Ordinance No. 14,993 ORDINANCE NO. 14,993
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN,
TEXAS, AUTHORIZING CHANGE ORDER NO. 2, WHICH AMENDS THE
CONSTRUCTION MANAGER-AT-RISK CONTRACT FOR THE PUBLIC
SAFETY FACILITY PROJECT WITH DUROTECH, INC., IN AN AMOUNT
NOT TO EXCEED THIRTEEN MILLION FIVE HUNDRED NINETY-FOUR
THOUSAND NINE HUNDRED THIRTY-SEVEN AND N0/100 DOLLARS
($13,594,937.00);AND PROVIDING FOR THE EFFECTIVE DATE THEREOF.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS:
Section 1: That the City Council does hereby authorize Change Order No. 2, which
amends the Construction Manager-at-Risk Contract for the Public Safety Facility Project with
Durotech, Inc., in an amount not to exceed THIRTEEN MILLION FIVE HUNDRED NINETY-
FOUR THOUSAND NINE HUNDRED THIRTY-SEVEN AND NO/100 DOLLARS
($13,594,937.00). A copy of said change order is attached hereto, marked Exhibit "A" and made
a part hereof for all intents and purposes.
Section 2: This ordinance shall take effect immediately from and after its passage by
the City Council of the City of Baytown.
INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the
City of Baytown this the 131h day of January, 2022.
NDON CAPETILL , Mayor
ATTEST:
O ,,Oa aapyn.�
O
O J
ANGE JACKSON, City Cie a A�
.A
e
APPROVED AS TO FORM:
TREVOR FANMNG, Interim City Attorney
RAKaren Anderson'•.ORDINANCES\2022\2022.01.13 ChangeOrderNo2-PublicsafetyFacilityProject.docx
Exhibit "A" CITY OF BAYTOWN
PUBLIC WORKS & ENGINEERING
2123 Market St.
E
Baytown,Texas 77520
BE TES
BAYTOWN CHANGE ORDER
For Public Safety Campus: Phase 1B
Date of Issuance: 12/21/2021 Change Order No.: 2
Contractor: Durotech Inc. CoB Project No.: FA1901
Designer: BVG4 Architecture P.O.No.: 2103500
Explanation:
This change order encompasses the following:
The Guaranteed Maximum Price (GMP) for the construction of the Baytown Public Safety—Phase 1B: Vehicle
Service Center in the amount of$13,594,937.00 and a duration of seven(7) months. These costs include General
Conditions, Bonds&Insurance; General Site Requirements; Existing Conditions,Construction of Pre-Fabricated
Metal Buildings (Vehicle Maintenance Building, Special Equipment Storage Buildings,Vehicle Impound
Processing Bay), Foundations, Paving,Final Grading, Masonry, Interior Finishes,Fire Protection Systems,
HVAC, Electrical, Plumbing,Fencing and Landscaping; and the Construction Manager at Risk Fee of 2.3%.
Included in this Change Order are three(3) Cummins Generators for Phase 2 since these are long lead items with
volatile pricing.
Description of Work Cost Time
1 General Conditions, Bonds&Insurance $644,572.00
2 General Site Requirements $557,942.00
3 Concrete(Building Foundation and Site Paving) $2,200,568.00
4 Masonry $250,000.00
5 Metals (Structural Steel, Rails, and Panels) $387,651.00
6 Woods(Rough Carpentry and Millwork) $66,654.00
7 Thermal and Moisture Protection $339,394.00
8 Openings (Doors and Glazing) $838,769.00
9 Finishes(Gypsum Board,Tiling, Resilient Flooring) $379,862.00
10 Specialties(Signage, Toilet Accessories,Protective Covers) $102,047.00
11 Equipment(Appliances) $1,496.00
12 Furnishings (Window Shades and Floor Mats) $10,060.00
13 Special Constructions(Metal Building Erection) $666,643.00
14 Fire Suppression Systems $105,000.00
15 Plumbing $595,620.00
16 HVAC $1,066,500.00
17 Electrical $2,665,066.00
18 Communications (Structured Cabling and AV System) $108,031.00
19 Electronic Safety and Security $268,635.00
20 Earthwork $153,401.00
21 Exterior Improvements(Fences, Gates,Irrigation,Landscaping $999,544.00
22 Utilities $15,625.00
23 Construction Manager At Risk Fee 2.3% (Phase 1A) $285,731.00
24 Phase 2 Generators By Cummins $886,126.00
$13,594,937.00 213 Days
(Change Order Continues on Next Page)
Construction 1 of D16 Revised 2020
The additional scope of work and the schedule associated with the same, are attached liereto as Exhibit
"A" dated December 17, 2021 and incorporated herein for all intents and purposes.
Cost&Time Change Summary Cost Time
Original Contract: $ 89,000.00 Days
Previous Change Order(s): $ 4,905,614.00 152 Days
Contract prior to this cliange order: $ 4,994,614.00 Days
Net increase(decrease) from this change order $ 13,594,937.00 213 Days
Revised Contract: $ 18,589,551.00 365 Days
Finance Approval: Date:
RECOMMENDED: RECOMMENDED:
13y: Date: 1-3-2022 ray:� �� - ' Date: 01/04/2022
Delign Architect Director of Public Works&Engineering
a:LA,—
APPROVED:
Date: Oaa By: Date:
Contractor City Manager
*Contractor agrees to perform change(s)included in this Change Order for the price and time indicated. The prices for changes included all costs associated
with this Change Order.
No work is to be done until this change order is executed No payment to the Contractm�(or Consultant)shall be nude for work included in the change order
until(lie Contractors pay estimate is updated.
Revise the project plans and specifications as referenced and insofar as the original project drawings and specifications are inconsistent,this Change Order
governs.Upon execution by all parties,the following changes identified for the contract value and/or contract time shown,are made part ofthe contract.
Construction 2 of 2 D 16 Revised 2020
DUROTECH
BUILDERS OF INTEGRITY
Date: December 17, 2021
Ms. Andrea Brinkley
Assistant Director— Capital Projects
City of Baytown - Public Works & Engineering
2123 Market Street
Baytown, TX 77522
Re: Guaranteed Maximum Price for Baytown Public Safety — Phase 1 B — Vehicle
Service Center
Dear Ms. Brinkley:
We wish to inform you that after several months of working together with City of Baytown
and BVG4 Architecture LLC on this important facility, we have formally advertised and
solicited proposals for the development of the GMP for the Phase 1 B — Vehicle Service
Center project. Over 200 proposals were received on November 23rd, 2021. After careful
review and compilation of these proposals, Durotech, Inc. is pleased to present a
Guaranteed Maximum Price for the construction of the Baytown Public Safety — Phase
1 B —Vehicle Service Center of$13,594,937.00
It is our recommendation that we ask City of Baytown Council to approve the Guaranteed
Maximum Price of$13,594,937.00 and to execute the GMP Amendment No. 2 between
City of Baytown and Durotech, Inc.
We are excited about the potential of entering into the construction phase of this project
and want to thank you and your team, BVG4 Architecture and their consultants for a very
successful pre-construction phase. Durotech is committed to City of Baytown in the
successful delivery of the New Vehicle Service Center project.
Thank you and City of Baytown for selecting Durotech as its building partner. It is our
goal to meet and exceed your expectations. Should you have any questions please do
not hesitate to contact me.
Sin rely,
avid Rowe
CEO
1
1
11931 Wickchester Lane e Suite 205 @ Houston, Texas 77043-4501
Phone 281.558.6892 e Fax: 281.496.5637
a U ROTEC H
BUILDERS OF INTEGRITY
GMP SUMMARY
Project: Baytown Public Safety— Phase 1 B —Vehicle Service Center
Location: 3200 N Main St., Baytown, TX 77522
Owner: City of Baytown
GMP Proposal Package:
The GMP proposal package consists of the following items:
1. Exhibit A — GMP Top Sheet — dated 17 December 2021
2. Exhibit B — Project Manual — dated 18 June 2021 (Reissued for bid — 15 October
2021)
3. Exhibit C — List of Drawings —dated 18 June 2021 (Reissued for bid — 15 October
2021)
4. Exhibit D — List of Addenda
5. Exhibit E — Qualifications & Assumptions
6. Exhibit F —Allowance Schedule
7. Exhibit G — Self Performed Work Items
8. Exhibit H — Unit Prices
9. Exhibit I — Cost Saving Items
Scope of Work:
A] The Project: The Project consists of the following:
1] Construction of 779 SF prefabricated Detailed Covered Area, Building "S".
2] Construction of 28,798 SF of air-conditioned, hurricane resistant prefabricated
steel Vehicle Maintenance Building "T" and 5,192 SF of non-conditioned space.
3] Construction of 975 SF of air-conditioned, hurricane resistant prefabricated steel
Vehicle Storage Building "U" and 7,373 of non-conditioned space.
4] Construction of 557 SF of air-conditioned, hurricane resistant prefabricated steel
Vehicle Storage Building "V" and 2, 595 SF of non-conditioned space.
5] Construction of 804 SF prefabricated steel Impound Covered Area Building "W".
6] Construction of 720 SF of air-conditioned, prefabricated Impound Vehicle
Building "X", with 2,560 of covered parking.
7] Balance of Associated Site Work including Paving, Sidewalks, and Foundations
8] Final Grading and Spread & Grade Spoils
9] All Masonry Work
10] Windstorm Inspections and Field Engineering
16] All Rough Carpentry, Millwork and Solid Surfaces
11] All Thermal & Moisture Protection
12] All Openings and Doors
13] All Interior Finishes
14] All Fire Protection Systems
15] All Plumbing Work
16] All HVAC Systems
2
11931 Wickchester Lane o Suite 205 • Houston, Texas 77043-4501
Phone; 281.558.6892 r Fax. 281.496.5637
DUROTECH
BUILDERS OF INTEGRITY
17] All Electrical Work, including Site Electrical Work and Cummins Generator
18] All Fences and Gates
191 All Concrete Screen Walls
201 All Landscaping and Irrigation
B] Included in this Phase 1 B proposal are the Cummins Generators (3) for Phase 2.
These generators are long lead items with volatile pricing which must be secured.
3
11931 Wickchester Lane • Suite 205 • Houston, Texas 77043-4501
Phone: 281.558.6892 • Fax: 281.496.5637
EXHIBIT'A'
PROJECT: Baytown Public Safety-Phase 1 B _
_ _ LOCATION: 3200 North Main St.,Baytown,TX 77521
D U ROT E C H
OWNER: City of Baytown
BUILDERS OF INTEGRITY ARCHITECT. BVG4 Architecture
_-_- DATE: 12N7/2021
BAYTOWN PUBLIC SAFETY-PHASE 1B
SECTION _ _ DESCRIPTION __ PHASE 1B _ REMARKS
LABOR MATERIAL SUB-BIDS TOTAL
01 1000 SUPERVISION 223,344 - 223,344
01 1500 TEMPORARY/GENERAL CONDITIONS 6,062 112,266 - 118,328
01 1940 ADVERTISEMENTS - - 630 630
01 2000 EQUIPMENT 7,375 - 7,375
01 4220 AGC FEES - 14,604 14,604
01 4225 BUILDER'S RISK INSURANCE 82,547 82,547
01 4230 GL INSURANCE 98,493 98,493
01 4240 IPAYMENT&PERFORMANCE BOND I - 99,251 99,251
SUB TOTAL-DIV 00 GENERAL CONDITIONS 229,406 119,641 295,526 644,572
01 21 00 QUANTITY ALLOWANCE 0 0 NONE
01 21 05 CONSTRUCTION CONTINGENCY ALLOWANCE 300,000 300,000
01 21 15 SITE ELECTRICAL CONDUIT ALLOWANCE 0 0 IN PHASE 1A
01 21 20 COURTS DRAINAGE ALLOWANCE 0 0 IN PHASE 1A
01 21 21 PHASE 16:BREAKROOM LOCKERS&APPLIANCES 0 0 BY OWNER
01 21 22 PHASE 1B:VEHICLE LIFTS&FLUID DISTRIBUTION 0 0 BY OWNER
01 21 23 PHASE 1B:SHOP EQUIPMENT 0 0 BY OWNER
01 21 24 IPHASE 113:MAINTENANCE EQUIPMENT 0 0 BY OWNER
01 21 25 PHASE 1B:BUILDING'U'WORKROOM EQUIPMENT 0 0 BY OWNER
01 21 26 PHASE 113:BUILDING'X'RELOCATION OF LIFT 0 0 BY OWNER
01 21 27 PHASE 2:HIGH DENSITY STORAGE SHELVING 0 0 BY OWNER
01 21 28 PHASE 2:CRIME SCENE LAB EQUIPMENT 0 0 BY OWNER
01 21 29 PHASE 2:FITNESS EQUIPMENT&WRESTLING MATS 0 0 BY OWNER
01 21 30 PHASE 2:BRK ROOM/KITCHEN/FA KITCHEN APPLIANCES 0 0 BY OWNER
01 21 31 PHASE 2:SWAT ARMORY STORAGE CABINETS 0 0 BY OWNER
01 21 32 PHASE 2:FARADAY ROOM ALLOWANCE 0 0 BY OWNER
01 21 33 PHASE 2:POLICE&FIRE DEPT SHIELDS/MONUMENT SIGN 0 0 ALLOWANCE
01 21 34 PHASE 3:BUILDING D RENOVATIONS 0 0 ALLOWANCE
01 21 35 EXISTING SOIL CONDITIONS ALLOWANCE 0 0 ALLOWANCE
01 4339 MOCKUP PANEL 7,500 7,500
01 4533 WINDSTORM INSPECTIONS 17,000 17,000
015113 TEMPORARY POWER 3,250 3,250
01 51 19 EQUIPMENT FUEL&FUEL TANK 1,674 1,674
01 51 36 TEMPORARY WATER 2,025 2,025
01 5370 QMS/SAFETY 40,668 40,668
01 54 16 IMATERIAL HANDLING&HOISTING 52,612 52,612
01 5423 TEMPORARY SCAFFOLDING 11,922 11,922
01 5523 TEMPORARY ROADS 0 0 IN PHASE 1A
01 5526 TRAFFIC CONTROL 0 0 IN PHASE 1A
01 5626 TEMPORARY FENCING 0 0 IN PHASE 1A
01 56 39 TEMPORARY TREE&PLANT PROTECTION - - 01 0 IN PHASE 1A
01 5700 EROSION&SEDIMENT CONTROL 2,850 2,000 4,850
01 5800 TEMPORARY PROJECT SIGNAGE 0 0 IN PHASE 1A
016400 OFCI ITEMS 1,625 1,625
01 71 23 FIELD ENGINEERING&LAYOUT 36,080 7,075 43,155
01 7416 SITE MAINTENANCE/CLEAN STREETS 1,543 3,520 5,063
4
EXHIBIT'A'
SECTION _ DESCRIPTION PHASE 1B REMARKS
LABOR MATERIAL SUB-BIDS TOTAL
01 74 19 CONSTRUCTION WASTE MANAGEMENT - 9,743 9,743
01 7423 FINAL CLEANING - - 12,855 12,855
019100 lCOMMISSIONING 44,000 - - 44,000
SUB TOTAL-DIV 01 GENERAL REQUIREMENTS 86,098 12,595 459,249 557,942
02 21 00 SURVEYS - 0 0 1
02 41 13 SITE DEMOLITION - 0 0 IN PHASE 1A
02 61 00 REMOVAL&DISPOSAL OF CONTAMINATED SOILS ol 0 IN PHASE 2&3
02 65 00 ]PUMP
UNDERGROUND STORAGE TANK REMOVAL 0 0 IN PHASE 2&3
02 65 10PLUG&ABANDON WATER WELL&MONITORING WELLS 0 0 IN PHASE 2&3
02 70 00 &DEWATER - ol 0 1 IN PHASE 1A
SUB TOTAL-DIV 02 EXISTING CONDITIONS 0
03 20 00 CONCRETE REINFORCING - 0 0 IN 03 30 00
03 30 00 SITE&BUILDING CONCRETE 2,149.346 2.149,346
03 35 10 ICONCRETE FLOOR SEALER 33,030 33,030
03 35 43 POLISHED CONCRETE 18,192 18,192
03 40 50 CONCRETE TILT UP PANELS 0 0 IN PHASE 2&3
03 40 55 CONCRETE TILT UP PANELS ERECTION - 0 0 IN PHASE 2&3
03 40 60 CONCRETE TILT UP PANELS ACCESSORIES - 0 0 IN PHASE 2&3
SUB TOTAL-DIV 03 CONCRETE 2,200,568 2,200,568
04 05 19 MASONRY REBAR - 0 0
04 20 00 MASONRY 250,000 250,000
SUB TOTAL-DIV 04 MASONRY 250,000 250,000
�rA�s. - ..._..-...... - "gym
05 12 00 STRUCTURAL STEEL FRAMING - 227.952 227,952
05 12 50 STRUCTURAL STEEL ERECTION - 0 0 IN 13 34 20
05 37 00 PREPARE EXPOSED STEEL STRUCTURE 22,435 22,435 - 44,870
05 50 00 MISCELLANEOUS STEEL 53,658 4,400 58,058
05 50 10 TIMBER MATS 14,809 16,750 31.559
05 50 20 SAFETY RAILS 1,928 1,354 3,282
05 53 00 METAL GRATINGS 713 5.235 5,948
05 55 00 METAL NOSINGS - - 0 0 IN PHASE 2&3
05 58 05 DOWNSPOUT BOOTS 4,916 11,066 15,982
05 73 00 DECORATIVE METAL RAILINGS - - 0 01 IN PHASE 2&3
05 75 10 PERFORATED METAL PANELS 01 0 IN PHASE 2&3
SUB TOTAL-DIV 05 METALS 98,459 61,240 227,952 387,651
06 10 00 ROUGH CARPENTRY 9,931 24,970 - 34,901
06 22 00 MILLWORK - - 31,753 31.753
0661 16 SOLID SURFACING FABRICATIONS - 01 01 IN 06 22 00
06 64 00 IPLASTIC PANELING - ol 0 1 IN PHASE 2&3
SUB TOTAL-DIV 06 WOOD,PLASTICS&COMPOSITES 24 970 71 751 66,654
071100 DAMPPROOFING - 76,251 76,251
07 18 00 TRAFFIC COATINGS - 0 0 IN PHASE 2&3
07 19 00 WATER REPELLENTS - 0 0 1 IN PHASE 2&3
07 21 00 THERMAL INSULATION - 127,803 127,803
07 41 00 METAL ROOF INSULATION&UNDERLAYMENT - 96,670 96,670
07 42 00 METAL WALL PANELS - 0 0 IN PHASE 2&3
5
EXHIBIT'A'
SECTION DESCRIPTION PHASE IB _ REMARKS
LABOR MATERIAL SUB-BIDS TOTAL
076200 MODIFIED BITUMINOUS MEMBRANE ROOFING 0 0 IN PHASE 2&3
07 72 00 ROOF ACCESSORIES 0 0 IN PHASE 2&3
0781 00 JAPPLIED FIREPROOFING 0 0 IN PHASE 2&3
07 84 00 FIRESTOPPING 10,234 10,234
07 92 00 JOINT SEALANTS 28,436 28,436
07 95 00 EXPANSION CONTROL 0 0 IN PHASE 2&3
SUB TOTAL-DIV 07 THERMAL&MOISTURE PROTECTION 339,394 339,394
08 08 00 DOOR&HARDWARE INSTALLATION 15,642 - 15,642
0811 00 METAL DOORS&FRAMES 11,012 146,000 157,012
081423 PLASTIC LAMINATE FACED WOOD DOORS - 0 0 IN PHASE 2&3
0831 00 ACCESS DOORS AND PANELS 428 600A464,955
1,028
08 33 00 COILING DOORS&GRILLES - 464,955
084229 SLIDING AUTOMATIC ENTRANCES 0 IN PHASE 2&3
084500 INSULATED TRANSLUCENT WALL PANELS 94,140
085653 SECURITY WINDOWS 0 IN PHASE 2&3
08 62 23 ITUBULAR DAYLIGHTING DEVICES - 0 0 IN PHASE 2&3
0871 00 DOOR HARDWARE 3,206 3,206
08 80 00 GLAZING - 73,860 73,860
08 80 10 TEMPORARY ENCLOSURES 5,274 3,700 - 8,974
0880 15 CLEAN GLASS 1,389 975 2,364
0891 00 LOUVERS 2,138 15,450 17,588
y� SUB TOTAL-DIV 08 OPENINGS 39,089 166,725 632,95t Y
09 24 00 CEMENT PLASTERING 0 0 IN PHASE 2&3
09 29 00 GYPSUM BOARD 186,306 186,306
09 30 00 ITILING 25,723 25,723
0951 00 ACOUSTICAL CEILINGS 9,336 9,336
09 60 00 FLOOR PREPARATION 10,595 4,957 - 15,552
09 60 10 FLOOR PROTECTION 3,532 2,478 - 6,010
09 65 00 RESILIENT FLOORING - - 5,278 5,278
09 65 66 RESILIENT ATHLETIC FLOORING 0 0 IN PHASE 2&3
09 66 00 TERRAZZO FLOORING 0 0 IN PHASE 2&3
09 67 00 FLUID-APPLIED FLOORING 8,750 8,750
09 68 00 CARPETING 0 0 IN PHASE 2&3
09 69 00 ACCESS FLOORING 0 0 IN PHASE 2&3
09 72 00 WALL COVERING 0 0 IN PHASE 2&3
09 77 00 SPECIAL WALL SURFACING 0 0 IN PHASE 2&3
09 84 00 ACOUSTIC WALL PANELS 0 0 IN PHASE 2&3
09 90 00 PAINTING&COATING 122,907 122,907
09 93 33 SILICATE MINERAL STAINS - - 0 0 NONE
SUB TOTAL-DIV 09 FINISHES 14,127 7,435 358,300 379,862
10 11 00 VISUAL DISPLAY UNITS - 0 0 IN PHASE 2&3
10 1400 SIGNAGE 25,000 25,000 ALLOWANCE
10 14 26 POST&PANEL/PYLON SIGNAGE - 0 0 IN PHASE 2&3
1021 13 TOILET COMPARTMENTS 0 0 IN PHASE 2&3
10 22 39 FOLDING PANEL PARTITIONS 0 0 IN PHASE 2&3
10 26 00 WALL&DOOR PROTECTION - 0 0 IN PHASE 2&3
10 28 13 TOILET ACCESSORIES 9,695 9,695
10 44 00 FIRE PROTECTION SPECIALTIES 1,887 1,887
1044 15 KNOX BOX 0 0 IN PHASE 2&3
1051 13 METAL LOCKERS 0 0 BY OWNER
10 73 00 PROTECTIVE COVERS 65,465 65,465
10 75 00 FLAGPOLES - 0 0 IN PHASE 2&3
EXHIBIT'A'
SECTION _ DESCRIPTION PHASE I REMARKS
LABOR MATERIAL SUB43IDS TOTAL
SUB TOTAL-DIV 10 SPECIALTIES
0 0 i.i ,1
11 31 00 RESIDENTIAL APPLIANCES 1,496 1,496
11 52 00 AUDIO-VISUAL EQUIPMENT - 0 0 IN PHASE 2&3
115300 LABORATORY EQUIPMENT 0 0 NONE
11 53 13 LABORATORY FUME HOODS 0 0 NONE
SUB TOTAL-DIV 11 EQUIPMENT 0 1,496
12 24 00 WINDOW SHADES 6,879 6,879
12 36 61 SIMULATED STONE COUNTERTOPS 0 0 IN 06 22 00
12 48 13 JENTRANCE FLOOR MATS 3,181 3,181
12 93 00 ISITE FURNISHINGS 0 0 IN PHASE 2&3
12 93 13 JBICYCLE RACKS 0 0 IN PHASE 2&3
SUB TOTAL-DIV 12 FURNISHINGS 10,060 10,060
1334 19 METAL BUILDING SYSTEMS 0 0 IN PHASE 1A
13 34 20 METAL BUILDING ERECTION 666,643 666,643
SUB TOTAL-DIV 13 SPECIAL CONSTRUCTION 666,643 666,643
14 21 00 ELECTRIC TRACTION ELEVATORS 0 0 IN PHASE 2&3
SUB TOTAL-DIV 14 CONVEYING EQUIPMENT 0 0
21 1000 FIRE SUPPRESSION SYSTEMS 105,000 105,000
SUB TOTAL-DIV 21 FIRE SUPPRESSION 105,000 105,000
22 00 00 IPLUMBING 595,620 595,620
SUB TOTAL-DIV 22 PLUMBING 595,620 595,620
23 00 00 HVAC 1.055,000 1,055,000
23 00 10 HVAC FILTER CHANGES 2,500 2,500
23 05 00 IMEP COORDINATION 9,000 9,000
SUB TOTAL-DIV 23 HVAC 1,066,500 1,066,500
26 00 00 ELECTRICAL 2,629,498 2,629,498 INCLUDES CUMMINS GENERATOR
26 00 05 ROUGH INIBACK BOXES-LOW VOLTAGE 15,000 15,000
26 00 10 IPERMANENT POWER START UP 20,568 20,568
26 41 00 ILIGHTNING PROTECTION ol 0 1 IN 26 00 00
SUB TOTAL-DIV 26 ELECTRICAL 2,665,066
27 1000 STRUCTURED CABLING 105,875 105,875
2741 16 INTEGRATED AUDIO-VIDEO SYSTEMS&EQUIPMENT 2,156 2,156
2753 19 IDISTRIBUTED ANTENNA SYSTEM(DAS) ol 0 1 NONE IN PHASE 1
SUB TOTAL-DIV 27 COMMUNICATIONS 108,031 108,031
28 13 00 JACCESS CONTROL SYSTEM 232,500 232,500
7
EXHIBIT'A'
SECTION _ DESCRIPTION PHASE I _ _REMARKS_
LABOR MATERIAL SUB-BIDS TOTAL
28 16 00 INTRUSION DETECTION SYSTEM 0 0 NONE
28 23 00 VIDEO SURVEILLANCE SYSTEM 0 0 IN 28 13 00
28 31 00 FIRE DETECTION&ALARM SYSTEM 36,135 36,135
SUB TOTAL-DIV 28 ELECTRONIC SAFETY b SECURITY 268,635 268,635
31 2000 EARTHWORK 0 0 IN PHASE 1A
31 2216 FINAL GRADING 37,285 13,082 50,367
31 2310 SPREAD&GRADE SPOILS 58,078 1 40,756 1 - 98,834
31 31 00 SOIL TREATMENT 4,200 4,20011
31 6329 DRILLED CONCRETE PIERS&SHAFTS ol Oil IN 03 30 00
SUB TOTAL-DIV 31 EARTHWORK 95,363 53,55_ 153,401
3201 11 CLEAN PAVING&SIDEWALKS 22,834 22,834
32 12 16 ASPHALT PAVING - - 0 0 IN PHASE 1A
32 13 73 CONCRETE PAVING JOINT SEALANTS 13,776 9,667 23.443
32 1375 REMOVE STRIPICLEAN PAVING JOINTS 20,204 - 20,204
32 14 00 UNIT PAVING - 0 0 IN PHASE 2&3
32 16 15 BACKFILL CURBS 11,623 11,623
32 17 23 PAVEMENT MARKINGS - 21,421 21,421
3231 00 FENCES&GATES 273,475 273,475
3231 15 CONCRETE SCREEN WALLS&FENCES 113,775 113,775
32 80 00 IRRIGATION - - 152,068 152,068
328010 IRRIGATION SLEEVES 6,189 5,103 - 11,292
32 90 00 LANDSCAPING - - 257,837 257,837
32 90 05 CRUSHED GRANITE 67,572 67,572
3290 10 AERATING FOUNTAIN 0 0 NONE
32 92 00 HYDROMULCH&SOD 0 0 IN 32 90 00
32 95 00 LANDSCAPE MAINTENANCE 24,000 24,000
SUB TOTAL-DIV 32 EXTERIOR IMPROVEMENTS 74,626 14,770 910,148 999,544
33 00 00 SITE UTILITIES - - 0 0
35 00 00 PUNCH LIST 13,683 1,942 - 15,625
SUB TOTAL-DIV 33 UTILITIES 13,683 1,942 0 15,625
SUB TOTAL-COST OF WORK ITEMS 662,278 463,156 11,297,647 12,423,080
CM FEE-2.30% 285,731
SUB TOTAL-PHASE 1 B 12,708,811
PHASE 2 GENERATORS BY CUMMINS 886,126 PHASE 2
SUB TOTAL-PHASE 2 CUMMINS GENERATORS 886,126
SUB TOTAL-PHASE 1 B+PHASE 2 LONG LEAD ITEMS 13,594,937
GMP:PHASE 1B 13,594,937
EXHIBIT 'B'
DUROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety &Vehicle Service Center
Phases IB
PROJECT MANUAL
TABLE OF CONTENTS
Baytown Public Safety—Phase I—Vehicle Service Center Re-Issued October 15, 2021
BVG4 PROJECT 20004: SPECIFICATIONS—CONSTRUCTION DOCUMENTS FOR PERMITTING
June 18, 2021
DIVISION 00: PROCUREMENT AND CONTRACTING REQUIREMENTS
0001 00 TABLE OF CONTENTS
0001 03 PROJECT DIRECTORY
0001 07 PROFESSIONAL SEALS PAGES
0001 15 LIST OF DRAWINGS (Revised in Addendum 3)
0011 00 NOTICE FOR SUBCONTRACTORS PROPOSALS (Durotech)
0021 00 INSTRUCTIONS TO SUBCONTRACTORS (Durotech)
00 21 11 SAMPLE CERTIFICATE OF INSURANCE (Durotech)
0031 32 GEOTECHNICAL DATA
GEOTECHNICAL REPORT
00 42 00 SUB PROPOSAL FORMS (Durotech)(Revised in Addendum 3)
WAGE RATE REQUIREMENTS (City of Baytown)
DIVISION 01: GENERAL REQUIREMENTS
01100 Summary of Work (City of Baytown)
01140 Contractor's Use of Premises (City of Baytown)
01200 Measurement and Payment Procedures (City of Baytown)
01290 Change Order Procedures (City of Baytown)
01310 Coordination and Meetings (City of Baytown)
01350 Submittals (City of Baytown)
01380 Construction Photographs (City of Baytown)
01420 Referenced Standards (City of Baytown)
01430 Contractor's Quality Control (City of Baytown)
01440 Observation Services (City of Baytown)
01450 Testing Laboratory Services (City of Baytown)
01500 Temporary Facilities and Controls (City of Baytown)
01505 Mobilization (City of Baytown)
01550 Stabilized Construction Exits (City of Baytown)
01554 Street Signs (City of Baytown)
01555 Traffic Control and Regulation (City of Baytown)
01560 Filter Fabric Fence (City of Baytown)
01561 Reinforced Filter Fabric Barrier(City of Baytown)
01562 Waste Material Disposal (City of Baytown)
01563 Tree and Plant Protection (City of Baytown)
01564 Control of Ground Water and Surface Water(City of Baytown)
01565 TPDES Requirements (City of Baytown)
01566 Source Controls for Erosion and Sedimentation (City of Baytown)
01570 Trench Safety System (City of Baytown)
01580 Project Identification Signs (City of Baytown)
01580a Project Identification Signs Exhibit(Added in Addendum 2)
01600 Materials and Equipment(City of Baytown)
01630 Product Options and Substitutions (City of Baytown)
9
EXHIBIT 'B'
DUROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety & Vehicle Service Center
Phases IB
PROJECT MANUAL
01720 Field Surveying (City of Baytown)
01750 Starting Systems (City of Baytown)
01760 Project Record Documents (City of Baytown)
01770 Contract Closeout (City of Baytown)
01 21 00 ALLOWANCES
01 2200 UNIT PRICES
01 25 00 SUBSTITUTION PROCEDURES
01 3310 BIM COORDINATION (Durotech)
01 45 00 WINDSTORM CONSTRUCTION REQUIREMENTS (Datum Engineers)
01 45 29 TESTING LABORATORY SERVICES (Datum Engineers)
01 80 00 COMCHECK ENVELOPE REPORT
01 91 13 GENERAL COMMISSIONING REQUIREMENTS(McMacCX)
01 91 14 FUNCTIONAL TESTING REQUIREMENTS(McMacCX)
01 91 15 BUILDING ENCLOSURE COMMISSIONING AND TESTING (McMacCX)
DIVISION 02: SITE WORK I EXISTING CONDITIONS
02200 Site Preparation (City of Baytown)
02220 Site Demolition (City of Baytown)
02252 Cement Stabilized Sand (City of Baytown)
02255 Bedding, Backfill, and Embankment Materials (City of Baytown)
02315 Excavation and Backfill for Detention Ponds (City of Baytown)
02316 Excavation and Backfill for Roadways (City of Baytown)
02317 Excavation and Backfill for Structures (City of Baytown)
02318 Excavation and Backfill for Utilities (City of Baytown)
02330 Embankment (City of Baytown)
02335 Subgrade (City of Baytown)
02370 Geotextile (City of Baytown)
02415 Augering Pipe or Casing for Sewers (City of Baytown)
02417 Augering Pipe or Casing for Water Lines (City of Baytown)
02430 Tunnel Grout (City of Baytown)
02510 Water Mains (City of Baytown)
02511 Water Meters (City of Baytown)
02512 Polyethylene Wrap (City of Baytown)
02513 Steel Pipe and Fittings for Large Diameter Water Lines (City of Baytown)
02514 Fire Hydrant Assembly (City of Baytown)
02515 Water Tap and Service Line Installation (City of Baytown)
02520 Valve Boxes, Meter Boxes, and Meter Vaults (City of Baytown)
02530 Gravity Sanitary Sewers (City of Baytown)
02531 Sanitary Sewer Service Leads or Reconnections (City of Baytown)
02532 High Density Polyethylene (HDPE) Solid Wall Pipe (City of Baytown)
02532W High Density Polyethylene (HDPE) Solid Wall Pipe for Water(City of Baytown)
02533 Sanitary Sewage Force Mains (City of Baytown)
02534 PVC Pipe (City of Baytown)
02540 Tapping Sleeves and Valves (City of Baytown)
02541 Water and Wastewater Line Valves (City of Baytown)
02542 Concrete Manholes and Accessories (City of Baytown)
02582 Thermoplastic Pavement Markings (City of Baytown)
02603 Frames, Grates, Rings, and Covers (City of Baytown)
10
EXHIBITS'
DUROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety & Vehicle Service Center
Phases IB
PROJECT MANUAL
02624 Structural Plate Culvert Structures (City of Baytown)
02628 Jacking Pipe or Box (City of Baytown)
02629 Safety End Treatments (City of Baytown)
02630 Storm Sewers (City of Baytown)
02631 Precast Inlets, Headwalls, and Wingwalls (City of Baytown)
02632 Cast-in-Place Inlets, Headwalls, and Wingwalls (City of Baytown)
02633 Adjusting Manholes, Inlets, and Valve Boxes (City of Baytown)
02634 Ductile Iron Pipe and Fittings (City of Baytown)
02635 Steel Pipe and Fittings (City of Baytown)
02636 Polyurethane Coating on Steel or Ductile Iron Pipe (City of Baytown)
02710 Base Course for Pavement(City of Baytown)
02741 Asphaltic Concrete Pavement(City of Baytown)
02742 Prime Coat(City of Baytown)
02743 Tack Coat(City of Baytown)
02744 Single Course Surface Treatment(City of Baytown)
02751 Concrete Pavement (City of Baytown)
02762 Temporary and Removable Reflectorized Pavement Marking (City of Baytown)
02770 Curb, Curb &Gutter, and Headers (City of Baytown)
02771 Concrete Sidewalks (City of Baytown)
02775 Concrete Driveways (City of Baytown)
02811 Landscape Irrigation (City of Baytown)
02821 Chain Link Fences and Gates (City of Baytown)
02910 Topsoil (City of Baytown)
02921 Hydromulch Seeding (City of Baytown)
02922 Sodding (City of Baytown)
02931 Landscape and Tree Planting (City of Baytown)
02980 Pavement Repair and Resurfacing (City of Baytown)
02981 Blast Cleaning of Pavement(City of Baytown)
02985 Fiber Optics (City of Baytown)
Fiber Optics Attachment A
DIVISION 03: CONCRETE
03100 Formwork (City of Baytown)
03300 Cast In Place Concrete (City of Baytown)
03310 Structural Concrete (City of Baytown)
03600 Structural Grout(City of Baytown)
03 10 00 CONCRETE FORMING AND ACCESSORIES (Datum Engineers)
03 20 00 CONCRETE REINFORCING (Datum Engineers)
03 30 00 CAST-IN-PLACE CONCRETE (Datum Engineers)
03 35 00 CONCRETE FLOOR FINISHING
03 35 43 GROUND AND POLISHED CONCRETE
DIVISION 04: MASONRY
04 20 00 UNIT MASONRY
DIVISION 05: METALS
05 12 00 STRUCTURAL STEEL FRAMING (Datum Engineers)
0531 13 STEEL FLOOR DECKING AND SHEAR STUDS (Datum Engineers)
11
EXHIBIT 'B'
DUROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety & Vehicle Service Center
Phases IB
PROJECT MANUAL
05 50 00 METAL FABRICATIONS
05 51 00 METAL STAIRS
DIVISION 06: WOOD, PLASTICS, AND COMPOSITES
06 10 00 CARPENTRY
0641 16 PLASTIC-LAMINATE-FACED ARCHITECTURAL CABINETS
0661 16 SOLID SURFACING FABRICATIONS
DIVISION 07: THERMAL AND MOISTURE PROTECTION
0721 00 THERMAL INSULATION
07 26 00 VAPOR BARRIER
07 27 00 SHEET AIR AND WATER BARRIERS
0741 13 METAL WALL AND ROOF PANELS
07 62 00 SHEET METAL FLASHING AND TRIM
0771 00 ROOF SPECIALTIES
07 92 00 JOINT SEALANTS
DIVISION 08: OPENINGS
08 11 13 HOLLOW METAL DOORS AND FRAMES
0831 13 ACCESS DOORS AND PANELS
08 36 00 OVERHEAD DOORS (Revised in Addendum 4)
0841 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 45 23 INSULATED TRANSLUCENT WALL PANELS
0871 00 FINISH HARDWARE (Revised in Addendum 4)
08 80 00 GLAZING
08 91 19 FIXED LOUVERS
DIVISION 09: FINISHES
09 23 00 GYPSUM BOARD AND NON-STRUCTURAL FRAMING
09 30 00 TILING
0951 00 ACOUSTICAL CEILINGS
09 65 13 RESILIENT BASE AND ACCESSORIES
09 65 13.23 RESILIENT RUBBER STAIR TREAD WITH RISERS
09 67 23 RESINOUS FLOORING
09 90 00 PAINTING
DIVISION 10: SPECIALTIES
10 00 00 MISCELLANEOUS ACCESSORIES
10 14 00 SIGNAGE
10 14 26 POST AND PANEL PYLON SIGNAGE
10 28 00 TOILET AND SHOWER ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
10 70 00 ALUMINUM CANOPY
DIVISION 11: EQUIPMENT
11 5224 FLAT SCREEN TV MOUNTS
DIVISION 12: FURNISHINGS
12
EXHIBITS'
DURO I 'ECH
BUILDERS OF INTEGRITY
Baytown Public Safety & Vehicle Service Center
Phases IB
PROJECT MANUAL
12 24 00 ROLLER SHADES
12 36 61 SIMULATED STONE COUNTERTOPS
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
DIVISION 13: SPECIAL CONSTRUCTION
13 34 19 METAL BUILDING SYSTEMS (Datum Engineers)
End of Volume 1
Volume 2
DIVISION 20: MECHANICAL SYSTEMS
Not Used
DIVISION 21: FIRE SUPPRESSION
21 13 13 WET STANDPIPE AND SPRINKLER SYSTEMS (E & C Engineers)
DIVISION 22: PLUMBING
22 00 00 PLUMBING PIPING SYSTEMS (E &C Engineers)
22 05 29 HANGERS &SUPPORTS FOR PLUMBING PIPING EQUIPMENT(E&C Engineers)
22 08 00 COMMISSIONING OF PLUMBING (McMacCX)
22 10 00 PLUMBING PIPING VALVES AND ACCESSORIES (E & C Engineers)
22 10 30 PLUMBING SPECIALTIES (E &C Engineers)
221400 ELECTRIC DOMESTIC WATER HEATERS (POINT OF USE) (E&C Engineers)
22 15 00 PLUMBING PUMPS (E &C Engineers)
22 40 00 PLUMBING FIXTURES (E &C Engineers)
22 45 00 EMERGENCY SHOWER AND EYE WASH (E &C Engineers)
DIVISION 23: HVAC SYSTEMS
23 00 00 BASIC MECHANICAL REQUIREMENTS (E&C Engineers)
23 05 13 MOTORS (E &C Engineers)
23 05 29 SLEEVES FLASHINGS SUPPORTS AND ANCHORS (E &C Engineers)
23 05 48 VIBRATION ISOLATION (E &C Engineers)
23 05 53 MECHANICAL IDENTIFICATION (E &C Engineers)
23 05 93 TESTING ADJUSTMENT AND BALANCING—(TAB FIRM) (E &C Engineers)
23 05 94 TESTING ADJUSTING AND BALANCING—(CONTRACTOR)(E &C Engineers)
23 07 13 DUCTWORK INSULATION (E& C Engineers)
23 07 19 PIPING INSULATION (E &C Engineers)
23 08 00 COMMISSIONING OF HVAC (McMacCX)
23 08 01 COMMISSIONING OF BUILDING AUTOMATION SYSTEMS (McMacCX)
23 09 23 DIRECT DIGITAL CONTROL SYSTEMS (E & C Engineers)
23 09 93 SEQUENCE OF OPERATIONS (E &C Engineers)(Revised in Addendum 3)
23 29 23 VARIABLE FREQUENCY DRIVES (E &C Engineers)
2331 00 DUCTWORK(E &C Engineers)
23 33 00 DUCTWORK ACCESSORIES (E& C Engineers)
23 34 00 FANS (E &C Engineers)
23 36 00 AIR TERMINAL UNITS (E &C Engineers)
23 37 00 AIR INLETS AND OUTLETS (E&C Engineers)
2341 00 FILTERS (E &C Engineers)
13
EXHIBIT 'B'
DUROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety & Vehicle Service Center
Phases IB
PROJECT MANUAL
23 62 13 AIR-COOLED SPLIT-SYSTEM AIR CONDITIONING UNITS (E & C Engineers)
DIVISION 26: ELECTRICAL
26 00 01 ELECTRICAL GENERAL PROVISIONS (E & C Engineers)
26 00 02 ELECTRICAL SCOPE OF WORK(E & C Engineers)
2601 25 ELECTRICAL TESTING (E & C Engineers)
26 05 01 ELECTRICAL BASIC MATERIALS AND METHODS (E & C Engineers)
26 05 19 LOW VOLTAGE CONDUCTORS AND CABLES (E & C Engineers)
26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS (E & C Engineers)
26 05 33 ELECTRICAL RACEWAYS (E & C Engineers)
26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS (E & C Engineers)
26 05 73 SHORT CIRCUIT ANALYSIS-COORDINATION STUDY(E & C Engineers)
?6 08 00 COMMISSIONING OF ELECTRICAL SYSTEMS (McMacCX)
26 09 16 ELECTRICAL CONTROLS AND RELAYS (E & C Engineers)
26 09 26 LOW VOLTAGE LIGHTING CONTROL—DIGITAL SENSORS (E &C Engineers)
26 22 00 LOW VOLTAGE TRANSFORMERS (E & C Engineers)
26 24 16 PANELBOARDS (E & C Engineers)
26 25 50 GENERATOR DOCKING STATION (E & C Engineers)
26 27 01 ELECTRICAL SERVICE ENTRANCE (E & C Engineers)
26 27 17 EQUIPMENT WIRING (E & C Engineers)
26 27 18 MISCELLANEOUS ELECTRICAL CONTRLS & CONTROL WIRING (E&C Engineers)
26 27 21 VOICE-DATA SYSTEM PROVISIONS (E & C Engineers)
26 27 23 AUDIO-VISUAL SYSTEM PROVISIONS (E & C Engineers)
26 27 24 SECURITY SYSTEM PROVISIONS (E & C Engineers)
26 27 26 WIRING DEVICES (E & C Engineers)
26 28 13 LOW VOLTAGE FUSES (E & C Engineers)
2628 17 ENCLOSED CIRCUIT BREAKERS (E & C Engineers)
26 28 18 ENCLOSED SWITCHES (E & C Engineers)
26 29 13 ENCLOSED MOTOR CONTROLLERS (E & C Engineers)
26 32 13 STANDBY GENERATOR SETS (E & C Engineers)(Revised in Addendum 3)
26 36 23 AUTOMATIC TRANSFER SWITCHES (E & C Engineers)
2641 13 LIGHTNING PROTECTION FOR STRUCTURES (E & C Engineers)
26 43 13 THOR SYSTEMS MASTER SPD SPECIFICATIONS (E & C Engineers)
2651 00 INTERIOR LIGHTING (E & C Engineers)
26 56 00 EXTERIOR LIGHTING (E & C Engineers)
DIVISION 27: COMMUNICATIONS
27 02 00 BASIC MATERIALS AND METHODS (DBR Engineers)
27 05 26 GROUNDING & BONDING FOR COMMUNICATIONS SYSTEMS (DBR Engineers)
27 05 28 PATHWAYS FOR COMMUNICATIONS SYSTEMS (DBR Engineers)
27 05 43 UNDERGROUND DUCTS & RACEWAYS FOR COMM SYSTEMS (DBR Engineers)
2711 00 COMMUNICATIONS EQUIPMENT ROOM FITTINGS (DBR Engineers)
27 13 00 COMMUNICATIONS BACKBONE CABLING (DBR Engineers)
27 15 00 COMMUNICATIONS HORIZONTAL CABLING (DBR Engineers)
DIVISION 28: SECURITY SYSTEMS
28 02 00 BASIC MATERIALS AND METHODS FOR SAFETY AND SECURITY SYSTEMS (DBR)
28 10 00 ACCESS CONTROL SYSTEM (DBR Engineers)
14
EXHIBITS'
DURC)TECH
BUILDERS OF INTEGRITY
Baytown Public Safety & Vehicle Service Center
Phases IB
PROJECT MANUAL
28 20 00 VIDEO SURVEILLANCE SYSTEM (DBR Engineers)
28 31 03 ADDRESSABLE FIRE ALARM SYSTEM (E & C Engineers)
DIVISION 31: EARTHWORK
31 31 16 TERMITE CONTROL
31 63 29 DRILLED PIERS (Datum Engineers)
DIVISION 32: EXTERIOR IMPROVEMENTS
32 31 00 STEEL ROLLING GATE SYSTEM
3231 15 CONCRETE SCREEN WALLS AND FENCES
3231 19 ALUMINUM ORNAMENTAL FENCE SYSTEM
DIVISION 33: UTILITIES
(Not Used)
15
EXHIBIT `C'
DUROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety &Vehicle Service Center
Phases IB
LIST OF DRAWINGS
Baytown Public Safety— Phase I—Vehicle Service Center Re-Issued October 15, 2021
BVG4 PROJECT 20004: SPECIFICATIONS—CONSTRUCTION DOCUMENTS FOR PERMITTING
June 18, 2021
Section 00 01 15
LIST OF DRAWINGS
General
G-000 Cover
G-001 Sheet List(Revised in Addendum 3)
G-002 Symbols, Abbreviations, General Notes
G-003 Accessibility Standards
G-100 Code Review Sheet
G-201 3-Dimensional Building Isometrics
G-202 3-Dimensional Building Isometrics
Civil
C1 Plat (1 of 2)
C2 Plat (2 of 2)
C3 Topographic Survey (1 of 4)
C4 Topographic Survey (2 of 4)
C5 Topographic Survey (3 of 4)
C6 Topographic Survey (4 of 4)
C7 General Notes
C8 Overall Demolition Plan
C9 Overall Sanitary Sewer Plan
C10 Sanitary Sewer Plan (1 of 3)
C11 Sanitary Sewer Plan (2 of 3)
C12 Sanitary Sewer Plan (3 of 3)
C13 Sanitary Sewer Insets
C14 Overall Water Distribution Plan
C15 Water Distribution Plan (1 of 2)
C16 Water Distribution Plan (2 of 2)
C17 Overall Storm Sewer Plan
C18 Storm Sewer Plan (1 of 3)
C19 Storm Sewer Plan (2 of 3)
C20 Storm Sewer Plan (3 of 3)
C21 Overall Dimension Control and Paving Plan
C22 Dimension Control and Paving Plan (1 of 3)
C23 Dimension Control and Paving Plan (2 of 3)
C24 Dimension Control and Paving Plan (3of 3)
C25 Overall Grading Plan
C26 Grading Plan (1 of 3)
C27 Grading Plan (2 of 3)
C28 Grading Plan (3 of 3)
C29 Grading Insets
C30 Existing Drainage Area Map
C31 Proposed Drainage Area Map
16
EXHIBIT 'C'
DURUTECH
BUILDERS OF INTEGRITY
Baytown Public Safety & Vehicle Service Center
Phases IB
LIST OF DRAWINGS
C32 Storm Sewer Calculations
C33 Plan and Profile (1 of 9)
C34 Plan and Profile (2 of 9)
C35 Plan and Profile (3 of 9)
C36 Plan and Profile (4 of 9)
C37 Plan and Profile (5 of 9)
C38 Plan and Profile (6 of 9)
C39 Plan and Profile (7 of 9)
C40 Plan and Profile (8 of 9)
C41 Plan and Profile (9 of 9)
C42 Detention Pond Plan and Calculations
C43 Stormwater Pollution Plan
C44 Stormwater Pollution Details
C45 Traffic Control Details
C46 Project Specific Details (1 of 2)
C47 Project Specific Details (2 of 2)
C48 City of Baytown Standard Details (1 of 6)
C49 City of Baytown Standard Details (2 of 6)
C50 City of Baytown Standard Details (3 of 6)
C51 City of Baytown Standard Details (4 of 6)
C52 City of Baytown Standard Details (5 of 6)
C53 City of Baytown Standard Details (6 of 6)
C54 Proctor Road Plan and Profile
C55 Proctor Road Grading Plan and Typical Cross Section
C56 Proctor Road Drainage Area Map and Calculations
Landscape
L1 Overall Landscape Plan
L2 Landscape Plan (1 of 4)
L3 Landscape Plan (2 of 4)
L4 Landscape Plan (3 of 4)
L5 Landscape Plan (4 of 4)
L6 Amenity Landscape Plan
L7 Landscape Schedule and Requirements
L8 Landscape Details
L9 Landscape Specifications
Irrigation
IR1 Overall Irrigation Plan
IR2 Irrigation Plan (1 of 5)
IR3 Irrigation Plan (2 of 5)
IR4 Irrigation Plan (3 of 5)
IR5 Irrigation Plan (4 of 5)
IR6 Irrigation Plan (5 of 5)
IR7 Irrigation Details and Specifications
Structural
17
EXHIBIT `C'
DUROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety & Vehicle Service Center
Phases IB
LIST OF DRAWINGS
S-001 Typical Abbreviations, Symbols and Plan Notes (Revised in Addendum 2)
S-002 General Notes
S-003 Required Special Inspections
S-201 Building S and T
S-202 Building U, V, W and X (Revised in Addendum 2)
S-301 Typical Expansive Clay Soil and Belled Pier Details
S-302 Typical Slab-On-Grade Details (Revised in Addendum 2)
S-303 Typical Concrete Foundation Details
S-310 Concrete Section and Details 'Revised in Addendum 2)
S-401 Simple Beam Connection Details
S-402 Composite Steel Beam Details
S-403 Typical Steel Details
S-501 Typical Masonry Details
Architectural
A-001 Site Plan—Overall
A-011 Site Plan —Phase 1
A-012 Site Plan Details
A-013 Site Plan Details
A-101 Floor Plans Building T—Maintenance
A-102 Floor Plans Storage Buildings U, V, W &X
A-141 Wall Types
A-161 Reflected Ceiling Plans—Building T
A-162 Reflected Ceiling Plans—Buildings U, V, W&X
A-181 Roof Plan Buildings S &T
A-182 Roof Plan Buildings U, V, W& X
A-201 Exterior Building Elevations Buildings S &T
A-202 Exterior Elevations Buildings U, V, W &X
A-301 Building Sections—Buildings S & T
A-302 Building Sections—Buildings U, V, W & X
A-401 Wall Sections - Building T
A-402 Wall Sections - Buildings U, V, W & X
A-403 Stair Section & Details
A-451 Section Details
A-452 Plan Details
A-501 Window & Storefront Elevations
A-601 Door Schedule & Details
Interior Design
ID-101 Finish Floor Plans Building T
ID-102 Finish Floor Plans Buildings U, V, W&X
ID-161 FF&E Equipment Plan (Revised in Addendum 3)
ID-162 FF&E Equipment Plan Buildings U, V,W&X
ID-201 Interior Elevations (Revised in Addendum 1)
ID-202 Interior Elevations
ID-401 Millwork Details (Revised in Addendum 1)
18
EXHIBIT 'C'
DURO-FECH
BUILDERS OF INTEGRITY
Baytown Public Safety & Vehicle Service Center
Phases IB
LIST OF DRAWINGS
Mechanical
M-000 Mechanical Abbreviations and Symbols
M-201 Mechanical Floor Plan Level 1 —Buildings U, V, W&X
M-202 Mechanical Floor Plan Level 1 —Buildings S &T
M-203 Mechanical Floor Plan Level 1 —Building T
M-204 Mechanical Floor Plan Mezzanine—Building T
M-205 Mechanical Roof Plan Building U,V,W&X
M-206 Mechanical Roof Plan Building T
M-207 Mechanical Roof Plan Building T
M-301 Mechanical Piping Plan Level 1 —Buildings U, V, W& X
M-302 Mechanical Piping Plan Level 1 —Buildings S &T
M-303 Mechanical Piping Plan Level 1 —Building T
M-304 Mechanical Piping Plan Mezzanine—Building T
M-501 Mechanical Details
M-502 Mechanical Details
M-503 Mechanical Details
M-701 Mechanical Controls Diagrams
M-702 Mechanical Controls Diagrams
M-801 Mechanical Schedules
M-802 Mechanical Schedules
Electrical
E-000 Electrical Abbreviations and Symbols
E-010 Electrical Site Plan
E-201 Electrical Lighting Plan Level 1 —Buildings U, V, W&X
E-202 Electrical Lighting Plan Level 1 —Buildings S &T
E-203 Electrical Lighting Plan Level 1 —Building T
E-204 Electrical Lighting Plan Mezzanine—Building T
E-301 Electrical Power Plan Level 1 —Buildings U, V, W&X
E-302 Electrical Power Plan Level 1 —Buildings S &T (Revised in Addendum 3)
E-303 Electrical Power Plan Level 1 —Building T (Revised in Addendum 3)
E-304 Electrical Power Plan Mezzanine—Building T
E-401 Electrical Power Mechanical Plan—Building U
E-402 Electrical Power Mechanical Roof Plan—Buildings U, V&X
E-403 Electrical Power Mechanical Level 1 Plan—Building T
E-404 Electrical Power Mechanical Mezzanine Plan—Building T
E-405 Electrical Power Mechanical Roof Plan—Building T
E-406 Electrical Power Mechanical Roof Plan—Building T
E-407 Electrical Power Mechanical Roof Plan—Building T
E-501 Electrical Fire Alarm Plan Level 1 —Buildings U, V, W&X
E-502 Electrical Fire Alarm Plan Level 1 —Building T
E-503 Electrical Fire Alarm Plan Level 1 —Building T
E-504 Electrical Fire Alarm Plan Mezzanine—Building T
E-701 Electrical Details
E-801 Electrical Riser Diagrams (Revised in Addendum 3)
E-901 Electrical Schedules
E-902 Electrical Schedules (Revised in Addendum 3)
E-903 Electrical Schedules (Revised in Addendum 3)
19
EXHIBIT 'C'
DUROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety & Vehicle Service Center
Phases IB
LIST OF DRAWINGS
Plumbing
P-000 Plumbing Abbreviations and Symbols
P-010 Plumbing Overall Site Plan— Natural Gas Distribution
P-011 Plumbing Site Plan
P-101 Plumbing Underfloor Floor Plan Level 1 — Buildings U, V, W&X
P-102 Plumbing Underfloor Floor Plan Level 1 — Buildings S &T (Revised in Addendum 1)
P-103 Plumbing Underfloor Floor Plan Level 1 — Building T
P-201 Plumbing Floor Plan Level 1 —Buildings U, V& X
P-202 Plumbing Floor Plan Level 1 & Mezzanine— Building T
P-203 Plumbing Floor Plan Level 1 — Building T
P-301 Plumbing Roof Plan— Buildings S & T
P-302 Plumbing Roof Plan—Buildings U, V, W&X
P-401 Plumbing Enlarged Plans (Revised in Addendum 1)
P-501 Plumbing Underfloor Riser Area A
P-502 Plumbing Underfloor Riser Area B &C
P-503 Plumbing Underfloor Riser Buildings U, V& X
P-504 Plumbing Water Riser Buildings U, V & X
P-505 Plumbing Water Riser Building T Area A & C
P-506 Plumbing Water Riser Building T Area B
P-601 Plumbing Details
P-701 Plumbing Schedules
Technology
T-001 Low Voltage Symbol Legend
T-101 Technology Site Plan
T-111 Composite Level 1 Technology Routing Plan
T-201 1st Level Technology Floor Plan—Maintenance Building T
T-202 Technology Plans Storage Buildings U, V, W & X, T Mezzanine
T-301 Technology Enlarged Plans
T-302 Network Enclosure Elevations
T-601 Technology Details
T-602 Security Details
T-603 Security Door Details
T-604 Security Door Details
T-605 Security Gate Details
T-606 Fiber Riser Diagram
END OF SECTION
20
EXHIBIT `D'
DUROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety & Vehicle Service Center
Phases IB
LIST OF ADDENDA
1. Addendum No. 1 Issued on October 22, 2021
2. Addendum No. 2 Issued on November 5, 2021
3. Addendum No. 3 Issued on November 12, 2021
4. Addendum No.4 Issued on November 16, 2021
5. Addendum No. 5 Issued on November 22, 2021
21
EXHIBIT 'E'
DURUTECH
BUILDERS OF INTEGRITY
Baytown Public Safety — Phase 1 B —Vehicle Service Center
QUALIFICATIONS & ASSUMPTIONS
DIVISION 00— PROCUREMENT AND CONTRACTING REQUIREMENTS
1. Excluded is Material Testing.
2. Excluded are Utility Assessment, Inspection Fees, Impact Fees, and Tap
Fees.
3. Utility Company agreements (terms and conditions), easements and
coordination which will serve as the termination point for Durotech to make
connections for building service shall be the responsibility of the Owner and
Design Team (Architect/MEP Engineer). Durotech will assist the Owner and
Design Team in coordinating the activities with the Utility Company(s).
4. All required utility providers (water, sewer, storm discharge point, electric,
gas, fiber, phone lines) are the responsibility of the owner to coordinate and
execute necessary agreements so that the utilities are installed per the
contractor's schedule for construction usage and systems startup.
5. We assume that there will be adequate water supply with sufficient pressure
available for the proper functioning of Fire Sprinkler system and other
systems.
6. Excluded are any Building Permit fees. Permit Fee costs to be by Owner.
7. Without regard to any other provision of this Agreement, Owner shall be
liable to Contractor for additional costs incurred by Contractor as the result
of any applicable state or local sales, excise, or use tax, governmental
payroll tax or healthcare tax if the tax is applicable to the Project, the Project
is not tax exempt from the specific tax and the tax became effective after
the date of execution of the Contract.
8. Electronic Files and CAD Files will be provided by the Architect/Engineer of
record for the purpose of preparing shop drawings and 3D models at no
cost to the General Contractor and/or Subcontractors. A signed release will
be submitted to the Architect/Engineer before electronic files are released
by the Architect/Engineer.
9. Excluded are unforeseen underground conditions or obstructions not
indicated in contract documents.
10. Owner and Contractor agree that all manufacturer's warranties, and
subcontractor's warranties which extend beyond Contractor's warranty
period, are hereby assigned to and run directly from the manufacturer to the
22
EXHIBIT 'E'
') U ROTEC H
BUILDERS OF INTEGRITY
Baytown Public Safety — Phase 1 B —Vehicle Service Center
QUALIFICATIONS & ASSUMPTIONS
Owner and from the subcontractor to the Owner, respectively. Owner
accepts these assignments and warranties, and releases and discharges
Contractor from any and all claims, liabilities, damages, costs and expenses
arising out of such manufacturer's warranties and any subcontractor's
extended warranties.
11. The Contractor's warranty excludes remedy for damage or defect caused
by abuse, material alteration to the work not executed by the Contractor,
insufficient maintenance, or maintenance not in compliance with
manufacturer's written recommendations.
12. Payment and Performance Bonds will be charged to the Owner based on
the State of Texas regulated rate.
13. The Guaranteed Maximum Price provided is a not to exceed amount for the
Cumulative Baytown Public Safety project.
Phase 1A $4,905,614
Phase 1 B & Phase 2 Generators $13,594,937
Total Phase 1 GMP $18,500,551
Individual line items within the project budget and earlier or later phase
packages are not individual Guaranteed Maximum Price amounts.
14. The GMP package is valid until January 14, 2022. The Owner will issue a
Notice to Proceed and sign the GMP Amendment on or before the stated
date.
15. Bids were solicited as a combination package for Phases 113, 2, and 3 to
maximize overall cost savings. Therefore, the Guaranteed Maximum Price
for Phase 1 B is contingent upon the approval of the Guaranteed Maximum
Price for Phases 2 and 3 to be submitted and approved at the January 27tn
2022 City Council meeting.
16. Durotech, Inc reserves the right to review the Issued for Construction documents to
confirm that changes to the Contract Documents referenced in this proposal are
consistent with the changes proposed during the Cost Savings process.
17. The proposed cost saving recommendations by Durotech, Inc. shall be
subject to the review and approval of the Architect, Owner, and the Owner's
Professional Consultants. Durotech, Inc. is not required to ascertain that
the cost savings are in accordance with applicable laws, statutes,
23
EXHIBIT 'E'
DURO' TECH
BUILDERS OF INTEGRITY
Baytown Public Safety— Phase 1 B —Vehicle Service Center
QUALIFICATIONS & ASSUMPTIONS
ordinances, codes, rules and regulations, or lawful orders of public
authorities. The Contractors review of the proposed cost savings is in the
capacity as a Construction Manager and not as a Design Professional.
18. For any delays caused by events outside of Contractor's control, including
but not limited to Acts of God, pandemics, epidemics, acts of governmental
authorities, acts of civil authorities, acts of war or terrorism, unanticipated
material shortages and price escalations, labor disputes and utilities delays,
Owner shall grant additional time extensions and price increases to
Contractor when properly documented, substantiated and approved by
Owner, subject to Contractor's right to dispute Owner's decision under the
claims procedures of the Contract
19. Stipulated Billing Rates:
No. Description Rate
1 General Contract amount per
Liability/Umbrella thousand x $7.75
Insurance
2 Builder's Risk Contract
Insurance amount/hundred x
0.05412 x # of
months
3 Project $115.00 per hour
Executive
4 Project Manager $76.00 per hour
5 Estimator $55.00 per hour
6 Safety/Field $101.00 per hour
Operation
Manage
7 Lead $79.00 per hour
Su erintendent
8 Assistant $48.00 per hour
Superintendent
9 Project Engineer $41.00 per hour
10 Quality Control $69.00 per hour
Inspector
11 Contract $33.00 per hour
Administrator
24
EXHIBIT 'E'
DUROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety — Phase 1 B —Vehicle Service Center
QUALIFICATIONS &ASSUMPTIONS
12 Preconstruction $97.00 per hour
Manager
13 Quality Control $69.00 per hour
Manager
14 BIM Coordinator $55.00 per hour
15 IT Coordinator $95.00 per hour
16 Intern $25.00 per hour
17 Labor Burden 42.5%
Labor Rates: Per
Hour
Semi-skilled Labor $27.00
Skilled Labor $30.00
Foreman/Operator $38.00
20. Billable rates will be subject to audit for hours worked only.
DIVISION 01 — GENERAL REQUIREMENTS
21. Section 01140 — Contractor's Use of Premises: Excluded is paragraph
1.5.A.
22. Section 01564 — Control of Ground Water and Surface Water: Excluded is
any ground water control systems, well-point systems, eductor and ejector-
type systems, deep wells, and piezometers or monitoring wells.
23. Section 01 21 00 —Allowances: Excluded are the following:
Para 1.05.13 — Entire paragraph
Para 1.06.E — Last sentence "These costs include delivery, installation,
insurance, equipment rental, and similar costs".
24. Section 01 21 00 — Allowances: The Construction Contingency Allowance
will be used jointly for the Owner's and Construction Manager's purposes.
DIVISION 02— SITEWORK/EXISTING CONDITIONS
DIVISION 03— CONCRETE
25. Section 03100 — Concrete Formwork: Excluded are any corrugated
fiberboard carton forms as mentioned in paragraph 2.01.1 and 3.01.J.
25
EXHIBITS
D U ROTEC H
BUILDERS OF INTEGRITY
Baytown Public Safety — Phase 1 B —Vehicle Service Center
QUALIFICATIONS & ASSUMPTIONS
26. Section 03300 — Cast-In-Place Concrete: Excluded are any corrugated
fiberboard carton forms as mentioned in paragraph 2.06.1 and 3.04.J.
27. Section 03 35 43 — Polished Concrete: Excluded is any `Dye' as mentioned
in paragraph 2.03.0 and 3.03.G.
DIVISION 04— MASONRY
DIVISION 05— METALS
28. Section 05 12 00 — Structural Steel Framing:
a] Excluded is any galvanized cooling tower grillage as mentioned in
paragraph 1.02.A.1.
b] Excluded is any survey work by a licensed professional engineer or
public surveyor as mentioned in paragraph 3.02.A.
29. Section 05 31 13 — Steel Floor Decking and Shear Studs: Excluded is
paragraph 2.05.A. There is no sprayed fireproofing in this project.
30. Excluded is any galvanizing of structural steel members in enclosed
unconditioned space areas of the building.
DIVISION 06— WOOD, PLASTICS, AND COMPOSITES
31. Section 06 41 16 — Plastic Laminate-Faced Architectural Cabinets:
Excluded is paragraph 1.02.A.4 — Magnetic dry erase plastic laminate
panels and paragraph 2.10 — Plastic Laminate Magnetic Marker Board.
32. Section 06 61 16 — Solid Surfacing Fabrications:
a] Excluded are any solid surface shower panels as mentioned in
paragraph 1.01.A.2 and 2.01.B.
b] Excluded are any solid surface shower panels noted as H1, H2 and
H3 on the architectural drawings.
DIVISION 07— THERMAL AND MOISTURE PROTECTION
33. Section 07 21 00 — Thermal Insulation:
a] Excluded is any rigid board insulation or spray-in-place foam
insulation.
b] Included is the following at Building T, U, V & X
Building T
Primary Roof Insulation
2 Layer— R-30 (19+11) simple Saver System (6 inches + 3.8 inches)
25,869 SF
Primary Wall Insulation
26
EXHIBIT 'E'
D U Ro rECH
BUILDERS OF INTEGRITY
Baytown Public Safety — Phase 1 B —Vehicle Service Center
QUALIFICATIONS & ASSUMPTIONS
1 Layer—R-25 Simple Saver System (8 inches)
17,421 SF
1 Layer—R-19 Simple Saver System (6 inches)
7,257 SF
Building U
Primary Roof Insulation
2 Layer—R-30 (19+11)simple Saver System (6 inches + 3.8 inches)
8,890 SF
Primary Wall Insulation
1 Layer— R-25 Simple Saver System (8 inches)
4,107 SF
1 Layer— R-19 Simple Saver System (6 inches)
9,311 SF
Building V
Primary Roof Insulation
2 Layer— R-30 (19+11)simple Saver System (6 inches + 3.8 inches)
3,410 SF
Primary Wall Insulation
1 Layer— R-13 Simple Saver System (4.4 inches)
5,568 SF
Building X
Primary Roof Insulation
2 Layer—R-30 (19+11)simple Saver System (6 inches +3.8 inches)
788 SF
Primary Wall Insulation
1 Layer— R-13 Simple Saver System (4.4 inches)
2,533 SF
c] Included is 2" polyisocyanu rate board insulation and dampproofing
at exterior sheathing walls in Building T (Grid Line 8-10/13-D and Grid
Line 8-10/G-N).
34. Included is the following under the metal roof panels at Building T (Grid Line
8-10/13-1) and Grid Line 8-10/G-N):
a] Loose lay 2 layers of 2.6 polyisocyan u rate insulation (R-30) to metal
deck.
b] Mechanically attach 3/" exterior grade plywood (non-fire rated).
c] Fully adhere new self-adhering peel and stick underlayment.
35. Section 07 27 00 — Sheet Air and Water Barriers: Excluded is this section
in its entirety.
36. Section 07 41 13 — Metal Roof and Wall Panels: Excluded is this section in
its entirety.
27
EXHIBIT 'E'
DUROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety — Phase 1 B —Vehicle Service Center
QUALIFICATIONS & ASSUMPTIONS
DIVISION 08— OPENINGS
37. Section 08 11 13 — Hollow Metal Doors & Frames: Included are Hollow
Metal Frames as manufactured by Pearland Industries or Door Pro
Systems.
38. Section 08 45 23 — Insulated Translucent Wall Panels:
a] Excluded are any requirements related to Texas Department of
Insurance.
DIVISION 09— FINISHES
39. Section 09 23 00— Gypsum Board and Non-Structural Framing:
a] Excluded is paragraph 2.09.0 — Isolation strip at exterior walls.
40. Section 09 30 00 — Tiling: Excluded is epoxy grout. Specifications require
standard grout unless otherwise indicated. The drawings do not indicate
epoxy grout.
41. Section 09 65 13.23 — Resilient Rubber Stair Treads with Risers: Excluded
is this section in its entirety.
DIVISION 10— SPECIALTIES
42. Section 10 00 00— Miscellaneous Accessories: Included is the labor only to
install the Bulletin Board furnished by the Owner.
43. Section 10 14 00 — Signage:
a] Included is an allowance of$25,000 for Signage.
b] Excluded is paragraph 3.03.13 — Client Logo Signage.
44. Section 10 14 26 — Post and Panel Pylon Signage: Excluded is this section
in its entirety.
45. Excluded are any Knox Boxes in Phase 1 B.
46. Section 10 70 00 — Aluminum Canopy: Included are Aluminum Canopies
for Building `S' and Building 'W' as manufactured by Avadek. The finish of
the aluminum canopy will be clear anodized.
DIVISION 11— EQUIPMENT
47, Section 11 52 24 — Flat Screen TV Mounts: Included is the labor only to
install the Flat Screen TV Mounts furnished by the Owner.
28
EXHIBIT 'E'
) UROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety — Phase 1 B —Vehicle Service Center
QUALIFICATIONS & ASSUMPTIONS
DIVISION 12— FURNISHINGS
DIVISION 13— SPECIAL CONSTRUCTION
48. Section 13 34 19 — Metal Building Systems
a] The Pre-Engineered Metal Building will be designed and fabricated
by Alliance Steel Building Systems.
b] Design Information
Building Code: IBC 2015
Collateral Load: Per Drawings
Wind Load: 160 MPH
Seismic Imp. Factor: 1.50
Live Load (Roof): 20 PSF
Deflections: Per Specifications
Wind Exp. Factor: C
Snow Imp. Factor: 1.20
Reducible Live Load: Yes
Snow Load (Ground): 0 PSF
Seismic (Ss) 0.070 (SI) 0.040
Wind Imp. Factor: Risk IV
c] Roof& Wall Material Finish Profile
Roof Panel 24 gauge Fluropon/Kynar
Alliance Seam 24
Wall Panel 24 gauge Fluropon/Kynar
LT3.3
Wall Liner 26 gauge Std Weather X
PBM
Trim 26 gauge Fluropon/Kynar
Gutter&
Downspouts
Liner Trim 24 gauge Std Weather X
Liner Trim
d] Excluded is all ceiling liner panel in Buildings T, U, V and X.
e] Included is interior wall liner panel up to a height of 14' 0" AFF in
Building T.
f] Included is interior wall liner panel up to a height of 8' 0" AFF in
Building U, V and X.
g] All interior liner panel to be 26 gauge, PBM "WXL" finish.
h] All exterior wall liner panel to be 24-gauge, Vertical LT3.3, Kynar
finish.
29
EXHIBIT `E'
D U ROTEC H
BUILDERS OF INTEGRITY
Baytown Public Safety — Phase 1 B — Vehicle Service Center
QUALIFICATIONS & ASSUMPTIONS
i] Included is partition wall framing above 10' 0" AFF along gridline
15/16 in Building T.
j] Furnish 22 ga, PBM, White at roof at Deck of Storage area in building
T.
k] Remove wall girts and provide wind girt at Breakroom and Storage
area in Building T.
1] Roof panels to be 24 gauge, "standard Alliance Kynar colors", UL90
rated, Alliance Seam 24 standing seam panels with concealed clips
and fasteners. All roof panels to be "machine seamed" at sidelaps
as specified.
m] Interior wall liner to be 26 gauge, "standard Alliance Kynar colors",
"PBM", single-skin panels with exposed fasteners to be installed at
the Apparatus Bays, Storage, Vehicle Bays, Dive / Bomb Team,
Trailers, and the Enclosed Bay of the Auto Theft.
n] Soffit at the below eave canopies to be 24 gauge, "standard Alliance
Kynar colors", "A-12" single-skin panels with concealed fasteners to
be installed over pre-engineered framing components as provided by
Alliance.
o] All standard building trim, eave gutter and downspouts to be 26
gauge, "standard Alliance Kynar colors".
p] Alliance to provide metal building column reactions and anchor bolt
settings for foundation and footing design by Structural Engineer.
q] Welding of shop connections shall be in accordance with the AWS
D1.1 standard code for"Structural Welding Code—Steel" (welding in
building construction) and AWS D1.3 "Structural Welding Code—
Sheet Metal" as directed and certified by AISC and the Alliance Steel
Engineering Department requirements. An independent testing
laboratory has previously certified welders and the welding process.
Alliance is an IAS accredited facility.
r] All exposed framing at the Wash Bay, Porch Area of Breakroom, and
Auto Theft / Bays are to be hot-dipped galvanized.
s] All metal building primary and secondary framing members to be
provided with Alliance standard red-oxide primer coating, which
meets or exceeds Federal Specification TT-P-636c.
t] Included is Alliance Steel standard, 20-year roof weather tightness
warranty requirement
DIVISION 21 — FIRE SUPPRESSION
DIVISION 22— PLUMBING
30
EXHIBIT 'E'
DUROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety — Phase 1 B —Vehicle Service Center
QUALIFICATIONS & ASSUMPTIONS
49. Section 22 40 00 — Plumbing Fixtures: Included are the Owner requested
Water Closets (WC-1) in lieu of specified model. Bowl to be Model #4326-
96 and Tank to be Model #19042-96.
50. Trench Drains: Included are East Jordan Iron Works frame and grate trench
drains at Auto Shop in lieu of specified products. Grate to be Model #
6906M2 and Trench Rail to be Model # 6900Z2.
DIVISION 23— HVAC
51. Section 23 31 00 — Ductwork: Excluded is paragraph 3.05.A requiring duct
cleaning. Duct ends will be covered during construction phase to prevent
contamination by dirt and/or debris.
DIVISION 26— ELECTRICAL
52. Included are aluminum conductors in lieu of copper conductors for 1/0 and
larger feeders.
DIVISION 27— COMMUNICATIONS
53. Excluded are any Network Switches or UPS devices. These will be
provided by the Owner.
DIVISION 28—ELECTRONIC SAFETY& SECURITY
DIVISION 31 — EARTHWORK
54. Section 31 63 29 — Drilled Piers: Excluded is any casing or slurry drilling of
piers.
55. Excluded is any drying of subgrade by chemical or mechanical means.
DIVISION 32— EXTERIOR IMPROVEMENTS
56. Areas that receive Hydromulch will not be warranted for developing full turf
grass. Owner understands that Hydromulch is a 2-season maintenance
program requiring continuous maintenance including watering and fertilizer
by the Owner. Areas that are not irrigated will not be warranted for grass or
plant development and sustainability. Any temporary irrigation requirement
by the contract will only be warranted to such date the temporary irrigation
is removed.
DIVISION 33— UTILITIES
31
EXHIBIT `F'
DUROTECH
BUILDEaRS OF INTEGRITY
Baytown Public Safety — Phase 1 B —Vehicle Service Center
ALLOWANCE SCHEDULE
1. Construction Contingency Allowance $300,000
2. Signage $25,000
32
EXHIBIT `G'
DUROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety— Phase 1 B —Vehicle Service Center
SELF PERFORMED WORK ITEMS
The following scope items will be self-performed by Durotech, Inc. and will be billed against the contract
based upon the proposal submitted to and accepted by the owner and will be treated as a lump sum sub-
contract amount.
No. Description of Scope Amount
1 OFCI Items (L) $1,625
2 Miscellaneous Steel (L) $58,058
3 Safety Rails (L &M) $3,282
4 Rough Carpentry(L & M) $34,901
5 Unload &distribute Metal Doors & Frames (L) $11,012
6 Unload &distribute PLAM Doors (L) N/A
7 Install Access Doors (L& M) $1,028
8 Unload &distribute Door Hardware(L) $3,206
9 Install Louvers (L) $2,138
10 Floor Preparation (L & M) $15,552
11 Floor Protection (L& M) $6,010
12 Install Knox Box (L & M) N/A
13 Install Residential Appliances (L) $1,496
14 Final Grading (L) $50,367
15 Haul off spoils (L) $98,834
16 Remove strip/clean paving joints (L) $20,204
17 Backfill curbs (L) $11,623
18 Install Irrigation Sleeves (L & M) $11,292
TOTAL $330,627
33
EXHIBIT 'H'
DURO' TEC
BUILDERS OF INTEGRITY
Baytown Public Safety — Phase 1 B —Vehicle Service Center
UNIT PRICES
A] UNIT PRICE NO. 1: N/A
B] UNIT PRICE NO. 2: N/A
C] UNIT PRICE NO. 3: Unit Price per linear foot for piers longer or shorter than base
lengths
Pier P1: 24/72 Add: $60.00/LF Deduct: $51.00/1-F
Pier P2: 30/90 Add: $93.92/LF Deduct: $79.83/1-F
Pier P3: 18/48 Add: $33.69/1-F Deduct: $28.63/LF
Description: Unit prices shall include all labor, materials, equipment, overhead and fee
for drilled piers complete. Adjustments to Contract shall be based on total linear feet of
each pier size greater than or less than the sum of base lengths of each size.
C] UNIT PRICE NO. 4: Unit Price per linear foot for Casing of Piers
Pier P1: 24" Add: $27.10/1-F
Pier P2: 30" Add: $37.60/1-F
Pier P3: 18" Add: $17.20/1-F
Description: Unit prices shall include all labor, materials, equipment, overhead and fee
for casing of drilled piers complete.
D] UNIT PRICE NO. 4: Unit Price per linear foot for Straight Shaft piers
Convert Pier P1: 24/72 to Straight Shaft 72" dia Add: $178.23/LF
Convert Pier P2: 30/90 to Straight Shaft 90" dia Add: $264.15/LF
Convert Pier P3: 18/48 to straight Shaft 48" dia Add: $81.92/1-F
Description: Unit prices shall include all labor, materials, equipment, overhead and fee
for drilling of straight shaft piers complete.
E] UNIT PRICE NO. 5: N/A
F] UNIT PRICE NO. 6: N/A
G] UNIT PRICE NO. 7: Additional Concrete Placement:
If additional concrete is required and approved by the Project Engineer, the following
unit prices shall be used in adjusting the Contract Price.
1. Grade Beams, price per cu. yd. $356.62/CY
2. Slab on grade, price per cu. yd. $291.47/CY
3. Normal weight concrete slab over metal deck, price per cu. yd.
$303.16/CY
4. Light weight concrete slab over metal deck, price per cu. yd.
$228.17/CY
H] UNIT PRICE NO. 8: Site Concrete Placement
The price includes subgrade prep, reinforcing steel, concrete, and labor.
34
EXHIBIT 'H'
DUROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety— Phase 1 B —Vehicle Service Center
UNIT PRICES
1. 8" concrete paving Add: $204.85/CY Deduct: $174.12/CY
2. 6" concrete paving Add: $219.00/CY Deduct: $186.15/CY
3. 4.5" concrete sidewalk Add: $404.50/CY Deduct: $343.82/CY
35
EXHIBIT `I'
DUROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety-Phase 1 B-Vehicle Service Center
COST SAVING ITEMS
The following Cost Savings Items have been incorporated into the Guaranteed
Maximum Price Proposal. This list is included for information purposes only.
DESCRIPTION ACCEPTED
3 CONCRETE
1 Delete rolled or mountable curb at crushed granite trail as shown in detail 07/C-45. $ (24,273)
6711PPENINGS
Section 08 36 00-Overhead Doors:Provide the following doors as outlined below:(refer to the
attached drawing sheet(pdf).
a)Type A Doors:3728,R-18.4,2"Electric Motor, 100,000 cycles(t2la,1:21 b,t22a,t22b,t23a,
t23b,t24a,t24b,t5l a,t5l b,t52a,t52b,t53a,t53b,t54a,t54b)
b]Type B Doors:3728,R-18.4,2",Manual Operation,25,000 cycles(t30,t34b,t35b,t39b)
1 c)Type C Doors:3718,R-16.2, 1 3/4",Manual Operation,25,000 cycles(1:61a,t6lb,t62a,t62b, $ (264,077)
t63a,t63b,u01a,u01b,u02a,u02b,u03a,u03b,u04a,u04b,u05a,u05b,u06a,u06b,u07a,
u09a,u09b,u10a,ul0b,v01a,v02,v03,v04,v05,v06a,x01a,x01b)
d]Provide standard door finish in lieu of the optional finish Color Blast(as specified in Para
2.02.A.14.b.1).Standard Door Color Options:white,almond,desert tan,sandstone,bronze,
chocolate,mocha brown,gray&charcoal
9; FINISHES (35,713)
1 Use Daltile(2"x 2")Reminiscent for Shower Floor Tile and Daltile(12"x 24")Reminiscent $ (35,713)
(Shower Wall Tile)in lieu of Solid Surfacing Fabrications(Swanstone panels)as shown.
13 SPECIAL CONSTRUCT/O_N
1 Section 13 34 19-Pre-Engineered Metal Building Frame
a Delete ceiling liner panel in Building U $ (9,972)
b Delete ceiling liner panel in Building V $ (3,763)
c Delete ceiling liner panel in Building X $ (3,552)
22 PLUMBING
Use Vehicle Trench Drain(TD-1)as manufactured by EJ Co.(Model 6906M2 20"x 24"Trench
1 Grate,Heavy Duty;Model 6900Z2 Trench Rail)in lieu of as specified(Dura Trench Model $ (87,517)
DTPF18-HDSS15ZSA 8'x 18")
2 WC-1:Use'Persuade Cury Comfort Height'(Model K-75790-96)as manufactured by Kohler in $ (3,100)
lieu of as specified.
3 Use Pex for water line piping $ (10,600)
26 ELECTRICAL
1 Provide 750kW natural gas generator in lieu of 1000kW and 1200 Amp ATS in lieu of 1600 Amp. $ (105,732)
2 Delete UPS-1 (Note#8/E-303). $ (57,500)
36
EXHIBIT T
DUROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety-Phase 1 B-Vehicle Service Center
COST SAVING ITEMS
Section 08 36 00-Overhead Doors:Provide the following doors as manual chain hoist in lieu of
motorized as specified:
Building T:t6la,t6lb,t62a,t62b,t63a,t63b(6 Doors)
3 Building U:u01a,u01b,u02a,u02b,u03a,u03b, u04a,u04b,u05a,u05b,u06a,u06b,u07a, $ (17,660)
u09a,u09b,ul0a,ul0b(All 17 doors)
Building V:v01a,v02,v03,v04,v05,v06a(All 6 doors)
Building X:x01a,x01b(All 2 doors)
Delete conduit,back boxes,rough-ins and wiring for the doors listed above.
Delete 1"conduit underground for Fire Alarm Cabling routed to Building U,V and X per Note
4 #1/E-010. $ (6,000)
Delete any conduit,back-boxes and rough-ins inside the buildings(U,V and X)related to the Fire
Alarms stem scope.
5 Use aluminum conductors in lieu of copper 1/0 and larger $ (119,000)
6 Reduce innerduct to(1)per conduit in lieu of(2) $ (13,500)
7 MC for device drops in lieu of conduit $ (1,000)
8 Use minimum 1/2"conduit in lieu of 3/4" $ (3,500)
28. ELECTRONICSAFETYAI'ND 5OWRITY F. (18,417)
1 Deduct for not providing spare parts(Section 28 10 00-Para 1.07.B.1;Section 28 20 00-Para $ (g 000)
1.05.B.1
2 Delete Fire Alarm System in Buildings U,V and X. $ (9,417)
32 EXTERIOR IMPROIIEENTS. _ (83,180)
1 Provide 8'H galvanized chain link fence with barbed wire in lieu of Precast Concrete Fence $ (93,939)
Panels.
2 Add concrete sloped paving at detention pond $ 10,759
33 UTILITIES. _ (27,548) .
1 Reduce the length of concrete pilot channel $ (27,548)
SUB TOTAL $ (895,604)
Total-Cost Saving Items $ (895,604)
37