOWNER
01 2124 PHASE 1B:MAINTENANCE EQUIPMENT - - 0 0 BYOWNER
012125 PHASE IB:BUILDING'U'WORKROOM EQUIPMENT - - 0 0 BYOWNER
01 21 26 PHASE 113:BUILDING W RELOCATION OF LIFT - - 0 0 BYOWNER
01 21 27 PHASE 2:HIGH DENSITY STORAGE SHELVING - - 0 0 BYOWNER
01 21 28 PHASE 2:CRIME SCENE LAB EQUIPMENT - - 0 0 BYOWNER
01 21 29 PHASE 2:FITNESS EQUIPMENT&WRESTLING MATS - - 0 0 BYOWNER
01 21 30 PHASE 2:BRK ROOM/KITCHEN/FA KITCHEN APPLIANCES - - 0 0 BYOWNER
012131 PHASE 2:SWAT ARMORY STORAGE CABINETS - - 0 0 BY OWNER
01 21 32 PHASE 2:FARADAY ROOM ALLOWANCE - - 110,000 110,000 ALLOWANCE
01 21 33 PHASE 2:POLICE&FIRE DEPT SHIELDS/MONUMENT SIGN - - 45,000 45,000 ALLOWANCE
01 21 34 PHASE 3:BUILDING D RENOVATIONS - - 20,000 20,000 ALLOWANCE
012135 EXISTING SOIL CONDITIONS ALLOWANCE - - 200,000 200,000 ALLOWANCE
01 4339 MOCKUP PANEL - - 30,000 30,000
01 45 33 WINDSTORM INSPECTIONS - - 11,400 11,400
01 51 13 ITEMPORARY POWER - - 13,000 13,000
01 51 19 EQUIPMENT FUEL&FUEL TANK - - 14,040 14,040
01 51 36 TEMPORARY WATER - - 8,100 8,100
01 5370 QMS/SAFETY - - 127,593 127,593
01 5416 MATERIAL HANDLING&HOISTING - - 104,344 104,344
01 5423 TEMPORARY SCAFFOLDING - - 27,740 27,740
01 55 23 TEMPORARY ROADS - - 0 0 IN PHASE 1A
01 5526 TRAFFIC CONTROL - - 20,000 20,000
01 5626 TEMPORARY FENCING - - 31,841 31,841
01 5639 ITEMPORARY TREE&PLANT PROTECTION 8,550 2,000 - 10,550
01 5700 EROSION&SEDIMENT CONTROL 15,907 25,000 - 40,907
015800 TEMPORARY PROJECT SIGNAGE - - 0 0 IN PHASE IA
016400 OFCI ITEMS 3,420 - - 3,420
01 71 23 IFIELD ENGINEERING&LAYOUT 36.080 7,075 - 43,155
4
EXHIBIT'A'
SECTION DESCRIPTION PHASE 2&3 REMARKS
LABOR MATERUL SUB-BIOS TOTAL
017416 SITE MAINTENANCEICLEAN STREETS 9,255 21,123 - 30,378
01 74 19 CONSTRUCTION WASTE MANAGEMENT - - 38,970 38,970
01 7423 FINAL CLEANING - - 27.740 27.740
019100 COMMISSIONING 65,000 - 65,000
SUBTOTAL-DIVOI GENERAL REQUIREMENTS 138,212 55,198 1,829,768 2,023,178
IV 02 EXISTING CONDITIONS
022100 SURVEYS - - 10.000 10.000
024113 SITE DEMOLITION - - 267,750 267,750
02 61 00 REMOVAL&DISPOSAL OF CONTAMINATED SOILS - - 114,800 114,800
02 65 00 UNDERGROUND STORAGE TANK REMOVAL - - 0 0 IN 02 61 00
026510 PLUG&ABANDON WATER WELL&MONITORING WELLS - - 64,610 64,610
027000 PUMP&DEWATER 3,600 2,400 - 61000
SUBTOTAL-DIV02 EXISTING CONDITIONS 3,600 2,400 457,160 463,160
DIV 03 CONCRETE _
032000 CONCRETE REINFORCING - - 0 0 IN 03 30 00
033000 SITE&BUILDING CONCRETE - - 4,442,967 4,442,967
03 35 10 CONCRETE FLOOR SEALER - - 21,380 21,380
03 35 43 POLISHED CONCRETE - - 0 0 IN PHASE 1 B
03 40 50 CONCRETE TILT UP PANELS - - 0 0 IN 03 30 00
03 40 55 ICONCRETE TILT UP PANELS ERECTION - - 132,990 132,990
03 40 60 CONCRETE TILT UP PANELS ACCESSORIES - 75,000 75,000
SUBTOTAL-DIV 03 CONCRETE - - 4,672,337 4,672,337
040519 MASONRY REBAR - - 0 0 IN 04 05 19
042000 MASONRY - - 1 522.5861 522,586
SUB TOTAL-DIV04 MASONRY - - 522,586 522,586
..•e..::...aRwa
051200 STRUCTURAL STEEL FRAMING - - 2,351,133 2,351.133
051250 STRUCTURAL STEEL ERECTION - - 632,796 632,796
053700 PREPARE EXPOSED STEEL STRUCTURE 5,649 5,649 - 11,298
055000 MISCELLANEOUS STEEL 130,014 2,200 - 132,214
05 50 10 TIMBER MATS 19,745 42,500 - 62.245
055020 SAFETY RAILS 22,439 10,498 - 32,937
055300 METAL GRATINGS - - 0 0 IN PHASE IB
055500 METAL NOSINGS 2.309 5,567 - 7,876
055805 DOWNSPOUT BOOTS - - 0 0 IN PHASE 1B
05 73 00 DECORATIVE METAL RAILINGS - - 107,644 107,644
0575 10 PERFORATED METAL PANELS 7,500 7,500
SUBTOTAL-DIV 05 METALS 180,156 66,414 3,099,073 3,345,643
06 WOOD,PLASTICS,AND COMPOS)TESAW.
061000 ROUGH CARPENTRY 125,828 85,510 - 211,338
062200 MILLWORK - - 397,953 397,953
0661 16 SOLID SURFACING FABRICATIONS - - 0 0 IN 06 22 00
066400 PLASTIC PANELING 1,756 1.232 2,988
SUB TOTAL-DIV O6 WOOD,PLASTICS&COMPOSITES 127,584 86,742 397,953 612,279
-.jffijfiffA� -E PRO71MION
071100 DAMPPROOFING - - 334.065 334,065
07 18 00 TRAFFIC COATINGS - - 6,440 6,440
071900 WATER REPELLENTS - - 0 0 NONE
072100 THERMAL INSULATION - - 161,286 161,286
5
EXHIBIT'A'
SECTION DESCRIPTION PHASE 2&3 REMARKS
LABOR MATERIAL SUB-BIDS TOTAL
0741 00 METAL ROOF INSULATION&UNDERLAYMENT - - 0 0 IN PHASE 1 B
074200 METAL WALL PANELS - - 294,156 294,156
075200 MODIFIED BITUMINOUS MEMBRANE ROOFING - - 1,715,225 1,715,225
077200 ROOF ACCESSORIES - - 7,500 7.500
078100 APPLIED FIREPROOFING - - 0 0 NONE
078400 IFIRESTOPPING - - 25,000 25,000
079200 JOINT SEALANTS - - 38,836 38.836
079500 EXPANSION CONTROL 11,286 6.880 - 18.166
SUBTOTAL-DIV 07 THERMAL&MOISTURE PROTECTION 11,286 6,880 2,582,508 2,600,674
DfV 08 OPENINGS
080800 DOOR&HARDWARE INSTALLATION 66,156 - - 66,156
08 11 00 METAL DOORS&FRAMES 35,480 712.374 - 747,854
08 14 23 PLASTIC LAMINATE FACED WOOD DOORS 19,915 - - 19,915
0831 00 ACCESS DOORS AND PANELS 3.135 4.895 - 8,030
08 33 00 COILING DOORS&GRILLES - - 88,348 88,348
08 42 29 SLIDING AUTOMATIC ENTRANCES - - 32,927 32,927
08 45 00 INSULATED TRANSLUCENT WALL PANELS - - 0 0 IN PHASE I
085653 SECURITYWINDOWS - - 0 0 IN 08 80 00
086223 TUBULAR DAYLIGHTING DEVICES - - 17,623 17,623
0871 00 DOOR HARDWARE 16,694 - - 16,694
088000 GLAZING - - 2,006,100 2,006,100
088010 TEMPORARY ENCLOSURES 18,019 12,644 - 30,663
08 80 15 CLEAN GLASS 2,670 937 - 3,607
089100 LOUVERS 5,878 22,846 28,724
SUBTOTAL-DIV 08 OPENINGS 167,947 753,696 2,144,998 3,066,641
092400 CEMENT PLASTERING - - 25.276 25,276
09 29 00 GYPSUM BOARD - - 2,100,594 2,100.594
093000 TILING - - 392,717 392,717
095100 ACOUSTICAL CEILINGS - - 284.937 284,937
096000 FLOOR PREPARATION 23,256 10,880 - 34,136
096010 FLOOR PROTECTION 7,752 5,440 - 13,192
096500 IRESILIENT FLOORING - - 362,222 362,222
096566 RESILIENT ATHLETIC FLOORING - - 32,636 32,636
096600 TERRAZZO FLOORING - - 213,140 213,140
096700 FLUID-APPLIED FLOORING - - 22,680 22,680
096800 CARPETING - - 0 0 IN 09 65 00
096900 ACCESS FLOORING - - 0 0 NONE
09 72 00 WALL COVERING - - 0 0 IN 09 90 00
09 77 00 SPECIAL WALL SURFACING - - 36,069 36,069
098400 ACOUSTIC WALL PANELS - - 101,016 101,016
099000 PAINTING&COATING - - 407.301 407,301
09 93 33 SILICATE MINERAL STAINS 0 0 IN 09 90 00
SUBTOTAL-DIV 09 FINISHES 31,008 16.320 3,978.588 4.025,916
K
VISUAL DISPLAY UNITS - - 0 0 NONE
SIGNAGE - - 60,000 60,000 ALLOWANCE
POST&PANELIPYLON SIGNAGE - - 0 0 NONE
TOILET COMPARTMENTS - - 20.664 20,664
FOLDING PANEL PARTITIONS - - 73,485 73,485
102600 WALL&DOOR PROTECTION - - 25,000 25,000
102813 ITOILET ACCESSORIES - - 74,466 74,466
1604400 FIRE PROTECTION SPECIALTIES - - 6,064 6,064
4415
KNOX BOX 627 2,860 - 3'487
6
EXHIBIT'A'
SECTION DESCRIPTION PHASE 2&3 REMARKS
LABOR MATERIAL SUB-BIDS TOTAL
105113 METAL LOCKERS - - 0 0 BY OWNER
107300 PROTECTIVE COVERS - - 261,881 261,881
107500 FLAGPOLES - 9,050 9,050
SUB TOTAL-DIV 10 SPECIALTIES 627 2,860 530,610 534.097
n", EQU(I. ,
111200 PARKING CONTROL EQUIPME. T - - 0 0 BY OWNER
113100 RESIDENTIAL APPLIANCES 7,695 - - 7,695 MATERIAL BY OWNER
115200 AUDIO-VISUAL EQUIPMENT - - 0 0 BY OWNER
115300 LABORATORY EQUIPMENT - - 0 0 BYOWNER
115313 LABORATORY FUME HOODS 0 0 BYOWNER
SUB TOTAL-DIV it EQUIPMENT - - - 7,695
DIV 11 FURNISHINGS
iw-
122400 WINDOW SHADES - - 98,846 98,846
12 36 61 SIMULATED STONE COUNTERTOPS - - 0 0 IN 06 22 00
12 48 13 ENTRANCE FLOOR MATS - - 12.371 12,371
129300 SITE FURNISHINGS - - 0 0 NONE
129313 BICYCLE RACKS - 10,970 10,970
SUB TOTAL-DIV 12 FURNISHINGS - - 122,187 122,187
DIV 13 SPECIAL CONSTRUCTION
13 34 19 METAL BUILDING SYSTEMS - - 0 0 IN PHASE 1A
133420 METAL BUILDING ERECTION - - 0 0 IN PHASE 1B
SUB TOTAL-DIV 13 SPECIAL CONSTRUCTION - - 0 0
DIV 14 CONVEI7NG9C0MMT
1 1 21 00 ELECTRIC TRACTION ELEVATORS - - 401.053 401,053
SUB TOTAL-DIV 14 CONVEYING EQUIPMENT - - 401,053 401,053
DIV 21 IFIRE SUPPRESSION -
21 10 00 IFIRE SUPPRESSION SYSTEMS - - 404,500 404,500
SUBTOTAL-DIV 21 FIRE SUPPRESSION - - 404,500 40-0,500
MaY22. . .. PLUMBING
220000 PLUMBING - - 1,810,214 1,810,214
SUB TOTAL-DIV 22 PLUMBING 1.810,214 1,810,214
230000 HVAC - - 2.323,000 2,323,000
2300 10 HVAC FILTER CHANGES - - 7,500 7,500
230500 MEP COORDINATION - - 16,000 16,000
SUBTOTAL-DIV 23 HVAC - - 2,346,500 2,346,500
DIV 26. : ELECTRICAL
260000 ELECTRICAL - - 5,359,451 5.359.451
260005 ROUGH INIBACKBOXES-LOWVOLTAGE - - 25,000 25.000
2600 10 PERMANENT POWER START UP - - 70,428 70.428
264100 LIGHTNING PROTECTION - 0 0 IN 26 00 00
SUBTOTAL-DIV 26 ELECTRICAL - - 5,454,879 5,454,879
271000 STRUCTURED CABLING - - 649,729 649,729
2741 16 INTEGRATED AUDIO-VIDEO SYSTEMS 8 EQUIPMENT - - 271,026 271,026
275319 DISTRIBUTED ANTENNA SYSTEM(DAS) 56,186 56,186
SUB TOTAL-DIV 27 COMMUNICATIONS - - 976,941 976741
7
EXHIBIT'A'
SECTION DESCRIPTION PHASE 2&3 REMARKS
LABOR "TERIQ sun BIDS To1A1.
=18 IELWOONIC SAPAW-4,7"
281300 ACCESS CONTROL SYSTEM - - 454,500 454,500
281600 INTRUSION DETECTION SYSTEM - - 0 0 NONE
282300 VIDEO SURVEILLANCE SYSTEM - - 0 0 IN 28 13 00
2831 00 IFIRE DETECTION&ALARM SYSTEM - 138,160 138,160
SUB TOTAL-DIV 28 ELECTRONIC SAFETY&SECURITY - - 592,660 592,660
DIV31 EARTHWORK
Aw-
31 EARTHWORK - - 732914 732,914
31 2216 FINAL GRADING 9,128 3,203 - 12,331
31 2310 SPREAD&GRADE SPOILS 37.664 26,432 - 64.096
31 31 00 SOIL TREATMENT - - 5,673 5,673
31 63 29 DRILLED CONCRETE PIERS&SHAFTS 0 0 IN 03 30 00
SUB TOTAL-DIV31 EARTHWORK 46,792 29,635 738,587 615,111
TS -
320111 CLEAN PAVING&SIDEWALKS 22.579 - - 22,579
321216 ASPHALT PAVING - - 0 0 IN PHASE 1A
321373 CONCRETE PAVING JOINT SEALANTS 10,761 T552 - 18,313
321375 REMOVE STRIP/CLEAN PAVING JOINTS 15,783 - - 15,783
321400 UNIT PAVING - - 0 0 NONE
32 16 15 1BACKFILL CURBS 11,649 - - 11,649
3217 23 PAVEMENT MARKINGS - - 50,503 50.503
3231 00 FENCES&GATES - - 128,290 128,290
3231 15 CONCRETE SCREEN WALLS&FENCES - - 167,167 167,167
328000 IRRIGATION - - 161,595 161,595
328010 IRRIGATION SLEEVES 10,056 8,575 - 18,631
329000 LANDSCAPING - - 288,705 288,705
329005 CRUSHED GRANITE - - 0 0 IN PHASE IB
329010 AERATING FOUNTAIN - - 0 0 NONE
329200 1HYDROMULCH&SOD - - 0 0 IN 32 90 00
329500 ILANDSCAPE MAINTENANCE 24,000 1
SUB TOTAL-DIV 32 EXTERIOR IMPROVEMENTS 70,828 16,127 820,260 907,215
330000 SITE UTILITIES - - 646,358 646,358
350000 PUNCH LIST 27,365 3.885 31,250
SUBTOTAL-DIV 33 UTILITIES 27,365 3,885 646,358 677,608
SUBTOTAL-COST OF WORK ITEMS 1,870,209 1,546,993 35,551,351 38,976,248
CM FEE-2.30% 896,454
BASE BID-PHASE 2&3 39,872,702
ALTERNATES
Alternate#1: Building B:Courts Building Addition 640.793 ACCEPTED
Alternate#2: Building L:Display Building - NOT SELECTED
Alternate#3A: Generators from Caterpillar Tractor Company - NOT SELECTED
Alternate 43B: Generators from Cummins Power Generation/Onan Corp. - ACCEPTED IN PHASE 1B
Alternate#3C:lGenerators from Atlantic Detroit Diesel Allison Division - NOT SELECTED
Alternate#3D:lGenerators from Kohler Company - NOT SELECTED
8
EXHIBIT'A'
SECTION DESCRIPTION PHASE 2&3 REMARKS
LABOR MATERIAL SUB-BIOS TOTAL
Alternate#3E: Generators from Stewart&Stevenson - NOT SELECTED
Alternate#3F: Generators from Generac Power Systems - NOT SELECTED
Alternate#3G: Generators from Waukesha-Pearce Industries - NOT SELECTED
Alternate#3H: Generators from Taylor Power - NOT SELECTED
Alternate#4A: Provide Air Cooled Split System AC Units from Carrier Corporation. - NOT SELECTED
Alternate#4B: Provide Air Cooled Split System AC Units from Trane Corporation. - NOT SELECTED
Alternate 94C:jProvide Air Cooled Split System AC Units from York. - NOT SELECTED
Alternate#4D: Provide Air Cooled Split System AC Units from Dalkin. 304.984 ACCEPTED
Alternate#5A: Provide VRV DX systems from DENT AC. 581,628 ACCEPTED
Alternate 458: Provide VRV DX systems from Mitsubishi. - NOT SELECTED
Alternate#SC: Provide VRV DX systems from LG. - NOT SELECTED
Alternate#50: Provide VRV DX systems from Samsung. - NOT SELECTED
Alternate#5E: Provide VRV DX systems from York. - NOT SELECTED
Alternate#5F: Provide VRV DX systems from Hitachi. - NOT SELECTED
Alternate#6A: Provide DDC Systems by Automated Logic. 430,751 ACCEPTED
Alternate#6B:jProvide DDC Systems by Unify. - NOT SELECTED
Alternate#6C: Provide DDC Systems by Johnson Controls. - NOT SELECTED
Alternate 17: Provide work depicted in Civil Drawings C49-052 and CE-01-CE07. - NOT SELECTED
GMP PHASE 2&3:BASE BID+ACCEPTED ALTERNATES+
COST SAVING ITEMS 41,830,859
9
EXHIBIT 'B'
D U ROTEC H
BUILDERS OF INTEGRITY
Baytown Public Safety — Phases 2 & 3
Public Safety Building
PROJECT MANUAL
TABLE OF CONTENTS
Baytown Public Safety—Phase II & III —Public Safety Building
BVG4 PROJECT 20004: SPECIFICATIONS—ISSUED FOR BID AND PERMIT October 15,2021
DIVISION 00: PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 00 TABLE OF CONTENTS
00 01 03 PROJECT DIRECTORY
00 11 00 NOTICE FOR SUBCONTRACTOR PROPOSALS
0021 00 INSTRUCTIONS TO SUBCONTRACTOR—VENDOR PROPOSERS
00 21 11 SAMPLE CERTIFICATE OF INSURANCE
0031 00 AVAILABLE INFORMATION
SOILS MANAGEMENT PLAN
GEOTECHNICAL REPORT
ENVELOPE COMPLIANCE CERTIFICATE
00 42 00 SUB PROPOSAL FORM
00 73 43 PREVAILING WAGE RATES
00 90 01 ADDENDUM 01
00 90 02 ADDENDUM 02
00 90 03 ADDENDUM 03
00 90 04 ADDENDUM 04 (Added in Addendum 4)
DIVISION 01: GENERAL REQUIREMENTS
01100 Summary of Work(City of Baytown)
01140 Contractor's Use of Premises (City of Baytown)
01200 Measurement and Payment Procedures (City of Baytown)
01290 Change Order Procedures (City of Baytown)
01310 Coordination and Meetings (City of Baytown)
01350 Submittals(City of Baytown)
01380 Construction Photographs (City of Baytown)
01420 Referenced Standards (City of Baytown)
01430 Contractor's Quality Control (City of Baytown)
01440 Observation Services (City of Baytown)
01450 Testing Laboratory Services(City of Baytown)
01500 Temporary Facilities and Controls (City of Baytown)
01505 Mobilization (City of Baytown)
01550 Stabilized Construction Exits (City of Baytown)
01554 Street Signs (City of Baytown)
01555 Traffic Control and Regulation (City of Baytown)
01560 Filter Fabric Fence (City of Baytown)
01561 Reinforced Filter Fabric Barrier(City of Baytown)
01562 Waste Material Disposal (City of Baytown)
01563 Tree and Plant Protection (City of Baytown)
01564 Control of Ground Water and Surface Water(City of Baytown)
01565 TPDES Requirements (City of Baytown)
01566 Source Controls for Erosion and Sedimentation (City of Baytown)
01570 Trench Safety System (City of Baytown)
01580 Project Identification Signs (City of Baytown)
10
EXHIBIT 'B'
DUROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety — Phases 2 & 3
Public Safety Building
PROJECT MANUAL
01600 Materials and Equipment(City of Baytown)
01630 Product Options and Substitutions (City of Baytown)
01720 Field Surveying (City of Baytown)
01750 Starting Systems (City of Baytown)
01760 Project Record Documents (City of Baytown)
01770 Contract Closeout(City of Baytown)
01 21 00 ALLOWANCES (Added in Addendum 4)
01 2200 UNIT PRICES
01 2300 ALTERNATES
01 2500 SUBSTITUTION PROCEDURES
01 45 00 WINDSTORM CONSTRUCTION REQUIREMENTS (Datum Engineers)
01 45 29 TESTING LABORATORY SERVICES (Datum Engineers)
01 91 13 GENERAL COMMISSIONING REQUIEMENTS
01 91 14 FUNCTIONAL TESTING REQUIREMENTS
01 91 15 BUILDING ENCLOSURE COMMISSIONING
DIVISION 02: SITE WORK/EXISTING CONDITIONS
02200 Site Preparation (City of Baytown)
02220 Site Demolition (City of Baytown)
02252 Cement Stabilized Sand (City of Baytown)
02255 Bedding, Backfill, and Embankment Materials (City of Baytown)
02315 Excavation and Backfill for Detention Ponds (City of Baytown)
02316 Excavation and Backfill for Roadways (City of Baytown)
02317 Excavation and Backfill for Structures (City of Baytown)
02318 Excavation and Backfill for Utilities (City of Baytown)
02330 Embankment(City of Baytown)
02335 Subgrade (City of Baytown)
02370 Geotextile (City of Baytown)
02415 Augering Pipe or Casing for Sewers (City of Baytown)
02417 Augering Pipe or Casing for Water Lines (City of Baytown)
02430 Tunnel Grout(City of Baytown)
02510 Water Mains(City of Baytown)
02511 Water Meters (City of Baytown)
02512 Polyethylene Wrap (City of Baytown)
02513 Steel Pipe and Fittings for Large Diameter Water Lines (City of Baytown)
02514 Fire Hydrant Assembly(City of Baytown)
02515 Water Tap and Service Line Installation (City of Baytown)
02520 Valve Boxes, Meter Boxes, and Meter Vaults (City of Baytown)
02530 Gravity Sanitary Sewers (City of Baytown)
02531 Sanitary Sewer Service Leads or Reconnections (City of Baytown)
02532 High Density Polyethylene (HOPE) Solid Wall Pipe (City of Baytown)
02532W High Density Polyethylene (HOPE) Solid Wall Pipe for Water(City of Baytown)
02533 Sanitary Sewage Force Mains (City of Baytown)
02534 PVC Pipe (City of Baytown)
02540 Tapping Sleeves and Valves (City of Baytown)
02541 Water and Wastewater Line Valves (City of Baytown)
02542 Concrete Manholes and Accessories (City of Baytown)
02582 Thermoplastic Pavement Markings (City of Baytown)
11
EXHIBIT'B'
D 'U' ROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety — Phases 2 & 3
Public Safety Building
PROJECT MANUAL
02603 Frames, Grates, Rings, and Covers(City of Baytown)
02624 Structural Plate Culvert Structures (City of Baytown)
02628 Jacking Pipe or Box (City of Baytown)
02629 Safety End Treatments (City of Baytown)
02630 Storm Sewers(City of Baytown)
02631 Precast Inlets, Headwalls, and Wingwalls (City of Baytown)
02632 Cast-in-Place Inlets, Headwalls, and Wingwalls (City of Baytown)
02633 Adjusting Manholes, Inlets, and Valve Boxes (City of Baytown)
02634 Ductile Iron Pipe and Fittings(City of Baytown)
02635 Steel Pipe and Fittings(City of Baytown)
02636 Polyurethane Coating on Steel or Ductile Iron Pipe (City of Baytown)
02710 Base Course for Pavement(City of Baytown)
02741 Asphaltic Concrete Pavement(City of Baytown)
02742 Prime Coat(City of Baytown)
02743 Tack Coat(City of Baytown)
02744 Single Course Surface Treatment(City of Baytown)
02751 Concrete Pavement(City of Baytown)
02762 Temporary and Removable Reflectorized Pavement Marking (City of Baytown)
02770 Curb, Curb &Gutter, and Headers(City of Baytown)
02771 Concrete Sidewalks (City of Baytown)
02775 Concrete Driveways(City of Baytown)
02811 Landscape Irrigation (City of Baytown)
02821 Chain Link Fences and Gates (City of Baytown)
02910 Topsoil (City of Baytown)
02921 Hydromulch Seeding (City of Baytown)
02922 Sodding (City of Baytown)
02931 Landscape and Tree Planting (City of Baytown)
02980 Pavement Repair and Resurfacing (City of Baytown)
02981 Blast Cleaning of Pavement(City of Baytown)
02985 Fiber Optics(City of Baytown)
Fiber Optics Attachment A
02 41 00 DEMOLITION
0241 19 SELECTIVE DEMOLITION
DIVISION 03: CONCRETE
03100 FORMWORK
03300 CAST IN PLACE CONCRETE (City of Baytown)
03310 STRUCTURAL CONCRETE(City of Baytown)
03600 STRUCTURAL GROUT(City of Baytown)
03 10 00 CONCRETE FORMING AND ACCESSORIES (Datum Engineers)
03 20 00 CONCRETE REINFORCING (Datum Engineers)
03 30 00 CAST-IN-PLACE CONCRETE (Datum Engineers)
03 35 11 CONCRETE FLOOR FINISHES
03 47 13 TILT-UP CONCRETE
03 54 00 CAST UNDERLAYMENT
DIVISION 04: MASONRY
12
EXHIBIT `B'
DUROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety — Phases 2 & 3
Public Safety Building
PROJECT MANUAL
04 20 00 UNIT MASONRY
DIVISION 05: METALS
05 12 00 STRUCTURAL STEEL FRAMING (Datum Engineers)
0531 13 STEEL FLOOR DECKING AND SHEAR STUDS (Datum Engineers)
05 31 23 STEEL ROOF DECKING (Datum Engineers)
05 40 00 COLD FORMED METAL FRAMING
05 50 00 METAL FABRICATIONS
05 51 00 METAL STAIRS
05 52 13 PIPE AND TUBE RAILINGS
05 73 00 DECORATIVE METAL RAILINGS
05 75 10 PERFORATED METAL PANELS
05 75 13 ORNAMENTAL METAL
DIVISION 06: WOOD, PLASTICS,AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 41 00 ARCHITECTURAL WOOD CASEWORK
06 83 16 FIBERGLASS REINFORCED PANELING
DIVISION 07: THERMAL AND MOISTURE PROTECTION
07 18 00 TRAFFIC COATINGS
07 19 00 WATER REPELLANTS
0721 00 THERMAL INSULATION
07 25 00 WEATHER BARRIERS
07 42 13 METAL WALL PANELS
07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 62 00 SHEET METAL FLASHING AND TRIM
0771 00 ROOF SPECIALTIES
07 72 00 ROOF ACESSORIES
0781 00 APPLIED FIRE PROTECTION
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
07 95 13 EXPANSION JOINT COVER ASSEMBLIES
DIVISION 08: OPENINGS
08 11 13 HOLLOW METAL DOORS AND FRAMES
08 14 16 FLUSH WOOD DOORS
08 31 00 ACCESS DOORS AND PANELS
08 33 23 OVERHEAD COILING DOORS
08 42 29 AUTOMATIC ENTRANCES
08 43 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 44 13 GLAZED ALUMINUM CURTAIN WALLS
08 56 53 SECURITY WINDOWS
08 62 23 TUBULAR DAYLIGHTING DEVICES
08 71 00 DOOR HARDWARE
08 80 00 GLAZING
08 83 00 MIRRORS
13
EXHIBIT 'B'
DUROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety — Phases 2 & 3
Public Safety Building
PROJECT MANUAL
08 91 00 LOUVERS
DIVISION 09: FINISHES
09 21 16 GYPSUM BOARD ASSEMBLIES
09 22 36 LATH
09 24 00 PORTLAND CEMENT PLASTERING
09 30 00 TILING
0951 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 65 66 RESILIENT ATHLETIC FLOORING
09 66 19 PRECAST TERRAZZO
09 66 23 RESINOUS MATRIX TERRAZZO FLOORING
09 67 00 FLUID-APPLIED FLOORING
09 68 13 TILE CARPETING
09 69 00 ACCESS FLOORING
09 72 00 WALL COVERING
09 77 00 SPECIAL WALL SURFACING
09 84 13 ACOUSTICAL WALL PANELS (Added in Addendum 4)
09 91 13 EXTERIOR PAINTING
09 91 23 INTERIOR PAINTING
09 93 33 SILICATE MINERAL STAINS
DIVISION 10: SPECIALTIES
101400 SIGNAGE
101426 POST AND PYLON SIGNAGE
10 21 13.17 PHENOLIC-CORE TOILET PARTITIONS
10 22 39 FOLDING PANEL PARTITIONS
10 26 00 WALL AND DOOR PROTECTION
10 28 00 TOILET, BATH AND LAUNDRY ACCESSORIES
10 44 00 FIRE PROTECTION SPECIALTIES
10 51 13 METAL LOCKERS
10 73 00 PROTECTIVE COVERS
10 75 29 PLAZA-MOUNTED FLAGPOLES (Added in Addendum 4)
DIVISION 11: EQUIPMENT
11 1200 PARKING CONTROL EQUIPMENT
11 30 13 RESIDENTIAL APPLIANCES
11 52 15 AUDIO-VISUAL EQUIPMENT
DIVISION 12: FURNISHINGS
122400 WINDOW SHADES
12 36 00 COUNTERTOPS
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
12 93 13 BICYCLE RACKS
DIVISION 13: SPECIAL CONSTRUCTION
NOT USED
14
EXHIBITS'
DUROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety— Phases 2 & 3
Public Safety Building
PROJECT MANUAL
DIVISION 14: CONVEYING EQUIPMENT
1421 00 ELECTRIC TRACTION ELEVATORS
End of Volume 1
Volume 2
DIVISION 20: MECHANICAL SYSTEMS
Not Used
DIVISION 21: FIRE SUPPRESSION
21 13 13 FIRE PROTECTION SYSTEMS (E &C Engineers)
21 31 13 FIRE PUMPS (E&C Engineers)
DIVISION 22: PLUMBING
22 00 00 PLUMBING PIPING SYSTEMS (E&C Engineers)
22 05 29 SUPPORTS AND SLEEVES (E&C Engineers)
22 08 00 COMMISSIONING OF PLUMBING
22 10 00 PLUMBING PIPING VALVES AND ACCESSORIES (E&C Engineers)
221030 PLUMBING SPECIALTIES (E&C Engineers)
221123 DOMESTIC WATER PRESSURE BOOSTING SYSTEMS(VFD) (E&C Engineers)
22 15 00 PLUMBING PUMPS (E&C Engineers)
22 20 23 NATURAL GAS PIPING (E &C Engineers)
22 33 33 ELECTRIC DOMESTIC WATER HEATERS NATURAL GAS FIRED (E&C Engineers)
22 40 00 PLUMBING FIXTURES (E &C Engineers)
22 45 00 EMERGENCY SHOWER AND EYE WASH EQUIPMENT(E&C Engineers)
DIVISION 23: HVAC SYSTEMS
23 00 00 BASIC MECHANICAL REQUIREMENTS (E &C Engineers)
23 05 13 MOTORS (E&C Engineers)
23 05 29 SLEEVES FLASHINGS SUPPORTS AND ANCHORS (E&C Engineers)
23 05 48 VIBRATION ISOLATION (E &C Engineers)
23 05 53 MECHANICAL IDENTIFICATION (E &C Engineers)
23 05 93 TESTING ADJUSTMENT AND BALANCING—(TAB FIRM)(E&C Engineers)
23 05 94 TESTING ADJUSTING AND BALANCING—(CONTRACTOR)(E&C Engineers)
23 07 13 DUCTWORK INSULATION (E&C Engineers)
23 07 19 PIPING INSULATION (E &C Engineers)
23 08 00 COMMISSIONING OF HVAC
23 08 01 COMMISSIONING OF BUILDING CONTROL SYSTEM
23 09 23 DIRECT DIGITAL CONTROL SYSTEMS (E&C Engineers)
23 09 93 SEQUENCE OF OPERATIONS (E &C Engineers)
23 29 23 VARIABLE FREQUENCY DRIVES (E &C Engineers)
2331 00 DUCTWORK(E &C Engineers)
23 33 00 DUCTWORK ACCESSORIES(E &C Engineers)
23 34 00 FANS(E&C Engineers)
23 37 00 AIR INLETS AND OUTLETS(E &C Engineers)
23 41 00 FILTERS(E &C Engineers)
15
EXHIBIT `B'
DLI .)IROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety — Phases 2 & 3
Public Safety Building
PROJECT MANUAL
23 62 13 AIR-COOLED SPLIT-SYSTEM AIR CONDITIONING UNITS(E &C Engineers)
23 63 13 VARIABLE REFRIGERANT VOLUME DX SYSTEMS (E &C Engineers)
23 82 16 AIR COILS(E&C Engineers)
DIVISION 26: ELECTRICAL
26 00 01 ELECTRICAL GENERAL PROVISIONS (E &C Engineers)
26 00 02 ELECTRICAL SCOPE OF WORK(E&C Engineers)
2601 25 ELECTRICAL TESTING (E&C Engineers)
26 05 01 ELECTRICAL BASIC MATERIALS AND METHODS (E &C Engineers)
26 05 19 LOW VOLTAGE CONDUCTORS AND CABLES (E &C Engineers)
26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS(E &C Engineers)
26 05 33 ELECTRICAL RACEWAYS (E&C Engineers)
26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS (E &C Engineers)
26 05 73 SHORT CIRCUIT ANALYSIS-COORDINATION STUDY(E &C Engineers)
26 08 00 COMMISSIONING OF ELECTRICAL SYSTEMS
26 09 16 ELECTRICAL CONTROLS AND RELAYS (E&C Engineers)
26 22 00 LOW VOLTAGE TRANSFORMERS(E &C Engineers)
26 23 13 PARALLEL LOW VOLTAGE SWITCHGEAR(E&C Engineers)
26 24 13 LOW VOLTAGE SWITCHBOARDS (E&C Engineers)
26 24 16 PANELBOARDS (E &C Engineers)
26 27 01 ELECTRICAL SERVICE ENTRANCE (E &C Engineers)
26 27 17 EQUIPMENT WIRING(E &C Engineers)
26 27 18 MISCELLANEOUS ELECTRICAL CONTOLS &CONTROL WIRING (E&C Engineers)
26 27 19 ELEVATOR EQUIOPMENT PROVISIONS(E&C Engineers)
26 27 21 VOICE-DATA SYSTEM PROVISIONS (E&C Engineers)
26 27 23 AUDIO-VISUAL SYSTEM PROVISIONS (E &C Engineers)
26 27 24 SECURITY SYSTEM PROVISIONS(E&C Engineers)
26 27 26 WIRING DEVICES(E&C Engineers)
26 28 13 LOW VOLTAGE FUSES (E&C Engineers)
26 28 17 ENCLOSED CIRCUIT BREAKERS (E &C Engineers)
26 28 18 ENCLOSED SWITCHES (E&C Engineers)
26 29 13 ENCLOSED MOTOR CONTROLLERS (E &C Engineers)
26 32 13 ENGINE GENERATORS (E &C Engineers)
26 36 23 AUTOMATIC TRANSFER SWITCHES (E &C Engineers)
2641 13 LIGHTNING PROTECTION FOR STRUCTURES (E&C Engineers)
26 43 13 THOR SYSTEMS MASTER SPD SPECIFICATIONS (E&C Engineers)
2651 00 INTERIOR LIGHTING (E &C Engineers)
26 56 00 EXTERIOR LIGHTING (E &C Engineers)
DIVISION 27: COMMUNICATIONS
27 02 00 BASIC MATERIALS AND METHODS FOR COMMUNICATIONS SYSTEMS
27 05 26 GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS
27 05 28 PATHWAYS FOR COMMUNICATIONS SYSTEMS
27 05 43 UNDERGROUND DUCTS AND RACEWAYS FOR COMMUNICATIONS SYSTEMS
2711 00 COMMUNICATIONS ROOM FITTINGS
27 13 00 COMMUNICATIONS BACKBONE CABLING
27 15 00 COMMUNICATIONS HORIZONTAL CABLING
2741 16 INTEGRATED AUDIO-VIDEO SYSTEM AND EQUIPMENT
16
EXHIBIT 'B'
DUROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety — Phases 2 & 3
Public Safety Building
PROJECT MANUAL
27 53 19 DISTRIBUTED ANTENNA SYSTEM (DAS)
DIVISION 28: SECURITY SYSTEMS
28 02 00 BASIC MATERIALS AND METHODS FOR SAFETY AND SECURITY SYSTEMS
28 10 00 ACCESS CONTROL SYSTEM
28 20 00 VIDEO SURVEILLANCE SYSTEM
28 31 03 ADDRESSABLE FIRE ALARM SYSTEM (E &C Engineers)
DIVISION 31: EARTHWORK
31 31 16 TERMTE CONTROL
31 63 29 DRILLED PIERS
DIVISION 32: EXTERIOR IMPROVEMENTS
32 1400 UNIT PAVERS (Added in Addendum 4)
32 33 00 SITE FURNISHINGS
DIVISION 33: UTILITIES
(NOT USED)
END OF SECTION
17
EXHIBIT 'C'
DUROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety— Phases 2 & 3
Public Safety Building
LIST OF DRAWINGS
Baytown Public Safety—Phase II & III—Public Safety Building
BVG4 PROJECT 20004: ISSUE FOR BID AND PERMIT October 15, 2021
Section 00 01 15
LIST OF DRAWINGS
General
G-000 Cover
G-001 Sheet List
G-002 Symbols,Abbreviations, General Notes
G-003 Accessibility Standards
G-004 Partition Types
G-100 Code Review&Exiting Plan
G-101 Exiting Plan
Civil
C1 Plat(1 of 2)
C2 Plat(2 of 2)
C3 Topographic Survey(1 of 4)
C4 Topographic Survey(2 of 4)
C5 Topographic Survey(3 of 4)
C6 Topographic Survey(4 of 4)
C7 General Notes
C8 Demolition Plan
C9 Overall Sanitary Sewer Plan
C10 Sanitary Sewer Plan (1 of 2)
C11 Sanitary Sewer Plan (2 of 2)
C12 Overall Water Distribution Plan
C13 Water Distribution Plan(1 of 2)
C14 Water Distribution Plan (2 of 2)
C15 Overall Storm Sewer Plan
C16 Storm Sewer Plan (1 of 2)
C17 Storm Sewer Plan (2 of 2)
C18 Storm Sewer Inset
C19 Overall Dimension Control and Paving Plan
C20 Dimension Control and Paving Plan (1 of 2)
C21 Dimension Control and Paving Plan (2of 2)
C22 Overall Grading Plan
C23 Grading Plan (1 of 2)
C24 Grading Plan (2 of 2)
C25 Existing Drainage Area Map
C26 Proposed Drainage Area Map
C27 Storm Sewer Calculations
C28 Plan and Profile (1 of 8)
C29 Plan and Profile (2 of 8)
C30 Plan and Profile (3 of 8)
C31 Plan and Profile(4 of 8)
18
EXHIBIT 'C'
Dl%.JIROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety— Phases 2 & 3
Public Safety Building
LIST OF DRAWINGS
C32 Plan and Profile(5 of 8)
C33 Plan and Profile(6 of 8)
C34 Plan and Profile(7 of 8)
C35 Plan and Profile(8 of 8)
C36 Stormwater Pollution Plan
C37 Stormwater Pollution Details
C38 Traffic Control Plan
C39 Project Specific Details(1 of 2)
C40 Project Specific Details(2 of 2)
C41 City of Baytown Standard Details(1 of 6)
C42 City of Baytown Standard Details(2 of 6)
C43 City of Baytown Standard Details(3 of 6)
C44 City of Baytown Standard Details(4 of 6)
C45 City of Baytown Standard Details(5 of 6)
C46 City of Baytown Standard Details(6 of 6)
Landscape
L1 Overall Landscape Plan
L2 Landscape Plan (1 of 4)
L3 Landscape Plan(2 of 4)
L4 Landscape Plan(3 of 4)
L5 Landscape Plan(4 of 4)
L6 Amenity Landscape Plan
L7 Landscape Schedule and Requirements
L8 Landscape Details
L9 Landscape Specifications
L10 Monument Sign Detail
Irrigation
IR1 Overall Irrigation Plan
IR2 Irrigation Plan(1 of 4)
IR3 Irrigation Plan(2 of 4)
IR4 Irrigation Plan (3 of 4)
IR5 Irrigation Plan (4 of 4)
IR6 Irrigation Details
IR7 Irrigation Specifications
Structural
S-001 Typical Abbreviations, Symbols and Plan Notes
S-002 General Notes
S-003 General Notes
S-004 Special Inspections Table
S-101 First Floor Plan—Overall—Building M
S-102 Second Floor Plan—Overall—Building M
S-103 Third Floor Plan—Overall—Building M
S-104 Roof Plan—Overall—Building M
S-110 First Floor Framing Plan—West—Building M
S-111 First Floor Framing Plan—East—Building M
19
EXHIBIT 'C'
k.-"%TECH
D R
BUILDERS OF INTEGRITY
Baytown Public Safety— Phases 2 & 3
Public Safety Building
LIST OF DRAWINGS
S-112 First Floor Framing Plan—South—Building M
S-113 Exterior Structure Plans, Sections and Details
S-120 Second Floor Framing Plan—West—Building M
S-121 Second Floor Framing Plan—East—Building M
S-122 Second Floor Framing Plan—South—Building M
S-130 Third Floor Framing Plan—West—Building M
S-131 Third Floor Framing Plan—East—Building M
S-132 Third Floor Framing Plan—South—Building M
S-140 Roof Framing Plan—West—Building M
S-141 Roof Framing Plan—East—Building M
S-150 Miscellaneous Framing
S-151 Miscellaneous Framing
S-152 Miscellaneous Framing
S-301 Expansive Clay Soil Details
S-302 Typical Footing Schedule and Details
S-303 Typical Foundation Details
S-304 Typical Foundation Details
S-305 Typical Slab On Grade Details
S-310 Foundation Sections and Details
S-401 Simple Beam Connection Details
S-402 Composite Steel Beam Details
S-403 Typical Steel Details
S-404 Steel Column Details
S-405 Pipe Column Details and Moment Connections
S-410 Steel Sections and Details
S-411 Steel Sections and Details
S-501 Typical Masonry Details
S-601 Tilt Wall Panel Elevations
S-602 Tilt Wall Panel Elevations
S-603 Tilt Wall Panel Elevations
S-604 Typical Tilt Wall Panel Details
S-605 Tilt Wall Panel Details
S-701 Wind Brace Elevations
S-702 Wind Brace Sections and Details
S1-001 General Notes
S1-110 Floor Framing Plans
S1-301 Foundation Sections and Details
S1-401 Steel Sections and Details
S2-001 General Notes
S2-110 Floor Framing Plans
S2-301 Foundation Sections and Details
S2-401 Steel Sections and Details
20
EXHIBIT `C'
DUROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety — Phases 2 & 3
Public Safety Building
LIST OF DRAWINGS
Architectural
A-001 Site Plan—Phase 2—Demolition
A-002 Site Plan—Phase 2—Overall
A-003 Site Plan—Phase 3—Demolition
A-004 Site Plan—Phase 3—Overall
A-011 Site Plan—Phase 2—Enlarged
A-012 Site Plan—Phase 3—Enlarged
A-013 Site Details
A-101 Floor Plan—Building M—First Floor Overall
A-102 Floor Plan—Building M—Second Floor Overall
A-103 Floor Plan—Building M—Third Floor Overall
A-104 Roof Plan—Building M
A-110 Floor Plan—Building M—First Floor—West Three Story
A-111 Floor Plan—Building M—First Floor—East Three Story
A-112 Floor Plan—Building M—First Floor—South One Story
A-120 Floor Plan—Building M—Second Floor—West Three Story
A-121 Floor Plan—Building M—Second Floor—East Three Story
A-130 Floor Plan—Building M—Third Floor—West Three Story
A-131 Floor Plan—Building M—Third Floor—East Three Story
A-161 Reflected Ceiling Plan—Building M—First Floor
A-162 Reflected Ceiling Plan—Building M—Second Floor
A-163 Reflected Ceiling Plan—Building M—Third Floor
A-221 Exterior Elevations Building M
A-222 Exterior Elevations Building M
A-223 Exterior Elevations Building M
A-224 Exterior Elevations Building M
A-301 Building Sections—Building M
A-302 Building Sections—Building M
A-351 Wall Sections—Building M
A-352 Wall Sections—Building M
A-353 Wall Sections—Building M
A-354 Wall Sections—Building M
A-401 Lobby Stair& Details
A-402 Stair 1 &2
A-403 Stair 3—Stair Details
A-404 Elevators
A-501 Window Elevations- Exterior
A-502 Window Elevations- Exterior
A-503 Window Elevations-Interior
A-601 Door Schedule
A-602 Door Details
Interior Design
ID-002 Room Finish Schedule—First Floor—Bldg M
ID-003 Room Finish Schedule—Second &Third Floor—Bldg M
ID-101 Overall Finish Plan—Ground Floor-Bldg M
ID-102 Overall Finish Plan—Second Floor-Bldg M
ID-103 Overall Finish Plan—Third Floor-Bldg M
21
EXHIBIT`C'
DUROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety— Phases 2 & 3
Public Safety Building
LIST OF DRAWINGS
ID-111 Finish Plan—Bldg M—First Floor—West
ID-112 Finish Plan—Bldg M—First Floor—East
ID-113 Finish Plan—Bldg M—First Floor—South
ID-120 Finish Plan—Bldg M—Second Floor—West
ID-121 Finish Plan—Bldg M—Second Floor—East
ID-130 Finish Plan—Bldg M—Third Floor—West
ID-131 Finish Plan—Bldg M—Third Floor—East
ID-161 Furniture Plan—Bldg M—First Floor
ID-162 Furniture Plan—Bldg M—Second Floor
ID-163 Furniture Plan—Bldg M—Third Floor
ID-201 Interior Elevations—Bldg M
ID-202 Interior Elevations—Bldg M
ID-203 Interior Elevations—Bldg M
ID-204 Interior Elevations—Bldg M
ID-205 Interior Elevations—Bldg M
ID-206 Interior Elevations—Bldg M
ID-207 Interior Elevations—Bldg M
ID-208 Interior Elevations—Bldg M
ID-209 Interior Elevations—Bldg M
ID-210 Interior Elevations—Bldg M
ID-211 Interior Elevations—Bldg M
ID-212 Interior Elevations—Bldg M
ID-301 Millwork Details
Al-101 Floor Plan, Roof Plan, Ext Elevations—Bldg L
Al-102 Doors &Windows—Bldg L
A2-101 Floor Plan—Bldg B—Courts Building
A2-200 Exterior Elevations—Bldg B
A2-201 Building Sections—Bldg B
A2-601 Door Schedule&Details &Millwork
ID2-101 Finish Plans&Interior Elevations-Bldg B
Mechanical
M-000 Mechanical Abbreviations and Symbols
M-201 A Mechanical Floor Plan Level 1 —Area A and B
M-201 C Mechanical Floor Plan Level 1 —Area C
M-201 D Mechanical Floor Plan Level 1 —Area D
M-202A Mechanical Floor Plan Level 2—Area A and B
M-202C Mechanical Floor Plan Level 2—Area C
M-203A Mechanical Floor Plan Level 3—Area A and B
M-204A Mechanical Roof Plan—Area A and B
M-204C Mechanical Roof Plan—Area C and D
M-301A Mechanical Piping Plan Level 1 —Area A and B
M-301 C Mechanical Piping Plan Level 1 —Area C
M-301 D Mechanical Piping Plan Level 1 —Area D
M-302A Mechanical Piping Plan Level 2—Area A and B
M-302C Mechanical Piping Plan Level 2—Area C
22
EXHIBIT`C'
DUROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety— Phases 2 & 3
Public Safety Building
LIST OF DRAWINGS
M-303A Mechanical Piping Plan Level 3—Area A and B
M-501 Mechanical Details
M-502 Mechanical Details
M-601 Mechanical Riser
M-602 Mechanical Riser
M-603 Mechanical Riser
M-701 Mechanical Controls Diagrams
M-801 Mechanical Schedules
M-802 Mechanical Schedules
M-803 Mechanical Schedules
M-900 Mechanical Energy Information
M1-211 Mechanical Floor Plan Level 1 —Courthouse
M1-221 Mechanical Floor Plan Level 1 —Display Pavilion
M1-311 Mechanical Piping Plan Level 1 —Courthouse
M1-321 Mechanical Piping Plan Level 1 —Display Pavilion
Electrical
E-000 Electrical Symbols and Abbreviations
E-020 Electrical Site Plan
E-201 A Electrical Lighting Plan Level 1 —Area A and B
E-201 C Electrical Lighting Plan Level 1 —Area C
E-201 D Electrical Lighting Plan Level 1 —Area D
E-202A Electrical Lighting Plan Level 2—Area A and B
E-202C Electrical Lighting Plan Level 2—Area C
E-202D Electrical Lighting Plan Level 2—Area D
E-203A Electrical Lighting Plan Level 3—Area A and B
E-301A Electrical Power Plan Level 1 —Area A and B
E-301 C Electrical Power Plan Level 1 —Area C
E-301 D Electrical Power Plan Level 1 —Area D
E-302A Electrical Power Plan Level 2—Area A and B
E-302C Electrical Power Plan Level 2—Area C and D
E-303A Electrical Power Plan Level 3—Area A and B
E-401A Electrical Power Mechanical Plan—Area A and B
E-401 C Electrical Power Mechanical Plan—Area C and D
E-402A Electrical Power Mechanical Plan—Area A and B
E-402C Electrical Power Mechanical Plan—Area C
E-403A Electrical Power Mechanical Plan—Area A and B
E-404A Electrical Power Mechanical Plan—Area A and B
E-404C Electrical Power Mechanical Plan—Area C and D
E-501A Electrical Fire Alarm Plan Level 1 —Area A and B
E-501 C Electrical Fire Alarm Plan Level 1 —Area C
E-501 D Electrical Fire Alarm Plan Level 1 —Area D
E-502A Electrical Fire Alarm Plan Level 2—Area A and B
E-502C Electrical Fire Alarm Plan Level 2—Area C
E-502D Electrical Fire Alarm Plan Level 2—Area D
E-503A Electrical Fire Alarm Plan Level 3—Area A and B
E-601 Electrical Enlarged Plans
23
EXHIBIT 'C'
D 'U' ROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety — Phases 2 & 3
Public Safety Building
LIST OF DRAWINGS
E-701 Electrical Details
E-801 Electrical Riser Diagrams
E-802 Electrical One-Line
E-803 Electrical Grounding Riser
E-901 Electrical Schedules
E-902 Electrical Schedules
E-903 Electrical Schedules
E-904 Electrical Schedules
E-905 Electrical Schedules
E-906 Electrical Schedules
E-907 Electrical Schedules
E1-211 Electrical Lighting Plan—Building B—Courts
E1-311 Electrical Power Plan—Building B—Courts
E1-511 Electrical Fire Alarm Plan—Building B—Courts
E2-221 Electrical Lighting Plan—Building L—Display Pavilion
E2-321 Electrical Power Plan—Building L—Display Pavilion
E2-521 Electrical Fire Alarm Plan—Building L—Display Pavilion
Plumbing
P-000 Plumbing Abbreviations and Symbols
P-010 Plumbing Overall Site Plan
P-011 Plumbing Site Plan
P-200A Plumbing Underfloor Floor Plan Level 1 —Area A
P-200B Plumbing Underfloor Floor Plan Level 1 —Area B
P-200C Plumbing Underfloor Floor Plan Level 1 —Area C
P-200D Plumbing Underfloor Floor Plan Level 1 —Area D
P-201 A Plumbing Floor Plan Level 1 —Area A
P-201 B Plumbing Floor Plan Level 1 —Area B
P-201 C Plumbing Floor Plan Level 1 —Area C
P-201 D Plumbing Floor Plan Level 1 —Area D
P-202A Plumbing Floor Plan Level 2—Area A
P-202B Plumbing Floor Plan Level 2—Area B
P-202C Plumbing Floor Plan Level 2—Area C
P-203A Plumbing Floor Plan Level 3—Area A and B
P-204 Plumbing Overall Roof Plan—Area A, B, C and D
P-401 Plumbing Enlarged Plans
P-501 Plumbing Riser/ Isometrics
P-601 Plumbing Details
P-701 Plumbing Schedules
P1-211 Plumbing Plan Level 1 —Courthouse
Technology
T-001 Low Voltage Symbol Legend
T-101 Technology Site Plan
T-111 Composite Level 1 Technology Routing Plan
T-112 Composite Level 2 Technology Routing Plan
24
EXHIBIT'C'
D 'UROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety — Phases 2 & 3
Public Safety Building
LIST OF DRAWINGS
T-113 Composite Level 3 Technology Routing Plan
T-114 Security Composite Plan
T-210 Technology Plan—Bldg M—Ground Floor—Northwest
T-211 Technology Plan—Bldg M—Ground Floor—Northeast
T-212 Technology Plan—Bldg M—Ground Floor—South
T-220 Technology Plan—Bldg M—Second Floor—Northwest
T-221 Technology Plan—Bldg M—Second Floor—Northeast
T-230 Technology Plan—Bldg M—Third Floor—Northwest
T-231 Technology Plan—Bldg M—Third Floor—Northeast
T-301 Technology Enlarged Plans
T-302 Technology Enlarged Plans
T-303 Rack Elevations
T-304 Rack Elevations
T-601 Technology Details
T-602 Technology Details
T-603 Security Details
T-604 Security Door Details
T-605 Security Door Details
T-606 Security Gate Details
T-607 Fiber Riser Diagram
T1-201 Technology Plan—Bldg L
T2-201 Technology Plan—Bldg B—Courts Building
END OF SECTION
25
EXHIBIT 'D'
DUROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety — Phases 2 & 3
Public Safety Building
LIST OF ADDENDA
1. Addendum No. 1 Issued on October 22, 2021
2. Addendum No. 2 Issued on November 5, 2021
3. Addendum No. 3 Issued on November 12, 2021
4. Addendum No. 4 Issued on November 16, 2021
5. Addendum No. 5 Issued on November 22, 2021
26
EXHIBIT 'E'
E
0 T nEm'�o C H
BUILDERS OF INTEGRITY
Baytown Public Safety — Phases 2 & 3
Public Safety Building
QUALIFICATIONS &ASSUMPTIONS
DIVISION 00— PROCUREMENT AND CONTRACTING REQUIREMENTS
1. Excluded is Material Testing.
2. Excluded are Utility Assessment, Inspection Fees, Impact Fees, and Tap
Fees.
3. Utility Company agreements (terms and conditions), easements and
coordination which will serve as the termination point for Durotech to make
connections for building service shall be the responsibility of the Owner and
Design Team (Architect/MEP Engineer). Durotech will assist the Owner and
Design Team in coordinating the activities with the Utility Company(s).
4. All required utility providers (water, sewer, storm discharge point, electric,
gas, fiber, phone lines)are the responsibility of the owner to coordinate and
execute necessary agreements so that the utilities are installed per the
contractor's schedule for construction usage and systems startup.
5. We assume that there will be adequate water supply with sufficient pressure
available for the proper functioning of Fire Sprinkler system and other
systems.
6. Excluded are any Building Permit fees. Permit Fee costs to be by Owner.
7. Without regard to any other provision of this Agreement, Owner shall be
liable to Contractor for additional costs incurred by Contractor as the result
of any applicable state or local sales, excise, or use tax, governmental
payroll tax or healthcare tax if the tax is applicable to the Project, the Project
is not tax exempt from the specific tax and the tax became effective after
the date of execution of the Contract.
8. Electronic Files and CAD Files will be provided by the Architect/Engineer of
record for the purpose of preparing shop drawings and 3D models at no
cost to the General Contractor and/or Subcontractors. A signed release will
be submitted to the Architect/Engineer before electronic files are released
by the Architect/Engineer.
9. Excluded are unforeseen underground conditions or obstructions not
indicated in contract documents.
10. Owner and Contractor agree that all manufacturer's warranties, and
subcontractor's warranties which extend beyond Contractor's warranty
27
EXHIBIT 'E'
Dnu' ROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety— Phases 2 & 3
Public Safety Building
QUALIFICATIONS &ASSUMPTIONS
period, are hereby assigned to and run directly from the manufacturer to the
Owner and from the subcontractor to the Owner, respectively. Owner
accepts these assignments and warranties, and releases and discharges
Contractor from any and all claims, liabilities, damages, costs and expenses
arising out of such manufacturer's warranties and any subcontractor's
extended warranties.
11. The Contractor's warranty excludes remedy for damage or defect caused
by abuse, material alteration to the work not executed by the Contractor,
insufficient maintenance, or maintenance not in compliance with
manufacturer's written recommendations.
12. Payment and Performance Bonds will be charged to the Owner based on
the State of Texas regulated rate.
13. The Guaranteed Maximum Price provided is a not to exceed amount for the
Cumulative Baytown Public Safety project.
Phase 1 A $4,905,614
Phase 1 B & Phase 2 Generators $13,594,937
Phase 2 & 3 $41,830,859
Total Phase 1 A, 1 B, 2 & 3 GMP $60,331,410
Individual line items within the project budget and earlier or later phase
packages are not individual Guaranteed Maximum Price amounts.
14. The GMP package is valid until January 28, 2022. The Owner will issue a
Notice to Proceed and sign the GMP Amendment on or before the stated
date.
15. Bids were solicited as a combination package for Phases 1 B, 2, and 3 to
maximize overall cost savings. Therefore, the Guaranteed Maximum Price
for Phase 2 & 3 is contingent upon the approval of the Guaranteed
Maximum Price for Phases 2 and 3 to be submitted and approved at the
January 27th 2022 City Council meeting.
16. Durotech, Inc reserves the right to review the Issued for Construction documents to
confirm that changes to the Contract Documents referenced in this proposal are
consistent with the changes proposed during the Cost Savings process.
28
EXHIBIT 'E'
D 'U' ROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety — Phases 2 & 3
Public Safety Building
QUALIFICATIONS &ASSUMPTIONS
17. The proposed cost saving recommendations by Durotech, Inc. shall be
subject to the review and approval of the Architect, Owner, and the Owner's
Professional Consultants. Durotech, Inc. is not required to ascertain that
the cost savings are in accordance with applicable laws, statutes,
ordinances, codes, rules and regulations, or lawful orders of public
authorities. The Contractors review of the proposed cost savings is in the
capacity as a Construction Manager and not as a Design Professional.
18. For any delays caused by events outside of Contractor's control, including
but not limited to Acts of God, pandemics, epidemics, acts of governmental
authorities, acts of civil authorities, acts of war or terrorism, unanticipated
material shortages and price escalations, labor disputes and utilities delays,
Owner shall grant additional time extensions and price increases to
Contractor when properly documented, substantiated and approved by
Owner, subject to Contractor's right to dispute Owner's decision under the
claims procedures of the Contract
19. Stipulated Billing Rates:
No. Description Rate
1 General Contract amount per
Liability/Umbrella thousand x $7.75
Insurance
2 Builder's Risk Contract
Insurance amount/hundred x
0.05412 x # of
months
3 Project $115.00 per hour
Executive
4 Project Manager $76.00 per hour
5 Estimator $55.00 per hour
6 Safety/Field $101.00 per hour
Operation
Manager
7 Lead $79.00 per hour
Superintendent
8 Assistant $48.00 per hour
Superintendent
9 Project Engineer $41.00 per hour
29
EXHIBIT'E'
DUROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety— Phases 2 & 3
Public Safety Building
QUALIFICATIONS &ASSUMPTIONS
10 Quality Control $69.00 per hour
Inspector
11 Contract $33.00 per hour
Administrator
12 Preconstruction $97.00 per hour
Manager
13 Quality Control $69.00 per hour
Manager
14 BIM Coordinator $55.00 per hour
15 IT Coordinator $95.00 per hour
16 Intern $25.00 per hour
17 Labor Burden 42.5%
Labor Rates: Per
Hour
Semi-skilled Labor $27.00
Skilled Labor $30.00
Foreman/Operator $38.00
20. Billable rates will be subject to audit for hours worked only.
DIVISION 01 — GENERAL REQUIREMENTS
21. Section 01140 — Contractor's Use of Premises: Excluded is paragraph
1.5.A.
22. Section 01564 — Control of Ground Water and Surface Water: Excluded is
any ground water control systems, well-point systems, eductor and ejector-
type systems, deep wells, and piezometers or monitoring wells.
23. Section 01 21 00 —Allowances: Excluded are the following:
Para 1.05.13 — Entire paragraph
Para 1.06.13 — Last sentence "These costs include delivery, installation,
insurance, equipment rental, and similar costs'.
24. Section 01 21 00 —Allowances:
a] The Construction Contingency Allowance will be used jointly for the
Owner's and Construction Manager's purposes.
b] Excluded are Allowance No. 7 thru No. 11 as shown in paragraph 3.03.
30
EXHIBIT'E'
Dru4 ' ROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety — Phases 2 & 3
Public Safety Building
QUALIFICATIONS &ASSUMPTIONS
DIVISION 02— SITEWORK/EXISTING CONDITIONS
25. Section 00 31 00 —Available Project Information:
a] Soil Management Plan & Underground Storage Tank Removal Plan —
Excluded is any geophysical survey for locating the existing underground
storage tanks (UST). The location of the existing underground storage
tanks (UST)will be provided by the Owner.
b] Geotechnical Engineering Report — Excluded is any cement stabilized
sand or flowable fill as noted on Page 16 of the report.
c] Any costs related to issues with the reworking of the existing fill soils if
encountered will be applied to the Existing Soils Conditions Allowance.
DIVISION 03— CONCRETE
26. Section 03100 — Concrete Formwork: Excluded are any corrugated
fiberboard carton forms as mentioned in paragraph 2.01.1 and 3.01.J.
27. Section 03300 — Cast-In-Place Concrete: Excluded are any corrugated
fiberboard carton forms as mentioned in paragraph 2.06.1 and 3.04.J.
28. Section 03 47 13 — Precast Concrete Tilt Up Panels: Excluded is any
sandblasted finish as indicated in paragraph 3.04.D.
29. Excluded is the pouring of slab on grade in strips per detail 2/S-305.
DIVISION 04—MASONRY
DIVISION 05—METALS
30. Section 05 12 00 —Structural Steel Framing:
a] Excluded is any galvanized cooling tower grillage and steel crane
rails as mentioned in paragraph 1.02.A.1.
b] Excluded is any survey work by a licensed professional engineer or
public surveyor as mentioned in paragraph 3.02.A.
31. Section 05 31 13 — Steel Floor Decking and Shear Studs: Excluded is
paragraph 2.06.A. There is no sprayed fireproofing in this project.
32. Section 05 73 00 — Decorative Metal Railings:
a] Included are Decorative Metal Railings as furnished and installed by Viva
Railings based on the following system:
Railing System 1 CIRCA PERF Railing System SS 304 42" H Fascia Mount
Post: 2" Dia SS Posts
In-fill: PMRO-0610 Perf Panel Steel Powder coated—R Kynar PC
31
EXHIBIT'E'
D 'U' ROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety — Phases 2 & 3
Public Safety Building
QUALIFICATIONS &ASSUMPTIONS
Top Rail: 1.5" Dia SS Rail (1.8 MM thick)
Assist Rail: 1.5" Dia SS Rail(1.8 MM thick)
Wall Rail: 1.5" Dia SS Rail(1.8 MM thick)
Locations: Admin Support WS Ramp Wall Rail 10/A-111
Lobby Stair Wall Rail 10/A-401
Lobby Stair Rake w/Assist Rail A-401
Lobby Stair Second Floor Landing Guardrail Level A-401
Railing System 2 CIRCA PERF Railing System SS 316 42" H Fascia Mount
Post: 2" Dia SS Posts
In-fill: PMRO-0610 Perf Panel Steel Powder coated—R Kynar PC
Top Rail: 1.5" Dia SS Rail (1.8 MM thick)
Locations: Level 2 Balcony Guardrail Level
Level 3 Balcony Guardrail Level
b] Excluded is any LED light at the handrails as indicated in paragraph
2.02.B.
c] Excluded are any decorative metal railings at Stairs 1, 2 and 3. Included
are primed & painted steel picket rails and handrails at Stairs 1, 2 and 3.
33. Section 05 7513—Ornamental Metal: Excluded is this section in its entirety.
There are no column covers in this project.
34. Excluded is any galvanizing of structural steel members in enclosed
unconditioned space areas of the building.
DIVISION 06— WOOD, PLASTICS, AND COMPOSITES
DIVISION 07— THERMAL AND MOISTURE PROTECTION
35. Section 07 52 00 — Modified Bituminous Membrane Roofing:
a] Included is a modified bituminous membrane roofing per the specification
section 07 52 16 prepared by Blake Dieste w/The Garland Co.
36. Excluded is any applied or sprayed fireproofing.
DIVISION 08— OPENINGS
37. Section 08 11 13 — Hollow Metal Doors & Frames: Included are Hollow
Metal Frames as manufactured by Pearland Industries or Door Pro
Systems.
38. Ballistic Specialty units are the product of Ceco. Doors are hollow metal
with plastic laminate face and vertical edges. Doors &frames are armored
with ballistic armor. Factory installed glass for doors with vision lite.
32
EXHIBIT 'E'
t
BUILDERS OF INTEGRITY
Baytown Public Safety— Phases 2 & 3
Public Safety Building
QUALIFICATIONS &ASSUMPTIONS
39. Section 08 33 23 — Overhead Coiling Doors: Included are overhead coiling
doors as manufactured by Cookson. Overhead coiling doors will meet a 50
PSF wind load with no impact.
40. Outrigger Sunshades:
a] Included is approximately 923 LF of outrigger sunshades with a 36" project at
areas noted on exterior elevations on sheets A-222, A-223 & A-224.
b] Due to the expansion joints at the punched opening Curtain Wall/Storefront
elevations on the 1st& 2nd floor, the sunshades that extend past the window will have
to attach to the building structure.
c] Sunshades at the building structure are to be anchored to embeds inside the wall.
Included is an allowance of$250/embed for a total of 82 embeds.
d] Manufacturer will be Kawneer.
41. Architectural Light Shelfs:
a] Included is approximately 432 LF of architectural light shelfs with a 24" projection.
Light shelf locations are based off notes on the reflective ceiling plans (A-161, A-162
&A-163).
b] Light shelfs at 1st & 2►,d floor will be the same product as specified for the 3rd floor.
Excluded are any light shelfs framed out of light gage framing.
c] Manufacturer will be Kawneer.
DIVISION 09— FINISHES
42. Section 09 24 00 — Portland Cement Plaster: Plaster is a cementitious material and is
prone to shrinkage cracks. Shrinkage cracks may develop as the excess water
evaporates from the drying cement mix. Shrinkage cracks are not structural in nature
and are not covered as a warrantable item.
43. Section 09 30 00 — Tiling: Excluded is epoxy grout. Specifications require
standard grout unless otherwise indicated. The drawings do not indicate
epoxy grout.
44. Section 09 65 13.23 — Resilient Rubber Stair Treads with Risers: Excluded
is this section in its entirety.
45. Section 09 66 19—Precast Terrazzo: Included is epoxy terrazzo at the stair
treads in the Lobby stair in lieu of precast terrazzo.
46. Section 09 66 23 — Resinous Matrix Terrazzo Flooring:
a] Excluded is precast tiles manufactured by Terrazzio.
33
EXHIBIT'E'
DUROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety— Phases 2 & 3
Public Safety Building
QUALIFICATIONS &ASSUMPTIONS
b] Included is 3/8" poured in place epoxy terrazzo to match the Terrazzio colors listed
on the drawings.
47. Section 09 67 00 — Fluid Applied Flooring: Manufacturer will be General
Polymers.
48. Section 09 77 00 — Special Wall Surfacing: Included are AP-2 Acoustic
Metal Panel starting at 3' 0" AFF up to a height of 7' 0" AFF in locations
noted on the drawings.
49. Section 09 84 13 — Acoustical Wall Panels: Included are AP-1 Acoustic
Panel starting at 3' 0" AFF up to a height of 7' 0" AFF in locations noted on
the drawings.
50. Excluded are any Special Wall Surfacing and Acoustic Wall Panels in
Rooms 1653, 1655, 1657 (juvenile holding and the observation room).
Included is paint only in these rooms.
DIVISION 10— SPECIALTIES
51. Section 10 14 00 —Signage:
a] Included is an allowance of$60,000 for Signage.
b] Excluded is paragraph 3.03.13 — Client Logo Signage.
52. Section 10 14 26 — Post and Panel Pylon Signage: Excluded is this section
in its entirety.
53. Section 10 73 00 — Protective Covers:
a] Excluded is any smooth metal soffit panels on the underside of the
exterior canopy deck system.
b] Included is Kynar finish for the exterior canopy system.
DIVISION 11 — EQUIPMENT
DIVISION 12—FURNISHINGS
54.Bicycle Racks — Included are two (2) wall mount powered Tilt N Store
Bike Lifts (47"W x 52"H).
DIVISION 13— SPECIAL CONSTRUCTION
DIVISION 21 — FIRE SUPPRESSION
34
EXHIBIT 'E'
DUROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety— Phases 2 & 3
Public Safety Building
QUALIFICATIONS &ASSUMPTIONS
DIVISION 22— PLUMBING
DIVISION 23— HVAC
55. Section 23 31 00 — Ductwork: Excluded is paragraph 3.05.A requiring duct
cleaning. Duct ends will be covered during construction phase to prevent
contamination by dirt and/or debris.
DIVISION 26— ELECTRICAL
56. Included are aluminum conductors in lieu of copper conductors for 1/0 and
larger feeders.
57. Excluded is the UPS for Building M.
58. The cost saving item 26.3 comprises of the following items:
a] Included are 6" steel pipe bollards in lieu of the lighted bollards (Type SD & SD2).
b] Included are 12 EA pedestal lighting to light path to front door.
c] Included are 7 EA Type W1 fixtures.
DIVISION 27— COMMUNICATIONS
59. Excluded are any Network Switches or UPS devices. These will be
provided by the Owner.
60. Section 27 53 19 — Distributed Antenna System (DAS): Excluded is a
Neutral Host DAS serving the Wireless Service Providers (Para 1.02A: 1
thru 4). Included is a ERRC system for Building M only operating in the
700/800 MHz range.
DIVISION 28—ELECTRONIC SAFETY& SECURITY
DIVISION 39— EARTHWORK
61. Section 31 63 29 — Drilled Piers: Excluded is any casing or slurry drilling of
piers.
62. Excluded is any drying of subgrade by chemical or mechanical means.
63. Sheet C7: Excluded is any pond liner.
64. Excluded is the cleaning of any existing storm pipes as noted in Storm
Sewer Note#5 on sheets C15, C16, C17 & 18.
DIVISION 32—EXTERIOR IMPROVEMENTS
35
EXHIBIT 'E'
i
BUILDERS OF INTEGRITY
Baytown Public Safety — Phases 2 & 3
Public Safety Building
QUALIFICATIONS &ASSUMPTIONS
65. Areas that receive Hydromulch will not be warranted for developing full turf
grass. Owner understands that Hydromulch is a 2-season maintenance
program requiring continuous maintenance including watering and fertilizer
by the Owner. Areas that are not irrigated will not be warranted for grass or
plant development and sustainability. Any temporary irrigation requirement
by the contract will only be warranted to such date the temporary irrigation
is removed.
DIVISION 33— UTILITIES
36
EXHIBIT `F'
D1%,,J1R0TECH
BUILDERS OF INTEGRITY
Baytown Public Safety— Phases 2 & 3
Public Safety Building
ALLOWANCE SCHEDULE
1. Construction Contingency Allowance $11000,000
2. Faraday Room Allowance $110,000
3. Police & Fire Dept. shields/Monument Sign Allowance $45,000
4. Building D Renovations Allowance $20,000
5. Existing Soil Conditions Allowance $200,000
6. Signage Allowance $60,000
37
EXHIBIT 'G'
Dl�..)IROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety — Phases 2 & 3
Public Safety Building
SELF PERFORMED WORK ITEMS
The following scope items will be self-performed by Durotech, Inc. and will be billed against the contract
based upon the proposal submitted to and accepted by the owner and will be treated as a lump sum sub-
contract amount.
No. Description of Scope Amount
1 OFCI Items(L) $3,240
2 Miscellaneous Steel (L) $132,214
3 Safety Rails(L&M) $32,937
4 Rough Carpentry(L&M) $211,338
5 Unload &distribute Metal Doors &Frames(L) $35,480
6 Unload &distribute PLAM Doors(L) $19,915
7 Install Access Doors (L&M) $8,030
8 Unload &distribute Door Hardware(L) $16,694
9 Install Louvers (L) $5,878
10 Floor Preparation(L&M) $34,136
11 Floor Protection (L&M) $13,192
12 Install Knox Box(L&M) $3,487
13 Install Residential Appliances(L) $7,695
14 Final Grading (L) $12,331
15 Haul off spoils (L) $64,096
16 Remove strip/clean paving joints(L) $15,783
17 Backfill curbs(L) $11,649
18 Install Irrigation Sleeves(L&M) $18,631
TOTAL $646,907
38
EXHIBIT `H'
D 'U' ROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety — Phases 2 & 3
Public Safety Building
UNIT PRICES
A] UNIT PRICE NO. 1: Removal of unsatisfactory soil and replacement with
satisfactory soil material $69.00/CY
Description: Unsatisfactory soil excavation and disposal off site and replacement
with satisfactory fill material or engineered fill from off site, as required, according
to Division 31 Section "Earth Moving."
B] UNIT PRICE NO. 2: Rock excavation and replacement with satisfactory soil
material $69.00/CY
Description: Classified rock excavation and disposal off site and replacement
with satisfactory fill material or engineered fill from off site, as required, according
to Division 31 Section "Earth Moving."
C] UNIT PRICE NO. 3: Unit Price per linear foot for piers longer or shorter than base
lengths
Pier P1: 24/72 Add: $60.00/LF Deduct: $51.00/LF
Pier P2: 30/90 Add: $93.92/LF Deduct: $79.83/LF
Pier P3: 18/48 Add: $33.69/LF Deduct: $28.63/LF
Description: Unit prices shall include all labor, materials, equipment, overhead and fee
for drilled piers complete. Adjustments to Contract shall be based on total linear feet of
each pier size greater than or less than the sum of base lengths of each size.
D] UNIT PRICE NO. 4: Unit Price per linear foot for Casing of Piers
Pier P1: 24" Add: $27.10/LF
Pier P2: 30" Add: $37.60/LF
Pier P3: 18" Add: $17.20/LF
Description: Unit prices shall include all labor, materials, equipment, overhead and fee
for casing of drilled piers complete.
E] UNIT PRICE NO. 5: Unit Price per linear foot for Straight Shaft piers
Convert Pier P1: 24/72 to Straight Shaft 72" dia Add: $178.23/LF
Convert Pier P2: 30/90 to Straight Shaft 90" dia Add: $264.15/LF
Convert Pier P3: 18/48 to straight Shaft 48" dia Add: $81.92/LF
Description: Unit prices shall include all labor, materials, equipment, overhead and fee
for drilling of straight shaft piers complete.
F] UNIT PRICE NO. 6: Additional excavation of existing fill soil/debris
$47.00/CY
This unit cost is for the additional excavation & removal of the existing fill
soil/debris and haul-off from the project site.
G] UNIT PRICE NO. 7: Additional Imported Select Fill $25/CY
39
EXHIBIT 'H'
DUROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety — Phases 2 & 3
Public Safety Building
UNIT PRICES
This unit cost is for the providing, placing and compacting additional imported
select fill.
H] UNIT PRICE NO. 8: Additional Concrete Placement:
If additional concrete is required and approved by the Project Engineer, the following
unit prices shall be used in adjusting the Contract Price.
1. Grade Beams, price per cu. yd. $356.62/CY
2. Slab on grade, price per cu. yd. $291.47/CY
3. Normal weight concrete slab over metal deck, price per cu. yd.
$303.16/CY
4. Light weight concrete slab over metal deck, price per cu. yd.
$228.17/CY
1] UNIT PRICE NO. 9: Site Concrete Placement
The price reinforcing steel, concrete, and labor.
1. 8" concrete paving Add: $204.85/CY Deduct: $174.12/CY
2. 6" concrete paving Add: $219.00/CY Deduct: $186.15/CY
3. 4.5" concrete sidewalk Add: $404.50/CY Deduct: $343.82/CY
The price includes subgrade preparation only.
2. 8" concrete paving Add: $0.95/SF Deduct: $0.95/SF
2. 6" concrete paving Add: $0.95/SF Deduct: $0.95/SF
3. 4.5" concrete sidewalk Add: $0.60/SF Deduct: $0.60/SF
40
EXHIBIT T
DUROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety — Phases 2 & 3
Public Safety Building
COST SAVING ITEMS
The following Cost Savings Items have been incorporated into the Guaranteed
Maximum Price Proposal. This list is included for information purposes only.
DESCRIPTION ACCEPTED
7 THERMAL&MOISTURE PROTECTION ($199,000)
1 Use Garland two-ply(base ply in asphalt,cap ply torched)30-yr system over poly-iso insulations ($54,000)
and gypsum cover board all adhered in hot asphalt in lieu of asspecified.
2 Change the gypsum cover board to an HD fiber board. ($21,000)
3 Install an asphalt-applied cap sheet in lieu of a torch-applied cap sheet. ($41,000)
4 If CS#7.3 is accepted,use a"regular white"granulated asphalt-applied cap sheet in lieu of a ($83,000)
"reflective white"product.
8 OPENINGS $(54,315)
1 Change the following windows to storefront in lieu of curtainwall:W12,W13,W19,W23,W23A, ($54,315)
W24,W24A,W25,W27,W34,W35,W36
9 FINISHES ($10,153)
1 Utilize Regupol Aktiv Athletic Flooring per Specifications in Lieu of Mondo Sports Impact in ($10,153)
Material Finish Legend
26 ELECTRICAL ($695,772)...
1 Use aluminum conductors in lieu of copper 1/0 and larger ($218,000)
2 Delete UPS and associated equipment ($428,000)
Use 6"steel pipe bollards in lieu of lighted bollards(Type SO&S02);add 12 EA pedestal lighting
3 to light path to front door;add Type W1 light fixtures. ($49,772)
Total-Cost Saving Items ($959,240)
41