Ordinance No. 14,721ORDINANCE NO. 14,721
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN,
TEXAS, AUTHORIZING CHANGE ORDER NO. 7 WITH COMEX
CORPORATION FOR THE FIRE TRAINING FACILITY PHASE 3 PROJECT;
AUTHORIZING PAYMENT BY THE CITY OF BAYTOWN IN THE AMOUNT
OF TWENTY-ONE THOUSAND EIGHT HUNDRED SIXTY AND 65/100
DOLLARS ($21,860.65); AND PROVIDING FOR THE EFFECTIVE DATE
THEREOF.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS:
Section 1: That the City Council of the City of Baytown, Texas, does hereby authorize
Change Order No. 7 with Comex Corporation for the Fire Training Facility Phase 3 Project. A copy
of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents
and purposes.
Section 2: That subject to funding from the Baytown Municipal Development District,
the City Council of the City of Baytown authorizes payment to Comex Corporation, in an amount not
to exceed TWENTY-ONE THOUSAND EIGHT HUNDRED SIXTY AND 65!100 DOLLARS
($21,860.65) in accordance with the change order authorized in Section 1 hereinabove.
Section 3: This ordinance shall take effect immediately from and after its passage by the
City Council of the City of Baytown.
INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City
of Baytown this the 13t1' day of May, 2021.
BRANDON CAPETILL , Mayor
ATTEST:
ANGELM JACKSON, Inte ty /
Sep
TF00�G
APPROVED AS TO FORM:
KAREN L. HORNER, City Attorney
RAKaren HorneADocumentsTiles City Council Ordinances\202 May 13.ChangeOrderNo7forFireTrainingFacilityPhase4Project.doc
Exhibit "A"
CITY OF BAYTOWN
Baytown Fire Training Facility Phase 3
Change Order No. 7
MON
PO: 1906779
Date: April 25, 2021
Synopsis: This change order includes two items: testing of the propanes service lines and electrical wiring upsizing to provide
adquate amperage to the drafting pond pumps. The pressure testing of the liquid propane lines from the propane tank to the fire
training structure requires a pressure of 375 PSI for 24 hours to ensure that the lines are safe for the use. Initial testing was
conducted under the incorrect NFPA standard due to a misunderstanding of the requirement and propane delivery method (liquid
vs. gas). Testing of the pumps at the drafting pond revealed inadquate electrical power. This change will increase the size of the
wire from the breaker box at the Storage Building to the drafting pond pumps that draw water from the reservoir to ensure all four
pumps can work at the same time as intended, to provide fire training water.
Brief Description of Changes:
Item 7.1: The first item of work is for an increase of $5,224,80 to pressure test the liquid propane lines from the propane tank to the
fire training structure with a pressure of 375 PSI for 24 hours to ensure that they are safe for the use of delivering the propane from
the tank to the fire training structure
Item 7.2: The second item of work is for an increase in the amount of $16,635.85 for increasing the size of the wire from the breaker
box by the Pre -Engineered Metal Storage Building to the pumps that draw water from the reservoir to ensure all four pumps can
work at the same time as intended. The work includes pullboxes and associated work.
Add or Deletg Items:
Item
7.1
Pressure Testing Liquid Propane Lines
LS
1
$ 5,224.80
$ 5,224.80
7.2
increase Size of the Wire to Pumps
LS
1
$ 16,635.85
$ 16,635.85
i oiai
21A60.65
n
a : Original Revised
1
Oridnal Contract Price
$7,438,000.00
$ 7,438,000.00
2
Owner Contingency
Previous Change Orders
This Change Order
Remaining Contingency
3
Change Orders
Previous Change Orders
$ 225,060.01
This change order
$ 21,860.65
4
Revised Contract Price
$7,438,000.00
$7,6K920.66
Original Contract Duration
450
NTP Date
7/15/19
Previous Extensions
137
Original Complete Date
10/7/20
This Change Order
129
Revised Duration - Calendar Days
716
Reused Duration Date
061VI21
Contractor Date:
05/05/2021
Director of Public Works & Engineering Date:
Frank O. Simoneaux, fr., P.E.
Ury onager ate;
Co t Date: Richard L. David, ICMA-CM
9144-1 )5.05.21
Asst. Director of Ellic Works & Engineering Date:
Andrea D. Brinkley, PMP
Finance Director Date:
Victor Brownlees
Pro*ect Manager
T4.. M1 , 5-5-2021
Documentation for Item 7.1
Comex Corporation Page 1 of 2
9841 Spencer Highway
LaPorte, TX 77571
(281) 479-2322
Change Order
04/01 /2021
Project: Baytown Fire Training
To: Contract : 1061
Change Order: 36
Owner/GC CP:
Reference:
Section:
RE: Panel HB 175Amps
Requested
Respond
Scope of Work:
Remove existing circuit and reinstall Larger circuit per attached sub proposal. We will Attempt to
pull wire without the pull boxes first per Email with John. If Gulf Coast has to cover extra Labor to
repull this wire after the first pull fails the cost will be deducted from the pull box allowances or
added to the total cost of this CO after installation is finished.
No final grading or hydro mulch is included in this pricing.
Contract will need to be extended a minimum of 45 days after we receive an executed Change
order from the city. No overtime is included in this CO. Estimates were based on conference call
conversations and attached Drawings.
Electrical
$ 10,567.73
Concrete
$
2,500.00
Supervision
$
2,000.00
OH &P
$
1,306.77
Ins and Bond $
261.35
Total $ 16,635.85
Pull Box Allowances Built into cost above. Partial credit may occur after installation is finished.
1 pull box in Dirt $ 488.27
1 Pull Box in area Paving $ $3,288.27
Original Contract: $7,438,000.00
Total Proposed Amount:
The Contract time Will be extended by:
Comex Corporation
9841 Spencer Highway
LaPorte, TX 77571
(281) 479-2322
45 days
$16,635.85
Please indicate your approval by returning a change order for the work specified.
Distribution:
Page 2 of 2
Sincerely,
Rickey Trani
`V-l', /-'I
' � Indusbale!
20p.frms @.fourth • Beaummit, Tws 77701
March 26, 2021
Comex Corp
MI Spencer Hwy
LaPorte, TX 77571
RE: Baytown We Training Academy- Pump Feeder
We are submitting pricing to remove existing circuit and reinstall larger circuit for pump at the above
project.
The price Includes demo, labor, miscellaneous material, pull boxes and excavation. The pull boxes will be
required to complete this work.
The price excludes overtime and sales tax.
Labor - $ 5,261.75
Material - $ 3,205.54
Pull Boxes (Installed) - $ 792.64
Excavation - $ 347.10
10%mark up and overhead -$ 960.70
Tonal - $ *567.73
The price is based on regular working hours of Monday through Friday from 7:00am to 3:30pm. If you
have any questions or comments, please contact the office.
Sincerely,
Gulf Coast Electric Co., Inc.
Kevin J. P card
Vice President
KJp/Jmh
Cc:files
IGWT
4019 0.0,M - TaX 403 &U 43m • 4tluwou#�MnAsi+elte�
F ^ns N 0 AemAMoyleg
OZSLLXfu
O 9 ZZOL
; + ' III 3SVHd NMOi kV1E3 f{ � 111 ;m o
to
►- °e ! S31n(13HOS IVOW1O313
B�oII�I
B�IAllllllliil
0�1@�Illlli�ol
@�I@i101iloOo�
osV9YYYYYYYYYI
@�fGlllllil'�
Fl��9�011ilo
�
9�V�ilililio��
IIIlI
B
i�
0o
B
�611i1�l�lli
B
�EIIIIIII
I
9
Y81�91i1�1i
0
I@liilll�lll
II�
I�I�Ik��l�ll
g
R
8
8
LL
7
9
�BIO�I
i
o€r
�s��An�o�oiio�
6E�16il0liiili�
fi��911�111111�
[��YAllillll'�
fi��@il�llli
i
Fl�Y�iloillP�lY
41
oa i�
8��91Illillli�
9�1@IIIIIIIoI�
I�I�iiliili�l7
B�IAlllllll
I
0��911111IICII
I��leslltl��l���
o f Wi k UGS^LL X1 �0 S
y:R 9 c ! a anud te"e" ZZ0"
Z Es °' III 36VHd NMO-LAv
9Q a k Ndld 311S JN18Wflld " ,fir eeaa
:; a s / ldOlb103-13 /-1VOINW03W �
I
Q
1
<
p 1
3 1
6 1
p 1
8 I
I
I
��y 1
p9 1
$6i i
1
I
Mir,
..
0
a
W
0�
Documentation for Item 7.2
Project:
To:
RE:
Requested
Respond
Scope of Work:
Comex Corporation Page 1 of 2
9841 Spencer Highway
LaPorte, TX 77571
(281) 479-2322
Change Order
04/13/2021
Baytown Fire Training
Retest Liquid Propane Lines
Contract : 1061
Change Order: 37
Owner/GC CP:
Reference:
Section:
See attached Pricing to retest the liquid propane lines to all props and propane tank per Propane
specialties standards. Per emails we will pressurize all Liquid Lines up to 375PSI with
Compressed Nitrogen and let sit for 24hrs to confirm that the lines do not have any leaks.
The lines have been tested previously to 200 PSI during the original installation. If a line is
damaged or springs a leak during the test Comex and their sub are not liable and will not repair the
line for free. The city accepts full Liability for retesting these lines to this new pressure.
Testing $ 4,665.00
OH&P $ 466.50
Bonds $ 93.30
Total $ 5,224.80
Original Contract: $7,438,000.00
Net Change by Previous Change Orders: $225,060.01
Contract Sum Prior to this Change Order, $7,663,060.01
Total Proposed Amount: $5,224.80
Revised Contract: $7,668,284.81
The Contract time Will be extended by: Odays only if approved with Comex's CO36
Please indicate your approval by retuming a change order for the work specified.
Comex Corporation Page 2 of 2
9841 Spencer Highway
LaPorte, TX 77571
(281) 479-2322
Distribution: Sincerely,
Rickey Trant
_o
PLUMBING SYSTEMS INC
9030 Solon Road Houston, Texas 77064
Phone: (832) 911-6733 Fax: (832) 912 67Y
Date: 04/14/21 Proposal: 214913-00-010
Phone: (281) 479-2322 BAYTOWN FIRE TRAINING TANK
Fax: (281) 479-2069
Proposal
Customer: 11760 Project:
COMEX CORP
9841 SPENCER HIGHWAY
LA PORTE, TX 77571
PROPOSAL PREPARED BY: Tommy Carpenter
BAYTOWN FIRE TRAINING TANK
7022 BAYWAY DRIVE
BAYTOWN TX 77520
AMOUNT TO BE ADDED TO THE CONTRACT FOR RE -TESTING THE UNDERGROUND LIQUIDE
PROPANE GAS LINES PER THE GAS SUPLIERS REQUEST.
PROJECT PLUMBING
MATERIAL $1,240.00
LABOR 2-MEN 48 HRS @ $125.00 PER HR $3.000.00
SUB TOTAL $4,240.00
X 10% O/P $ 425.00
TOTAL $4,665.00
UNDERGROUND LINES WILL BE TESTED UP TO 375 PSI. WE WILL TEST EACH LINE
SEPARATELY
WITH COMPRESSED NITROGEN TO REACH THE REQUIRED PRESSURE FOR
24 HRS. SO IT CAN BE VERIFIED BY THE PERSON HAVING JURISDICTION NOTE THESE
LINES HAVE ALREADY BEEN TESTED TO 200 PSI WITH NO LEAKS. IF ANY LEAKS ACCUR
DURING THE TESTING DO TO THE HIGH PRESSURE THERE WILL ADDITIONAL CHAGRES TO
LOCATE AND REPAIR THE LEAKS.
EXCLUSIONS
4,665.00
Total Bid: $4,666.00
Items not listed above, meter or impact fees, repairs to unmarked utilities, x-ray of concrete slab for
core drilling or saw cutting, cutting and patching of roof, all concrete work unless otherwise noted,
condensate lines, overtime or after hours labor. any CADD production drawings or Record Drawings unless
specifically included, any work not shown on the Plumbing bid drawings unless specifically included above.
This proposal contains Belknap Plumbing Systems' standard insurance as follows $2M GL aggregate / $500K
Auto / $1 M WC / $4M Umbrella / No E80
This proposal does not include any GC -required insurance other than the standard general liability
automobile, and workers' compensation All bonding and/or special insurance requirements are supplied at
additional cost if requested from general contractor after the bid date.
Price may include sales tax unless resale/exempt certificate is provided.
This quote is good for 30 days.
NOTE: If we are awarded this project, a copy of our proposal in its entirety shall become part of the
contract.
License M-18741 Kenneth 0. Belknap — Regulated by the Texas State Board of Plumbing Examiners
PO Box 4200 Austin TX 75765-4200—1-800-845-6584
Date:
Phone:
Fax:
Customer:
04/14/21
(281) 479-2322
(281) 479-2069
17766
COMEX CORP
9841 SPENCER HIGHWAY
LA PORTE, TX 77571
Accepted by: signed:
Page 2
PLUMBING SYSTEMS INC
9030 Solon Road Houston, Texas 77064
Phone: (832)912-6733 Fax: (832) 912-6739
Proposal
Proposal: 214913-00-010
BAYTOWN FIRE TRAINING TANK
Project:
Title:
BAYTOWN FIRE TRAINING TANK
7022 BAYWAY DRIVE
BAYTOWN TX 77520
Dated:
License M-18741 Kenneth 0. Belknap — Regulated by the Texas State Board of Plumbing Examiners
PO Box 4200 Austin TX 75765-4200—1-800-845-6584
.p
N
`Y }
LIQUID PROPANE TO PROP # 1
t
--VAPOR PROPANE TO PROP #1
00
C
( LIQUID PROPANE TO PROP #2
X
00
-*-VAPOR PROPANE TO PROP #2
IDUQUID PROPANE TO PROP #3
�
rn�
�,5
-0-VAPOR PROPANE TO PROP #3
a-i
IGLIQUID PROPANE TO PROP #4
0 rn >
VAPOR
0 PROPANE TO PROP #4
zM�
rn C) .0
rn
--1
()LIQUID PROPANE TO PROP #8
�n0
.�
�
-WVAPOR PROPANE TO PROP #8
4� >
CD Z
r rn
7C
IDUQUID PROPANE TO PROP #7
o =
-VAPOR PROPANE TO PROP #7
► X 0
rn 9
}LIQUID PROPANE TO PROP #�i
rn
-*-VAPOR PROPANE TO PROP #6
s
IGLIQUID PROPANE TO PROP #5
00
0
-S-VAPOR PROPANE TO PROP #5
-Q
rn
$LIQUID PROPANE TO PROP #9
VAPOR PROFANE TO PROP #9
co
0
O_ m
r
W
N
Z11 -zL,
Cm
vR
OO�
m A m
M '�V
-n -n
0 0
3
z z
Z5 -5
1�
rrnn 0,0
>O
�rnlp
0�
vQ
o�
Ln
7�
rn00
m v
p A
D
L qo
n
n
Cz
i
oc7
�v
m
m
op
b~
30
O
lv�
0
N