Ordinance No. 14,918 ORDINANCE NO. 14,918
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN,
TEXAS, AUTHORIZING CHANGE ORDER NO. 1 WITH DUROTECH, INC.,
FOR THE BAYTOWN PUBLIC SAFETY FACILITY PROJECT TO APPROVE
AND AUTHORIZE THE PHASE 1 A GUARANTEED MAXIMUM PRICE IN
AN AMOUNT NOT TO EXCEED FOUR MILLION NINE HUNDRED FIVE
THOUSAND SIX HUNDRED FOURTEEN AND NO/100 DOLLARS
($4,905,614.00); AND PROVIDING FOR THE EFFECTIVE DATE THEREOF.
WHEREAS, on November 17, 2020, via Resolution 2686, the City Council determined
that the construction manager-at-risk method of construction was the alternate delivery method
that provided the best value to the City for construction services for the Baytown Public Safety
Facility Project (the "Project"); and
WHEREAS, pursuant to the construction manager-at-risk one-step process, the City
advertised for proposals for the Project to be received on December 17, 2020; and
WHEREAS, on January 28, 2021, the City Council accepted the proposal of Durotech,
Inc., for the Project, entered into a construction manager-at-risk contract, and authorized pre-
construction services; and
WHEREAS, the Project design consultant has completed design of the Project
improvements; and
WHEREAS, the project team, composed of the City staff, the design consultant and the
construction manager-at-risk, has undergone several pricing and scoping exercises as well as the
formal bidding of Phase 1 as part of the pre-construction services; and
WHEREAS, based upon such services, Phase 1A is ready for approval; NOW
THEREFORE,
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS:
Section 1: That the City Council does hereby authorizes Change Order No. 1 with
Durotech, Inc., for the Public Safety Facility Project to approve the Phase 1 A Guaranteed
Maximum Price. A copy of said change order is attached hereto, marked Exhibit"A" and made a
part hereof for all intents and purposes.
Section 2: That the City Council of the City of Baytown authorizes payment to
Durotech, Inc., in an amount not to exceed FOUR MILLION NINE HUNDRED FIVE
THOUSAND SIX HUNDRED FOURTEEN AND NO/100 DOLLARS ($4,905,614.00) in
accordance with the change order authorized in Section I hereinabove.
Section 3: This ordinance shall take effect immediately from and after its passage by
the City Council of the City of Baytown.
INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the
City of Baytown this the 281h day of October, 2021.
e J Z
B NDON CAPETILUO, Mayor
ATTEST: of gpYTO�;e,✓T
ham " F
ANGELA ACKSON, City Cler tp e co
or
APPROVED AS TO FORM:
)
KATMV L. HORNER, City Attorney
RAKaren Homer\Documents\Files\City Council\Ordinances\2021\October MChangeOrderNo l PublicSnfetyFacilityProject.docx
2
Exhibit "A"
` CITY OF BAYTOWN
f0 PUBLIC WORKS& ENGINEERING
2123 Market St.
Baytown,Texas 77520
BETTER
BMTOWN CHANGE ORDER
For Public Safety Campus: Phase IA
Date of Issuance: 10/28/2021 Change Order No.: 1
Contractor: Durotech Inc. Coll Project No.: FA1901
Designer: BVG4 Architecture P.O. No.: 2103500
Explanation:
This change order encompasses the following:
The Guaranteed Maximum Price(GMP) for the construction of the Baytown Public Safety—Phase I A: Vehicle
Service Center in the amount of$4,905,614.00 and a duration of five (5)months. These costs include General
Conditions, Bonds & Insurance; General Site Requirements; Existing Conditions, Concrete Roadway for Proctor
Rd, Special Construction/Pre-Engineered Metal Buildings (Vehicle Maintenance Building, Special Equipment
Storage Buildings, Vehicle Impound Processing Bay), Earthwork, Exterior Improvements/Asphalt Paving at
Bob Smith Rd; and the Construction Manager at Risk Fee of 2.3%.
Description of Work Cost Time
I General Conditions, Bonds & Insurance $355,813.00
2 General Site Requirements $575,124.00
3 Existing Conditions $81,369.00
4 Concrete/Proctor Rd. $128,917.00
5 Special Construction/Pre-Engineered Metal Buildings $1,717,940.00
6 Earthwork $819,488.00
7 Exterior Improvements/Asphalt Paving at Bob Smith $11,200.00
8 Utilities $1,105,471.00
9 Construction Manager At Risk Fee 2.3%(Phase IA) $110,292.00
$4,905,614.00 152 Days
The additional scope of work and the schedule associated with the same, are attached hereto as Exhibit
"A" dated October 1,2021 and incorporated herein for all intents and purposes.
Cost & Time Change Summary Cost Time
Original Contract: $ 89,000.00 Days
Previous Change Order(s): $ - Days
Contract prior to this change order: $ 89,000.00 Days
Net increase(decrease)from this change order $ 4,905,614.00 152 Days
Revised Contract: $ 4,994,614.00 Days
This section intentionally left blank.
Construction 1 of 2 D16 Revised 2020
Finance Approval: Date:
RECOMMENDED: RECOMMENDED:
By: I� • I — (I Date: 10/20/2021 10-20-2021
Director of Public Works&Engineering
CC PI'GD APPROVED:
ate: By: Date:
Contractor City Manager
*Contractor agrees to[lei Conn change(s)included in this Change Order for the prim and tittle indicated. The prices for changes included all costs associated
will this Change Order.
No work is to be done until this change order is execuled.No payment to the Contractor(or Consultant)shall be made for work included in the change order
until the Contractor's pay estimate is updated.
Revise the project plans and specifications as referenced and insofm as the original project drawings and specifications are inconsistent,this Change Order
goveras.Upon execution by all parties,the following changes identified for[lie contract valmc and/or contract time Shown,are madc part of the contract.
Conduction 2 of 2 DIG Revised 2020
D U ROTECH
BUILDERS OF INTEGRITY
Date: October 01, 2021
Ms. Andrea Brinkley
Assistant Director— Capital Projects
City of Baytown - Public Works & Engineering
2123 Market Street
Baytown, TX 77522
Re: Guaranteed Maximum Price for Baytown Public Safety— Phase 1A—Vehicle
Service Center
Dear Ms. Brinkley:
We wish to inform you that after several months of working together with City of
Baytown and BVG4 Architecture LLC on this important facility, we have formally
advertised and solicited proposals for the development of the GMP for the Phase 1A—
Vehicle Service Center project. Over 200 proposals were received on July 141h, 2021.
After careful review and compilation of these proposals, Durotech, Inc. is pleased to
present a Guaranteed Maximum Price for the construction of the Baytown Public Safety
— Phase 1 A—Vehicle Service Center of$4,905,614.00
It is our recommendation that we ask City of Baytown Council to approve the
Guaranteed Maximum Price of$4,905,614.00 and to execute the GMP Amendment No.
1 between City of Baytown and Durotech, Inc.
We are excited about the potential of entering into the construction phase of this
project and want to thank you and your team, BVG4 Architecture and their consultants
for a very successful pre-construction phase. Durotech is committed to City of Baytown
in the successful delivery of the New Vehicle Service Center project.
Thank you and City of Baytown for selecting Durotech as its building partner. It
is our goal to meet and exceed your expectations. Should you have any questions
please do not hesitate to contact me.
Sincerely,
(��'
David Rowe
CEO
1
g
11931 Wickchester Lane • Suite 205 • Houston, Texas 77043-4501
Phone: 281.558.6892 . Fax: 281.496.5637
D U ROTECH
BUILDERS OF INTEGRITY
GMPSUMMARY
Project: Baytown Public Safety— Phase 1A— Vehicle Service Center
Location: 3200 N Main St., Baytown, TX 77522
Owner: City of Baytown
GMP Proposal Package:
The GMP proposal package consists of the following items:
1. Exhibit A — GMP Top Sheet—dated 01 October 2021
2. Exhibit B — Project Manual — dated 18 June 2021
3. Exhibit C —List of Drawings — dated 18 June 2021
4. Exhibit D —List of Addenda
5. Exhibit E — Qualifications & Assumptions
6. Exhibit F —Allowance Schedule
7. Exhibit G — Self Performed Work Items
8. Exhibit H — Unit Prices
9. Exhibit I — Cost Saving Items
Scope of Work:
A] The Project: The Project consists of the following:
1] Construction of 779 SF pre-fabricated Detailed Covered Area, Building "S".
2] Construction of 28,798 SF of air-conditioned, hurricane resistant pre-fabricated
steel Vehicle Maintenance Building "T" and 5,192 SF of non-conditioned space.
3] Construction of 975 SF of air-conditioned, hurricane resistant pre-fabricated
steel Vehicle Storage Building "U" and 7,373 of non-conditioned space.
4] Construction of 557 SF of air-conditioned, hurricane resistant pre-fabricated
steel Vehicle Storage Building "V" and 2, 595 SF of non-conditioned space.
5] Construction of 804 SF pre-fabricated steel Impound Covered Area Building
„ff.
6] Construction of 720 SF of air-conditioned, pre-fabricated Impound Vehicle
Building "X", with 2,560 of covered parking.
7] Sitework including parking areas and drives, landscaping and fencing
2
11931 Wickchester Lane • Suite 205 • Houston, Texas 77043-4501
Phone: 281.558,6892 • Fax: 281.496.5637
DUROTECH
BUILDERS Of INTEGRITY
B] The work will be completed in 2 parts, Phase 1A and Phase 1B.
Phase 1A will consist of the following:
i. General Conditions (Supervision/Mobilization/Site Trailer/Builders Risk
Insurance/GL Insurance/P&P Bonds)
ii. General Requirements (Allowances, Temporary Roads, Traffic Control,
Temporary Tree & Plant Protection, Temporary Fencing, Erosion Control,
Temporary Signage, Construction Waste Management, Clean Streets)
iii. Existing Conditions (Surveys/Site Demolition/Pump & Dewater)
iv. Concrete (Concrete paving @ Proctor Road only)
V. Pre-Engineered Metal Building Procurement (Not Erection)
vi. Earthwork (Grading, Cut & Fill at Paving & Site areas, Select Fill at
Building Pads, Excavation of Detention Pond)
vii. Site Utilities (Not including Electrical)
viii. Asphalt Paving at Bob Smith Road (Sanitary Sewer tie-in area)
The duration of Phase 1A will be 5 months (152 calendar days) with a start date of
November 1, 2021 (tentatively).
l-
PHASE 1A
3
11931 Wickchester Lane • Suite 205 • Houston, Texas 77043-4501
Phone: 281.558.6892 • Fax: 281.496.5637
DUROTECH
BUILDERS OF INTEGRITY
Phase 1 B will consist of the following:
i. Erosion Control
ii. Site Maintenance and Construction Waste Management
iii. Final Grading and Spread & Grade Spoils
iv. Soil Treatment and Drilled Bell Piers
V. All Concrete Site Paving, Sidewalks and Foundations
vi. All Masonry Work
vii. All Steel Framing and Miscellaneous Steel
viii. Pre-Engineered Metal Building Erection
ix. Windstorm Inspections and Field Engineering
x. All Rough Carpentry, Millwork and Solid Surfaces
A. All Thermal & Moisture Protection
xii. All Openings and Doors
xiii. All Interior Finishes
xiv. All Fire Protection Systems
xv. All Plumbing Work
xvi. All FIVAC Systems
xvii. All Electrical Work, including Site Electrical Work
xviii. All Security and Technology Work
Ax. All Fences and Gates
xx. All Concrete Screen Walls
xxi. All Landscaping and Irrigation
i
s
PHASE 1B - `
4
11931 Wickchester Lane • Suite 205 • Houston, Texas 77043-4501
Phone: 281.558.6892 • Fax 281.496.5637
EXHIBIT'A'
PROJECT: Baytown Public Safety-Phase 1A
DU ROT E C H LOCATION: 3200 North Main St.,Baytown,TX 77521
OWNER: City of Baytown
BUILDERS OF INTEGRITY ARCHITECT: BVG4 Architecture
DATE: 1011/2021
BAYTOWN PUBLIC SAFETY- PHASE 1A
SECTION DESCRIPTION BASE BID REMARKS
LABOR MATERIAL SUB-BIDS TOTAL
DIV 00 GENERAL CONDITIONS
01 10 00 SUPERVISION 148,544 148544
011500 EMPORARY/GENERAL CONDITIONS 500 69,881 70381
011940 ADVERTISEMENTS 630 630
012000 EQUIPMENT 11,375 11,375
01 42 20 AGC FEES 8,108 8,108
01 4225 BUILDER'S RISK INSURANCE 31.863 31,863
01 4230 L INSURANCE 38.019 38,019
014240 PAYMENT&PERFORMANCE BOND 46893 46893
SUB TOTAL-DIV 00 GENERAL CONDITIONS 355,613
DIV01 GENERAL REQUIREMENTS
01 21 00 QUANTITY ALLOWANCE 0 0 IN PHASE 18
01 21 05 CONTRACTOR CONTINGENCY ALLOWANCE 50000 50000 ALLOWANCE
012110 OWNER CONTINGENCY ALLOWANCE 50,000 50,000 ALLOWANCE
01 21 15 SITE ELECTRICAL CONDUIT ALLOWANCE 75,000 75,000 ALLOWANCE
01 21 20 COURTS DRAINAGE ALLOWANCE 200,000 200,000 ALLOWANCE
01 43 39 MOCKUP PANEL 0 0 IN PHASE 1 B
0145 33 VINDSTORM INSPECTIONS 0 0 IN PHASE 1 B
015113 1TEMPORARY POWER 3,250 3.250
01 51 19 1EQUIPMENT FUEL&FUEL TANK 2.524 2,524
01 51 36 1 EMPORARY WATER 8.525 8,525
015370 1 )MS/SAFETY 15,147 15,147
015416 1MATERIAL HANDLING&HOISTING 0 0 IN PHASE 113
01 5423 1 EMPORARY SCAFFOLDING 0 0 IN PHASE 113
015523 EMPORARY ROADS 12610 31,525 44,135
015526 1TRAFFIC CONTROL 10.000 10,000
015626 EMPORARY FENCING 15,709 19.392 35.101
01 5639 EMPORARY TREE&PLANT PROTECTION 10,303 2,410 12,713
015700 EROSION&SEDIMENT CONTROL 7,508 22,163 29,671
01 58 00 TEMPORARY PROJECT SIGNAGE 1,000 3,000 4,000
016400 OFCI ITEMS 0 0 IN PHASE IB
01 7123 FIELD ENGINEERING&LAYOUT 0 0 IN PHASE 1 B
017416 SITE MAINTENANCE/CLEAN STREETS 7,713 17,602 25,315
01 7419 CONSTRUCTION WASTE MANAGEMENT 9,743 9,743
01 7423 FINAL CLEANING 0 0 IN PHASE 1B
01 91 00 COMMISSIONING 0 1 0 IN PHASE 1B
SUB TOTAL-DIV 01 GENERAL REQUIREMENTS 575,12.1
DIV 02 EXISTING CONDITIONS
02 21 00 SURVEYS 7,500 7,500
024113 SITE DEMOLITION 59.869 59869
027000 PUMP&DEWATER 8400 5.600 14000
SUB TOTAL-DIV 02 EXISTING CONDITIONS 81,369
CONCRETE DIV 03 .., .:... . - ,. -
03 20 00 CONCRETE REINFORCING - - 0 0 IN 03 20 00
03 30 00 SITE&BUILDING CONCRETE 128,917 128,917 Proctor Road only
03 35 10 CONCRETE FLOOR SEALER 0 0 IN PHASE 18
3543 POLISHED CONCRETE 0 0 IN PHASE IB
SUB TOTAL-DIV 03 CONCRETE 126,917
040519 MASONRY REBAR 0 0 IN PHASE 1B
042000 MA NRY 0 0 IN PHASE 15
SUB TOTAL-DIV 04 MASONRY I Oil
DfVDSMETALS
051200 STRUCTURAL STEEL FRAMING 0 0 IN PHASE iB
05 12 50 STRUCTURAL STEEL ERECTION 0 0 IN PHASE 1B
OS 37 00 PREPARE EXPOSED STEEL STRUCTURE 0 0 IN PHASE iB
5
EXHIBIT'A'
SECTION DESCRIPTION BASE BID REMARKS
LABOR MATERIAL SU&BIOS TOTAL
055000 MISCELLANEOUS STEEL 0 0 IN PHASE IB
05 50 10 TIMBER MATS 0 0 IN PHASE 1B
055020 SAFETY RAILS 0 0 IN PHASE IB
055300 METAL GRATINGS 0 0 IN PHASE IB
055805 DOWNSPOUT BOOTS 0 0 IN PHASE IB
SUBTOTAL-DIV 05 METALS 0
DIV06- - WOOD PLASFIOS AND'OOMP:OSff _. T
06 10 00 ROUGH CARPENTRY 5i0 0 IN PHASE 18
062200 MILLWORK 0 0 IN PHASE IB
O6 61 16 SOLID SURFACING FABRICATIONS 0 0 IN PHASE 1B
SUB TOTAL-DIV 06 WOOD,PLASTICS,&COMPOSITES 0
DIV 07 THERMAL AND MOISTURE PROTECTION
0711 00 DAMPPROOFING 0 0 IN PHASE 1B
07 21 00 THERMAL INSULATION 0 0 IN PHASE 18
07 41 W METAL ROOF INSULATION&UNDERLAYMENT 0 0 IN PHASE 1B
07 84 00 FIRESTOPPING 0 0 IN PHASE 1B
07 92 00 JOINT SEALANTS 0 0 IN PHASE 1B
SUB TOTAL-DIV 07 THERMAL&MOISTURE PROTECTION 0
DIV08 OPENINGS
080800 DOOR&HARDWARE INSTALLATION 0 0 IN PHASE IB
08 1100 METAL DOORS&FRAMES 0 0 IN PHASE 113
08 14 23 PLASTIC LAMINATE FACED WOOD DOORS 0 0 IN PHASE 16
08 31 00 ACCESS DOORS AND PANELS 0 0 IN PHASE 1B
08 33 00 COILING DOORS&GRILLES 0 0 IN PHASE 18
084500 INSULATED TRANSLUCENT WALL PANELS 0 0 IN PHASE IB
08 71 00 DOOR HARDWARE 0 0 IN PHASE IB
08 80 00 GLAZING 0 0 IN PHASE 1B
OB 80 10 EMPORARY ENCLOSURES 0 0 IN PHASE 1B
08 80 15 JILLEAN GLASS 0 0 IN PHASE 1B
089100 LOUVERS1 01 0 1 IN PHASE 1B
SUB TOTAL-DIV 08 OPENINGS 0
DIV 09 FINISHES '4111W'..
092900 GYPSUM BOARD 0 0 IN PHASE IB
09 30 00 TILING 0 0 IN PHASE 16
0951 00 ACOUSTICAL CEILINGS 0 0 IN PHASE IB
09 60 00 FLOOR PREPARATION 0 0 IN PHASE 113
0960 10 FLOOR PROTECTION 0 0 IN PHASE IB
09 65 00 RESILIENT FLOORING 0 0 IN PHASE 18
096700 RESINOUS FLOORING 0 0 IN PHASE 1B
09 90 00 IPAINTING&COATING 0 0 IN PHASE 18
SUB TOTAL-DIV 09 FINISHES 0
DIV 10 SPECIALTIES
10 1100 VISUAL DISPLAY UNITS 0 0 IN PHASE 18
10 1400 SIGNAGE 0 0 IN PHASE 113
10 1426 POST&PANEL/PYLON SIGNAGE 0 0 IN PHASE 1B
10 28 13 TOILET ACCESSORIES 0 0 IN PHASE 1B
10 44 00 FIRE PROTECTION SPECIALTIES 0 0 IN PHASE 16
10 44 15 KNOX BOX 0 0 IN PHASE 1B
10 73 00 PROTECTIVE COVERS 0 0 IN PHASE 18
SU8 TOTAL-DIV 10 SPECIALTIES 0
..yw=:' E9'dPIIRMENT
11 5200 AUDIO-VISUAL EQUIPMENT 0 0 IN PHASE iB
SUB TOTAL-DIV 11 EQUIPMENT 0
-VTZ - FURNISHINGS
122400 WINDOW SHADES 0 0 IN PHASE 1B
12 36 61 SIMULATED STONE COUNTERTOPS 0 0 IN PHASE 1B
12 48 13 ENTRANCE FLOOR MATS 0 0 IN PHASE 1B
SUB TOTAL-DIV 12 FURNISHINGS 0
DIV f3 SPECIAL CONSTRUCTION.
13 34 19 METAL BUILDING SYSTEMS 1 1,717,940 1,717,940
133420 METAL BUILDING ERECTION I0 0 IN PHA E 1 B
SUB TOTAL-DIV 13 SPECIAL CONSTRUCTION 1,717,940
DIV 14 CONVEYING EQUIPMENT
DIV 21 1 FIRE SUPPRESSION
6
EXHIBIT'A'
SECTION DESCRIPTION BASE BID REMARKS
LABOR MATERIAL BUB-BIDS TOTAL
21 10 00 FIRE SUPPRESSION SYSTEMS - - 0 0 IN PHASE 1B
SUB TOTAL-DIV 21 FIRE SUPPRESSION 0
DIV 21 PLUMBING Amw
22 OD 00 PLUMBING - 0 1 1 IN PHASE 1B
SUB TOTAL-DIV 22 PLUMBING 0
7 HVAC
230000 HVAC 0 0 IN PHASE I6
23 00 10 HVAC FILTER CHANGES 0 0 IN PHASE 113
230500 MEP COORDINATION - 0 0 IN PHASE IS
SUB TOTAL-DIV 13 HVAC 0
ON 26 ELECTRIC -
2li 00 00 ELECTRICAL 0 0 IN PHASE iB
260005 ROUGH IN/BACK BOXES-LOW VOLTAGE 0 0 IN PHASE IB
260010 PERMANENT POWER START UP 0 0 IN PHASE 1B
2641 00 LIGHTNING PROTECTION 0 0 IN PHASE 1B
SUB TOTAL-DIV 26 ELECTRICAL 0
DIV 27 COMMUNICATONS
27 1000 STRUCTURED CABLING 0 0 IN PHASE 1B
SUB TOTAL-DIV 27 COMMUNICATIONS 0
NIECTRONIGSAIIIIIIIIIIIIIIIIIIIIIIIIII&I
281300 ACCESS CONTROL SYSTEM 0 0 IN PHASE I
28 16 00 INTRUSION DETECTION SYSTEM 0 0 IN PHASE 1B
282300VIDEO SURVEILLANCE SYSTEM 0 0 IN PHASE IB
28 3t 00 FIRE DETECTION&ALARM SYSTEM 0 0 IN PHASE 1 R
SUB TOTAL-DIV 28 ELECTRONIC SAFETY&SECURITY 0
�1K-:32 EARTHWORK - -411111111111111k— -
312000 EARTHWORK 819,488 819.488
31 2216 FINAL GRADING 0 0 IN PHASE 1B
31 2310 SPREAD&GRADE SPOILS 0 0 IN PHASE 1B
31 31 00 SOIL TREATMENT 0 0 IN PHASE 1B
31 63 29 DRILLED CONCRETE PIERS&SHAFTS 0 0 IN PHASE 15
SUB TOTAL-DIV 31 EARTHWORK 819.488
_..:DIV32_ EXTdERIORJMPROVEMENM
3201 11 CLEAN PAVING&SIDEWALKS - - 0 0 IN PHASE 1B
321216 ASPHALT PAVING 11,200 11.200 At Bob Smith Road only
32 13 73 CONCRETE PAVING JOINT SEALANTS 0 0 IN PHASE 1B
32 1375 REMOVE STRIP/CLEAN PAVING JOINTS 0 0 IN PHASE 1B
32 16 15 BACKFILL CURBS 0 0 IN PHASE 1B
321723 PAVEMENT MARKINGS 0 0 IN PHASE 1B
32 31 00 FENCES&GATES 0 0 IN PHASE 1B
32 31 15 11CONCRETE SCREEN WALLS&FENCES 0 01 IN PHASE 1B
328000 IRRIGATION 0 0 IN PHASE IB
328010 IRRIGATION SLEEVES 0 0 IN PHASE 1B
329000 LANDSCAPING 0 0 IN PHASE 16
329005 CRUSHED GRANITE 0 0 IN PHASE IB
329010 AERATING FOUNTAIN 0 0 IN PHASE 1B
329200 HYDROMULCH&SOD 0 0 IN PHASE 1B
329500 LANDSCAPE MAINTENANCE 0 0 IN PHASE IB
SUBTOTAL-DIV32EXTERIORIMPROVEMENTS 11,200
330000 SITE UTILITIES 1 11054711 11 5471
SUBTOTAL-DIV 33 UTILITIES 1,105,477
FE
SUBTOTAL-COST OF WORK ITEM S 212,287 197,247 4,385,787 4,795,322
CM FEE-2.30% 110,292
OTAL-GMP-PHASE 1A 905614
7
EXHIBITS'
UROTECH
D
BUILDERS OF INTEGRITY
Baytown Public Safety — Phase 1 A—Vehicle Service Center
PROJECT MANUAL
PROJECT MANUAL DATED June 18, 2021
DIVISION 00: PROCUREMENT AND CONTRACTING REQUIREMENTS
0001 00 TABLE OF CONTENTS
0001 03 PROJECT DIRECTORY
0001 07 PROFESSIONAL SEALS PAGE
0001 15 LIST OF DRAWINGS
0011 00 NOTICE FOR SUBCONTRACTORS PROPOSALS (Durotech)
0021 00 INSTRUCTIONS TO SUBCONTRACTORS (Durotech)
00 21 11 SAMPLE CERTIFICATE OF INSURANCE(Durotech)
0031 32 GEOTECHNICAL DATA
GEOTECHNICAL REPORT
00 42 00 SUB PROPOSAL FORMS (Durotech)
DIVISION 01: GENERAL REQUIREMENTS
01100 Summary of Work(City of Baytown)
01140 Contractor's Use of Premises(City of Baytown)
01200 Measurement and Payment Procedures (City of Baytown)
01290 Change Order Procedures(City of Baytown)
01310 Coordination and Meetings(City of Baytown)
01350 Submittals(City of Baytown)
01380 Construction Photographs (City of Baytown)
01420 Referenced Standards(City of Baytown)
01430 Contractor's Quality Control (City of Baytown)
01440 Observation Services (City of Baytown)
01450 Testing Laboratory Services (City of Baytown)
01500 Temporary Facilities and Controls (City of Baytown)
01505 Mobilization (City of Baytown)
01550 Stabilized Construction Exits (City of Baytown)
01554 Street Signs (City of Baytown)
01555 Traffic Control and Regulation (City of Baytown)
01560 Filter Fabric Fence(City of Baytown)
01561 Reinforced Filter Fabric Barrier(City of Baytown)
01562 Waste Material Disposal (City of Baytown)
01563 Tree and Plant Protection (City of Baytown)
01564 Control of Ground Water and Surface Water(City of Baytown)
01565 TPDES Requirements (City of Baytown)
01566 Source Controls for Erosion and Sedimentation (City of Baytown)
01570 Trench Safety System (City of Baytown)
01580 Project Identification Signs (City of Baytown)
01600 Materials and Equipment(City of Baytown)
01630 Product Options and Substitutions (City of Baytown)
01720 Field Surveying (City of Baytown)
01750 Starting Systems (City of Baytown)
01760 Project Record Documents(City of Baytown)
01770 Contract Closeout(City of Baytown)
01 21 00 ALLOWANCES
8
EXHIBIT 'B'
DUROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety — Phase 1 A—Vehicle Service Center
PROJECT MANUAL
01 22 00 UNIT PRICES
01 25 00 SUBSTITUTION PROCEDURES
013310 BIM COORDINATION (Durotech)
01 4500 WINDSTORM CONSTRUCTION REQUIREMENTS (Datum Engineers)
01 45 29 TESTING LABORATORY SERVICES (Datum Engineers)
01 8000 COMCHECK ENVELOPE REPORT
DIVISION 02: SITE WORK/EXISTING CONDITIONS
02200 Site Preparation (City of Baytown)
02220 Site Demolition (City of Baytown)
02252 Cement Stabilized Sand (City of Baytown)
02255 Bedding, Backfill, and Embankment Materials(City of Baytown)
02315 Excavation and Backfill for Detention Ponds (City of Baytown)
02316 Excavation and Backfill for Roadways (City of Baytown)
02317 Excavation and Backfill for Structures (City of Baytown)
02318 Excavation and Backfill for Utilities (City of Baytown)
02330 Embankment(City of Baytown)
02335 Subgrade(City of Baytown)
02370 Geotextile(City of Baytown)
02415 Augering Pipe or Casing for Sewers (City of Baytown)
02417 Augering Pipe or Casing for Water Lines(City of Baytown)
02430 Tunnel Grout(City of Baytown)
02510 Water Mains(City of Baytown)
02511 Water Meters (City of Baytown)
02512 Polyethylene Wrap(City of Baytown)
02513 Steel Pipe and Fittings for Large Diameter Water Lines(City of Baytown)
02514 Fire Hydrant Assembly(City of Baytown)
02515 Water Tap and Service Line Installation (City of Baytown)
02520 Valve Boxes, Meter Boxes, and Meter Vaults (City of Baytown)
02530 Gravity Sanitary Sewers (City of Baytown)
02531 Sanitary Sewer Service Leads or Reconnections (City of Baytown)
02532 High Density Polyethylene(HDPE)Solid Wall Pipe(City of Baytown)
02532W High Density Polyethylene(HDPE) Solid Wall Pipe for Water(City of Baytown)
02533 Sanitary Sewage Force Mains (City of Baytown)
02534 PVC Pipe(City of Baytown)
02540 Tapping Sleeves and Valves (City of Baytown)
02541 Water and Wastewater Line Valves (City of Baytown)
02542 Concrete Manholes and Accessories (City of Baytown)
02582 Thermoplastic Pavement Markings (City of Baytown)
02603 Frames, Grates, Rings, and Covers(City of Baytown)
02624 Structural Plate Culvert Structures (City of Baytown)
02628 Jacking Pipe or Box(City of Baytown)
02629 Safety End Treatments(City of Baytown)
02630 Storm Sewers(City of Baytown)
02631 Precast Inlets, Headwalls, and Wingwalls(City of Baytown)
02632 Cast-in-Place Inlets, Headwalls,and Wingwalls (City of Baytown)
02633 Adjusting Manholes, Inlets, and Valve Boxes (City of Baytown)
02634 Ductile Iron Pipe and Fittings (City of Baytown)
9
EXHIBIT '&
DUROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety — Phase 1A—Vehicle Service Center
PROJECT MANUAL
02635 Steel Pipe and Fittings (City of Baytown)
02636 Polyurethane Coating on Steel or Ductile Iron Pipe (City of Baytown)
02710 Base Course for Pavement(City of Baytown)
02741 Asphaltic Concrete Pavement(City of Baytown)
02742 Prime Coat(City of Baytown)
02743 Tack Coat(City of Baytown)
02744 Single Course Surface Treatment(City of Baytown)
02751 Concrete Pavement(City of Baytown)
02762 Temporary and Removable Reflectorized Pavement Marking (City of Baytown){
02770 Curb,Curb &Gutter, and Headers (City of Baytown)
02775 Concrete Driveways(City of Baytown)
_f Baytown)
Blast Gleaning of Pavement(Gity of BaytewR)
Giber Optirs Attachment A
DIVISION 03: CONCRETE 744
03300 Gast In Plane Conr,.Fete(City of gaytewn)
CONCRETE FORMING AND ACCESSORIES (Datum EngineeFG)
022000 CONCRETE REINFORCING(Datum ERgiRee
033000 r-ZA.S.1-IN-121 AGE CONCRETE(Datum Engineers)
022500 CONCRETE FLOOR FINISHING
02 as da GROUND AND POLISHED CONCRETE
DIVISION 04: MASONRY
DIVISION 05: METALS
05 12 an STRUCTURAL STEEL FRAMING (Mat,im F,nniReeFG)
STEEL FLOOR CKIN -,AND�.-r vry IDS'-(Datum-FaRg 7
as
METAL STAIRS
DIVISION 06: WOOD, PLASTICS,AND COMPOSITES
10
EXHIBIT 'B'
DUROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety — Phase I—Vehicle Service Center
PROJECT MANUAL
nQ A4 4Q DI ACTIf_I AMIAIATC_GACED ARCHITECTURAL AI CABINETS
SOLID SURFACIN AT-IONS
DIVISION 07: THERMAL AND MOISTURE PROTECTION
0724 nn T-Wr=RAAAI INSULATION
072600
072700 CWEET A117 AAIn IA/ATCI7 BARRIERS
Adi m.�� METAL ROOF DAAICI C
07 az2�nn �CsGZGT AcTA1 GI ARMING AND T71A
07 74 nn ROOF CDCCIAI TICS
079200- JOINT SEALANTS
DIVISION 08: OPENINGS
08 11 13 HOLLOW OW MCTAI 130O 7S AAIn CDAMCC
ACED WOOD DOORS
0834 44 A.C-C-CCC nnnRC CI C
084523 INSI11 ATCD TRANS I GENT 1AIA1 I DAAICI C
nQ 74 fin FINISH WAR131A/ARrm
088000 GOI A71A1G
nQ A4 4 A FIXED 1 O1 1VE44
DIVISION 09: FINISHES
on 23 an
GYPSUM BOARD AND NOW-STRI ICTI IRA' FRAMING
093000 TILING
0954 00 ACOUSTICAL CEILINGS
096513 REAL-I D ER
an GS 13 23 RE ILIENT RUBBER STAIR TRCAn WITH RISERS
0967-23 RESINOUS FLOORING
DIVISION 10: SPECIALTIES
401426 P/1CT AAIn PA.NE L PVI /lAI 5 _NAGE
102800 TQI1-F-T AAIn CL1/11A/C1�E 5 S G R I€5
4n AA 46 r='RE EXTINGUISHERS
107000 - UM CANOPY
DIVISION 11: EQUIPMENT
152 2q CI AT SCRFr=N TV M/11INTS
DIVISION 12: FURNISHINGS
11
EXHIBIT `B'
Dlk.JIROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety— Phase 1A—Vehicle Service Center
PROJECT MANUAL
ROLLER SHADES
423661 SIMULATED STONE Cnil I,TERT-O S
DIVISION 13: SPECIAL CONSTRUCTION
133419 METAL BUILDING SYSTEMS
DIVISION 14: CONVEYING EQUIPMENT
(Not Used)
End of Volume 1
Volume 2
DIVISION 20: MECHANICAL SYSTEMS
Not Used
DIVISION 21: FIRE SUPPRESSION
211313 WET CTAN DPI F AN C_vrDrDciNKI E=R SYSTEMS S (E &G F=RqirrQce-m)
DIVISION 22: PLUMBING
220000 PLUMBING MBI IG PIPING SYSTEMS (E&GF=RgnTeG &)
220529 NA IGGRC JL CI IDDr1RTC FOR DI I'RARING PIPING EQUIPMENT(E&C F=giReeFs)
221010 D I-',MBAG v�€ST AND-ACCESSORIES (E& EngffiReeF64
PLUMDf ALTI€STE &G ERgiA 9f
221400 ELECTRIC DOMESTIC WATER HEATERS (POINT Or= 11CL) E=: &G-€RgiReef6)
221500 DII81NIG PUMPS(R st_ r` Ennincnrcl
77 An nn INIG FIXTI IRES (E &G �)
224500 EMERGENCY SHOWER AND EYE WASH(Egg G ERg+ReeM4
DIVISION 23: HVAC SYSTEMS
2300 a- RACIr MECHANICAL REQUIREMENTS E &G ERq*REeM4
230529 SLEEVES FAR-WING-r-% SI IDvPPORcTra AND 4NGHORS (E &G ErAr9TiReeFs)
23 cis 4aVIBRATION 1C/II ATIO 1 (E &G EnglFieeF )
230553 I G ENITICICATION (E&G Enn „]
220592 TR 'I ICTMGAIT AND RALAPI6`ING- (T-AI; CIR &G ER9mceF6)
230719 PIPING MIC111 AT10-hI (1= &GE�nn��nee1FS)
23�099 23 -DIRECT DIGITAL;CONTROL SYSTEMS TFoivDnrrcrrgiA99F0
232923 I.I.A.R-I.A.-R-1E FREQUENCY DRIVER- (F &G ERginoeFG)
23 41 an DI ICMA/ARK(E&G_F=Rg'TRe£Fr-,)
12
EXHIBIT `B'
DUROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety— Phase 1 A—Vehicle Service Center
PROJECT MANUAL
Z2- 24 AA CANS IG Q_ G Cnnineorc 1
233600 A.IR_TFRMINAI UNITS (F= &GEngineeFG)
232700 AIR IAII STS AND 011T1 RT-S (E `^r_ �n�,Tne�s�
2341 AA FILTERSRS(F. &G ERgineem " ����
236213 A117 COO) Cn SPLIT-SYSTEM AIR/ ON-DITInAIING UNITS (E&G Rgiineem)
DIVISION 26: ELECTRICAL
260001 CI G/'`TRIQA1 GENERAL PROVISIONS (F= &GCrEn9meefo
260002 ELECTRICAL SCOPE OF WORK/G &G Cnnineerc 1
260125 ELECTRICAL TESTING(E &G Engineers)
ELECTRICAL RARIC PAATERIALS AND METHODS /G S2_ G Cnnmc
260519 I01AVOLTAGECONDUCTORS AND CABLES (E &GERgin„�eeFS)
26 05
260522 ELECTRICAL RAMM/AVC (F=: &G ERgiReeFS
260553 IDENTIFICATION FOR F1 SCTRICe1 CVCTEMST9&G Eng�eeF:&)
aS E1 9GTR1GAl rna.TRn1 C AN13 I A�grGE R g Fs)
2R zvo C31AI VO TAr€TP.ANS€ORM€RS.(E &G ERg+eeeFS)
262701 G1 G_TR_IQAcL vCpc�aAC-F-mmENTC7ANCE (F= &G E-ngiReeceFS)
L7 47 EQUIPMENT WI INN (1= A_ G Ennineerc)
MISCELLANEOUS ELECTRICAL CONTOLS &CONTROL WIRING (E&G EROIRews)
AUDIO-VISUAL SYSTEM PROVISIONS (E &G Engineefs)
26 2�7-f_`4 SECURITY^SYSTEM PROVISIONS (G Q_ r Gnnineerc)
262726 WIRING DEVICES/G &G GnnineeFo
26 2R 13 1 QIA VOLTAGE (9 &E-Agn-ee G)
26 2g 17 E (I= &€Ag+AeeFG)
262918- ENCLOSED SWITCHES (F= R_ G Ennineera)
262913 ENCLOSED CONTROLLERS ERS IF= &G nni Zee~
263213 raTANDBY GENEPATOR SETS (E &G-€Ag+fleem)
263623 23 AI ITnMATIP`TRA SFE S (=&,gRgiReen;)
THOR CVCT ER CRn SPECIFICATIONSE�Rgh;eeFs)
265100 INTERIO,�p LIGHTING &G Enn*Re�6) '`'"' '"" '"'
265600 EXT E TING (F=&G-EngineeeFa)
DIVISION 27: COMMUNICATIONS
270200 RACY 11AATRRIAI C AN-0 METHODS (913R 1=RgineeFG)
I-IN-DERGROUND DUCTS & RAG91MAYS FOR COMM SYSTEMS
13
EXHIBITS'
D ' ' ROTECH
'u'
BUILDERS OF INTEGRITY
Baytown Public Safety — Phase 1A—Vehicle Service Center
PROJECT MANUAL
DIVISION 28: SECURITY SYSTEMS
280200 RACY` MATERIALS AND MEAD FOR SAFETY AND SECURITY SYST �Cd`
2g 20 an VIDEO SURVEILLANCE SY OBRRg s)
283103 ADDRESSABLE EIRE A1 ARM SYSTEM (E &G ERgineeF&)
DIVISION 31: EARTHWORK
34 31 46 TER�ARIITE G0—NTR0L
31 6329 DRILLED PIERS (Datum F=RgiReeFr,)
DIVISION 32: EXTERIOR IMPROVEMENTS
3234 nn STEEL ROLLING SYSTEM
323115 CONCRETE SCREEN WAl L $ AND EENCES
rr CONCRETE SCREEN cv
22 24 449 A111RAIN11MORWARAENTAI EEAGE SYST-E-.".
DIVISION 33: UTILITIES
END OF SECTION
Note: The specification sections which are struck out are not applicable to Phase 1 A scope of work.
14
Si
NVId N011flmd 2131`dMMIO1S Ltl0
SNOIlt/1f1O1dO ONb N`dld ONOd N0I1N3130 Otto
(8 d0 8)311JOW ONV Ndld 6£O
(8 dO L)3113MId 0NV Ndld 8£O
(8 30 9)311JOUd 0NV NVId L£O
(8 30 9)311=1MId 0NV NVId 9£O
(8 d0 t�)S311d0�ld ON`d Ndld 9£O
(8 30£)31130bd ONV N`dld t1£O
(8 d0 Z)311=1MM ONV Ndld ££O
(8 d0 L)31130bd (INV NVId Z£O
SN011blf10ld0 2i3M3S INUO1S 6£O
dVN d3UV 3E)VNI` U(I 03SOdOUd 0£0
dbW V31:Id 3JdNIVU(I JNIISIX3 6ZO
S13SN1 ON10dbJ 8ZO
(£30 £) NVld JN10V'8J LZO
(£d0 Z) NVId JNIOb'IJ 9ZO
(£d0 0 NVId ONICM19 9ZO
NVId ONKIVUE)lWU3A0 tlZO
(£3O£) Ndld JNIAVd 0Nd 10�A1NOO NOISN31MIa £Z0
(£d0 Z) NVld JNIAVd ONV lOb1NOO NOISN3WIa ZZO
(£dO L) N`dld JNIAVd ONV 10UiNOO NOISN3WIa 20
Ndld JNIAVd ONV-IOUINOO NOISN31NIa TIVU3AO OZ0
(£d0 £) NVld U3M3S MlO1S 6 LO
(£d0 Z) N`dld U3M3S VVWiS 8 LO
(£d0 0 NVld U3M3S VVUO1S LSO
NVId U3M3S MO1S 11bU3AO 96O
((Zd0 Z) Ndld NOI1f191u1S10 u31dM 96O
(Z dO 0 Nbld NOIlf1ouis1a�tDiVM tILO
NVId N011f191b1S10 U31VM TIVU3AO £LO
S13SN1 U3M3S Abb11NVS UO
(£d0£) Ndld U3M3S AUViINVS 6 6O
(£30 Z) NVld U3M3S kl lViINVS OLO
(£30 0 NVld U3M3S AUd11NVS 60
NVld 2:13M3S AUd11NVS TIVU3AO 80
NVld NOI1110W30 TIVU3AO LO
S310N ldU3N3J 90
(t,d0 0 A3Auns OIHdVUE)0d01 90
(t,d0 £)A3Auns OIHdb'IJOd01 tlo
(t,d0 Z)A3Auns OIHdVU90d01 CO
(t?30 O A3Auns OIHdVU!DOdOl ZO
1'dld LO
SOlUi3lNOSl J019 0£ ZOZ-J
SOIU13VYOSI 9019 0£ 60Z-9
133HS M31AMI 3000 00 L-0
SOUVONb1S A111191SS300d £00-J
S310N-IV'd3N3J `SN011dln3?J99d`S109WAS Z00-J
1Sll 133HS 600-0
U3AOO 000-9
I za/s wito Peiea) SJNIMvIa :jO isn
a0W0a 001na0S 013140n-Vr Oseud - AjejeS 3ilgnd umOlAeS
AlIM93INI 30 Sd3ciiina
HD3i0"dl I
,0,1191HX3
EXHIBIT 'C'
D 'U' ROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety — Phase 1A—Vehicle Service Center
LIST OF DRAWINGS (Dated 07/18/2021)
C42 STORMWATER POLLUTION DETAILS
C43 TRAFFIC CONTROL PLAN
C44 PROJECT SPECIFIC DETAILS (1 OF 2)
C45 PROJECT SPECIFIC DETAILS (2 OF 2)
C46 CITY OF BAYTOWN STANDARD DETAILS(1 OF 4)
C47 CITY OF BAYTOWN STANDARD DETAILS(2 OF 4)
C48 CITY OF BAYTOWN STANDARD DETAILS(3 OF 4)
C49 CITY OF BAYTOWN STANDARD DETAILS (4 OF 4)
1 VF= AI I I ANIMCA1212 RLAN
1 : I A n l D S C A,�E PLAN (I Qrm.Al
1=3 I ANDSGAPE_PLAN r2Qr.AX
1_11 I AnlncrARFE PLAN ti
LF4 1 enlncQeRF= PLAN n-o7
16 AUR IIT-Y I ANDwAPE 121 AN
17 I AnlncreR� 2CZuF=nl n ANIM REQ IREMEN:1 c
L6 LAA'BRr-Al2F= DETAILS
1 tJ I AAIIIC(`ARC CRR�`IRIr`AT1r1AICo
IR4 QVRRA1 I IRRICZAT1041 RI AN'
IR'2 IRRIGATION PLAN (I OF 5)
IrRI'� IRRIQ-ATI�Gr1 AN (2 OF-5)
I^ IRRIGATION PLAN (3 OF 5)
I R F9 IRRI(_ATIrIAI RI AAI (4 OF F)
rr
IRR IRRIGATIGN PLAN (5 OF= F)
S-001 TYPICAL ABBREVIATIONS, SYMBOLS AND PLAN NOTES
S-002 GENERAL NOTES
S-003 REQUIRED SPECIAL INSPECTIONS
9_204 RI u1 DING S AND T-
2-:20:2 RI 111 DING I I V Inl
��yr
9 39i TYPICAL EXPANSIVE GLAXxSQ11 St_ RGI I Rll RlF-=Rrn�-TrAll 2
4n� TYPICAL SLAB I F=T—A"
� 3 TYPICAL Gv^.GRi€TEAIBATION ^�L�
S 340 C-QN'rRFETFE 2-FErT1r1AIC AAlll PICTAII C
S_401 21 AR1���REAM rQh1A1F=CT1Qh1 IIGTAII C
2_407 r`r1{14Rr12ITR CTRRI BEAM DETAILS
9_403 TVRIr`AI CTRRI n�AT ll
Ffl4 TVRIr`AI A/IACr1AIRV I1RTAll C
A-001 SITE PLAN -OVERALL-PHASE 1
A-011 SITE PLAN - PHASE 1
A-012 SITE DETAILS
A-013 SITE PLAN DETAILS
A-101 FLOOR PLANS BLDG 'T'-MAINTENANCE
A-102 FLOOR PLANS STORAGE BLDGS'U'-'V'-'W'-'X'
A-141 WALL TYPES
A-161 REFLECTED CEILING PLANS -BLDG 'T'
16
EXHIBIT 'C'
DUROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety — Phase 1 A—Vehicle Service Center
LIST OF DRAWINGS (Dated 07/18/2021)
A-162 REFLECTED CEILING PLANS BLDG 'U'-'V'-'W'-'X'
A-181 ROOF PLAN BLDGS "S &'T'
A-182 ROOF PLANS BLDGS'U'-"V-'W'-'X'
A-201 EXTERIOR BUILDING ELEVATIONS BLDGS'S' &'T'
A-202 EXTERIOR ELEVATIONS BLDGS'U'-'V'-'W'-'X'
A-301 BUILDING SECTIONS-BLDG'S'&'T'
A-302 BUILDING SECTIONS-BLDGS'U'-'V'-'W'-'X'
A-401 WALL SECTIONS-BLDG 'T'
A-402 WALL SECTIONS-BLDG "U""V"-"W"-"X"
A-403 STAIR SECTIONS&DETAILS
A-451 SECTION DETAILS
A-452 PLAN DETAILS
A-501 WINDOW&STOREFRONT ELEVATIONS
A-601 DOOR SCHEDULE &DETAILS
Ifl_101 r=14II2I-1 RI QQR 121 AAIC R1 DCZ 'T'
ID-10:2 PIN' H FLOOR PLANS I3LDGS 'U'-'V-'W -'X'
ID-161 RR R. R EQUIPMENT
Q 162 RR S?_ C F=Q 11I711nRAIT RI Plf_C 1 1_\/_lAl_Y
ITS n1 INTERIOR RI R\/ATIGNIC
11) 202 INTERIOR CI C\/ATICInIC
ID-401 nn11 I WORK f1RTAIL�
11n_nnn AND SYMB I &
'1n'7 EGHAAIIGAI FLOOR PLAN LEVEL 1 RLnr_C C Q_ T
M-�n2 MEGMANIGAL FLOOR PLAN LEVEIL I BL-DQ T
An_2n4 MEGHANIGAL FLOOR PLAN nnE;Z;Ze.NIISjF R1 DG T
MFEGHAN r AN R1 nr; 1 I, V, VVI �r
n�� nn� TVrT\1 ROOF 121 AN 61 QCZ T
n
m 301 MEC14ANICAL PIPING PLAN I RVGI 1 _I I \/ 1n1 Y
M 302 MECHANICAL PIPING PLAN LEVEL 1 BL-DG 6 &T
mm� 3no3 n EGHANIGAI�PING PLAN LEVEL 1 BUILDINGT-
nn_304 n4R/^LJAN1 AI 12112INICZ 121 AN n4R77AA1IAIR _ RI III DIN T
nn 501 54FEr-uA.4.11 QAl DFTe1L S—;
nn_502 nnFEruennrel nEETeI1 c
nn 503 MECH NIGAl nFTA11—&
-RQI=9 DIAGRAM
M-2011 nn E-
nn_ 102 MEGH NIGAl SGHED 11 ES
E-000 AND Cv Rn�
€-010 RI ECT-RIGAI CITR 121 AN
F=-:201 ELEGTRIGAL LIGHTING PLAN LEVEL 1 _ RI=DG , X
F=-=2 RI ErTRIreI LIGHTING RI enI I FV€1 I-6'-D6 cdT
F=-:202 RI EGTrRICA-L LIGHTINGT1kN' I M4C1 1 R1 QQT
€--2204 €L-€CTRIGAL 1L HTrPJ RI-Ahl A�4F=;Z;ZAN11 ESL-OCT-
17
EXHIBIT 'C'
DUROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety — Phase 1A—Vehicle Service Center
LIST OF DRAWINGS (Dated 07/18/2021)
E_2-n1 E1 FCTrRICAI 170141ER 121 ANI I M _ I-RI nr_ I I of ��,-x
E-207 EI Er`TRIr'AI Rn1n/ER I E\/EI 1 RI nG C -&T
EE2-n-2 EI FCTRICAI Rn1n1E.R 121 A"I I E\/EI 1 - R1 MCZT
E-204 Fal-ECT-RIGAL POWER-PLAN MEZZANINE --BLDG-T-
E 401 EI FEGTRIGA1 12QIn1ER A4FeGHA"II QA1- 12I A"1 - 1 E\/EI 1 -RI�GIPI
E 402 E- EEGTRIrn1 17nlNETR A.49GH N1Gre_I—QnnR 171 e .1 - g 1)GS I I, V,AND X
E 403 1=1 1=rTR1rA- 12CMA1F=R MFICHANICA1 - I RVRI 1 PL/'tt 13LDG Tr-
nA EI Er`T-R 'AIWER AAEruA"Ilr`AI RI e"I I E\/EI 1 RI Da B
F405 EI EGTRIGAI PGWER MECHANICAL _ MEZZANINE RL��
E 4065 EI ErTRIr`AI 1201N CHAh11C 1 ROOF PLAN BLDG T
€An7 M Rr`TRICAI POWER MECHANICAL RnnC F21 n"�1 QCZT
E 601 E1 ErTR1r'AI LIRE ALARM PLAN LEVEL 1 _BLDG I 1 V 1N x
Fw2 M CrTRIrA- PRE L-ARM PLAN I-E\/EI 1 _ R1--MC-ZT
F5n?. EI FeGTRIGAL PRE ALARM PLAN LEVEL 1 _R1--QC-Z T-
FF5nn ELECTRICAL Q1 . "1 MFZZA IINIRRB1 QCZ
R �n1 EI 1=rTRIGA1 nETe11 B
E 9W El-FEGTRIGAL DIAGRAM
E nn1 CI ECT-RIGn1 Cry €Co
E nnn EI ECTRIGA1 Cruel 1c-E-
E 903 EI EGTRIGAI SCHEnt 11 Ec
PLUMBING A96-RF=V'AT-'0N9 AND SYMBOLS
p 010 RI I HAAMING n1/ERnI 1 CITE RLA"I NATURAL GAS nICTRIR1 1T1n"1
rp�n�1 PLUMBING 1{ BING SITE RI A"I
D 1n1 ERE- nnR FLOOR LAN LEVEL 1�� W. V VV Y
v � c--L �T�c
R 102 RL-I IMRINICZ I IN DgRF=LOGR FLOOR 121 A"I I E\/EI 1 RI Mr. C Q_T
te�o�,o-a
D 103 171 1 1MR1"IG 11"InF=RG1 nnR EI nnR 121 AN I EVE1 1 - R1 MG T-
P i01 PLUMBING FLOOR PLAN 1-€NVEL I BLDG Up V, X
PLUMBING MBING FLOOR PLAN LEVEL 1 AND MEZZA"INELQQ T
P`n4 RLI IMBING FLOOR PLAN LEVEL 1 - RI nG T
n_3n 1 RL1 1MRINICZ R0QF= PLAN BBB S .R. T-
P 307 121 1 I[ BING ROOF PLAN - Bl nG 1 I, V, W&Y
P^n1 PLUMBING IMBI G EE.NIIARGEn 171 A"IC
P1 I IMBING 1 I"InERE-zv nnR RICER AREA rnrvr� crvzr� c
R��n7 RI I IMBI"IG 11"InERC�oR RISER AREA6 &-,ry
o 503 RLI I{1AR1"IG I I"In R LOO f�E�RC BLDG AND VI, AND X
R-- 504 pL PRISER BLDG 1 I, V,AND Nf
p 505 RI 1 1MR1"Ir`_ WATER RICER RI nG T AREA A Q_ r`
D 54n6 pl I M-61"Ir`_ WATER RICER RI nG T AREA R
p 691 RI 1 IAnRI"IG nETA11 C
D 701 pL €B
T 001 I nW VOLTAGE SYMBOL LEGEND
T-101 TE OL9GY SITE PLAN
T 111 r`nAARnCITE I EVEI 1 T-EGHNGLOGY ROUTING PLA4
T--7n1 TErNOLOGY PLANS RI nr`_T- A4e1"ITC"IA"Ir`E
W -uru"In1 nr_v R c eTnRe�E RI n�C I 1 �/ ►n1 y -�-MEZZANINE
a. v-s c B L D v-v ,—t rT�c, M EZZ n�
T_4n1 TEr`1-1"Inl nGV E"II ARGE;
NETWORK ENIQ 021 IRE EI EVAT104I5;
18
EXHIBIT 'C'
Dl�.JIROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety — Phase 1A—Vehicle Service Center
LIST OF DRAWINGS (Dated 07/18/2021)
T_Rf11 TEGHNGLOd`Y DFT- ll
T 602 SECURITY DETAILS
T G/�► c
2F=Q IRIT-Y CZAa-F= D€TA4tlS;
T,16n16 FmIQF Rae E Rr-DIAa—R-
Note: The drawing sheets which are struck out are not applicable to Phase 1A scope of work.
19
EXHIBIT `D'
DUROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety — Phase 1A—Vehicle Service Center
LIST OF ADDENDA
1. Addendum No. 1 Issued on June 30, 2021
2. Addendum No. 2 Issued on July 9, 2021
3. Addendum No. 3 Issued on July 12, 2021
4. Addendum No. 4 Issued on September 28, 2021
20
EXHIBIT'E'
DOUIROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety — Phase 1A—Vehicle Service Center
QUALIFICATIONS &ASSUMPTIONS
DIVISION 00— PROCUREMENT AND CONTRACTING REQUIREMENTS
1. Excluded is Material Testing.
2. Utility Company agreements (terms and conditions), easements and coordination
which will serve as the termination point for Durotech to make connections for
building service shall be the responsibility of the Owner and Design Team
(Architect/MEP Engineer). Durotech will assist the Owner and Design Team in
coordinating the activities with the Utility Company(s).
3. All required utility providers (water, sewer, storm discharge point, electric, gas, fiber,
phone lines) are the responsibility of the owner to coordinate and execute necessary
agreements so that the utilities are installed per the contractor's schedule for
construction usage and systems startup.
4. Without regard to any other provision of this Agreement, Owner shall be liable to
Contractor for additional costs incurred by Contractor as the result of any applicable
state or local sales, excise, or use tax, governmental payroll tax or healthcare tax if
the tax is applicable to the Project, the Project is not tax exempt from the specific tax
and the tax became effective after the date of execution of the Contract.
5. Electronic Files and CAD Files will be provided by the Architect/Engineer of record for
the purpose of preparing shop drawings and 3D models at no cost to the General
Contractor and/or Subcontractors. A signed release will be submitted to the
Architect/Engineer before electronic files are released by the Architect/Engineer.
6. Excluded are unforeseen underground conditions or obstructions not indicated in
contract documents.
7. Owner and Contractor agree that all manufacturer's warranties, and subcontractor's
warranties which extend beyond Contractor's warranty period, are hereby assigned to
and run directly from the manufacturer to the Owner and from the subcontractor to
the Owner, respectively. Owner accepts these assignments and warranties, and
releases and discharges Contractor from any and all claims, liabilities, damages,
costs and expenses arising out of such manufacturer's warranties and any
subcontractor's extended warranties.
8. The Contractor's warranty excludes remedy for damage or defect caused by abuse,
material alteration to the work not executed by the Contractor, insufficient
maintenance or maintenance not in compliance with manufacturer's written
recommendations.
21
EXHIBIT'E'
DUROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety — Phase 1 A—Vehicle Service Center
QUALIFICATIONS &ASSUMPTIONS
9. Payment and Performance Bonds will be charged to the Owner based on the State of
Texas regulated rate.
10. The Guaranteed Maximum Price provided is a not to exceed amount for the entire
Baytown Public Safety— Phase 1A—Vehicle Service Center project scope.
Individual line items within the project budget are not individual Guaranteed Maximum
Price amounts.
11. The GMP package is valid until October 15, 2021. The Owner will issue a Notice to
Proceed and sign the GMP Amendment on or before the stated date.
12. The proposed cost saving recommendations by Durotech, Inc. shall be subject to the
review and approval of the Architect, Owner and the Owner's Professional
Consultants. Durotech, Inc. is not required to ascertain that the cost savings are in
accordance with applicable laws, statutes, ordinances, codes, rules and regulations,
or lawful orders of public authorities. The Contractors review of the proposed cost
savings is in the capacity as a Construction Manager and not as a Design
Professional.
13. For any delays caused by events outside of Contractor's control, including but not
limited to Acts of God, pandemics, epidemics, acts of governmental authorities, acts
of civil authorities, acts of war or terrorism, unanticipated material shortages and price
escalations, labor disputes and utilities delays, Owner shall grant additional time
extensions and price increases to Contractor when properly documented,
substantiated and approved by Owner, subject to Contractor's right to dispute
Owner's decision under the claims procedures of the Contract
14. Stipulated Billing Rates:
No. Description Rate
1 General Liability/Umbrella Contract amount per thousand
Insurance x $7.75
2 Builder's Risk Insurance Contract amount/hundred x
$0.012 x#of months
3 Project Executive $115.00 per hour
4 Project Manager $76.00 per hour
5 Estimator $55.00 per hour
6 Safety/Field Operation $101.00 per hour
Mana er
22
EXHIBIT 'E'
DUROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety— Phase 1A—Vehicle Service Center
QUALIFICATIONS & ASSUMPTIONS
7 Lead Superintendent $79.00 per hour
8 Assistant Superintendent $48.00 per hour
9 Project Engineer $41.00 per hour
10 Quality Control Inspector $69.00 per hour
11 Contract Administrator $33.00 per hour
12 Preconstruction Manager $97.00 per hour
13 Quality Control Manager $69.00 per hour
14 BIM Coordinator $55.00 per hour
15 IT Coordinator $95.00 per hour
16 Intern $25.00 per hour
17 Labor Burden 42.5%
Labor Rates: Per Hour
Semi-skilled Labor $27.00
Skilled Labor $30.00
Foreman/Operator $38.00
15. Billable rates will be subject to audit for hours worked only.
16. All labor burden rates from a subcontractor that are 42% or less are considered to be
acceptable.
DIVISION 01 — GENERAL REQUIREMENTS
17. Section 01564 — Control of Ground Water and Surface Water: Excluded is any
ground water control systems, well-point systems, eductor and ejector-type systems,
deep wells, and piezometers or monitoring wells.
18. Section 01 21 00 —Allowances: Excluded are the following:
Para 1.05.13 — Entire paragraph
Para 1.06.13 — Last sentence "These costs include delivery, installation, insurance,
equipment rental, and similar costs".
DIVISION 02— SI TEWORK/EXI S TING CONDITIONS
DIVISION 03— CONCRETE
23
EXHIBIT'E'
D 'U' ROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety— Phase 1 A—Vehicle Service Center
QUALIFICATIONS &ASSUMPTIONS
DIVISION 04— MASONRY
DIVISION 05—METALS
19. Excluded is any galvanizing of structural steel members in enclosed unconditioned
space areas of the building.
DIVISION 06— WOOD, PLASTICS, AND COMPOSITES
DIVISION 07— THERMAL AND MOISTURE PROTECTION
DIVISION 08— OPENINGS
DIVISION 09— FINISHES
DIVISION 10— SPECIALTIES
DIVISION 12— FURNISHINGS
DIVISION 13— SPECIAL CONSTRUCTION
20. Section 13 34 19 — Metal Building Systems
a] The Pre Engineered Metal Building will be designed and fabricated by Alliance
Steel Building Systems.
b] Design Information
Building Code: IBC 2015
Collateral Load: Per Drawings
Wind Load: 160 MPH
Seismic Imp. Factor: 1.50
Live Load (Roof): 20 PSF
Deflections: Per Specifications
Wind Exp. Factor: C
Snow Imp. Factor: 1.20
Reducible Live Load: Yes
Snow Load (Ground): 0 PSF
Seismic (Ss) 0.070 (SI) 0.040
Wind Imp. Factor: Risk IV
c] Roof& Wall Material Finish Profile
Roof Panel 24 gauge Fluropon/Kynar Alliance Seam 24
Wall Panel 24 gauge Fluropon/Kynar LT3.3
Wall Liner 26 gauge Std Weather X PBM
Trim 26 gauge Fluropon/Kynar Gutter&
24
EXHIBIT 'E'
DUROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety— Phase 'IA—Vehicle Service Center
QUALIFICATIONS &ASSUMPTIONS
Downspouts
Liner Trim 24 gauge Std Weather X Liner Trim
d] Excluded is all ceiling liner panel in Buildings T, U, V and X.
e] Included is interior wall liner panel up to a height of 14' 0" AFF in Building T.
f] Included is interior wall liner panel up to a height of 8' 0" AFF in Building U, V
and X.
g] All interior liner panel to be 26 gauge, PBM "WXL" finish.
h] All exterior wall liner panel to be 24 gauge, Vertical LT3.3, Kynar finish.
i] Included is partition wall framing above 10' 0"AFF along gridline 15/16 in
Building T.
j] Furnish 22 ga, PBM, White at roof at Deck of Storage area in building T.
k] Remove wall girts and provide wind girt at Breakroom and Storage area in
Building T.
1] Roof panels to be 24 gauge, "standard Alliance Kynar colors", UL90 rated,
Alliance Seam 24 standing seam panels with concealed clips and fasteners.
All roof panels to be "machine seamed" at sidelaps as specified.
m] Interior wall liner to be 26 gauge, "standard Alliance Kynar colors", "PBM",
single-skin panels with exposed fasteners to be installed at the Apparatus
Bays, Storage, Vehicle Bays, Dive/ Bomb Team, Trailers, and the Enclosed
Bay of the Auto Theft.
n] Soffit at the below eave canopies to be 24 gauge, "standard Alliance Kynar
colors", "A-12" single-skin panels with concealed fasteners to be installed over
pre-engineered framing components as provided by Alliance.
o] All standard building trim, eave gutter and downspouts to be 26 gauge,
it Alliance Kynar colors'.
p] Alliance to provide metal building column reactions and anchor bolt settings for
foundation and footing design by Structural Engineer.
q] Welding of shop connections shall be in accordance with the AWS D 1.1
standard code for"Structural Welding Code—Steel" (welding in building
construction) and AWS D1.3 "Structural Welding Code—Sheet Metal" as
directed and certified by AISC and the Alliance Steel Engineering Department
requirements. An independent testing laboratory has previously certified
welders and the welding process. Alliance is an IAS accredited facility.
r] All exposed framing at the Wash Bay, Porch Area of Breakroom, and Auto
Theft/ Bays are to be hot-dipped galvanized.
s] All metal building primary and secondary framing members to be provided with
Alliance standard red-oxide primer coating, which meets or exceeds Federal
Specification TT-P-636c.
t] Included is Alliance Steel standard, 20-year roof weather tightness warranty
requirement
25
EXHIBIT 'E'
DUROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety— Phase I—Vehicle Service Center
QUALIFICATIONS &ASSUMPTIONS
DIVISION 21 — FIRE SUPPRESSION
DIVISION 22— PLUMBING
DIVISION 23— HVAC
DIVISION 26— ELECTRICAL
DIVISION 27— COMMUNICATIONS
DIVISION 28—ELECTRONIC SAFETY& SECURITY
DIVISION 31 — EARTHWORK
DIVISION 32—EXTERIOR IMPROVEMENTS
DIVISION 33— UTILITIES
21. Utility spoils will be stockpiled onsite for Phase 2 and 3. Any costs for hauling off
excess spoils will be included in Phase 1 B/2/3.
26
EXHIBIT `F'
DUROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety — Phase 1 A—Vehicle Service Center
ALLOWANCE SCHEDULE
1. Contractor Contingency Allowance $50,000
2. Owner Contingency Allowance $50,000
3. Site Electrical Conduit Allowance $75,000
4. Courts Drainage Allowance $200,000
27
EXHIBIT`G'
DUROTECH
BUILDERS OF INTEGRITY
Baytown Public Safety — Phase 1 A—Vehicle Service Center
SELF PERFORMED WORK ITEMS
There are no self-performed work scope items in Phase 1 A.
28
EXHIBIT `H'
D R fk'_J�T E C H
BUILDERS OF INTEGRITY
Baytown Public Safety — Phase 1A—Vehicle Service Center
UNIT PRICES
AJ UNIT PRICE NO. 1: Removal of unsatisfactory soil and replacement with
satisfactory soil material $69.00/CY
Description: Unsatisfactory soil excavation and disposal off site and replacement
with satisfactory fill material or engineered fill from off site, as required, according
to Division 31 Section "Earth Moving."
BJ UNIT PRICE NO. 2: Rock excavation and replacement with satisfactory soil
material $69.00/CY
Description: Classified rock excavation and disposal off site and replacement
with satisfactory fill material or engineered fill from off site, as required, according
to Division 31 Section "Earth Moving.to
CJ UNIT PRICE NO. 5:Additional excavation of existing fill soil/debris
$47.00/CY
This unit cost is for the additional excavation &removal of the existing fill
soil/debris and haul-off from the project site.
DJ UNIT PRICE NO. 6:Additional Imported Select Fill $25/CY
This unit cost is for the providing, placing and compacting additional imported
select fill.
EJ UNIT PRICE NO. 8: Subgrade preparation for concrete paving
The price includes subgrade preparation only.
1. 8" concrete paving Add: $0.95/SF Deduct: $0.95/SF
2. 6" concrete paving Add: $0.95/SF Deduct: $0.95/SF
3. 4.5" concrete sidewalk Add. $0.60/SF Deduct: $0.60/SF
29
EXHIBIT T
D U ROTEC H
BUILDERS OF INTEGRITY
Baytown Public Safety — Phase 1A—Vehicle Service Center
COST SAVING ITEMS
The following cost saving items have been reviewed and approved by the
Owner/Architect and are included in the GMP pricing.
DIV# DESCRIPTION DEDUCT
13 SPECIAL CONSTRUCTION
1 Section 13 34 19 - Pre-Engineered Metal Building Frame
a] Delete ceiling liner panel in Building U ($23,060.00)
b] Delete ceiling liner panel in Building V ($8,290.00)
c] Delete ceiling liner panel in Building X ($1,750.00
d] Change the wall liner panel in Building U from full height to 8'0"AFF ($2,240.00
el Change the wall liner panel in Building V from full height to 8'0"AFF $2,590.00
fl Change the wall liner panel in Building X from full height to 8'0"AFF $1,480.00
gj Change the wall liner panel in Building T from full height to 14'0"AFF $26,960.00
hI Delete the ceiling liner panel in Building T $60,290.00
il Use LT3.3 vertical wall panels in lieu of FW-120 wall panels $25,261.00
hl Use LT3.3 vertical wall panels in lieu of Masterline16 wall panels $19,433.00
SUB TOTAL $(171,354.00)
30