Ordinance No. 15,020 ORDINANCE NO, 15,020 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AUTHORIZING CHANGE ORDER NO. 3, WHICH AMENDS THE CONSTRUCTION MANAGER-AT-RISK CONTRACT FOR THE PUBLIC SAFETY FACILITY PROJECT, WITH DUROTECH, INC., IN AN AMOUNT NOT TO EXCEED FORTY-ONE MILLION EIGHT HUNDRED THIRTY THOUSAND EIGHT HUNDRED FIFTY-NINE AND NO/100 DOLLARS ($41,830,859.00);AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council of the City of Baytown,Texas, does hereby authorize Change Order No. 3, which amends the Construction Manager-at-Risk Contract for the Public Safety Facility Project, with Durotech, Inc., in an amount not to exceed FORTY-ONE MILLION EIGHT HUNDRED THIRTY THOUSAND EIGHT HUNDRED FIFTY-NINE AND NO/100 DOLLARS ($41,830,859.00). A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. Section 2: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 27t1' day of January, 2022. BRANDON CAPETILLO, Ilayor ATTEST: yA09JOOLL+I LL «a YL ANGELA CKSO , &ifyl_ co c� �a APPROVED AS TO Iy TRffVOR FANNING, Interim City Attorney RAKaren AndersonlORDINANCESL02"212022.OL271ChangcOrderNo3-Durotecli-Puhlic5afetyfacility.docx EXHIBIT °A° CITY OF BAYTOWN PUBLIC WORKS & ENGINEERING '9� 2123 Market Baytown, Texas 7752020 BETTER BAYTOWN CHANGE ORDER For Public Safety Campus: Phase 2 and 3 Date of Issuance: 1/27/2022 Change Order No.: 3 Contractor: Durotech Inc. CoB Project No.: FA1901 Designer: BVG4 Architecture P.O. No.: 2103500 Explanation: This change order encompasses the following: The Guaranteed Maximum Price(GMP)for the construction of the Baytown Public Safety—Phase 2 and 3: Administration Building in the amount of$41,830,859.00 and a duration of seven(20)months. These costs include General Conditions, Bonds &Insurance; General Site Requirements; Existing Conditions, Foundations, Paving,Final Grading, Masonry, Interior Finishes, Fire Protection Systems, HVAC,Electrical, Plumbing, Fencing and Landscaping; and the Construction Manager at Risk Fee of 2.3%. Included in this Change Order are four(4) alternates. Description of Work Cost Time 1 General Conditions, Bonds&Insurance $2,593,272.00 2 General Site Requirements $2,023,178.00 3 Existing Conditions $463,160.00 4 Concrete(Building Foundation and Site Paving) $4,672,337.00 5 Masonry $522,586.00 6 Metals(Structural Steel, Rails,and Panels) $3,345,643.00 7 Woods (Rough Carpentry and Millwork) $612,279.00 8 Thermal and Moisture Protection $2,600,674.00 9 Openings(Doors and Glazing) $3,066,641.00 10 Finishes (Gypsum Board,Tiling,Resilient Flooring) $4,025,916.00 11 Specialties(Signage, Toilet Accessories,Protective Covers) $534,097.00 12 Equipment(Appliances) $7,695.00 13 Furnishings $122,187.00 14 Conveying Equipment $401,053.00 15 Fire Suppression Systems $404,500.00 16 Plumbing $1,810,214.00 17 HVAC $2,346,500.00 18 Electrical $5,454,879.00 19 Communications (Structured Cabling and AV System) $976,941.00 20 Electronic Safety and Security $592,660.00 21 Earthwork $815,014.00 22 Exterior Improvements (Fences, Gates, Irrigation, Landscaping) $907,215.00 23 Utilities $677,608.00 24 Construction Manager At Risk Fee 2.3% (Phase 1A) $896,454.00 25 Alternate#1 Courts Building Addition $640,793.00 26 Alternate#4D Air Cooled Split System AC Units from Daikin $304,984.00 27 Alternate#5AVRX DX Systems from Daikin AC $581,628.00 28 Alternate#6A DDC Systems by Automated Logic $430,751.00 $41,830,859.00 609 Days Construction 1 of 2 D16 Revised 2020 The additional scope of work and the schedule associated with the same,are attached hereto as Exhibit "A" dated December 17,2021 and incorporated herein for all intents and purposes. Cost& Time Change Summary Cost Time Original Contract: $ 89,000.00 Days Previous Change Order(s): $ 18,589,551.00 365 Days Contract prior to this change order: $ 18,678,551.00 Days Net increase(decrease) from this change order $ 41,830,859.00 609 Days Revised Contract: $ 60,509,140.00 974 Days Finance Approval: Date: RECOMMENDED: RECOMMENDED: By _ Date: 1-13-2022 By: 7 / —� Date: 01/14/2022 —}I _ D6sign Architilct 11 Director of Public Works&Engineering ACCEPTED*: APPROVED: By: Date: 1-13-2022 By: Date: Contractor City Manager -Contractor agrees to perform change(s)included in this Change Order for the price and time indicated. The prices for changes included all costs associated with this Change Order. No work is to be done until this change order is executed.No payment to the Contractor(or Consultant)shall be made for work included in the change order until the Contractors pay estimate is updated. Revise the project plans and specifications as referenced and insofar as the original project drawings and specifications are inconsistent,this Change Order governs.Upon execution by all parties,the following changes identified for the contract value and/or contract time shown,are made part of the contract. Construction 2 of 2 D 16 Revised 2020 DUR®TECH BUILDERS OF INTEGRITY Date: January 12, 2022 Ms. Andrea Brinkley Assistant Director—Capital Projects City of Baytown - Public Works & Engineering 2123 Market Street Baytown, TX 77522 Re: Guaranteed Maximum Price for Baytown Public Safety — Phases 2 & 3 — Public Safety Building Dear Ms. Brinkley: We wish to inform you that after several months of working together with City of Baytown and BVG4 Architecture LLC on this important facility, we have formally advertised and solicited proposals for the development of the GMP for the Baytown Public Safety - Phases 2 & 3 — Public Safety Building project. Over 200 proposals were received on November 23rd, 2021. After careful review and compilation of these proposals, Durotech, Inc. is pleased to present a Guaranteed Maximum Price for the construction of the Baytown Public Safety— Phases 2 & 3 — Public Safety Building of$41,830,859.00. It is our recommendation that we ask City of Baytown Council to approve the Guaranteed Maximum Price of$41,830,869.00 and to execute the GMP Amendment No. 3 between City of Baytown and Durotech, Inc. We are excited about the potential of entering into the construction phase of this project and want to thank you and your team, BVG4 Architecture and their consultants for a very successful pre-construction phase. Durotech is committed to City of Baytown in the successful delivery of the New Public Safety Building project. Thank you and City of Baytown for selecting Durotech as its building partner. It is our goal to meet and exceed your expectations. Should you have any questions please do not hesitate to contact me. Si erely, " VV avid Rowe CEO 1 11931 Wickchester Lane • Suite 205 ® Houston, Texas 77043-4501 Phone: 281.558.6892 • Fax: 281.496.5637 DUROTECH BUILDERS OF INTEGRITY GMPSUMMARY Project: Baytown Public Safety — Phases 2 & 3 — Public Safety Building Location: 3200 N Main St., Baytown, TX 77522 Owner: City of Baytown GMP Proposal Package: The GMP proposal package consists of the following items: 1. Exhibit A — GMP Top Sheet —dated 12 January 2022 2. Exhibit B — Project Manual —dated 15 October 2021 3. Exhibit C — List of Drawings —dated 15 October 2021 4. Exhibit D — List of Addenda 5. Exhibit E — Qualifications & Assumptions 6. Exhibit F —Allowance Schedule 7. Exhibit G — Self Performed Work Items 8. Exhibit H — Unit Prices 9. Exhibit I — Cost Saving Items Scope of Work: A] The Project: The Project consists of the following: Phase 2: 1. Demolition of existing Police Vehicle Maintenance buildings "H", "I", "J", "K", "P" & „Q„ 2. Demolition of existing site paving east and north of existing Police Staff parking. 3. Construction of 110,960 SF tilt-up concrete and brick, 3-story Building "M", with VRF Air Conditioning system and full building UPS to meet risk category II hurricane resistant requirements. 4. Construction of new 485 SF CMU masonry Pump House adjacent to building "M". 5. Construction of new 595 SF Sallyport integrated into the construction of building ,'M" 6. Construction of new central campus generator yard for Phases 1 & 2. 7. Sitework including required utilities, staff parking areas and drives, landscaping and fencing. 8. Final grading and spread & grade spoils 9. All Masonry Work 10.All Rough Carpentry, Millwork and Solid Surfaces 11.All Thermal & Moisture Protection 12.All Openings and Doors 13.AII Interior Finishes 14.AII Fire Protection Systems 15.AII Plumbing Work 16.AII HVAC Systems 17.AII Electrical Work, including Site Electrical Work 2 11931 Wickchester Lane • Suite 205 • Houston, Texas 77043-4501 Phone: 281,558.6892 9 Fax: 281.496.5637 DUROTECH BUILDERS OF INTEGRITY 18.AII Fences and Gates 19.AII Concrete Screen Walls 20.All Landscaping and Irrigation Phase 3: 1. Demolition of existing Police Building "G". 2. Demolition of existing Police Staff Parking, including connection to North Main Street. 3. Construction of air-conditioned, hurricane resistant 1,200 SF steel framed addition to the existing Courts Building "B". 4. Sitework including required utilities, public plaza, public parking areas and drives, landscaping and fencing. Duration: The construction duration for Phase 2 & 3 will be 20 months (606 days) from the date of completion of Phase 1A & 1B. 3 11931 Wickchester Lane . Suite 205 . Houston, Texas 77043-4501 Phone: 281.558.6892 • Fax: 281.496.5637 EXHIBIT'A' PROJECT: Baytown Public Safety-Phase 1 B D U ROT E C H LOCATION: 3200 North Main St.,Baytown,TX 77521 OWNER: City of Baytown BUILDERS OF INTEGRITY ARCHITECT: BV134 Architecture DATE: 11/212022 - BAYTOWN PUBLIC SAFETY- PHASE 2 &3 SECTION DESCRIPTION PHASE 2&3 REMARKS LABOR MATERIAL SU&BIOS TOTAL GENERAL CONDITIONS 011000 SUPERVISION 1,052,180 - - 1,052,180 011500 TEMPORARY/GENERAL CONDITIONS 12,624 432.196 - 444,820 011940 ADVERTISEMENTS - - 3,000 3,000 012000 EQUIPMENT - 74,640 - 74,640 014220 JAGC FEES - - 28,186 28,186 01 4225 BUILDER'S RISK INSURANCE - - 382,311 382,311 01 4230 GL INSURANCE - - 309,013 309,013 014240 IPAYMENT&PERFORMANCE BOND 299,121 299,191 SUBTOTAL-DIV 00 GENERAL CONDITIONS 1,064,804 506,836 1,021,631 2,593,272 GENERAL REQUIRE/'BENTS 01 21 00 QUANTITY ALLOWANCE - - 0 0 NONE 012105 CONSTRUCTION CONTINGENCY ALLOWANCE - - 1,000,000 1,000,000 012115 SITE ELECTRICAL CONDUIT ALLOWANCE - - 0 0 IN PHASE IA 0121 20 COURTS DRAINAGE ALLOWANCE - - 0 0 IN PHASE 1A 01 21 21 PHASE 1 B:BREAKROOM LOCKERS&APPLIANCES - - 0 0 BY OWNER 01 21 22 PHASE 1 B:VEHICLE LIFTS&FLUID DISTRIBUTION - - 0 01 BY OWNER 012123 PHASE I B:SHOP EQUIPMENT - - 0 0 BYOWNER 01 2124 PHASE 1B:MAINTENANCE EQUIPMENT - - 0 0 BYOWNER 012125 PHASE IB:BUILDING'U'WORKROOM EQUIPMENT - - 0 0 BYOWNER 01 21 26 PHASE 113:BUILDING W RELOCATION OF LIFT - - 0 0 BYOWNER 01 21 27 PHASE 2:HIGH DENSITY STORAGE SHELVING - - 0 0 BYOWNER 01 21 28 PHASE 2:CRIME SCENE LAB EQUIPMENT - - 0 0 BYOWNER 01 21 29 PHASE 2:FITNESS EQUIPMENT&WRESTLING MATS - - 0 0 BYOWNER 01 21 30 PHASE 2:BRK ROOM/KITCHEN/FA KITCHEN APPLIANCES - - 0 0 BYOWNER 012131 PHASE 2:SWAT ARMORY STORAGE CABINETS - - 0 0 BY OWNER 01 21 32 PHASE 2:FARADAY ROOM ALLOWANCE - - 110,000 110,000 ALLOWANCE 01 21 33 PHASE 2:POLICE&FIRE DEPT SHIELDS/MONUMENT SIGN - - 45,000 45,000 ALLOWANCE 01 21 34 PHASE 3:BUILDING D RENOVATIONS - - 20,000 20,000 ALLOWANCE 012135 EXISTING SOIL CONDITIONS ALLOWANCE - - 200,000 200,000 ALLOWANCE 01 4339 MOCKUP PANEL - - 30,000 30,000 01 45 33 WINDSTORM INSPECTIONS - - 11,400 11,400 01 51 13 ITEMPORARY POWER - - 13,000 13,000 01 51 19 EQUIPMENT FUEL&FUEL TANK - - 14,040 14,040 01 51 36 TEMPORARY WATER - - 8,100 8,100 01 5370 QMS/SAFETY - - 127,593 127,593 01 5416 MATERIAL HANDLING&HOISTING - - 104,344 104,344 01 5423 TEMPORARY SCAFFOLDING - - 27,740 27,740 01 55 23 TEMPORARY ROADS - - 0 0 IN PHASE 1A 01 5526 TRAFFIC CONTROL - - 20,000 20,000 01 5626 TEMPORARY FENCING - - 31,841 31,841 01 5639 ITEMPORARY TREE&PLANT PROTECTION 8,550 2,000 - 10,550 01 5700 EROSION&SEDIMENT CONTROL 15,907 25,000 - 40,907 015800 TEMPORARY PROJECT SIGNAGE - - 0 0 IN PHASE IA 016400 OFCI ITEMS 3,420 - - 3,420 01 71 23 IFIELD ENGINEERING&LAYOUT 36.080 7,075 - 43,155 4 EXHIBIT'A' SECTION DESCRIPTION PHASE 2&3 REMARKS LABOR MATERUL SUB-BIOS TOTAL 017416 SITE MAINTENANCEICLEAN STREETS 9,255 21,123 - 30,378 01 74 19 CONSTRUCTION WASTE MANAGEMENT - - 38,970 38,970 01 7423 FINAL CLEANING - - 27.740 27.740 019100 COMMISSIONING 65,000 - 65,000 SUBTOTAL-DIVOI GENERAL REQUIREMENTS 138,212 55,198 1,829,768 2,023,178 IV 02 EXISTING CONDITIONS 022100 SURVEYS - - 10.000 10.000 024113 SITE DEMOLITION - - 267,750 267,750 02 61 00 REMOVAL&DISPOSAL OF CONTAMINATED SOILS - - 114,800 114,800 02 65 00 UNDERGROUND STORAGE TANK REMOVAL - - 0 0 IN 02 61 00 026510 PLUG&ABANDON WATER WELL&MONITORING WELLS - - 64,610 64,610 027000 PUMP&DEWATER 3,600 2,400 - 61000 SUBTOTAL-DIV02 EXISTING CONDITIONS 3,600 2,400 457,160 463,160 DIV 03 CONCRETE _ 032000 CONCRETE REINFORCING - - 0 0 IN 03 30 00 033000 SITE&BUILDING CONCRETE - - 4,442,967 4,442,967 03 35 10 CONCRETE FLOOR SEALER - - 21,380 21,380 03 35 43 POLISHED CONCRETE - - 0 0 IN PHASE 1 B 03 40 50 CONCRETE TILT UP PANELS - - 0 0 IN 03 30 00 03 40 55 ICONCRETE TILT UP PANELS ERECTION - - 132,990 132,990 03 40 60 CONCRETE TILT UP PANELS ACCESSORIES - 75,000 75,000 SUBTOTAL-DIV 03 CONCRETE - - 4,672,337 4,672,337 040519 MASONRY REBAR - - 0 0 IN 04 05 19 042000 MASONRY - - 1 522.5861 522,586 SUB TOTAL-DIV04 MASONRY - - 522,586 522,586 ..•e..::...aRwa 051200 STRUCTURAL STEEL FRAMING - - 2,351,133 2,351.133 051250 STRUCTURAL STEEL ERECTION - - 632,796 632,796 053700 PREPARE EXPOSED STEEL STRUCTURE 5,649 5,649 - 11,298 055000 MISCELLANEOUS STEEL 130,014 2,200 - 132,214 05 50 10 TIMBER MATS 19,745 42,500 - 62.245 055020 SAFETY RAILS 22,439 10,498 - 32,937 055300 METAL GRATINGS - - 0 0 IN PHASE IB 055500 METAL NOSINGS 2.309 5,567 - 7,876 055805 DOWNSPOUT BOOTS - - 0 0 IN PHASE 1B 05 73 00 DECORATIVE METAL RAILINGS - - 107,644 107,644 0575 10 PERFORATED METAL PANELS 7,500 7,500 SUBTOTAL-DIV 05 METALS 180,156 66,414 3,099,073 3,345,643 06 WOOD,PLASTICS,AND COMPOS)TESAW. 061000 ROUGH CARPENTRY 125,828 85,510 - 211,338 062200 MILLWORK - - 397,953 397,953 0661 16 SOLID SURFACING FABRICATIONS - - 0 0 IN 06 22 00 066400 PLASTIC PANELING 1,756 1.232 2,988 SUB TOTAL-DIV O6 WOOD,PLASTICS&COMPOSITES 127,584 86,742 397,953 612,279 -.jffijfiffA� -E PRO71MION 071100 DAMPPROOFING - - 334.065 334,065 07 18 00 TRAFFIC COATINGS - - 6,440 6,440 071900 WATER REPELLENTS - - 0 0 NONE 072100 THERMAL INSULATION - - 161,286 161,286 5 EXHIBIT'A' SECTION DESCRIPTION PHASE 2&3 REMARKS LABOR MATERIAL SUB-BIDS TOTAL 0741 00 METAL ROOF INSULATION&UNDERLAYMENT - - 0 0 IN PHASE 1 B 074200 METAL WALL PANELS - - 294,156 294,156 075200 MODIFIED BITUMINOUS MEMBRANE ROOFING - - 1,715,225 1,715,225 077200 ROOF ACCESSORIES - - 7,500 7.500 078100 APPLIED FIREPROOFING - - 0 0 NONE 078400 IFIRESTOPPING - - 25,000 25,000 079200 JOINT SEALANTS - - 38,836 38.836 079500 EXPANSION CONTROL 11,286 6.880 - 18.166 SUBTOTAL-DIV 07 THERMAL&MOISTURE PROTECTION 11,286 6,880 2,582,508 2,600,674 DfV 08 OPENINGS 080800 DOOR&HARDWARE INSTALLATION 66,156 - - 66,156 08 11 00 METAL DOORS&FRAMES 35,480 712.374 - 747,854 08 14 23 PLASTIC LAMINATE FACED WOOD DOORS 19,915 - - 19,915 0831 00 ACCESS DOORS AND PANELS 3.135 4.895 - 8,030 08 33 00 COILING DOORS&GRILLES - - 88,348 88,348 08 42 29 SLIDING AUTOMATIC ENTRANCES - - 32,927 32,927 08 45 00 INSULATED TRANSLUCENT WALL PANELS - - 0 0 IN PHASE I 085653 SECURITYWINDOWS - - 0 0 IN 08 80 00 086223 TUBULAR DAYLIGHTING DEVICES - - 17,623 17,623 0871 00 DOOR HARDWARE 16,694 - - 16,694 088000 GLAZING - - 2,006,100 2,006,100 088010 TEMPORARY ENCLOSURES 18,019 12,644 - 30,663 08 80 15 CLEAN GLASS 2,670 937 - 3,607 089100 LOUVERS 5,878 22,846 28,724 SUBTOTAL-DIV 08 OPENINGS 167,947 753,696 2,144,998 3,066,641 092400 CEMENT PLASTERING - - 25.276 25,276 09 29 00 GYPSUM BOARD - - 2,100,594 2,100.594 093000 TILING - - 392,717 392,717 095100 ACOUSTICAL CEILINGS - - 284.937 284,937 096000 FLOOR PREPARATION 23,256 10,880 - 34,136 096010 FLOOR PROTECTION 7,752 5,440 - 13,192 096500 IRESILIENT FLOORING - - 362,222 362,222 096566 RESILIENT ATHLETIC FLOORING - - 32,636 32,636 096600 TERRAZZO FLOORING - - 213,140 213,140 096700 FLUID-APPLIED FLOORING - - 22,680 22,680 096800 CARPETING - - 0 0 IN 09 65 00 096900 ACCESS FLOORING - - 0 0 NONE 09 72 00 WALL COVERING - - 0 0 IN 09 90 00 09 77 00 SPECIAL WALL SURFACING - - 36,069 36,069 098400 ACOUSTIC WALL PANELS - - 101,016 101,016 099000 PAINTING&COATING - - 407.301 407,301 09 93 33 SILICATE MINERAL STAINS 0 0 IN 09 90 00 SUBTOTAL-DIV 09 FINISHES 31,008 16.320 3,978.588 4.025,916 K VISUAL DISPLAY UNITS - - 0 0 NONE SIGNAGE - - 60,000 60,000 ALLOWANCE POST&PANELIPYLON SIGNAGE - - 0 0 NONE TOILET COMPARTMENTS - - 20.664 20,664 FOLDING PANEL PARTITIONS - - 73,485 73,485 102600 WALL&DOOR PROTECTION - - 25,000 25,000 102813 ITOILET ACCESSORIES - - 74,466 74,466 1604400 FIRE PROTECTION SPECIALTIES - - 6,064 6,064 4415 KNOX BOX 627 2,860 - 3'487 6 EXHIBIT'A' SECTION DESCRIPTION PHASE 2&3 REMARKS LABOR MATERIAL SUB-BIDS TOTAL 105113 METAL LOCKERS - - 0 0 BY OWNER 107300 PROTECTIVE COVERS - - 261,881 261,881 107500 FLAGPOLES - 9,050 9,050 SUB TOTAL-DIV 10 SPECIALTIES 627 2,860 530,610 534.097 n", EQU(I. , 111200 PARKING CONTROL EQUIPME. T - - 0 0 BY OWNER 113100 RESIDENTIAL APPLIANCES 7,695 - - 7,695 MATERIAL BY OWNER 115200 AUDIO-VISUAL EQUIPMENT - - 0 0 BY OWNER 115300 LABORATORY EQUIPMENT - - 0 0 BYOWNER 115313 LABORATORY FUME HOODS 0 0 BYOWNER SUB TOTAL-DIV it EQUIPMENT - - - 7,695 DIV 11 FURNISHINGS iw- 122400 WINDOW SHADES - - 98,846 98,846 12 36 61 SIMULATED STONE COUNTERTOPS - - 0 0 IN 06 22 00 12 48 13 ENTRANCE FLOOR MATS - - 12.371 12,371 129300 SITE FURNISHINGS - - 0 0 NONE 129313 BICYCLE RACKS - 10,970 10,970 SUB TOTAL-DIV 12 FURNISHINGS - - 122,187 122,187 DIV 13 SPECIAL CONSTRUCTION 13 34 19 METAL BUILDING SYSTEMS - - 0 0 IN PHASE 1A 133420 METAL BUILDING ERECTION - - 0 0 IN PHASE 1B SUB TOTAL-DIV 13 SPECIAL CONSTRUCTION - - 0 0 DIV 14 CONVEI7NG9C0MMT 1 1 21 00 ELECTRIC TRACTION ELEVATORS - - 401.053 401,053 SUB TOTAL-DIV 14 CONVEYING EQUIPMENT - - 401,053 401,053 DIV 21 IFIRE SUPPRESSION - 21 10 00 IFIRE SUPPRESSION SYSTEMS - - 404,500 404,500 SUBTOTAL-DIV 21 FIRE SUPPRESSION - - 404,500 40-0,500 MaY22. . .. PLUMBING 220000 PLUMBING - - 1,810,214 1,810,214 SUB TOTAL-DIV 22 PLUMBING 1.810,214 1,810,214 230000 HVAC - - 2.323,000 2,323,000 2300 10 HVAC FILTER CHANGES - - 7,500 7,500 230500 MEP COORDINATION - - 16,000 16,000 SUBTOTAL-DIV 23 HVAC - - 2,346,500 2,346,500 DIV 26. : ELECTRICAL 260000 ELECTRICAL - - 5,359,451 5.359.451 260005 ROUGH INIBACKBOXES-LOWVOLTAGE - - 25,000 25.000 2600 10 PERMANENT POWER START UP - - 70,428 70.428 264100 LIGHTNING PROTECTION - 0 0 IN 26 00 00 SUBTOTAL-DIV 26 ELECTRICAL - - 5,454,879 5,454,879 271000 STRUCTURED CABLING - - 649,729 649,729 2741 16 INTEGRATED AUDIO-VIDEO SYSTEMS 8 EQUIPMENT - - 271,026 271,026 275319 DISTRIBUTED ANTENNA SYSTEM(DAS) 56,186 56,186 SUB TOTAL-DIV 27 COMMUNICATIONS - - 976,941 976741 7 EXHIBIT'A' SECTION DESCRIPTION PHASE 2&3 REMARKS LABOR "TERIQ sun BIDS To1A1. =18 IELWOONIC SAPAW-4,7" 281300 ACCESS CONTROL SYSTEM - - 454,500 454,500 281600 INTRUSION DETECTION SYSTEM - - 0 0 NONE 282300 VIDEO SURVEILLANCE SYSTEM - - 0 0 IN 28 13 00 2831 00 IFIRE DETECTION&ALARM SYSTEM - 138,160 138,160 SUB TOTAL-DIV 28 ELECTRONIC SAFETY&SECURITY - - 592,660 592,660 DIV31 EARTHWORK Aw- 31 EARTHWORK - - 732914 732,914 31 2216 FINAL GRADING 9,128 3,203 - 12,331 31 2310 SPREAD&GRADE SPOILS 37.664 26,432 - 64.096 31 31 00 SOIL TREATMENT - - 5,673 5,673 31 63 29 DRILLED CONCRETE PIERS&SHAFTS 0 0 IN 03 30 00 SUB TOTAL-DIV31 EARTHWORK 46,792 29,635 738,587 615,111 TS - 320111 CLEAN PAVING&SIDEWALKS 22.579 - - 22,579 321216 ASPHALT PAVING - - 0 0 IN PHASE 1A 321373 CONCRETE PAVING JOINT SEALANTS 10,761 T552 - 18,313 321375 REMOVE STRIP/CLEAN PAVING JOINTS 15,783 - - 15,783 321400 UNIT PAVING - - 0 0 NONE 32 16 15 1BACKFILL CURBS 11,649 - - 11,649 3217 23 PAVEMENT MARKINGS - - 50,503 50.503 3231 00 FENCES&GATES - - 128,290 128,290 3231 15 CONCRETE SCREEN WALLS&FENCES - - 167,167 167,167 328000 IRRIGATION - - 161,595 161,595 328010 IRRIGATION SLEEVES 10,056 8,575 - 18,631 329000 LANDSCAPING - - 288,705 288,705 329005 CRUSHED GRANITE - - 0 0 IN PHASE IB 329010 AERATING FOUNTAIN - - 0 0 NONE 329200 1HYDROMULCH&SOD - - 0 0 IN 32 90 00 329500 ILANDSCAPE MAINTENANCE 24,000 1 SUB TOTAL-DIV 32 EXTERIOR IMPROVEMENTS 70,828 16,127 820,260 907,215 330000 SITE UTILITIES - - 646,358 646,358 350000 PUNCH LIST 27,365 3.885 31,250 SUBTOTAL-DIV 33 UTILITIES 27,365 3,885 646,358 677,608 SUBTOTAL-COST OF WORK ITEMS 1,870,209 1,546,993 35,551,351 38,976,248 CM FEE-2.30% 896,454 BASE BID-PHASE 2&3 39,872,702 ALTERNATES Alternate#1: Building B:Courts Building Addition 640.793 ACCEPTED Alternate#2: Building L:Display Building - NOT SELECTED Alternate#3A: Generators from Caterpillar Tractor Company - NOT SELECTED Alternate 43B: Generators from Cummins Power Generation/Onan Corp. - ACCEPTED IN PHASE 1B Alternate#3C:lGenerators from Atlantic Detroit Diesel Allison Division - NOT SELECTED Alternate#3D:lGenerators from Kohler Company - NOT SELECTED 8 EXHIBIT'A' SECTION DESCRIPTION PHASE 2&3 REMARKS LABOR MATERIAL SUB-BIOS TOTAL Alternate#3E: Generators from Stewart&Stevenson - NOT SELECTED Alternate#3F: Generators from Generac Power Systems - NOT SELECTED Alternate#3G: Generators from Waukesha-Pearce Industries - NOT SELECTED Alternate#3H: Generators from Taylor Power - NOT SELECTED Alternate#4A: Provide Air Cooled Split System AC Units from Carrier Corporation. - NOT SELECTED Alternate#4B: Provide Air Cooled Split System AC Units from Trane Corporation. - NOT SELECTED Alternate 94C:jProvide Air Cooled Split System AC Units from York. - NOT SELECTED Alternate#4D: Provide Air Cooled Split System AC Units from Dalkin. 304.984 ACCEPTED Alternate#5A: Provide VRV DX systems from DENT AC. 581,628 ACCEPTED Alternate 458: Provide VRV DX systems from Mitsubishi. - NOT SELECTED Alternate#SC: Provide VRV DX systems from LG. - NOT SELECTED Alternate#50: Provide VRV DX systems from Samsung. - NOT SELECTED Alternate#5E: Provide VRV DX systems from York. - NOT SELECTED Alternate#5F: Provide VRV DX systems from Hitachi. - NOT SELECTED Alternate#6A: Provide DDC Systems by Automated Logic. 430,751 ACCEPTED Alternate#6B:jProvide DDC Systems by Unify. - NOT SELECTED Alternate#6C: Provide DDC Systems by Johnson Controls. - NOT SELECTED Alternate 17: Provide work depicted in Civil Drawings C49-052 and CE-01-CE07. - NOT SELECTED GMP PHASE 2&3:BASE BID+ACCEPTED ALTERNATES+ COST SAVING ITEMS 41,830,859 9 EXHIBIT 'B' D U ROTEC H BUILDERS OF INTEGRITY Baytown Public Safety — Phases 2 & 3 Public Safety Building PROJECT MANUAL TABLE OF CONTENTS Baytown Public Safety—Phase II & III —Public Safety Building BVG4 PROJECT 20004: SPECIFICATIONS—ISSUED FOR BID AND PERMIT October 15,2021 DIVISION 00: PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 00 TABLE OF CONTENTS 00 01 03 PROJECT DIRECTORY 00 11 00 NOTICE FOR SUBCONTRACTOR PROPOSALS 0021 00 INSTRUCTIONS TO SUBCONTRACTOR—VENDOR PROPOSERS 00 21 11 SAMPLE CERTIFICATE OF INSURANCE 0031 00 AVAILABLE INFORMATION SOILS MANAGEMENT PLAN GEOTECHNICAL REPORT ENVELOPE COMPLIANCE CERTIFICATE 00 42 00 SUB PROPOSAL FORM 00 73 43 PREVAILING WAGE RATES 00 90 01 ADDENDUM 01 00 90 02 ADDENDUM 02 00 90 03 ADDENDUM 03 00 90 04 ADDENDUM 04 (Added in Addendum 4) DIVISION 01: GENERAL REQUIREMENTS 01100 Summary of Work(City of Baytown) 01140 Contractor's Use of Premises (City of Baytown) 01200 Measurement and Payment Procedures (City of Baytown) 01290 Change Order Procedures (City of Baytown) 01310 Coordination and Meetings (City of Baytown) 01350 Submittals(City of Baytown) 01380 Construction Photographs (City of Baytown) 01420 Referenced Standards (City of Baytown) 01430 Contractor's Quality Control (City of Baytown) 01440 Observation Services (City of Baytown) 01450 Testing Laboratory Services(City of Baytown) 01500 Temporary Facilities and Controls (City of Baytown) 01505 Mobilization (City of Baytown) 01550 Stabilized Construction Exits (City of Baytown) 01554 Street Signs (City of Baytown) 01555 Traffic Control and Regulation (City of Baytown) 01560 Filter Fabric Fence (City of Baytown) 01561 Reinforced Filter Fabric Barrier(City of Baytown) 01562 Waste Material Disposal (City of Baytown) 01563 Tree and Plant Protection (City of Baytown) 01564 Control of Ground Water and Surface Water(City of Baytown) 01565 TPDES Requirements (City of Baytown) 01566 Source Controls for Erosion and Sedimentation (City of Baytown) 01570 Trench Safety System (City of Baytown) 01580 Project Identification Signs (City of Baytown) 10 EXHIBIT 'B' DUROTECH BUILDERS OF INTEGRITY Baytown Public Safety — Phases 2 & 3 Public Safety Building PROJECT MANUAL 01600 Materials and Equipment(City of Baytown) 01630 Product Options and Substitutions (City of Baytown) 01720 Field Surveying (City of Baytown) 01750 Starting Systems (City of Baytown) 01760 Project Record Documents (City of Baytown) 01770 Contract Closeout(City of Baytown) 01 21 00 ALLOWANCES (Added in Addendum 4) 01 2200 UNIT PRICES 01 2300 ALTERNATES 01 2500 SUBSTITUTION PROCEDURES 01 45 00 WINDSTORM CONSTRUCTION REQUIREMENTS (Datum Engineers) 01 45 29 TESTING LABORATORY SERVICES (Datum Engineers) 01 91 13 GENERAL COMMISSIONING REQUIEMENTS 01 91 14 FUNCTIONAL TESTING REQUIREMENTS 01 91 15 BUILDING ENCLOSURE COMMISSIONING DIVISION 02: SITE WORK/EXISTING CONDITIONS 02200 Site Preparation (City of Baytown) 02220 Site Demolition (City of Baytown) 02252 Cement Stabilized Sand (City of Baytown) 02255 Bedding, Backfill, and Embankment Materials (City of Baytown) 02315 Excavation and Backfill for Detention Ponds (City of Baytown) 02316 Excavation and Backfill for Roadways (City of Baytown) 02317 Excavation and Backfill for Structures (City of Baytown) 02318 Excavation and Backfill for Utilities (City of Baytown) 02330 Embankment(City of Baytown) 02335 Subgrade (City of Baytown) 02370 Geotextile (City of Baytown) 02415 Augering Pipe or Casing for Sewers (City of Baytown) 02417 Augering Pipe or Casing for Water Lines (City of Baytown) 02430 Tunnel Grout(City of Baytown) 02510 Water Mains(City of Baytown) 02511 Water Meters (City of Baytown) 02512 Polyethylene Wrap (City of Baytown) 02513 Steel Pipe and Fittings for Large Diameter Water Lines (City of Baytown) 02514 Fire Hydrant Assembly(City of Baytown) 02515 Water Tap and Service Line Installation (City of Baytown) 02520 Valve Boxes, Meter Boxes, and Meter Vaults (City of Baytown) 02530 Gravity Sanitary Sewers (City of Baytown) 02531 Sanitary Sewer Service Leads or Reconnections (City of Baytown) 02532 High Density Polyethylene (HOPE) Solid Wall Pipe (City of Baytown) 02532W High Density Polyethylene (HOPE) Solid Wall Pipe for Water(City of Baytown) 02533 Sanitary Sewage Force Mains (City of Baytown) 02534 PVC Pipe (City of Baytown) 02540 Tapping Sleeves and Valves (City of Baytown) 02541 Water and Wastewater Line Valves (City of Baytown) 02542 Concrete Manholes and Accessories (City of Baytown) 02582 Thermoplastic Pavement Markings (City of Baytown) 11 EXHIBIT'B' D 'U' ROTECH BUILDERS OF INTEGRITY Baytown Public Safety — Phases 2 & 3 Public Safety Building PROJECT MANUAL 02603 Frames, Grates, Rings, and Covers(City of Baytown) 02624 Structural Plate Culvert Structures (City of Baytown) 02628 Jacking Pipe or Box (City of Baytown) 02629 Safety End Treatments (City of Baytown) 02630 Storm Sewers(City of Baytown) 02631 Precast Inlets, Headwalls, and Wingwalls (City of Baytown) 02632 Cast-in-Place Inlets, Headwalls, and Wingwalls (City of Baytown) 02633 Adjusting Manholes, Inlets, and Valve Boxes (City of Baytown) 02634 Ductile Iron Pipe and Fittings(City of Baytown) 02635 Steel Pipe and Fittings(City of Baytown) 02636 Polyurethane Coating on Steel or Ductile Iron Pipe (City of Baytown) 02710 Base Course for Pavement(City of Baytown) 02741 Asphaltic Concrete Pavement(City of Baytown) 02742 Prime Coat(City of Baytown) 02743 Tack Coat(City of Baytown) 02744 Single Course Surface Treatment(City of Baytown) 02751 Concrete Pavement(City of Baytown) 02762 Temporary and Removable Reflectorized Pavement Marking (City of Baytown) 02770 Curb, Curb &Gutter, and Headers(City of Baytown) 02771 Concrete Sidewalks (City of Baytown) 02775 Concrete Driveways(City of Baytown) 02811 Landscape Irrigation (City of Baytown) 02821 Chain Link Fences and Gates (City of Baytown) 02910 Topsoil (City of Baytown) 02921 Hydromulch Seeding (City of Baytown) 02922 Sodding (City of Baytown) 02931 Landscape and Tree Planting (City of Baytown) 02980 Pavement Repair and Resurfacing (City of Baytown) 02981 Blast Cleaning of Pavement(City of Baytown) 02985 Fiber Optics(City of Baytown) Fiber Optics Attachment A 02 41 00 DEMOLITION 0241 19 SELECTIVE DEMOLITION DIVISION 03: CONCRETE 03100 FORMWORK 03300 CAST IN PLACE CONCRETE (City of Baytown) 03310 STRUCTURAL CONCRETE(City of Baytown) 03600 STRUCTURAL GROUT(City of Baytown) 03 10 00 CONCRETE FORMING AND ACCESSORIES (Datum Engineers) 03 20 00 CONCRETE REINFORCING (Datum Engineers) 03 30 00 CAST-IN-PLACE CONCRETE (Datum Engineers) 03 35 11 CONCRETE FLOOR FINISHES 03 47 13 TILT-UP CONCRETE 03 54 00 CAST UNDERLAYMENT DIVISION 04: MASONRY 12 EXHIBIT `B' DUROTECH BUILDERS OF INTEGRITY Baytown Public Safety — Phases 2 & 3 Public Safety Building PROJECT MANUAL 04 20 00 UNIT MASONRY DIVISION 05: METALS 05 12 00 STRUCTURAL STEEL FRAMING (Datum Engineers) 0531 13 STEEL FLOOR DECKING AND SHEAR STUDS (Datum Engineers) 05 31 23 STEEL ROOF DECKING (Datum Engineers) 05 40 00 COLD FORMED METAL FRAMING 05 50 00 METAL FABRICATIONS 05 51 00 METAL STAIRS 05 52 13 PIPE AND TUBE RAILINGS 05 73 00 DECORATIVE METAL RAILINGS 05 75 10 PERFORATED METAL PANELS 05 75 13 ORNAMENTAL METAL DIVISION 06: WOOD, PLASTICS,AND COMPOSITES 06 10 00 ROUGH CARPENTRY 06 41 00 ARCHITECTURAL WOOD CASEWORK 06 83 16 FIBERGLASS REINFORCED PANELING DIVISION 07: THERMAL AND MOISTURE PROTECTION 07 18 00 TRAFFIC COATINGS 07 19 00 WATER REPELLANTS 0721 00 THERMAL INSULATION 07 25 00 WEATHER BARRIERS 07 42 13 METAL WALL PANELS 07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING 07 62 00 SHEET METAL FLASHING AND TRIM 0771 00 ROOF SPECIALTIES 07 72 00 ROOF ACESSORIES 0781 00 APPLIED FIRE PROTECTION 07 84 00 FIRESTOPPING 07 92 00 JOINT SEALANTS 07 95 13 EXPANSION JOINT COVER ASSEMBLIES DIVISION 08: OPENINGS 08 11 13 HOLLOW METAL DOORS AND FRAMES 08 14 16 FLUSH WOOD DOORS 08 31 00 ACCESS DOORS AND PANELS 08 33 23 OVERHEAD COILING DOORS 08 42 29 AUTOMATIC ENTRANCES 08 43 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 08 44 13 GLAZED ALUMINUM CURTAIN WALLS 08 56 53 SECURITY WINDOWS 08 62 23 TUBULAR DAYLIGHTING DEVICES 08 71 00 DOOR HARDWARE 08 80 00 GLAZING 08 83 00 MIRRORS 13 EXHIBIT 'B' DUROTECH BUILDERS OF INTEGRITY Baytown Public Safety — Phases 2 & 3 Public Safety Building PROJECT MANUAL 08 91 00 LOUVERS DIVISION 09: FINISHES 09 21 16 GYPSUM BOARD ASSEMBLIES 09 22 36 LATH 09 24 00 PORTLAND CEMENT PLASTERING 09 30 00 TILING 0951 00 ACOUSTICAL CEILINGS 09 65 00 RESILIENT FLOORING 09 65 66 RESILIENT ATHLETIC FLOORING 09 66 19 PRECAST TERRAZZO 09 66 23 RESINOUS MATRIX TERRAZZO FLOORING 09 67 00 FLUID-APPLIED FLOORING 09 68 13 TILE CARPETING 09 69 00 ACCESS FLOORING 09 72 00 WALL COVERING 09 77 00 SPECIAL WALL SURFACING 09 84 13 ACOUSTICAL WALL PANELS (Added in Addendum 4) 09 91 13 EXTERIOR PAINTING 09 91 23 INTERIOR PAINTING 09 93 33 SILICATE MINERAL STAINS DIVISION 10: SPECIALTIES 101400 SIGNAGE 101426 POST AND PYLON SIGNAGE 10 21 13.17 PHENOLIC-CORE TOILET PARTITIONS 10 22 39 FOLDING PANEL PARTITIONS 10 26 00 WALL AND DOOR PROTECTION 10 28 00 TOILET, BATH AND LAUNDRY ACCESSORIES 10 44 00 FIRE PROTECTION SPECIALTIES 10 51 13 METAL LOCKERS 10 73 00 PROTECTIVE COVERS 10 75 29 PLAZA-MOUNTED FLAGPOLES (Added in Addendum 4) DIVISION 11: EQUIPMENT 11 1200 PARKING CONTROL EQUIPMENT 11 30 13 RESIDENTIAL APPLIANCES 11 52 15 AUDIO-VISUAL EQUIPMENT DIVISION 12: FURNISHINGS 122400 WINDOW SHADES 12 36 00 COUNTERTOPS 12 48 13 ENTRANCE FLOOR MATS AND FRAMES 12 93 13 BICYCLE RACKS DIVISION 13: SPECIAL CONSTRUCTION NOT USED 14 EXHIBITS' DUROTECH BUILDERS OF INTEGRITY Baytown Public Safety— Phases 2 & 3 Public Safety Building PROJECT MANUAL DIVISION 14: CONVEYING EQUIPMENT 1421 00 ELECTRIC TRACTION ELEVATORS End of Volume 1 Volume 2 DIVISION 20: MECHANICAL SYSTEMS Not Used DIVISION 21: FIRE SUPPRESSION 21 13 13 FIRE PROTECTION SYSTEMS (E &C Engineers) 21 31 13 FIRE PUMPS (E&C Engineers) DIVISION 22: PLUMBING 22 00 00 PLUMBING PIPING SYSTEMS (E&C Engineers) 22 05 29 SUPPORTS AND SLEEVES (E&C Engineers) 22 08 00 COMMISSIONING OF PLUMBING 22 10 00 PLUMBING PIPING VALVES AND ACCESSORIES (E&C Engineers) 221030 PLUMBING SPECIALTIES (E&C Engineers) 221123 DOMESTIC WATER PRESSURE BOOSTING SYSTEMS(VFD) (E&C Engineers) 22 15 00 PLUMBING PUMPS (E&C Engineers) 22 20 23 NATURAL GAS PIPING (E &C Engineers) 22 33 33 ELECTRIC DOMESTIC WATER HEATERS NATURAL GAS FIRED (E&C Engineers) 22 40 00 PLUMBING FIXTURES (E &C Engineers) 22 45 00 EMERGENCY SHOWER AND EYE WASH EQUIPMENT(E&C Engineers) DIVISION 23: HVAC SYSTEMS 23 00 00 BASIC MECHANICAL REQUIREMENTS (E &C Engineers) 23 05 13 MOTORS (E&C Engineers) 23 05 29 SLEEVES FLASHINGS SUPPORTS AND ANCHORS (E&C Engineers) 23 05 48 VIBRATION ISOLATION (E &C Engineers) 23 05 53 MECHANICAL IDENTIFICATION (E &C Engineers) 23 05 93 TESTING ADJUSTMENT AND BALANCING—(TAB FIRM)(E&C Engineers) 23 05 94 TESTING ADJUSTING AND BALANCING—(CONTRACTOR)(E&C Engineers) 23 07 13 DUCTWORK INSULATION (E&C Engineers) 23 07 19 PIPING INSULATION (E &C Engineers) 23 08 00 COMMISSIONING OF HVAC 23 08 01 COMMISSIONING OF BUILDING CONTROL SYSTEM 23 09 23 DIRECT DIGITAL CONTROL SYSTEMS (E&C Engineers) 23 09 93 SEQUENCE OF OPERATIONS (E &C Engineers) 23 29 23 VARIABLE FREQUENCY DRIVES (E &C Engineers) 2331 00 DUCTWORK(E &C Engineers) 23 33 00 DUCTWORK ACCESSORIES(E &C Engineers) 23 34 00 FANS(E&C Engineers) 23 37 00 AIR INLETS AND OUTLETS(E &C Engineers) 23 41 00 FILTERS(E &C Engineers) 15 EXHIBIT `B' DLI .)IROTECH BUILDERS OF INTEGRITY Baytown Public Safety — Phases 2 & 3 Public Safety Building PROJECT MANUAL 23 62 13 AIR-COOLED SPLIT-SYSTEM AIR CONDITIONING UNITS(E &C Engineers) 23 63 13 VARIABLE REFRIGERANT VOLUME DX SYSTEMS (E &C Engineers) 23 82 16 AIR COILS(E&C Engineers) DIVISION 26: ELECTRICAL 26 00 01 ELECTRICAL GENERAL PROVISIONS (E &C Engineers) 26 00 02 ELECTRICAL SCOPE OF WORK(E&C Engineers) 2601 25 ELECTRICAL TESTING (E&C Engineers) 26 05 01 ELECTRICAL BASIC MATERIALS AND METHODS (E &C Engineers) 26 05 19 LOW VOLTAGE CONDUCTORS AND CABLES (E &C Engineers) 26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS(E &C Engineers) 26 05 33 ELECTRICAL RACEWAYS (E&C Engineers) 26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS (E &C Engineers) 26 05 73 SHORT CIRCUIT ANALYSIS-COORDINATION STUDY(E &C Engineers) 26 08 00 COMMISSIONING OF ELECTRICAL SYSTEMS 26 09 16 ELECTRICAL CONTROLS AND RELAYS (E&C Engineers) 26 22 00 LOW VOLTAGE TRANSFORMERS(E &C Engineers) 26 23 13 PARALLEL LOW VOLTAGE SWITCHGEAR(E&C Engineers) 26 24 13 LOW VOLTAGE SWITCHBOARDS (E&C Engineers) 26 24 16 PANELBOARDS (E &C Engineers) 26 27 01 ELECTRICAL SERVICE ENTRANCE (E &C Engineers) 26 27 17 EQUIPMENT WIRING(E &C Engineers) 26 27 18 MISCELLANEOUS ELECTRICAL CONTOLS &CONTROL WIRING (E&C Engineers) 26 27 19 ELEVATOR EQUIOPMENT PROVISIONS(E&C Engineers) 26 27 21 VOICE-DATA SYSTEM PROVISIONS (E&C Engineers) 26 27 23 AUDIO-VISUAL SYSTEM PROVISIONS (E &C Engineers) 26 27 24 SECURITY SYSTEM PROVISIONS(E&C Engineers) 26 27 26 WIRING DEVICES(E&C Engineers) 26 28 13 LOW VOLTAGE FUSES (E&C Engineers) 26 28 17 ENCLOSED CIRCUIT BREAKERS (E &C Engineers) 26 28 18 ENCLOSED SWITCHES (E&C Engineers) 26 29 13 ENCLOSED MOTOR CONTROLLERS (E &C Engineers) 26 32 13 ENGINE GENERATORS (E &C Engineers) 26 36 23 AUTOMATIC TRANSFER SWITCHES (E &C Engineers) 2641 13 LIGHTNING PROTECTION FOR STRUCTURES (E&C Engineers) 26 43 13 THOR SYSTEMS MASTER SPD SPECIFICATIONS (E&C Engineers) 2651 00 INTERIOR LIGHTING (E &C Engineers) 26 56 00 EXTERIOR LIGHTING (E &C Engineers) DIVISION 27: COMMUNICATIONS 27 02 00 BASIC MATERIALS AND METHODS FOR COMMUNICATIONS SYSTEMS 27 05 26 GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS 27 05 28 PATHWAYS FOR COMMUNICATIONS SYSTEMS 27 05 43 UNDERGROUND DUCTS AND RACEWAYS FOR COMMUNICATIONS SYSTEMS 2711 00 COMMUNICATIONS ROOM FITTINGS 27 13 00 COMMUNICATIONS BACKBONE CABLING 27 15 00 COMMUNICATIONS HORIZONTAL CABLING 2741 16 INTEGRATED AUDIO-VIDEO SYSTEM AND EQUIPMENT 16 EXHIBIT 'B' DUROTECH BUILDERS OF INTEGRITY Baytown Public Safety — Phases 2 & 3 Public Safety Building PROJECT MANUAL 27 53 19 DISTRIBUTED ANTENNA SYSTEM (DAS) DIVISION 28: SECURITY SYSTEMS 28 02 00 BASIC MATERIALS AND METHODS FOR SAFETY AND SECURITY SYSTEMS 28 10 00 ACCESS CONTROL SYSTEM 28 20 00 VIDEO SURVEILLANCE SYSTEM 28 31 03 ADDRESSABLE FIRE ALARM SYSTEM (E &C Engineers) DIVISION 31: EARTHWORK 31 31 16 TERMTE CONTROL 31 63 29 DRILLED PIERS DIVISION 32: EXTERIOR IMPROVEMENTS 32 1400 UNIT PAVERS (Added in Addendum 4) 32 33 00 SITE FURNISHINGS DIVISION 33: UTILITIES (NOT USED) END OF SECTION 17 EXHIBIT 'C' DUROTECH BUILDERS OF INTEGRITY Baytown Public Safety— Phases 2 & 3 Public Safety Building LIST OF DRAWINGS Baytown Public Safety—Phase II & III—Public Safety Building BVG4 PROJECT 20004: ISSUE FOR BID AND PERMIT October 15, 2021 Section 00 01 15 LIST OF DRAWINGS General G-000 Cover G-001 Sheet List G-002 Symbols,Abbreviations, General Notes G-003 Accessibility Standards G-004 Partition Types G-100 Code Review&Exiting Plan G-101 Exiting Plan Civil C1 Plat(1 of 2) C2 Plat(2 of 2) C3 Topographic Survey(1 of 4) C4 Topographic Survey(2 of 4) C5 Topographic Survey(3 of 4) C6 Topographic Survey(4 of 4) C7 General Notes C8 Demolition Plan C9 Overall Sanitary Sewer Plan C10 Sanitary Sewer Plan (1 of 2) C11 Sanitary Sewer Plan (2 of 2) C12 Overall Water Distribution Plan C13 Water Distribution Plan(1 of 2) C14 Water Distribution Plan (2 of 2) C15 Overall Storm Sewer Plan C16 Storm Sewer Plan (1 of 2) C17 Storm Sewer Plan (2 of 2) C18 Storm Sewer Inset C19 Overall Dimension Control and Paving Plan C20 Dimension Control and Paving Plan (1 of 2) C21 Dimension Control and Paving Plan (2of 2) C22 Overall Grading Plan C23 Grading Plan (1 of 2) C24 Grading Plan (2 of 2) C25 Existing Drainage Area Map C26 Proposed Drainage Area Map C27 Storm Sewer Calculations C28 Plan and Profile (1 of 8) C29 Plan and Profile (2 of 8) C30 Plan and Profile (3 of 8) C31 Plan and Profile(4 of 8) 18 EXHIBIT 'C' Dl%.JIROTECH BUILDERS OF INTEGRITY Baytown Public Safety— Phases 2 & 3 Public Safety Building LIST OF DRAWINGS C32 Plan and Profile(5 of 8) C33 Plan and Profile(6 of 8) C34 Plan and Profile(7 of 8) C35 Plan and Profile(8 of 8) C36 Stormwater Pollution Plan C37 Stormwater Pollution Details C38 Traffic Control Plan C39 Project Specific Details(1 of 2) C40 Project Specific Details(2 of 2) C41 City of Baytown Standard Details(1 of 6) C42 City of Baytown Standard Details(2 of 6) C43 City of Baytown Standard Details(3 of 6) C44 City of Baytown Standard Details(4 of 6) C45 City of Baytown Standard Details(5 of 6) C46 City of Baytown Standard Details(6 of 6) Landscape L1 Overall Landscape Plan L2 Landscape Plan (1 of 4) L3 Landscape Plan(2 of 4) L4 Landscape Plan(3 of 4) L5 Landscape Plan(4 of 4) L6 Amenity Landscape Plan L7 Landscape Schedule and Requirements L8 Landscape Details L9 Landscape Specifications L10 Monument Sign Detail Irrigation IR1 Overall Irrigation Plan IR2 Irrigation Plan(1 of 4) IR3 Irrigation Plan(2 of 4) IR4 Irrigation Plan (3 of 4) IR5 Irrigation Plan (4 of 4) IR6 Irrigation Details IR7 Irrigation Specifications Structural S-001 Typical Abbreviations, Symbols and Plan Notes S-002 General Notes S-003 General Notes S-004 Special Inspections Table S-101 First Floor Plan—Overall—Building M S-102 Second Floor Plan—Overall—Building M S-103 Third Floor Plan—Overall—Building M S-104 Roof Plan—Overall—Building M S-110 First Floor Framing Plan—West—Building M S-111 First Floor Framing Plan—East—Building M 19 EXHIBIT 'C' k.-"%TECH D R BUILDERS OF INTEGRITY Baytown Public Safety— Phases 2 & 3 Public Safety Building LIST OF DRAWINGS S-112 First Floor Framing Plan—South—Building M S-113 Exterior Structure Plans, Sections and Details S-120 Second Floor Framing Plan—West—Building M S-121 Second Floor Framing Plan—East—Building M S-122 Second Floor Framing Plan—South—Building M S-130 Third Floor Framing Plan—West—Building M S-131 Third Floor Framing Plan—East—Building M S-132 Third Floor Framing Plan—South—Building M S-140 Roof Framing Plan—West—Building M S-141 Roof Framing Plan—East—Building M S-150 Miscellaneous Framing S-151 Miscellaneous Framing S-152 Miscellaneous Framing S-301 Expansive Clay Soil Details S-302 Typical Footing Schedule and Details S-303 Typical Foundation Details S-304 Typical Foundation Details S-305 Typical Slab On Grade Details S-310 Foundation Sections and Details S-401 Simple Beam Connection Details S-402 Composite Steel Beam Details S-403 Typical Steel Details S-404 Steel Column Details S-405 Pipe Column Details and Moment Connections S-410 Steel Sections and Details S-411 Steel Sections and Details S-501 Typical Masonry Details S-601 Tilt Wall Panel Elevations S-602 Tilt Wall Panel Elevations S-603 Tilt Wall Panel Elevations S-604 Typical Tilt Wall Panel Details S-605 Tilt Wall Panel Details S-701 Wind Brace Elevations S-702 Wind Brace Sections and Details S1-001 General Notes S1-110 Floor Framing Plans S1-301 Foundation Sections and Details S1-401 Steel Sections and Details S2-001 General Notes S2-110 Floor Framing Plans S2-301 Foundation Sections and Details S2-401 Steel Sections and Details 20 EXHIBIT `C' DUROTECH BUILDERS OF INTEGRITY Baytown Public Safety — Phases 2 & 3 Public Safety Building LIST OF DRAWINGS Architectural A-001 Site Plan—Phase 2—Demolition A-002 Site Plan—Phase 2—Overall A-003 Site Plan—Phase 3—Demolition A-004 Site Plan—Phase 3—Overall A-011 Site Plan—Phase 2—Enlarged A-012 Site Plan—Phase 3—Enlarged A-013 Site Details A-101 Floor Plan—Building M—First Floor Overall A-102 Floor Plan—Building M—Second Floor Overall A-103 Floor Plan—Building M—Third Floor Overall A-104 Roof Plan—Building M A-110 Floor Plan—Building M—First Floor—West Three Story A-111 Floor Plan—Building M—First Floor—East Three Story A-112 Floor Plan—Building M—First Floor—South One Story A-120 Floor Plan—Building M—Second Floor—West Three Story A-121 Floor Plan—Building M—Second Floor—East Three Story A-130 Floor Plan—Building M—Third Floor—West Three Story A-131 Floor Plan—Building M—Third Floor—East Three Story A-161 Reflected Ceiling Plan—Building M—First Floor A-162 Reflected Ceiling Plan—Building M—Second Floor A-163 Reflected Ceiling Plan—Building M—Third Floor A-221 Exterior Elevations Building M A-222 Exterior Elevations Building M A-223 Exterior Elevations Building M A-224 Exterior Elevations Building M A-301 Building Sections—Building M A-302 Building Sections—Building M A-351 Wall Sections—Building M A-352 Wall Sections—Building M A-353 Wall Sections—Building M A-354 Wall Sections—Building M A-401 Lobby Stair& Details A-402 Stair 1 &2 A-403 Stair 3—Stair Details A-404 Elevators A-501 Window Elevations- Exterior A-502 Window Elevations- Exterior A-503 Window Elevations-Interior A-601 Door Schedule A-602 Door Details Interior Design ID-002 Room Finish Schedule—First Floor—Bldg M ID-003 Room Finish Schedule—Second &Third Floor—Bldg M ID-101 Overall Finish Plan—Ground Floor-Bldg M ID-102 Overall Finish Plan—Second Floor-Bldg M ID-103 Overall Finish Plan—Third Floor-Bldg M 21 EXHIBIT`C' DUROTECH BUILDERS OF INTEGRITY Baytown Public Safety— Phases 2 & 3 Public Safety Building LIST OF DRAWINGS ID-111 Finish Plan—Bldg M—First Floor—West ID-112 Finish Plan—Bldg M—First Floor—East ID-113 Finish Plan—Bldg M—First Floor—South ID-120 Finish Plan—Bldg M—Second Floor—West ID-121 Finish Plan—Bldg M—Second Floor—East ID-130 Finish Plan—Bldg M—Third Floor—West ID-131 Finish Plan—Bldg M—Third Floor—East ID-161 Furniture Plan—Bldg M—First Floor ID-162 Furniture Plan—Bldg M—Second Floor ID-163 Furniture Plan—Bldg M—Third Floor ID-201 Interior Elevations—Bldg M ID-202 Interior Elevations—Bldg M ID-203 Interior Elevations—Bldg M ID-204 Interior Elevations—Bldg M ID-205 Interior Elevations—Bldg M ID-206 Interior Elevations—Bldg M ID-207 Interior Elevations—Bldg M ID-208 Interior Elevations—Bldg M ID-209 Interior Elevations—Bldg M ID-210 Interior Elevations—Bldg M ID-211 Interior Elevations—Bldg M ID-212 Interior Elevations—Bldg M ID-301 Millwork Details Al-101 Floor Plan, Roof Plan, Ext Elevations—Bldg L Al-102 Doors &Windows—Bldg L A2-101 Floor Plan—Bldg B—Courts Building A2-200 Exterior Elevations—Bldg B A2-201 Building Sections—Bldg B A2-601 Door Schedule&Details &Millwork ID2-101 Finish Plans&Interior Elevations-Bldg B Mechanical M-000 Mechanical Abbreviations and Symbols M-201 A Mechanical Floor Plan Level 1 —Area A and B M-201 C Mechanical Floor Plan Level 1 —Area C M-201 D Mechanical Floor Plan Level 1 —Area D M-202A Mechanical Floor Plan Level 2—Area A and B M-202C Mechanical Floor Plan Level 2—Area C M-203A Mechanical Floor Plan Level 3—Area A and B M-204A Mechanical Roof Plan—Area A and B M-204C Mechanical Roof Plan—Area C and D M-301A Mechanical Piping Plan Level 1 —Area A and B M-301 C Mechanical Piping Plan Level 1 —Area C M-301 D Mechanical Piping Plan Level 1 —Area D M-302A Mechanical Piping Plan Level 2—Area A and B M-302C Mechanical Piping Plan Level 2—Area C 22 EXHIBIT`C' DUROTECH BUILDERS OF INTEGRITY Baytown Public Safety— Phases 2 & 3 Public Safety Building LIST OF DRAWINGS M-303A Mechanical Piping Plan Level 3—Area A and B M-501 Mechanical Details M-502 Mechanical Details M-601 Mechanical Riser M-602 Mechanical Riser M-603 Mechanical Riser M-701 Mechanical Controls Diagrams M-801 Mechanical Schedules M-802 Mechanical Schedules M-803 Mechanical Schedules M-900 Mechanical Energy Information M1-211 Mechanical Floor Plan Level 1 —Courthouse M1-221 Mechanical Floor Plan Level 1 —Display Pavilion M1-311 Mechanical Piping Plan Level 1 —Courthouse M1-321 Mechanical Piping Plan Level 1 —Display Pavilion Electrical E-000 Electrical Symbols and Abbreviations E-020 Electrical Site Plan E-201 A Electrical Lighting Plan Level 1 —Area A and B E-201 C Electrical Lighting Plan Level 1 —Area C E-201 D Electrical Lighting Plan Level 1 —Area D E-202A Electrical Lighting Plan Level 2—Area A and B E-202C Electrical Lighting Plan Level 2—Area C E-202D Electrical Lighting Plan Level 2—Area D E-203A Electrical Lighting Plan Level 3—Area A and B E-301A Electrical Power Plan Level 1 —Area A and B E-301 C Electrical Power Plan Level 1 —Area C E-301 D Electrical Power Plan Level 1 —Area D E-302A Electrical Power Plan Level 2—Area A and B E-302C Electrical Power Plan Level 2—Area C and D E-303A Electrical Power Plan Level 3—Area A and B E-401A Electrical Power Mechanical Plan—Area A and B E-401 C Electrical Power Mechanical Plan—Area C and D E-402A Electrical Power Mechanical Plan—Area A and B E-402C Electrical Power Mechanical Plan—Area C E-403A Electrical Power Mechanical Plan—Area A and B E-404A Electrical Power Mechanical Plan—Area A and B E-404C Electrical Power Mechanical Plan—Area C and D E-501A Electrical Fire Alarm Plan Level 1 —Area A and B E-501 C Electrical Fire Alarm Plan Level 1 —Area C E-501 D Electrical Fire Alarm Plan Level 1 —Area D E-502A Electrical Fire Alarm Plan Level 2—Area A and B E-502C Electrical Fire Alarm Plan Level 2—Area C E-502D Electrical Fire Alarm Plan Level 2—Area D E-503A Electrical Fire Alarm Plan Level 3—Area A and B E-601 Electrical Enlarged Plans 23 EXHIBIT 'C' D 'U' ROTECH BUILDERS OF INTEGRITY Baytown Public Safety — Phases 2 & 3 Public Safety Building LIST OF DRAWINGS E-701 Electrical Details E-801 Electrical Riser Diagrams E-802 Electrical One-Line E-803 Electrical Grounding Riser E-901 Electrical Schedules E-902 Electrical Schedules E-903 Electrical Schedules E-904 Electrical Schedules E-905 Electrical Schedules E-906 Electrical Schedules E-907 Electrical Schedules E1-211 Electrical Lighting Plan—Building B—Courts E1-311 Electrical Power Plan—Building B—Courts E1-511 Electrical Fire Alarm Plan—Building B—Courts E2-221 Electrical Lighting Plan—Building L—Display Pavilion E2-321 Electrical Power Plan—Building L—Display Pavilion E2-521 Electrical Fire Alarm Plan—Building L—Display Pavilion Plumbing P-000 Plumbing Abbreviations and Symbols P-010 Plumbing Overall Site Plan P-011 Plumbing Site Plan P-200A Plumbing Underfloor Floor Plan Level 1 —Area A P-200B Plumbing Underfloor Floor Plan Level 1 —Area B P-200C Plumbing Underfloor Floor Plan Level 1 —Area C P-200D Plumbing Underfloor Floor Plan Level 1 —Area D P-201 A Plumbing Floor Plan Level 1 —Area A P-201 B Plumbing Floor Plan Level 1 —Area B P-201 C Plumbing Floor Plan Level 1 —Area C P-201 D Plumbing Floor Plan Level 1 —Area D P-202A Plumbing Floor Plan Level 2—Area A P-202B Plumbing Floor Plan Level 2—Area B P-202C Plumbing Floor Plan Level 2—Area C P-203A Plumbing Floor Plan Level 3—Area A and B P-204 Plumbing Overall Roof Plan—Area A, B, C and D P-401 Plumbing Enlarged Plans P-501 Plumbing Riser/ Isometrics P-601 Plumbing Details P-701 Plumbing Schedules P1-211 Plumbing Plan Level 1 —Courthouse Technology T-001 Low Voltage Symbol Legend T-101 Technology Site Plan T-111 Composite Level 1 Technology Routing Plan T-112 Composite Level 2 Technology Routing Plan 24 EXHIBIT'C' D 'UROTECH BUILDERS OF INTEGRITY Baytown Public Safety — Phases 2 & 3 Public Safety Building LIST OF DRAWINGS T-113 Composite Level 3 Technology Routing Plan T-114 Security Composite Plan T-210 Technology Plan—Bldg M—Ground Floor—Northwest T-211 Technology Plan—Bldg M—Ground Floor—Northeast T-212 Technology Plan—Bldg M—Ground Floor—South T-220 Technology Plan—Bldg M—Second Floor—Northwest T-221 Technology Plan—Bldg M—Second Floor—Northeast T-230 Technology Plan—Bldg M—Third Floor—Northwest T-231 Technology Plan—Bldg M—Third Floor—Northeast T-301 Technology Enlarged Plans T-302 Technology Enlarged Plans T-303 Rack Elevations T-304 Rack Elevations T-601 Technology Details T-602 Technology Details T-603 Security Details T-604 Security Door Details T-605 Security Door Details T-606 Security Gate Details T-607 Fiber Riser Diagram T1-201 Technology Plan—Bldg L T2-201 Technology Plan—Bldg B—Courts Building END OF SECTION 25 EXHIBIT 'D' DUROTECH BUILDERS OF INTEGRITY Baytown Public Safety — Phases 2 & 3 Public Safety Building LIST OF ADDENDA 1. Addendum No. 1 Issued on October 22, 2021 2. Addendum No. 2 Issued on November 5, 2021 3. Addendum No. 3 Issued on November 12, 2021 4. Addendum No. 4 Issued on November 16, 2021 5. Addendum No. 5 Issued on November 22, 2021 26 EXHIBIT 'E' E 0 T nEm'�o C H BUILDERS OF INTEGRITY Baytown Public Safety — Phases 2 & 3 Public Safety Building QUALIFICATIONS &ASSUMPTIONS DIVISION 00— PROCUREMENT AND CONTRACTING REQUIREMENTS 1. Excluded is Material Testing. 2. Excluded are Utility Assessment, Inspection Fees, Impact Fees, and Tap Fees. 3. Utility Company agreements (terms and conditions), easements and coordination which will serve as the termination point for Durotech to make connections for building service shall be the responsibility of the Owner and Design Team (Architect/MEP Engineer). Durotech will assist the Owner and Design Team in coordinating the activities with the Utility Company(s). 4. All required utility providers (water, sewer, storm discharge point, electric, gas, fiber, phone lines)are the responsibility of the owner to coordinate and execute necessary agreements so that the utilities are installed per the contractor's schedule for construction usage and systems startup. 5. We assume that there will be adequate water supply with sufficient pressure available for the proper functioning of Fire Sprinkler system and other systems. 6. Excluded are any Building Permit fees. Permit Fee costs to be by Owner. 7. Without regard to any other provision of this Agreement, Owner shall be liable to Contractor for additional costs incurred by Contractor as the result of any applicable state or local sales, excise, or use tax, governmental payroll tax or healthcare tax if the tax is applicable to the Project, the Project is not tax exempt from the specific tax and the tax became effective after the date of execution of the Contract. 8. Electronic Files and CAD Files will be provided by the Architect/Engineer of record for the purpose of preparing shop drawings and 3D models at no cost to the General Contractor and/or Subcontractors. A signed release will be submitted to the Architect/Engineer before electronic files are released by the Architect/Engineer. 9. Excluded are unforeseen underground conditions or obstructions not indicated in contract documents. 10. Owner and Contractor agree that all manufacturer's warranties, and subcontractor's warranties which extend beyond Contractor's warranty 27 EXHIBIT 'E' Dnu' ROTECH BUILDERS OF INTEGRITY Baytown Public Safety— Phases 2 & 3 Public Safety Building QUALIFICATIONS &ASSUMPTIONS period, are hereby assigned to and run directly from the manufacturer to the Owner and from the subcontractor to the Owner, respectively. Owner accepts these assignments and warranties, and releases and discharges Contractor from any and all claims, liabilities, damages, costs and expenses arising out of such manufacturer's warranties and any subcontractor's extended warranties. 11. The Contractor's warranty excludes remedy for damage or defect caused by abuse, material alteration to the work not executed by the Contractor, insufficient maintenance, or maintenance not in compliance with manufacturer's written recommendations. 12. Payment and Performance Bonds will be charged to the Owner based on the State of Texas regulated rate. 13. The Guaranteed Maximum Price provided is a not to exceed amount for the Cumulative Baytown Public Safety project. Phase 1 A $4,905,614 Phase 1 B & Phase 2 Generators $13,594,937 Phase 2 & 3 $41,830,859 Total Phase 1 A, 1 B, 2 & 3 GMP $60,331,410 Individual line items within the project budget and earlier or later phase packages are not individual Guaranteed Maximum Price amounts. 14. The GMP package is valid until January 28, 2022. The Owner will issue a Notice to Proceed and sign the GMP Amendment on or before the stated date. 15. Bids were solicited as a combination package for Phases 1 B, 2, and 3 to maximize overall cost savings. Therefore, the Guaranteed Maximum Price for Phase 2 & 3 is contingent upon the approval of the Guaranteed Maximum Price for Phases 2 and 3 to be submitted and approved at the January 27th 2022 City Council meeting. 16. Durotech, Inc reserves the right to review the Issued for Construction documents to confirm that changes to the Contract Documents referenced in this proposal are consistent with the changes proposed during the Cost Savings process. 28 EXHIBIT 'E' D 'U' ROTECH BUILDERS OF INTEGRITY Baytown Public Safety — Phases 2 & 3 Public Safety Building QUALIFICATIONS &ASSUMPTIONS 17. The proposed cost saving recommendations by Durotech, Inc. shall be subject to the review and approval of the Architect, Owner, and the Owner's Professional Consultants. Durotech, Inc. is not required to ascertain that the cost savings are in accordance with applicable laws, statutes, ordinances, codes, rules and regulations, or lawful orders of public authorities. The Contractors review of the proposed cost savings is in the capacity as a Construction Manager and not as a Design Professional. 18. For any delays caused by events outside of Contractor's control, including but not limited to Acts of God, pandemics, epidemics, acts of governmental authorities, acts of civil authorities, acts of war or terrorism, unanticipated material shortages and price escalations, labor disputes and utilities delays, Owner shall grant additional time extensions and price increases to Contractor when properly documented, substantiated and approved by Owner, subject to Contractor's right to dispute Owner's decision under the claims procedures of the Contract 19. Stipulated Billing Rates: No. Description Rate 1 General Contract amount per Liability/Umbrella thousand x $7.75 Insurance 2 Builder's Risk Contract Insurance amount/hundred x 0.05412 x # of months 3 Project $115.00 per hour Executive 4 Project Manager $76.00 per hour 5 Estimator $55.00 per hour 6 Safety/Field $101.00 per hour Operation Manager 7 Lead $79.00 per hour Superintendent 8 Assistant $48.00 per hour Superintendent 9 Project Engineer $41.00 per hour 29 EXHIBIT'E' DUROTECH BUILDERS OF INTEGRITY Baytown Public Safety— Phases 2 & 3 Public Safety Building QUALIFICATIONS &ASSUMPTIONS 10 Quality Control $69.00 per hour Inspector 11 Contract $33.00 per hour Administrator 12 Preconstruction $97.00 per hour Manager 13 Quality Control $69.00 per hour Manager 14 BIM Coordinator $55.00 per hour 15 IT Coordinator $95.00 per hour 16 Intern $25.00 per hour 17 Labor Burden 42.5% Labor Rates: Per Hour Semi-skilled Labor $27.00 Skilled Labor $30.00 Foreman/Operator $38.00 20. Billable rates will be subject to audit for hours worked only. DIVISION 01 — GENERAL REQUIREMENTS 21. Section 01140 — Contractor's Use of Premises: Excluded is paragraph 1.5.A. 22. Section 01564 — Control of Ground Water and Surface Water: Excluded is any ground water control systems, well-point systems, eductor and ejector- type systems, deep wells, and piezometers or monitoring wells. 23. Section 01 21 00 —Allowances: Excluded are the following: Para 1.05.13 — Entire paragraph Para 1.06.13 — Last sentence "These costs include delivery, installation, insurance, equipment rental, and similar costs'. 24. Section 01 21 00 —Allowances: a] The Construction Contingency Allowance will be used jointly for the Owner's and Construction Manager's purposes. b] Excluded are Allowance No. 7 thru No. 11 as shown in paragraph 3.03. 30 EXHIBIT'E' Dru4 ' ROTECH BUILDERS OF INTEGRITY Baytown Public Safety — Phases 2 & 3 Public Safety Building QUALIFICATIONS &ASSUMPTIONS DIVISION 02— SITEWORK/EXISTING CONDITIONS 25. Section 00 31 00 —Available Project Information: a] Soil Management Plan & Underground Storage Tank Removal Plan — Excluded is any geophysical survey for locating the existing underground storage tanks (UST). The location of the existing underground storage tanks (UST)will be provided by the Owner. b] Geotechnical Engineering Report — Excluded is any cement stabilized sand or flowable fill as noted on Page 16 of the report. c] Any costs related to issues with the reworking of the existing fill soils if encountered will be applied to the Existing Soils Conditions Allowance. DIVISION 03— CONCRETE 26. Section 03100 — Concrete Formwork: Excluded are any corrugated fiberboard carton forms as mentioned in paragraph 2.01.1 and 3.01.J. 27. Section 03300 — Cast-In-Place Concrete: Excluded are any corrugated fiberboard carton forms as mentioned in paragraph 2.06.1 and 3.04.J. 28. Section 03 47 13 — Precast Concrete Tilt Up Panels: Excluded is any sandblasted finish as indicated in paragraph 3.04.D. 29. Excluded is the pouring of slab on grade in strips per detail 2/S-305. DIVISION 04—MASONRY DIVISION 05—METALS 30. Section 05 12 00 —Structural Steel Framing: a] Excluded is any galvanized cooling tower grillage and steel crane rails as mentioned in paragraph 1.02.A.1. b] Excluded is any survey work by a licensed professional engineer or public surveyor as mentioned in paragraph 3.02.A. 31. Section 05 31 13 — Steel Floor Decking and Shear Studs: Excluded is paragraph 2.06.A. There is no sprayed fireproofing in this project. 32. Section 05 73 00 — Decorative Metal Railings: a] Included are Decorative Metal Railings as furnished and installed by Viva Railings based on the following system: Railing System 1 CIRCA PERF Railing System SS 304 42" H Fascia Mount Post: 2" Dia SS Posts In-fill: PMRO-0610 Perf Panel Steel Powder coated—R Kynar PC 31 EXHIBIT'E' D 'U' ROTECH BUILDERS OF INTEGRITY Baytown Public Safety — Phases 2 & 3 Public Safety Building QUALIFICATIONS &ASSUMPTIONS Top Rail: 1.5" Dia SS Rail (1.8 MM thick) Assist Rail: 1.5" Dia SS Rail(1.8 MM thick) Wall Rail: 1.5" Dia SS Rail(1.8 MM thick) Locations: Admin Support WS Ramp Wall Rail 10/A-111 Lobby Stair Wall Rail 10/A-401 Lobby Stair Rake w/Assist Rail A-401 Lobby Stair Second Floor Landing Guardrail Level A-401 Railing System 2 CIRCA PERF Railing System SS 316 42" H Fascia Mount Post: 2" Dia SS Posts In-fill: PMRO-0610 Perf Panel Steel Powder coated—R Kynar PC Top Rail: 1.5" Dia SS Rail (1.8 MM thick) Locations: Level 2 Balcony Guardrail Level Level 3 Balcony Guardrail Level b] Excluded is any LED light at the handrails as indicated in paragraph 2.02.B. c] Excluded are any decorative metal railings at Stairs 1, 2 and 3. Included are primed & painted steel picket rails and handrails at Stairs 1, 2 and 3. 33. Section 05 7513—Ornamental Metal: Excluded is this section in its entirety. There are no column covers in this project. 34. Excluded is any galvanizing of structural steel members in enclosed unconditioned space areas of the building. DIVISION 06— WOOD, PLASTICS, AND COMPOSITES DIVISION 07— THERMAL AND MOISTURE PROTECTION 35. Section 07 52 00 — Modified Bituminous Membrane Roofing: a] Included is a modified bituminous membrane roofing per the specification section 07 52 16 prepared by Blake Dieste w/The Garland Co. 36. Excluded is any applied or sprayed fireproofing. DIVISION 08— OPENINGS 37. Section 08 11 13 — Hollow Metal Doors & Frames: Included are Hollow Metal Frames as manufactured by Pearland Industries or Door Pro Systems. 38. Ballistic Specialty units are the product of Ceco. Doors are hollow metal with plastic laminate face and vertical edges. Doors &frames are armored with ballistic armor. Factory installed glass for doors with vision lite. 32 EXHIBIT 'E' t BUILDERS OF INTEGRITY Baytown Public Safety— Phases 2 & 3 Public Safety Building QUALIFICATIONS &ASSUMPTIONS 39. Section 08 33 23 — Overhead Coiling Doors: Included are overhead coiling doors as manufactured by Cookson. Overhead coiling doors will meet a 50 PSF wind load with no impact. 40. Outrigger Sunshades: a] Included is approximately 923 LF of outrigger sunshades with a 36" project at areas noted on exterior elevations on sheets A-222, A-223 & A-224. b] Due to the expansion joints at the punched opening Curtain Wall/Storefront elevations on the 1st& 2nd floor, the sunshades that extend past the window will have to attach to the building structure. c] Sunshades at the building structure are to be anchored to embeds inside the wall. Included is an allowance of$250/embed for a total of 82 embeds. d] Manufacturer will be Kawneer. 41. Architectural Light Shelfs: a] Included is approximately 432 LF of architectural light shelfs with a 24" projection. Light shelf locations are based off notes on the reflective ceiling plans (A-161, A-162 &A-163). b] Light shelfs at 1st & 2►,d floor will be the same product as specified for the 3rd floor. Excluded are any light shelfs framed out of light gage framing. c] Manufacturer will be Kawneer. DIVISION 09— FINISHES 42. Section 09 24 00 — Portland Cement Plaster: Plaster is a cementitious material and is prone to shrinkage cracks. Shrinkage cracks may develop as the excess water evaporates from the drying cement mix. Shrinkage cracks are not structural in nature and are not covered as a warrantable item. 43. Section 09 30 00 — Tiling: Excluded is epoxy grout. Specifications require standard grout unless otherwise indicated. The drawings do not indicate epoxy grout. 44. Section 09 65 13.23 — Resilient Rubber Stair Treads with Risers: Excluded is this section in its entirety. 45. Section 09 66 19—Precast Terrazzo: Included is epoxy terrazzo at the stair treads in the Lobby stair in lieu of precast terrazzo. 46. Section 09 66 23 — Resinous Matrix Terrazzo Flooring: a] Excluded is precast tiles manufactured by Terrazzio. 33 EXHIBIT'E' DUROTECH BUILDERS OF INTEGRITY Baytown Public Safety— Phases 2 & 3 Public Safety Building QUALIFICATIONS &ASSUMPTIONS b] Included is 3/8" poured in place epoxy terrazzo to match the Terrazzio colors listed on the drawings. 47. Section 09 67 00 — Fluid Applied Flooring: Manufacturer will be General Polymers. 48. Section 09 77 00 — Special Wall Surfacing: Included are AP-2 Acoustic Metal Panel starting at 3' 0" AFF up to a height of 7' 0" AFF in locations noted on the drawings. 49. Section 09 84 13 — Acoustical Wall Panels: Included are AP-1 Acoustic Panel starting at 3' 0" AFF up to a height of 7' 0" AFF in locations noted on the drawings. 50. Excluded are any Special Wall Surfacing and Acoustic Wall Panels in Rooms 1653, 1655, 1657 (juvenile holding and the observation room). Included is paint only in these rooms. DIVISION 10— SPECIALTIES 51. Section 10 14 00 —Signage: a] Included is an allowance of$60,000 for Signage. b] Excluded is paragraph 3.03.13 — Client Logo Signage. 52. Section 10 14 26 — Post and Panel Pylon Signage: Excluded is this section in its entirety. 53. Section 10 73 00 — Protective Covers: a] Excluded is any smooth metal soffit panels on the underside of the exterior canopy deck system. b] Included is Kynar finish for the exterior canopy system. DIVISION 11 — EQUIPMENT DIVISION 12—FURNISHINGS 54.Bicycle Racks — Included are two (2) wall mount powered Tilt N Store Bike Lifts (47"W x 52"H). DIVISION 13— SPECIAL CONSTRUCTION DIVISION 21 — FIRE SUPPRESSION 34 EXHIBIT 'E' DUROTECH BUILDERS OF INTEGRITY Baytown Public Safety— Phases 2 & 3 Public Safety Building QUALIFICATIONS &ASSUMPTIONS DIVISION 22— PLUMBING DIVISION 23— HVAC 55. Section 23 31 00 — Ductwork: Excluded is paragraph 3.05.A requiring duct cleaning. Duct ends will be covered during construction phase to prevent contamination by dirt and/or debris. DIVISION 26— ELECTRICAL 56. Included are aluminum conductors in lieu of copper conductors for 1/0 and larger feeders. 57. Excluded is the UPS for Building M. 58. The cost saving item 26.3 comprises of the following items: a] Included are 6" steel pipe bollards in lieu of the lighted bollards (Type SD & SD2). b] Included are 12 EA pedestal lighting to light path to front door. c] Included are 7 EA Type W1 fixtures. DIVISION 27— COMMUNICATIONS 59. Excluded are any Network Switches or UPS devices. These will be provided by the Owner. 60. Section 27 53 19 — Distributed Antenna System (DAS): Excluded is a Neutral Host DAS serving the Wireless Service Providers (Para 1.02A: 1 thru 4). Included is a ERRC system for Building M only operating in the 700/800 MHz range. DIVISION 28—ELECTRONIC SAFETY& SECURITY DIVISION 39— EARTHWORK 61. Section 31 63 29 — Drilled Piers: Excluded is any casing or slurry drilling of piers. 62. Excluded is any drying of subgrade by chemical or mechanical means. 63. Sheet C7: Excluded is any pond liner. 64. Excluded is the cleaning of any existing storm pipes as noted in Storm Sewer Note#5 on sheets C15, C16, C17 & 18. DIVISION 32—EXTERIOR IMPROVEMENTS 35 EXHIBIT 'E' i BUILDERS OF INTEGRITY Baytown Public Safety — Phases 2 & 3 Public Safety Building QUALIFICATIONS &ASSUMPTIONS 65. Areas that receive Hydromulch will not be warranted for developing full turf grass. Owner understands that Hydromulch is a 2-season maintenance program requiring continuous maintenance including watering and fertilizer by the Owner. Areas that are not irrigated will not be warranted for grass or plant development and sustainability. Any temporary irrigation requirement by the contract will only be warranted to such date the temporary irrigation is removed. DIVISION 33— UTILITIES 36 EXHIBIT `F' D1%,,J1R0TECH BUILDERS OF INTEGRITY Baytown Public Safety— Phases 2 & 3 Public Safety Building ALLOWANCE SCHEDULE 1. Construction Contingency Allowance $11000,000 2. Faraday Room Allowance $110,000 3. Police & Fire Dept. shields/Monument Sign Allowance $45,000 4. Building D Renovations Allowance $20,000 5. Existing Soil Conditions Allowance $200,000 6. Signage Allowance $60,000 37 EXHIBIT 'G' Dl�..)IROTECH BUILDERS OF INTEGRITY Baytown Public Safety — Phases 2 & 3 Public Safety Building SELF PERFORMED WORK ITEMS The following scope items will be self-performed by Durotech, Inc. and will be billed against the contract based upon the proposal submitted to and accepted by the owner and will be treated as a lump sum sub- contract amount. No. Description of Scope Amount 1 OFCI Items(L) $3,240 2 Miscellaneous Steel (L) $132,214 3 Safety Rails(L&M) $32,937 4 Rough Carpentry(L&M) $211,338 5 Unload &distribute Metal Doors &Frames(L) $35,480 6 Unload &distribute PLAM Doors(L) $19,915 7 Install Access Doors (L&M) $8,030 8 Unload &distribute Door Hardware(L) $16,694 9 Install Louvers (L) $5,878 10 Floor Preparation(L&M) $34,136 11 Floor Protection (L&M) $13,192 12 Install Knox Box(L&M) $3,487 13 Install Residential Appliances(L) $7,695 14 Final Grading (L) $12,331 15 Haul off spoils (L) $64,096 16 Remove strip/clean paving joints(L) $15,783 17 Backfill curbs(L) $11,649 18 Install Irrigation Sleeves(L&M) $18,631 TOTAL $646,907 38 EXHIBIT `H' D 'U' ROTECH BUILDERS OF INTEGRITY Baytown Public Safety — Phases 2 & 3 Public Safety Building UNIT PRICES A] UNIT PRICE NO. 1: Removal of unsatisfactory soil and replacement with satisfactory soil material $69.00/CY Description: Unsatisfactory soil excavation and disposal off site and replacement with satisfactory fill material or engineered fill from off site, as required, according to Division 31 Section "Earth Moving." B] UNIT PRICE NO. 2: Rock excavation and replacement with satisfactory soil material $69.00/CY Description: Classified rock excavation and disposal off site and replacement with satisfactory fill material or engineered fill from off site, as required, according to Division 31 Section "Earth Moving." C] UNIT PRICE NO. 3: Unit Price per linear foot for piers longer or shorter than base lengths Pier P1: 24/72 Add: $60.00/LF Deduct: $51.00/LF Pier P2: 30/90 Add: $93.92/LF Deduct: $79.83/LF Pier P3: 18/48 Add: $33.69/LF Deduct: $28.63/LF Description: Unit prices shall include all labor, materials, equipment, overhead and fee for drilled piers complete. Adjustments to Contract shall be based on total linear feet of each pier size greater than or less than the sum of base lengths of each size. D] UNIT PRICE NO. 4: Unit Price per linear foot for Casing of Piers Pier P1: 24" Add: $27.10/LF Pier P2: 30" Add: $37.60/LF Pier P3: 18" Add: $17.20/LF Description: Unit prices shall include all labor, materials, equipment, overhead and fee for casing of drilled piers complete. E] UNIT PRICE NO. 5: Unit Price per linear foot for Straight Shaft piers Convert Pier P1: 24/72 to Straight Shaft 72" dia Add: $178.23/LF Convert Pier P2: 30/90 to Straight Shaft 90" dia Add: $264.15/LF Convert Pier P3: 18/48 to straight Shaft 48" dia Add: $81.92/LF Description: Unit prices shall include all labor, materials, equipment, overhead and fee for drilling of straight shaft piers complete. F] UNIT PRICE NO. 6: Additional excavation of existing fill soil/debris $47.00/CY This unit cost is for the additional excavation & removal of the existing fill soil/debris and haul-off from the project site. G] UNIT PRICE NO. 7: Additional Imported Select Fill $25/CY 39 EXHIBIT 'H' DUROTECH BUILDERS OF INTEGRITY Baytown Public Safety — Phases 2 & 3 Public Safety Building UNIT PRICES This unit cost is for the providing, placing and compacting additional imported select fill. H] UNIT PRICE NO. 8: Additional Concrete Placement: If additional concrete is required and approved by the Project Engineer, the following unit prices shall be used in adjusting the Contract Price. 1. Grade Beams, price per cu. yd. $356.62/CY 2. Slab on grade, price per cu. yd. $291.47/CY 3. Normal weight concrete slab over metal deck, price per cu. yd. $303.16/CY 4. Light weight concrete slab over metal deck, price per cu. yd. $228.17/CY 1] UNIT PRICE NO. 9: Site Concrete Placement The price reinforcing steel, concrete, and labor. 1. 8" concrete paving Add: $204.85/CY Deduct: $174.12/CY 2. 6" concrete paving Add: $219.00/CY Deduct: $186.15/CY 3. 4.5" concrete sidewalk Add: $404.50/CY Deduct: $343.82/CY The price includes subgrade preparation only. 2. 8" concrete paving Add: $0.95/SF Deduct: $0.95/SF 2. 6" concrete paving Add: $0.95/SF Deduct: $0.95/SF 3. 4.5" concrete sidewalk Add: $0.60/SF Deduct: $0.60/SF 40 EXHIBIT T DUROTECH BUILDERS OF INTEGRITY Baytown Public Safety — Phases 2 & 3 Public Safety Building COST SAVING ITEMS The following Cost Savings Items have been incorporated into the Guaranteed Maximum Price Proposal. This list is included for information purposes only. DESCRIPTION ACCEPTED 7 THERMAL&MOISTURE PROTECTION ($199,000) 1 Use Garland two-ply(base ply in asphalt,cap ply torched)30-yr system over poly-iso insulations ($54,000) and gypsum cover board all adhered in hot asphalt in lieu of asspecified. 2 Change the gypsum cover board to an HD fiber board. ($21,000) 3 Install an asphalt-applied cap sheet in lieu of a torch-applied cap sheet. ($41,000) 4 If CS#7.3 is accepted,use a"regular white"granulated asphalt-applied cap sheet in lieu of a ($83,000) "reflective white"product. 8 OPENINGS $(54,315) 1 Change the following windows to storefront in lieu of curtainwall:W12,W13,W19,W23,W23A, ($54,315) W24,W24A,W25,W27,W34,W35,W36 9 FINISHES ($10,153) 1 Utilize Regupol Aktiv Athletic Flooring per Specifications in Lieu of Mondo Sports Impact in ($10,153) Material Finish Legend 26 ELECTRICAL ($695,772)... 1 Use aluminum conductors in lieu of copper 1/0 and larger ($218,000) 2 Delete UPS and associated equipment ($428,000) Use 6"steel pipe bollards in lieu of lighted bollards(Type SO&S02);add 12 EA pedestal lighting 3 to light path to front door;add Type W1 light fixtures. ($49,772) Total-Cost Saving Items ($959,240) 41