Loading...
Ordinance No. 14,721ORDINANCE NO. 14,721 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AUTHORIZING CHANGE ORDER NO. 7 WITH COMEX CORPORATION FOR THE FIRE TRAINING FACILITY PHASE 3 PROJECT; AUTHORIZING PAYMENT BY THE CITY OF BAYTOWN IN THE AMOUNT OF TWENTY-ONE THOUSAND EIGHT HUNDRED SIXTY AND 65/100 DOLLARS ($21,860.65); AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council of the City of Baytown, Texas, does hereby authorize Change Order No. 7 with Comex Corporation for the Fire Training Facility Phase 3 Project. A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. Section 2: That subject to funding from the Baytown Municipal Development District, the City Council of the City of Baytown authorizes payment to Comex Corporation, in an amount not to exceed TWENTY-ONE THOUSAND EIGHT HUNDRED SIXTY AND 65!100 DOLLARS ($21,860.65) in accordance with the change order authorized in Section 1 hereinabove. Section 3: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 13t1' day of May, 2021. BRANDON CAPETILL , Mayor ATTEST: ANGELM JACKSON, Inte ty / Sep TF00�G APPROVED AS TO FORM: KAREN L. HORNER, City Attorney RAKaren HorneADocumentsTiles City Council Ordinances\202 May 13.ChangeOrderNo7forFireTrainingFacilityPhase4Project.doc Exhibit "A" CITY OF BAYTOWN Baytown Fire Training Facility Phase 3 Change Order No. 7 MON PO: 1906779 Date: April 25, 2021 Synopsis: This change order includes two items: testing of the propanes service lines and electrical wiring upsizing to provide adquate amperage to the drafting pond pumps. The pressure testing of the liquid propane lines from the propane tank to the fire training structure requires a pressure of 375 PSI for 24 hours to ensure that the lines are safe for the use. Initial testing was conducted under the incorrect NFPA standard due to a misunderstanding of the requirement and propane delivery method (liquid vs. gas). Testing of the pumps at the drafting pond revealed inadquate electrical power. This change will increase the size of the wire from the breaker box at the Storage Building to the drafting pond pumps that draw water from the reservoir to ensure all four pumps can work at the same time as intended, to provide fire training water. Brief Description of Changes: Item 7.1: The first item of work is for an increase of $5,224,80 to pressure test the liquid propane lines from the propane tank to the fire training structure with a pressure of 375 PSI for 24 hours to ensure that they are safe for the use of delivering the propane from the tank to the fire training structure Item 7.2: The second item of work is for an increase in the amount of $16,635.85 for increasing the size of the wire from the breaker box by the Pre -Engineered Metal Storage Building to the pumps that draw water from the reservoir to ensure all four pumps can work at the same time as intended. The work includes pullboxes and associated work. Add or Deletg Items: Item 7.1 Pressure Testing Liquid Propane Lines LS 1 $ 5,224.80 $ 5,224.80 7.2 increase Size of the Wire to Pumps LS 1 $ 16,635.85 $ 16,635.85 i oiai 21A60.65 n a : Original Revised 1 Oridnal Contract Price $7,438,000.00 $ 7,438,000.00 2 Owner Contingency Previous Change Orders This Change Order Remaining Contingency 3 Change Orders Previous Change Orders $ 225,060.01 This change order $ 21,860.65 4 Revised Contract Price $7,438,000.00 $7,6K920.66 Original Contract Duration 450 NTP Date 7/15/19 Previous Extensions 137 Original Complete Date 10/7/20 This Change Order 129 Revised Duration - Calendar Days 716 Reused Duration Date 061VI21 Contractor Date: 05/05/2021 Director of Public Works & Engineering Date: Frank O. Simoneaux, fr., P.E. Ury onager ate; Co t Date: Richard L. David, ICMA-CM 9144-1 )5.05.21 Asst. Director of Ellic Works & Engineering Date: Andrea D. Brinkley, PMP Finance Director Date: Victor Brownlees Pro*ect Manager T4.. M1 , 5-5-2021 Documentation for Item 7.1 Comex Corporation Page 1 of 2 9841 Spencer Highway LaPorte, TX 77571 (281) 479-2322 Change Order 04/01 /2021 Project: Baytown Fire Training To: Contract : 1061 Change Order: 36 Owner/GC CP: Reference: Section: RE: Panel HB 175Amps Requested Respond Scope of Work: Remove existing circuit and reinstall Larger circuit per attached sub proposal. We will Attempt to pull wire without the pull boxes first per Email with John. If Gulf Coast has to cover extra Labor to repull this wire after the first pull fails the cost will be deducted from the pull box allowances or added to the total cost of this CO after installation is finished. No final grading or hydro mulch is included in this pricing. Contract will need to be extended a minimum of 45 days after we receive an executed Change order from the city. No overtime is included in this CO. Estimates were based on conference call conversations and attached Drawings. Electrical $ 10,567.73 Concrete $ 2,500.00 Supervision $ 2,000.00 OH &P $ 1,306.77 Ins and Bond $ 261.35 Total $ 16,635.85 Pull Box Allowances Built into cost above. Partial credit may occur after installation is finished. 1 pull box in Dirt $ 488.27 1 Pull Box in area Paving $ $3,288.27 Original Contract: $7,438,000.00 Total Proposed Amount: The Contract time Will be extended by: Comex Corporation 9841 Spencer Highway LaPorte, TX 77571 (281) 479-2322 45 days $16,635.85 Please indicate your approval by returning a change order for the work specified. Distribution: Page 2 of 2 Sincerely, Rickey Trani `V-l', /-'I ' � Indusbale! 20p.frms @.fourth • Beaummit, Tws 77701 March 26, 2021 Comex Corp MI Spencer Hwy LaPorte, TX 77571 RE: Baytown We Training Academy- Pump Feeder We are submitting pricing to remove existing circuit and reinstall larger circuit for pump at the above project. The price Includes demo, labor, miscellaneous material, pull boxes and excavation. The pull boxes will be required to complete this work. The price excludes overtime and sales tax. Labor - $ 5,261.75 Material - $ 3,205.54 Pull Boxes (Installed) - $ 792.64 Excavation - $ 347.10 10%mark up and overhead -$ 960.70 Tonal - $ *567.73 The price is based on regular working hours of Monday through Friday from 7:00am to 3:30pm. If you have any questions or comments, please contact the office. Sincerely, Gulf Coast Electric Co., Inc. Kevin J. P card Vice President KJp/Jmh Cc:files IGWT 4019 0.0,M - TaX 403 &U 43m • 4tluwou#�MnAsi+elte� F ^ns N 0 AemAMoyleg OZSLLXfu O 9 ZZOL ; + ' III 3SVHd NMOi kV1E3 f{ � 111 ;m o to ►- °e ! S31n(13HOS IVOW1O313 B�oII�I B�IAllllllliil 0�1@�Illlli�ol @�I@i101iloOo� osV9YYYYYYYYYI @�fGlllllil'� Fl��9�011ilo � 9�V�ilililio�� IIIlI B i� 0o B �611i1�l�lli B �EIIIIIII I 9 Y81�91i1�1i 0 I@liilll�lll II� I�I�Ik��l�ll g R 8 8 LL 7 9 �BIO�I i o€r �s��An�o�oiio� 6E�16il0liiili� fi��911�111111� [��YAllillll'� fi��@il�llli i Fl�Y�iloillP�lY 41 oa i� 8��91Illillli� 9�1@IIIIIIIoI� I�I�iiliili�l7 B�IAlllllll I 0��911111IICII I��leslltl��l��� o f Wi k UGS^LL X1 �0 S y:R 9 c ! a anud te"e" ZZ0" Z Es °' III 36VHd NMO-LAv 9Q a k Ndld 311S JN18Wflld " ,fir eeaa :; a s / ldOlb103-13 /-1VOINW03W � I Q 1 < p 1 3 1 6 1 p 1 8 I I I ��y 1 p9 1 $6i i 1 I Mir, .. 0 a W 0� Documentation for Item 7.2 Project: To: RE: Requested Respond Scope of Work: Comex Corporation Page 1 of 2 9841 Spencer Highway LaPorte, TX 77571 (281) 479-2322 Change Order 04/13/2021 Baytown Fire Training Retest Liquid Propane Lines Contract : 1061 Change Order: 37 Owner/GC CP: Reference: Section: See attached Pricing to retest the liquid propane lines to all props and propane tank per Propane specialties standards. Per emails we will pressurize all Liquid Lines up to 375PSI with Compressed Nitrogen and let sit for 24hrs to confirm that the lines do not have any leaks. The lines have been tested previously to 200 PSI during the original installation. If a line is damaged or springs a leak during the test Comex and their sub are not liable and will not repair the line for free. The city accepts full Liability for retesting these lines to this new pressure. Testing $ 4,665.00 OH&P $ 466.50 Bonds $ 93.30 Total $ 5,224.80 Original Contract: $7,438,000.00 Net Change by Previous Change Orders: $225,060.01 Contract Sum Prior to this Change Order, $7,663,060.01 Total Proposed Amount: $5,224.80 Revised Contract: $7,668,284.81 The Contract time Will be extended by: Odays only if approved with Comex's CO36 Please indicate your approval by retuming a change order for the work specified. Comex Corporation Page 2 of 2 9841 Spencer Highway LaPorte, TX 77571 (281) 479-2322 Distribution: Sincerely, Rickey Trant _o PLUMBING SYSTEMS INC 9030 Solon Road Houston, Texas 77064 Phone: (832) 911-6733 Fax: (832) 912 67Y Date: 04/14/21 Proposal: 214913-00-010 Phone: (281) 479-2322 BAYTOWN FIRE TRAINING TANK Fax: (281) 479-2069 Proposal Customer: 11760 Project: COMEX CORP 9841 SPENCER HIGHWAY LA PORTE, TX 77571 PROPOSAL PREPARED BY: Tommy Carpenter BAYTOWN FIRE TRAINING TANK 7022 BAYWAY DRIVE BAYTOWN TX 77520 AMOUNT TO BE ADDED TO THE CONTRACT FOR RE -TESTING THE UNDERGROUND LIQUIDE PROPANE GAS LINES PER THE GAS SUPLIERS REQUEST. PROJECT PLUMBING MATERIAL $1,240.00 LABOR 2-MEN 48 HRS @ $125.00 PER HR $3.000.00 SUB TOTAL $4,240.00 X 10% O/P $ 425.00 TOTAL $4,665.00 UNDERGROUND LINES WILL BE TESTED UP TO 375 PSI. WE WILL TEST EACH LINE SEPARATELY WITH COMPRESSED NITROGEN TO REACH THE REQUIRED PRESSURE FOR 24 HRS. SO IT CAN BE VERIFIED BY THE PERSON HAVING JURISDICTION NOTE THESE LINES HAVE ALREADY BEEN TESTED TO 200 PSI WITH NO LEAKS. IF ANY LEAKS ACCUR DURING THE TESTING DO TO THE HIGH PRESSURE THERE WILL ADDITIONAL CHAGRES TO LOCATE AND REPAIR THE LEAKS. EXCLUSIONS 4,665.00 Total Bid: $4,666.00 Items not listed above, meter or impact fees, repairs to unmarked utilities, x-ray of concrete slab for core drilling or saw cutting, cutting and patching of roof, all concrete work unless otherwise noted, condensate lines, overtime or after hours labor. any CADD production drawings or Record Drawings unless specifically included, any work not shown on the Plumbing bid drawings unless specifically included above. This proposal contains Belknap Plumbing Systems' standard insurance as follows $2M GL aggregate / $500K Auto / $1 M WC / $4M Umbrella / No E80 This proposal does not include any GC -required insurance other than the standard general liability automobile, and workers' compensation All bonding and/or special insurance requirements are supplied at additional cost if requested from general contractor after the bid date. Price may include sales tax unless resale/exempt certificate is provided. This quote is good for 30 days. NOTE: If we are awarded this project, a copy of our proposal in its entirety shall become part of the contract. License M-18741 Kenneth 0. Belknap — Regulated by the Texas State Board of Plumbing Examiners PO Box 4200 Austin TX 75765-4200—1-800-845-6584 Date: Phone: Fax: Customer: 04/14/21 (281) 479-2322 (281) 479-2069 17766 COMEX CORP 9841 SPENCER HIGHWAY LA PORTE, TX 77571 Accepted by: signed: Page 2 PLUMBING SYSTEMS INC 9030 Solon Road Houston, Texas 77064 Phone: (832)912-6733 Fax: (832) 912-6739 Proposal Proposal: 214913-00-010 BAYTOWN FIRE TRAINING TANK Project: Title: BAYTOWN FIRE TRAINING TANK 7022 BAYWAY DRIVE BAYTOWN TX 77520 Dated: License M-18741 Kenneth 0. Belknap — Regulated by the Texas State Board of Plumbing Examiners PO Box 4200 Austin TX 75765-4200—1-800-845-6584 .p N `Y } LIQUID PROPANE TO PROP # 1 t --VAPOR PROPANE TO PROP #1 00 C ( LIQUID PROPANE TO PROP #2 X 00 -*-VAPOR PROPANE TO PROP #2 IDUQUID PROPANE TO PROP #3 � rn� �,5 -0-VAPOR PROPANE TO PROP #3 a-i IGLIQUID PROPANE TO PROP #4 0 rn > VAPOR 0 PROPANE TO PROP #4 zM� rn C) .0 rn --1 ()LIQUID PROPANE TO PROP #8 �n0 .� � -WVAPOR PROPANE TO PROP #8 4� > CD Z r rn 7C IDUQUID PROPANE TO PROP #7 o = -VAPOR PROPANE TO PROP #7 ► X 0 rn 9 }LIQUID PROPANE TO PROP #�i rn -*-VAPOR PROPANE TO PROP #6 s IGLIQUID PROPANE TO PROP #5 00 0 -S-VAPOR PROPANE TO PROP #5 -Q rn $LIQUID PROPANE TO PROP #9 VAPOR PROFANE TO PROP #9 co 0 O_ m r W N Z11 -zL, Cm vR OO� m A m M '�V -n -n 0 0 3 z z Z5 -5 1� rrnn 0,0 >O �rnlp 0� vQ o� Ln 7� rn00 m v p A D L qo n n Cz i oc7 �v m m op b~ 30 O lv� 0 N