2001 01 11 CC Minutes-.1Z-
MINUTES OF THE REGULAR SESSION
OF THE CITY COUNCIL OF THE CITY OF BAYTOWN
January 11, 2001
The City Council of the City of Baytown, Texas, met in regular session on January 11, 2001, at
6:30 p.m. in the Council Chamber of the Baytown City Hall with the following in attendance:
Ronnie Anderson
Council Member
Calvin Mundinger
Council Member
Don Murray
Council Member
Coleman Godwin
Council Member
Scott Sheley
Council Member
Pete C. Alfaro Mayor
Monte Mercer City Manager
Ignacio Ramirez, Sr. City Attorney
Gary W. Smith City Clerk
Absent: Victor Almendarez Council Member
The meeting was opened with a quorum present and Council Member Murrray led the pledge of
allegiance and offered the invocation after which the following business was conducted:
Mayor Alfaro recognized the students in attendance from Ms. White's class at Sterling High
School.
Consider approval of the minutes of the Council Meeting held on December 14, 2000.
Council Member Mundinger moved approval of the minutes. Council Member Sheley seconded
the motion. The vote follows:
Ayes: Council Members Anderson, Godwin, Mundinger, Murray
and Sheley
Mayor Alfaro.
Nays: None.
The motion carried.
Id
ki
Page 2 of 19
Minutes of the Regular Session — January 11, 2001
Proposed Resolution No. 010111 -1 and Proposed Ordinance No. 010111 -1 were considered
together.
Consider Proposed Resolution No. 010111 -1, granting the petition of Christopher A.
Presley for annexation.
Proposed Resolution 010111 -1, grants the petition of Christopher A. Presley for annexation of a
1.961 -acre tract proposed for the construction of town homes on Hunt Road adjacent to the Hunt
Garden Apartments. Texas Local Government Code, Section 43.028 provides for the annexation
of sparsely populated property upon the petition of the owners of all interest in the property.
Section 43.052 provides that an annexation made upon the request of the property owners is
exempt from the requirements of a municipal annexation plan.
The town homes, when completed, will be sold to individuals. The submitted petition meets the
requirements of Section 43.028. Upon approval, City Council will schedule two public hearings
and authorize staff to complete a service plan for the territory requesting annexation.
We recommend approval.
Consider Proposed Ordinance 010111 -1, setting the date, time and place for public
hearings on the proposed annexation of a 1.961 -acre tract of property within the extra-
territorial jurisdiction of the City of Baytown on Hunt Road east of and adjacent to Hunt
Garden Apartments.
Proposed Ordinance 010111 -1, sets the date, time and place for public hearings on the proposed
annexation of a 1.961 -acre tract of property within the extra - territorial jurisdiction of the City of
Baytown on Hunt Road east of and adjacent to Hunt Garden Apartments. Texas Local
Government Code, Section 43.063 requires the City Council to conduct two public hearings at
which persons interested in the annexation are given the opportunity to be heard. The proposed
ordinance schedules the public hearings for January 25, 2001, at 6:45 p.m. and 6:50 p.m.
Christopher A. Presley owns the property and proposes to develop the property with the
construction of town homes that will be individually sold.
We recommend approval.
Council Member Murray moved approval of the proposed resolution and proposed ordinance.
Council Member Anderson seconded the motion. The vote follows:
Ayes: Council Members Anderson, Godwin, Mundinger, Murray
and Sheley
Mayor Alfaro.
Nays: None.
The motion carried.
Page 3 of 19
Minutes of the Regular Session — January 11, 2001
RESOLUTION NO. 1466
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
BAYTOWN, TEXAS, GRANTING THE PETITION OF CHRISTOPHER
A. PRESLEY CONCERNING THE ANNEXATION OF A 1.961 -ACRE
TRACT ON HUNT ROAD ADJACENT TO HUNT GARDEN
APARTMENTS; AND PROVIDING FOR THE EFFECTIVE DATE
THEREOF.
ORDINANCE NO. 9074
AN ORDINANCE SETTING A DATE, TIME AND PLACE FOR THE
PUBLIC HEARINGS ON THE PROPOSED ANNEXATION OF A 1.961 -
ACRE TRACT OF PROPERTY ON HUNT ROAD EAST OF AND
ADJACENT TO HUNT GARDEN APARTMENTS; DIRECTING THE
PREPARATION OF A SERVICE PLAN; AUTHORIZING AND
DIRECTING THE CITY CLERK TO PUBLISH NOTICE OF SUCH
PUBLIC HEARINGS; AND PROVIDING FOR THE EFFECTIVE DATE
THEREOF.
Consider Proposed Ordinance No. 010111 -2, granting an easement to TE Products Pipeline
Company, Limited Partnership in the Baytown Nature Center.
Proposed Ordinance No. 010111 -2, grants an easement to TE Products Pipeline Company,
Limited Partnership ( "TEPPCO ") in the Baytown Nature Center (the "Center "). TEPPCO
currently has a pipeline running through the Center. However, with the widening of the channel,
TEPPCO is forced to abandon the use of a portion of its line within the Center. Because of this
circumstance, TEPPCO's commitment to utilizing the directional drilling method of construction
(instead of the more invasive open ditch technique), and a portion of the new line will fall
outside the existing right -of -way, it is necessary for TEPPCO to acquire the proposed easement.
As part of its remediation plan, TEPPCO will access the property by laying down a board road
from Bayshore Drive to the proposed drill site. The drill site will also be laid down in board.
After completion, the boards will be removed and the affected land will restored to its pre -
construction condition. As consideration for granting this easement, TEPPCO will make a
$50,000 donation for the Center's enhancement. Additionally, TEPPCO will reimburse the City
for the employment Gregg Crouch of Crouch Environmental Services, Inc., who will perform the
following services:
➢ review construction documents and perform inspections to ensure compliance
with all environmental laws and regulations;
➢ inspect post - construction activities to assure that measures have been
implemented to protect the environment while the disturbed areas re- vegetate; and
➢ act as a liaison between the pipeline company and the City so that environmental
concerns will be adequately addressed.
The Nature Center Committee has reviewed the proposal and has no objection.
Page 4 of 19
Minutes of the Regular Session — January 11, 2001
We recommend approval.
Council Member Mundinger moved approval of the proposed ordinance. Council Member
Sheley seconded the motion. The vote follows:
Ayes: Council Members Anderson, Godwin, Mundinger, Murray
and Sheley
Mayor Alfaro.
Nays: None.
The motion carried.
ORDINANCE NO. 9075
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF
BAYTOWN, TEXAS, GRANTING AN EASEMENT TO TE PRODUCTS
PIPELINE COMPANY, LIMITED PARTNERSHIP IN THE BAYTOWN
NATURE CENTER; AND PROVIDING FOR THE EFFECTIVE DATE
THEREOF.
Consider Proposed Ordinance No. 010111 -3, awarding contract for Veteran's Memorial
Plaza.
Proposed Ordinance No. 010111 -3, awards contract for Veteran's Memorial Plaza to D & W
Contractors, Inc in the amount of $103,434. Five potential bidders attended the mandatory
prebid meeting and we received two bids. The scope of work includes concrete plaza paving,
flagpoles, signage, free standing fiberglass reinforced polyester painted columns, and selective
demolition. The architect's estimated construction cost was $95,000. The construction duration
is 45 working days on site and will be funded by private donations, Harris County and the City
of Baytown. The bid tabulation is attached as an exhibit.
We recommend approval.
Council Member Godwin moved approval of the proposed ordinance. Council Member
Mundinger seconded the motion. The vote follows:
Ayes: Council Members Anderson, Godwin, Mundinger, Murray
and Sheley
Mayor Alfaro.
Nays: None.
The motion carried.
Page 5 of 19
Minutes of the Regular Session — January 11, 2001
ORDINANCE NO. 9076
AN ORDINANCE AUTHORIZING AND DIRECTING THE CITY
MANAGER AND CITY CLERK TO EXECUTE AND ATTEST TO A
CONTRACT WITH D & W CONTRACTORS, INC., FOR THE
VETERAN'S MEMORIAL PLAZA; AUTHORIZING PAYMENT OF THE
SUM OF ONE HUNDRED THREE THOUSAND FOUR HUNDRED
THIRTY -FOUR AND NO/100 DOLLARS ($103,434.00); MAKING OTHER
PROVISIONS RELATED THERETO; AND PROVIDING FOR THE
EFFECTIVE DATE THEREOF
Consider Proposed Ordinance No. 010111 -4, approving Change Order No. 3 for the
Municipal Court and Jail contract.
Proposed Ordinance No. 010111 -4, approves Change Order No. 3 in the amount of $68,825 to
Firemen Construction Company, Inc. Change Order No. 3 adds two bollards, adds additional
steel support for roof penetrations in both buildings for the mechanical units, corrects installation
of underground pipes to both backflow preventers, revises the window frames in the guardhouse
to improve vision into the jail cells, widens the countertop in Room 241, and provides $40,000
allowance to install additional security equipment (i.e., cameras and panic alarm button). The
contract award amount was $4,650,000.00 and this change order along with the previous change
orders represents a 1.6% cost growth. Change Order No. 1 increased the contract amount by
$7,000 and Change Order No. 2 increased the duration by 120 construction days. The contract's
revised duration was 485 calendar days and the duration remains unchanged.
We recommend approval.
Council Member Mundinger moved approval of the proposed ordinance. Council Member
Anderson seconded the motion. The vote follows:
Ayes: Council Members Anderson, Godwin, Mundinger, Murray
and Sheley
Mayor Alfaro.
Nays: None.
The motion carried.
Page 6 of 19
Minutes of the Regular Session — January 11, 2001
ORDINANCE NO. 9077
AN ORDINANCE AUTHORIZING CHANGE ORDER NO. 3 WITH
FIREMEN CONSTRUCTION COMPANY, INC., FOR THE MUNICIPAL
COURT AND JAIL; AUTHORIZING PAYMENT BY THE CITY OF
BAYTOWN, THE SUM OF SIXTY -EIGHT THOUSAND EIGHT
HUNDRED TWENTY -FIVE AND N01100 DOLLARS ($68,825.00);
MAKING OTHER PROVISIONS RELATED THERETO; AND
PROVIDING FOR THE EFFECTIVE DATE THEREOF
Consider Proposed Resolution 010111 -2, approving membership in Sister City
International and authorizing the negotiation of a Sister City Agreement with Dormagen,
Germany.
Proposed Resolution 010111 -2, approves membership in Sister City International and authorizes
the Mayor to negotiate a formal agreement with the Burgermeister of Dormagen to establish the
relationship. The sister city committee has reviewed the benefits of the sister city relationship
and recommends it as beneficial to Baytown and its citizens.
We recommend approval.
Mayor Alfaro explained that the sister city relationship with Dormagen could be used to improve
our economics and business; including workforce development; and educational system,
including discipline, teacher training and parental involvement.
Council Member Sheley moved approval of the proposed resolution. Council Member
Mundinger seconded the motion. The vote follows:
Ayes: Council Members Anderson, Godwin, Mundinger, Murray
and Sheley
Mayor Alfaro.
Nays: None.
The motion carried.
RESOLUTION NO. 1467
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
BAYTOWN, TEXAS, APPROVING MEMBERSHIP IN SISTER CITY
INTERNATIONAL AND AUTHORIZING THE NEGOTIATION OF A
SISTER CITY AGREEMENT WITH DORMAGEN, GERMANY; AND
PROVIDING FOR THE EFFECTIVE DATE THEREOF
Page 7 of 19
Minutes of the Regular Session — January 11, 2001
Consider approval of the Consent Agenda.
a. Consider Proposed Resolution No. 010111 -3, authorizing the City Manager to
apply for a grant from the State of Texas, Office of the Governor, Criminal Justice
Division, for the Juvenile Accountability Incentive Block Grant Program and
authorizing the City Manager to appoint a Juvenile Crime Enforcement Coalition.
This will be the third year to apply for the grant. We will use this grant to
enhance and expand the existing Juvenile R.A.P. Program.
We recommend approval.
b. Proposed Ordinance No. 010111 -5, amends Ordinance No. 9045, approved
November 30, 2000, which authorized Change Orders No. 1 to each Work Order
1, 2, 3 and 4 with P.M. Construction and Rehabilitation, L.P., to adjust the final
unit bid quantities for the Annual Sanitary Sewer Rehabilitation Contract, Year
2000. Previously, the City of Baytown contracted with P.M. Construction and
Rehabilitation, L.P., for the Annual Sanitary Sewer Rehabilitation Contract, Year
2000 (the "Project "). On November 30, 2000, City Council accepted the work
and authorized final payment in the amount of $107,364.28, based upon deduct
change orders for Work Orders 1, 2, 3, and 4. The total of the change orders
should have increased the total contract amount by $5,005, instead of decreasing
the same. However, because of a calculation error, the City Council did not
authorize the correct final payment amount, which is $124,640.54. This
ordinance amends the previous ordinance to reflect the correct change orders and
final payment amounts.
We recommend approval.
C. Proposed Ordinance No. 010111 -6, approves Deduct Change Order No. 1 (to
adjust final quantities) in the amount of $14,390 to Work Order No. 5 and
approves final payment in the amount of $29,295 to P. M. Construction and
accepts Work Order No. 5 to the Annual Sanitary Sewer Rehabilitation Project,
Year 2000. Work Order No. 5 was an emergency work order for three failed
manholes on Garth Road as well as work on Polly and Park Streets. The original
work order amount was $43,985 and the final contract amount is $29,295, which
represents a 33.4% cost savings. The cost savings was largely due to well
pointing not being required as anticipated, one less point repair being required,
and the removal of work on Polly and Park Streets to future Work Order No. 6.
The original contract duration was five working days and the contractor
completed the work in five working days. This work was funded by 2000
Certificates of Obligation.
We recommend approval.
Page 8 of 19
Minutes of the Regular Session — January 11, 2001
d. Proposed Ordinance 010111 -7, awards rehabilitation contract for 311 Avenue J to
Investment Group in the amount of $24,938. This property is in a target
neighborhood that is approximately 50 years old. This home has been approved
for the rehabilitation program. The test for the presence of lead produced a
positive result. All major items such as the electrical system, plumbing system,
foundation leveling and roof have been included in the scope of work. In
addition, the reduction of lead using safe work practices to comply with new lead
regulation has been included in the scope of work. The low bidder has attended
the 8 -hour lead "Safe Work Practices" course which will be utilized to complete
this project and comply with the new HUD regulations. Two bid packets were
picked up and two contractors attended the pre -bid meeting. We received one bid
and one no bid.
We recommend approval.
e. Proposed Ordinance 010111 -8, awards rehabilitation contract for 308 Morrell to
Colts Development in the amount of $25,000. This property located in a target
neighborhood that is approximately 50 years old. This home has been approved
for the rehabilitation program. The test for the presence of lead produced a
positive result. Most major items such as the plumbing system, foundation
leveling and roof have been included in the scope of work. In addition, the
reduction of lead using safe work practices to comply with new lead regulation
has been included in the scope of work. The low bidder attended the 8 -hour lead
"Safe Work Practices" course which will be utilized to complete this project and
comply with the new HUD regulations. Two bid packets were picked up and two
contractors attended the pre -bid meeting.
We recommend approval.
Proposed Ordinance 010111 -9, awards the annual gasoline and diesel fuel
contract to King Fuels, Inc. in the amount of for $980,304.70. This amount
includes all taxes and environmental fees for all entities participating in the
Interlocal Contract for fuel (City of Baytown, Goose Creek CISD, Barbers Hill
CISD, Lee College, and Seabrook). The City of Baytown's portion of this contract
is $531,041.58. The price per gallon of fuel is based on the discount offered added
to the daily Oil Publication Information Sheet (OPIS) price per gallon. Last year's
December pricing is compared to this year's December pricing for total delivered
price per gallon (including all taxes and fees) as follows:
Fuel: 1999 -2000
2000 -01
% Increase
Regular
$.9145
$1.0305 13%
Premium
$.9890
$1.0916 10%
Diesel
$.9288
$1.1682 26%
Current Unit Cost Comparison as follows:
W
Page 9 of 19
Minutes of the Regular Session — January 11, 2001
Fuel: Current Contract: New Contract: % Decrease:
Regular $1.0345 $1.0305 .39%
Premium $1.1077 $1.0916 1.45%
Diesel $1.1688 $1.1682 .05%
All bids were based on the daily Oil Publication Information Sheet of
December 5, 2000.
There is a 48.2% increase from last year's award for City of Baytown's
portion. The majority of the increase (30 %) is due to adjusted quantities
based on projected usage.
Increases in quantities are due to several factors: the unusually dry summer
and the numerous water breaks, increased overtime, increased mosquito
control spraying, more Police patrol units, the new chipper and various other
equipment which utilize more fuel.
We recommend approval.
g. Proposed Ordinance 010111 -10, authorizes renewal of the annual calcium
hypochlorite contract to Harcross Chemicals, Inc. in the amount of $18,031.
Harcross Chemicals submitted a written request to renew the current contract for
the same pricing. Quantities remain the same. This contract is used for cleaning
clarifiers as a disinfectant at various job sites by the Utilities Department.
We recommend approval.
h. Proposed Ordinance 010111 -11, authorizes the second year renewal of the annual
roll -off dumpster container (40 yard) services contract to Waste Management in
the amount of $99,820. Waste Management submitted a written request to renew
the current contract for the same quantity, pricing, terms and conditions. The
budget for this account is included in the household garbage account. This
contract is used to deliver and furnish containers to haul and dispose of the
contents of the containers. These containers shall be used by the public for
collection of junk, heavy trash, and building materials.
We recommend approval.
i. Proposed Ordinance 010111 -12, authorizes renewal of the annual pavement
marking replacement contract to United Rentals Highway Technologies in the
amount of $54,550. The company has changed names. It was previously called
Safety Lights Sales & Leasing. United Rentals Highway Technologies has
submitted a written request to renew the current contract for the same quantity,
pricing, terms and conditions. Pavement markings vary from year to year dependent
upon street requirements for the year. Quantities are an estimate and remain the
same as last year.
We recommend approval.
Page 10 of 19
Minutes of the Regular Session — January 11, 2001
j. Proposed Ordinance 010111 -13, authorizes renewal of the annual concrete pipe
contract to National Concrete Products in the amount of $36,978. National
Concrete submitted a written request to renew the current contract for an
allowable 3.4% Consumer Price Index (CPI J) increase. Quantities remain the
same this year compared to last year's contract. This contract is used by the
Streets and Drainage Division for drainage projects.
We recommend approval.
k. Proposed Ordinance 010111 -14, authorizes renewal of the annual ammunition
contract Items 1 and 2 to Bailey's House of Guns in the amount of $2,368.50;
Items 3, 7 and 11 to GT Distributors, Inc. in the amount of $3,454.60; Items 5, 6,
8, 9 and 12 to Gulf States Distributors in the amount of $7,542; and Items 4 and
10 to Black Hills Ammunition in the amount of $45,318.50 for a total contract of
$58,683.60. All suppliers submitted written requests to renew the current contract
for the same pricing, terns and conditions. Quantities remain the same. This
contract will be used by the Fire Marshal, SWAT, Organized Crime, and the
Police Department.
We recommend approval.
1. Proposed Ordinance 010111 -15, awards the annual brass fittings contract to
Golden Triangle Pipe in the amount of $33,253.05. Invitations to bid were mailed
to five suppliers and we received two bids and one no bid. Municipal Pipe was
unable to put together a bid in time for the bid opening. The remaining company has
not responded to phone inquiries. There is no significant increase in awarded
amount compared to last year's contract. Quantities have been adjusted to reflect
anticipated usage. This contract is used for water rehabilitation, water distribution,
water taps and utility construction projects.
We recommend approval.
M. Proposed Ordinance No. 010111 -16, authorizes renewal of the contract for the
Collection of Outstanding City of Baytown Warrants with State Municipal
Services, Inc. This is the second renewal period of this contract. State Municipal
Services, Inc. has requested renewal at the same rate based on a commission of
15 %. Collections for the 1999 -00 fiscal year totaled $129,888.37 and the agency
was paid $19,483.25 in fees.
We recommend approval.
Page 11 of 19
Minutes of the Regular Session — January 11, 2001
n. Consider Proposed Ordinance No. 010111 -17, authorizing an industrial district
agreement with SAW Pipes USA, Inc. for a seven -year period. The former
agreement has expired and the proposed agreement covers valuation years 2001
through 2007. This agreement is in conformity with the policies adopted by the
City Council for companies in the City's industrial districts.
We recommend approval.
o. Proposed Ordinance No. 010111 -18, authorizes an industrial district agreement
with Samson Controls, Inc. for a seven -year period. The former agreement has
expired and the proposed agreement covers valuation years 2000 through 2006.
This agreement is in conformity with the policies adopted by the City Council for
companies in the City's industrial districts.
We recommend approval.
Mayor Alfaro announced that item b. was withdrawn as it was not ready. Council Member
Sheley moved approval of the consent agenda items a and b and d through o. Council Member
Godwin seconded the motion. The vote follows:
Ayes: Council Members Anderson, Godwin, Mundinger, Murray
and Sheley
Mayor Alfaro.
Nays: None.
The motion carried.
RESOLUTION NO. 1468
A RESOLUTION AUTHORIZING THE CITY MANAGER OF THE CITY
OF BAYTOWN, TEXAS, TO APPLY FOR A GRANT WITH THE STATE
OF TEXAS, OFFICE OF THE GOVERNOR, CRIMINAL JUSTICE
DIVISION, FOR THE JUVENILE ACCOUNTABILITY INCENTIVE
BLOCK GRANT PROGRAM; AUTHORIZING THE CITY MANAGER
TO APPOINT A JUVENILE CRIME ENFORCEMENT COALITION;
AND PROVIDING FOR THE EFFECTIVE DATE THEREOF.
la
Page 12 of 19
Minutes of the Regular Session — January 11, 2001
ORDINANCE NO. 9078
AN ORDINANCE AUTHORIZING DEDUCT CHANGE ORDER NO. 1 ON
WORK ORDER NO. 5 WITH P.M. CONSTRUCTION AND
REHABILITATION, L.P., TO ADJUST THE FINAL UNIT BID
QUANTITIES FOR THE ANNUAL SANITARY SEWER
REHABILITATION PROJECT - YEAR 2000; AUTHORIZING FINAL
PAYMENT OF THE SUM OF TWENTY -NINE THOUSAND TWO
HUNDRED NINETY -FIVE AND N01100 DOLLARS ($29,295.00) TO P.M.
CONSTRUCTION AND REHABILITATION, L.P., FOR SAID PROJECT;
AND PROVIDING FOR THE EFFECTIVE DATE THEREOF.
ORDINANCE NO. 9079
AN ORDINANCE AWARDING THE CONTRACT FOR COMMUNITY
DEVELOPMENT REHABILITATION PROJECT NO. 00 -02 TO
INVESTMENT GROUP, INC., FOR THE SUM OF TWENTY -FOUR
THOUSAND NINE HUNDRED THIRTY -EIGHT AND NO /100 DOLLARS
($24,938.00); AUTHORIZING PAYMENT THEREOF; MAKING OTHER
PROVISIONS RELATED THERETO; AND PROVIDING FOR THE
EFFECTIVE DATE THEREOF.
ORDINANCE NO. 9080
AN ORDINANCE AWARDING THE CONTRACT FOR COMMUNITY
DEVELOPMENT REHABILITATION PROJECT NO. 00 -10 TO COLTS
DEVELOPMENT FOR THE SUM OF TWENTY -FIVE THOUSAND AND
NO 1100 DOLLARS ($25,000.00); AUTHORIZING PAYMENT THEREOF;
MAKING OTHER PROVISIONS RELATED THERETO; AND
PROVIDING FOR THE EFFECTIVE DATE THEREOF.
ORDINANCE NO. 9081
AN ORDINANCE ACCEPTING THE BID OF KING FUELS, INC., FOR
THE ANNUAL GASOLINE AND DIESEL FUEL CONTRACT AND
AUTHORIZING PAYMENT BY THE CITY OF BAYTOWN, THE SUM
OF NINE HUNDRED EIGHTY THOUSAND THREE HUNDRED FOUR
AND 70/100 DOLLARS ($980,304.70); MAKING OTHER PROVISIONS
RELATED THERETO; AND PROVIDING FOR THE EFFECTIVE DATE
THEREOF.
Page 13 of 19
Minutes of the Regular Session — January 11, 2001
ORDINANCE NO. 9082
AN ORDINANCE RENEWING THE CONTRACT OF HARCROSS
CHEMICALS, INC., FOR THE ANNUAL CALCIUM HYPOCHLORITE
CONTRACT AND AUTHORIZING PAYMENT BY THE CITY OF
BAYTOWN, THE SUM OF EIGHTEEN THOUSAND THIRTY -ONE AND
NO /100 DOLLARS ($18,031.00); MAKING OTHER PROVISIONS
RELATED THERETO; AND PROVIDING FOR THE EFFECTIVE DATE
THEREOF.
ORDINANCE NO. 9083
AN ORDINANCE RENEWING THE CONTRACT OF WASTE
MANAGEMENT FOR THE ANNUAL FORTY -YARD ROLL -OFF
CONTAINERS SERVICES CONTRACT AND AUTHORIZING.
PAYMENT BY THE CITY OF BAYTOWN, THE SUM OF NINETY -NINE
THOUSAND EIGHT HUNDRED TWENTY AND N01100 DOLLARS
($99,820.00); MAKING OTHER PROVISIONS RELATED THERETO;
AND PROVIDING FOR THE EFFECTIVE DATE THEREOF.
ORDINANCE NO. 9084
AN ORDINANCE RENEWING THE CONTRACT OF UNITED RENTALS
HIGHWAY TECHNOLOGIES FOR THE ANNUAL PAVEMENT
MARKINGS REPLACEMENT CONTRACT AND AUTHORIZING
PAYMENT BY THE CITY OF BAYTOWN, THE SUM OF FIFTY -FOUR
THOUSAND FIVE HUNDRED FIFTY AND N01100 DOLLARS
($54,550.00); MAKING OTHER PROVISIONS RELATED THERETO;
AND PROVIDING FOR THE EFFECTIVE DATE THEREOF.
ORDINANCE NO. 9085
AN ORDINANCE RENEWING THE CONTRACT OF NATIONAL
CONCRETE PRODUCTS FOR THE ANNUAL CONCRETE PIPE
CONTRACT AND AUTHORIZING PAYMENT BY THE CITY OF
BAYTOWN, THE SUM OF THIRTY -SIX THOUSAND NINE HUNDRED
SEVENTY -EIGHT AND N01100 DOLLARS ($36,978.00); MAKING
OTHER PROVISIONS RELATED THERETO; AND PROVIDING FOR
THE EFFECTIVE DATE THEREOF.
ki
Page 14 of 19
Minutes of the Regular Session — January 11, 2001
ORDINANCE NO. 9086
AN ORDINANCE RENEWING THE CONTRACTS OF BAILEY'S
HOUSE OF GUNS, INC., GT DISTRIBUTORS, INC., GULF STATES
DISTRIBUTORS, AND BLACK HILLS AMMUNITION, INC., FOR THE
ANNUAL AMMUNITION CONTRACT AND AUTHORIZING PAYMENT
BY THE CITY OF BAYTOWN, THE SUM OF FIFTY -EIGHT
THOUSAND SIX HUNDRED EIGHTY -THREE AND 601100 DOLLARS
($58,683.60); MAKING OTHER PROVISIONS RELATED THERETO;
AND PROVIDING FOR THE EFFECTIVE DATE THEREOF.
ORDINANCE NO. 9087
AN ORDINANCE ACCEPTING THE BID OF GOLDEN TRIANGLE PIPE
FOR THE ANNUAL BRASS FITTINGS CONTRACT AND
AUTHORIZING PAYMENT BY THE CITY OF BAYTOWN, THE SUM
OF THIRTY -THREE THOUSAND TWO HUNDRED FIFTY -THREE AND
051100 DOLLARS ($33,253.05); MAKING OTHER PROVISIONS
RELATED THERETO; AND PROVIDING FOR THE EFFECTIVE DATE
THEREOF.
ORDINANCE NO. 9088
AN ORDINANCE RENEWING THE CONTRACT OF STATE
MUNICIPAL SERVICES, INC., FOR THE COLLECTION OF
OUTSTANDING CITY OF BAYTOWN WARRANTS AND
AUTHORIZING PAYMENT BY THE CITY OF BAYTOWN, THE SUM
OF FORTY -FIVE THOUSAND AND NO 1100 DOLLARS ($45,000.00);
MAKING OTHER PROVISIONS RELATED THERETO; AND
PROVIDING FOR THE EFFECTIVE DATE THEREOF.
ORDINANCE NO. 9089
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF
BAYTOWN, TEXAS, AUTHORIZING AND DIRECTING THE MAYOR
TO EXECUTE AND THE CITY CLERK TO ATTEST TO AN
INDUSTRIAL DISTRICT AGREEMENT WITH SAW PIPES USA, INC.;
AND PROVIDING FOR THE EFFECTIVE DATE THEREOF.
ORDINANCE NO. 9090
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF
BAYTOWN, TEXAS, AUTHORIZING AND DIRECTING THE MAYOR
TO EXECUTE AND THE CITY CLERK TO ATTEST TO AN
INDUSTRIAL DISTRICT AGREEMENT WITH SAMSON CONTROLS,
INC.; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF.
Id
Page 15 of 19
Minutes of the Regular Session — ,January 11, 2001
Consider confirmation of City Manager's appointment of Finance Director.
City Manager Monte Mercer announced that it was his extreme pleasure to present Donna Sams
as the new Finance Director for the City.
Council Member Mundinger moved confirmation of the appointment. Council Member Sheley
seconded the motion. The vote follows:
Ayes: Council Members Anderson, Godwin, Mundinger, Murray
and Sheley
Mayor Alfaro.
Nays: None.
The motion carried.
Consider appointment to Baytown Emergency Medical Services Advisory Committee.
Dr. James Bernick has served on the Committee in the past and has agreed to serve an additional
term if reappointed.
Council Member Murray moved appointment of Dr. James Bernick. Council Member
Mundinger seconded the motion. The vote follows:
Ayes: Council Members Anderson, Godwin, Mundinger, Murray
and Sheley
Mayor Alfaro.
Nays: None.
The motion carried.
Consider appointments to the Electrical Board.
Bill Hollaway has served on the Electrical Board as a Master Sign Electrician or Master
Electrician since 1995. Gregory D. Rhea has served on the Electrical Board as a citizen not
engaged in the electrical industry since 1995. Both have agreed to serve if reappointed. Each
has been diligent in attendance of meetings and contributed to the Board.
Page 16 of 19
Minutes of the Regular Session — January 11, 2001
Council Member Anderson moved appointment of Bill Hollaway and Gregory D. Rhea. Council
Member Mundinger seconded the motion. The vote follows:
Ayes: Council Members Anderson, Godwin, Mundinger, Murray
and Sheley
Mayor Alfaro.
Nays: None.
The motion carried.
Consider appointments to the Growth Management and Development Advisory
Commission and the Baytown Zoning Commission.
The terms of Carmen Torres (District 2), Barry Bobbitt (District 3), Glen Angel (District 5),
Lewis McRee (Mayor), and Monte Young (CM -ETJ) expired January 1, 2001. The terms are for
two years.
Council Member Mundinger moved appointment of Barry Bobbitt, Glen Angel, Lewis McRee,
and Monte Young. Council Member Anderson seconded the motion. The vote follows:
Ayes: Council Members Anderson, Godwin, Mundinger, Murray
and Sheley
Mayor Alfaro.
Nays: None.
The motion carried.
Consider appointments to Baytown Area Community Long Range Planning Commission.
The terms of Kenneth Roach (District 2), Bill Hollaway (District 5), Carole Opryshek (Mayor),
Lisa Urban (CC), Janet Simon (CC), Sheryl Ward (CC), Jim Hutchison (CM -ETJ), and Wayne
Baldwin (CM -ETJ) expired January 1, 2001. The terms are for two years.
N
Page 17 of 19
Minutes of the Regular Session — January 11, 2001
Council Member Sheley moved appointment of Carole Opryshek, Mercedes Renteria, Jim
Hutchison, and Wayne Baldwin. Council Member Anderson seconded the motion. The vote
follows:
Ayes: Council Members Anderson, Godwin, Mundinger, Murray
and Sheley
Mayor Alfaro.
Nays: None.
The motion carved.
Consider confirmation of appointment to the Baytown Civil Service Commission.
Mark Himsel was appointed to the Baytown Civil Service Commission to complete the term
Ronnie Anderson. He has agreed to serve if confirmed.
Council Member Godwin moved confirmation of the appointment. Council Member Anderson
seconded the motion. The vote follows:
Ayes: Council Members Anderson, Godwin, Mundinger, Murray
and Sheley
Mayor Alfaro.
Nays: None.
The motion carried.
City Manager's Report.
The "Go Figure" Exhibit at the Sterling Municipal Library is fantastic. It must be seen.
The Parks and Recreation Department has recently hired Steven Maness, Recreation
Supervisor, and Kylie Doucet, Recreation Superintendent.
A letter from Goose Creek Consolidated Independent School District commending the
actions of Pat Brown, Claudell Scott, Walter Lee, Doug Dangerfield, Glen Gibson and
Junior Lopez was read.
A Fire Entry test will be given on February 1. 78 applicants have qualified to take the
test.
Page 18 of 19
Minutes of the Regular Session — January 11, 2001
Consider appeal of the Urban Rehabilitation Standards Review Board decision to demolish
the structure located at 8 Morrell.
This hearing is not necessary due to the appellant signing an agreement to repair the structure.
Items 17 and 19 were considered together.
Consider affirming, reversing or modifying the decision of the Urban Rehabilitation
Standards Review Board to demolish the structure located at 8 Morrell.
The owner has signed an agreement to repair the structure. Staff believes the agreement to be
reasonable.
We recommend approval.
Consider appeal of the Urban Rehabilitation Standards Review Board decision to demolish
the structure located at 3316 Illinois.
This hearing is not necessary due to the appellant signing an agreement to repair the structure.
Consider affirming, reversing or modifying the decision of the Urban Rehabilitation
Standards Review Board to demolish the structure located at 3316 Illinois.
The owner has signed an agreement to repair the structure. Staff believes the agreement to be
reasonable.
We recommend approval.
Council Member Sheley moved modification of the decisions by approval of the agreements.
Council Member Godwin seconded the motion. The vote follows:
Ayes: Council Members Anderson, Godwin, Mundinger, Murray
and Sheley
Mayor Alfaro.
Nays: None.
The motion carried.
Page 19 of 19
Minutes of the Regular Session — January 11, 2001
There being no further business to transact, on motion of Council Member Anderson, seconded
by Council Member Mundinger and approved unanimously, the meeting was adjourned at 6:56
p.m.
Signed this the [�e(day of January, 2001.
GadVy W. Smith,
City Clerk
OW
BID TABULATION - BAYTOWN VETERAN'S MEMORIAL PLAZA
REQUIREMENTS
D & W CONST., INC.
STEVEN R. HILL CONST.
Sealed Proposal Submitted By 10 a.m., S
January 2001
Yes
Yo:
Bid Bond Provided With Proposal
Yes
Yes
Receipt of Addenda No. 1 & No. 2
Yes
Yes
Schedule ( 45 calendar days on site)
Yes
Yes
Lump Sum Proposal to incorporate
Addenda No. I & No. 2
stos,usoo
slss,00aoo
CITY OF BAYTOWN
ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Your 2000
Change Order #1 on Work Order 181
11!22!2000
This work order included pipe bursting. service reconnections, well pointing, manhole wall rehabilitation and miscellaneous items
related to work on Coachman. Glenhaven. SL Andrews. Kilgore, Walker ® Cline and Civic Drive.
EXHIBIT A
Cotwot Mal
Orig.
Final
Cost
Item
Description
Unit
Quant.
QuanL
DIN.
Price
Difference
1
Pipe bursting 6' & 8' with 8'
HOPE min. SDR 17.0' -8' deep
LF
2358
2062
-296
S 38.00
S(t 1,248.00)
2
Pipe bursting 6' & 8' with 8'
HOPE min. SOR 17. WAS deep
LF
2700
2179
-521
S 40.00
5(20.840.00)
3
Pipe bursting 6' & 8' with 8'
HOPE min. SDR 17, over 1S
deep
LF
0
0
0
$ 45.00
S
4
Pipe bursting 8' & 10' with 10'
HOPE min. SDR 17.0' -8' deep
LF
0
0
0
S 42.00
S
5
Pipe bursting 8'& 10' with 10'
HOPE min. SDR 17, 8' -15' deep
LF
0
0
0
S 45.00
S
6
Pipe bursting 8'& 10' with 10'
HOPE min. SDR 17, over 158'
deep
LF
01
0
0
S 50.00
S
7
Pipe bursting 10' & 12' with 12'
HOPE min SDR 17.0 -8' deep
LF
0
0
0
S 55.00
S
8
Pipe bursting 10' & 12' with 12'
HOPE min. OR 17.8' -1S deep
LF
0
0
0
S 60.00
S
9
Ptpe bursting 10' & 12' with 12'
HOPE min. SOR 17, over 19
deep
LF
01
0
S 75.00
S
10
Pipe bursting 12' & 15' with 15'
HOPE min. SOR 17, min, PVC
SDR 26, 0'-8' deep
LF
0
210
210
S 75.00
S 15,750.00
11
Pipe bursttrhg 12' & 15' with 15'
HOPE min. SOR 17, min, PVC
SOR 26, 8' -15' deep
LF
263
264
1
S 85.00
S 85.00
1
Pipe bursting 12' & 15' with IS-
HOPE min. SDR 17, mPn, PVC
SOR 26. over 15' deep
LF
0
0
0
S 100.00
S
13
Remove existing stipliner, ail
sizes and depths
LF
1032
2408
1376
S 5.00
S 6.860.00
14
Reconnect service -short side,
0'-8' deep
EA
28
34
6
S 500.00
S 3.000.00
15
Reconnect service - short side,
over 8' deep
EA
50
38
-12
S 700.00
$ (8.400.00
16
Reconnect service - tong side, 0'
8' deep
EA
0
0
0
S 1.200.00
S
17
Reconnect service - tong side,
over 8' deep
EA
0
0
0
S 1.500.00
$
18
Manhole Wall Sealing
VF
145
123.53
-21.47
S 85.00
S (1,824.95)
19
Repi/irtsttall new manhole, 0'-8'
deep
EA
3
1
-2
S 1.500.00
$ (3.000.00)
20
New Manhole , over 8' deep
VF
1
1
0
$ 200.00
$
21
Realacef nstatl ring and cover
EA
0
1
1
S 300.00
S 300.00
Extra cement stabilized sand
badddl. 2 sk.fton
TON
70
151.72
81.72
S 2100
S 1.634.40
23
Point Rprfobst mw - pipe
Cr - 8' deep
EA
0
3
3
S 300.00
S 900.00
24
Point Rprfobst nmv - pipe
burstina. 8' - 15 deep
EA
0
0
0
S 400.00
S
25
Point Rpdobst mw - pipe
burs' . over iS deep
EA
0
01
0
S 500.00
S
26
Extra Length point repair all
depths
LF
0
0
0
$ 60.00
S
27
Well Point set up, up to 12 If
EA
2
0
-2
S 2.800.00
S (5.600.00)
28
Wetl Point, Extra length over 12
If
LF
20
0
201
S 20.00
$ (400.00
29
Trench Safety. 0' to 8' deep
I LF
200
20
-1801
S 1.00
$ 180.00)
EXHIBIT A
Cotwot Mal
CITY OF BAYTOWN
ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000
Change Order 01 on Work Order #1
111=2000
This work order included pipe bursting , service reconnections, well pointing, manhole wall rehabilitation and miscellaneous items
related to work on Coachman, Glenhaven, St. Andrews. Kilgore. Walker ® Cline and Civic Drive.
30
Trench Safety. 8' to 15' deep
LF
2251
233
8
S 1.00
S 8.00
31
Trench Safety. 8' to 1S deep
LF
0
0
0
S 1.00
S -
32
Clean 6' to 12- Sewer
LF
0
989
989
S 3.00
S 2.967.00
33
Clean 15- to 21- Sewer
LF
0
0
0
S 5.00
S
34
Clean 24- to 36- Sewer
LF
0
0
0
S 10.00
S
35
TV Inspection of Sewer
LF
0
989
989
$ 1.00
S 989.00
36
Bypass , 3' pump
Day
01
9
9
S 1.00
S 9.00
37
Bypass Pumping, 4- pump
Day
01
0
0
S 1.00
$
38
Bypass Pumping, 8- pump
Day
01
0
S
S
39
Bypass Pumping. 8- pump
Day
0
0
0
$
S
40
PL Repair. 6' -1r, 0' - 8' deep.
up to 12 N
EA
0
3
3
S 1.250.00
S 3.750.00
41
PL Repair, S"- t r. 8' -15
deep, up to 12 if
EA
0
6
6
S 1.750.00
S 10.500.00
42
PL Repair, 6- -1 r, over 1S
deep, up to 12 If
EA
0
0
0
$ 2.500.00
S
43
PL Repair, 15' - I S% 0' - 8'
deep, up to 1211
EA
0
1
1
$ 2250.00
S 2250.00
44
PL Repair, 1S -18', 8' -15'
deep, up to 12 If
EA
C
0
0
S 2.900.00
S
45
PL Repair. 1S-- 18 -. over 1S
deep, up to 12 if
EA
0
0
0
S 3.500.00
S
46
Pt. Repair. 21' - 38% 0' - 8'
deep, up to 12 N
EA
0
0
0
S 4.000.00
S
47
PL Repair, 21' - 36% 8' - IS
deep, up to 12 N
EA
0
0
0
S 6.000.00
S -
48
PL Repair. 21- - 367, over 15
deep, up to 12 N
EA
0
0
0
S 8.000.00
S
49
Extra length pL Repair, all sizes.
0' - 8' deep
LF
0
0
0
$ 80.00
$
50
Extra tength pL Repair. all sizes.
8' -1 S deep
LF
0
0
0
S 120.00
S.
51
Extra length pL Repair, all sizes,
overlS' deep
LF
0
0
0
$ 160.00
S -
RmvM4ftc:e 6' - ir, includes
modified bedding. 0- - 8' deep.
50 LF. min.
LF
0
0
0
$ 65.00
$
53
Rn viRplaee 6' - 112% includes
modified bedding, 8' -1S deep.
50 LF. min.
LF
01
0
0
$ 75.00
$
54
Rmv/Rpiaoe 6- - 1 r, includes
modified bedding, over 1 S
deep. 50 LF. min.
LF
0
0
0
$ 1.000.00
$
55
Rmv/Rpiaoe 15' -18% includes
modified bedding. 0'- 8' deep.
60 LF. min.
LF
0
0
0
$ 75.00
$ -
56
Rmv/Rplace IS*- 18% includes
modified bedding. 8' -1S deep,
50 LF. min.
LF
0
0
0
$ 100.00
$
57
Rmv/Rplace 15-- 18', includes
modified bedding, over 15'
deep, 60 LF. min.
0
0
0
S 125.00
S
Auger & Encase 8' -10% an
depths
LF
0
0
0
S 100.00
S
Auger b Encase 12'-15". a0
Peolsaw0litting
depths
LF
0
0
0
S 150.00
S
Rmv/reptace up toy' concrete
sidewalk/driveway (includes
& reinforcement)
SY
0
0
01S
45.00
1 S
Cotwoll page2
0,
id
Id
Cotwot
CITY OF BAYTOWN
ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000
Change Order 01 on Work Order 01
11/2212000
This worts order included pipe bursting . service reconnections. well pointing. manhole wall rehabilitation and miscellaneous items
related to work on Coachman. Gtenhaven, St. Andrews. Kilgore. Walker ® Cline and Civic Drive.
61
Rmvireplace up toy' concrete
sidewallddriveway (Includes
sawcutting 8 reinfaroement )
SY
0
0
0
S 50.00
S
62
Rmvfrepl up to 2' HMAC, Type
D. (incl. Saw cut,tadt coat, base
repair)
SY
0
22.26
22.26
S 30.00
S 667.80
63
1' rock with no fires for bed&v
(incidental to point repairs)
TON
10
6
-4
S 20.00
S (80.00)
64
Annular and void space grouting
CY
6
0
-6
S 100.00
$ 600.00
65
FIa man for direWon of traffic
MHR
0
0
0
5 20.00
S
66
Hydmmulch Seeding
SY
480
420
-60
S 3.00
S 180.00)
67
Bypass Pumping, 6''or greater
Day
2
0
-2
S 1.00
S (2.00
68
Rout & tuberculation removal. 6'
- 12•
LF
0
0
0
5 10.00
S
69
Root & tuberculation removal,
12' - 24•
LF
0
0
0
S 20.00
S
70
Steel Casing, up to 112% above
ground. coated and wrapped,
Including supports
Drop manhole assembly, up to
V deep
Drop manhole assembly. over 8'
deep
Ememency mobilization
LF
0
0
0
S 100.00
S
71
EA
01
0
0
S 2.500.00
S
VF
0
0
0
S 500.00
$
73
EA
0
0
0
$ 1,000.00
3
Finance Date
Work Order Summary.
Final Construction Cost 3 298.54625
Initial Work Osier S 301.211.00
Change Osier #1 S (2,664.75)
Oirector of Engmeenng Date
City manager Date
5 (2,684.75)
page3
CITY OF BAYTOWN
Project: ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000
P.M. Construction and Rehabilitation, L.P.
kPlEast Erath
iton. Texas 77012
Pay Estimate No. 4 final
Pay Estimate Cutoff date November16.2000 (Invoice Date)
Work Order a1 rev., Total Time Allowed: 60 Working Days
Total Time Used: 52 Working Days
Item
I Description I
Unit
Est. WOt
QuanL
P.E.1
Quantities (Quantities
P.E.2
(
P.E.3 P.EA Total
Quantities Quantities 1 to Date
Unit
Price
Total
I Estimate
I
I
1
I
i
I
I
1
7 0 8' dee 6' 8 8' with 8' HOPE min SDR
LF
2358
0 I
1606
0
456 I 2062
S 38.00
I S7e.356.(
2
Pipe bursting 6' 8 8' with 8' HOPE min. SOR
17, 8 -15' deep
LF
2700
1163
1016 I
0
0 I 2179
S 40.00
S87.teO.(
3
Pipe bursting 6' 6 e' with 8' HOPE min. SDR
17, over 15' deep
I LF
0
0 I
0 I
0
0
I 0
S 45.00
S0.(
4IS
bursting S' & 1l0' with to- HOPE min.
R7.0' -8' deep
LF
0 I
0 I
0
0
I 0
S 42.00
S0.(
.1pipe
17.8'15' deep vrsth 10' HOPE min.
LF
:::!0
0
0 I
0
0
0
S 45.00
S0.(
6
(Pipe btusto 8' & 10' with 10' HDPE min.
SOR 17. over 158' deep
LF
0
I 0
0
0
0
0
S 50.00
SO.(
7
Pipe bursting 10' 8 12' with 1Z' HOPE min.
SOR 17.0' -8' deep
LF
0
0
0
0
0
0
S 55.00
S0.(
8
Pipe bursting 10' 3 12' with 12' HOPE min.
SOR 17.8' -15' deep
LF
0
0
0
0
0
0
S 60.00
SO.0
9
Pipe bursting 10' b 12' with 12' HOPE min.
SDR 17, over 15' deep
LF
0
0
0
0
0
0
S 75.00
SOA
10IPipe
bursting 12' b 15" with 1S' HOPE min.
SOR 17. min. PVC SDR 26.0' -8' deep
LF
0
0
0
210
0
210
S 75.00
515.7501
11
Ifte basting 12- & IS- with
SR 1 min. PVC SOR 28, 8'-15' HOPE
eep n
LF
263
( 0
264
0
0
I 264
S e5.00
522.440.[
2
Pipe
SDR bursting min. PVC SDR 26, Lover IT deep
LF
1 0
0
0
0
0
I 0
S 100.00
SOX
13
Remove existing stipliner. all sues and depths
LF
1 1032
1163
1245
0
0
2408
S 5.00
$12.040.0
14
Reconnect service - short side, 0'-8' deep
EA
1 28
0
1 29
1 1
4
34
IS 500.00
$17.000.0
15
Reconnect service - short side. over 8' deep
EA
50
22
16
0
0
38
is 700.00
S26.e00.0
18
Reconnect service -long We. 0'-8' deep
EA
0
0
0
0
0
0
1 S 1.200.00
SOX
17
Reconnect service - long side, over 8' tleen
EA
0
0
0
0
0
1 0
1 S 1.500.00
SOX
18
Manhole Wag Seating
VF
145
0
0
72 87
50.66
123.53
S 85.00
510.500.[
19
Reolfinstall new manhole. 0'-8' deep
EA
3
0
1
0
0
1
S 1.500.00
S11500.0
20
New Manhole , over 8' deep
VF
1
0
1
0
0
1
S 200.00
S200.0
211
Reolaceriinstall ring and cover
EA
0
0
0
1 0
1 1
1
1 S 300.00
530010
221
Extra cement stabilized sand baCldll. 2 skilon
TON
1 70
1 29.53
122.09
0
0
151.72
I S 20.00
53.034.4
23
Pcint RPdcbst rmv - pipe bursting. 0' - 8' deep
Qom,
0
1 0
0
3
1 0
3
$ 300.00
$900.0
241
Point Rpriobst rim - pipe bursting, 8' -15'
EA
1 0
0
0
0
1 0
I 0
S 400.00
SO.0
25
P m aint Rpr /cbst rim - pipe bursting, over 15'
dean
EA
0
0
0
0
0
0
S 500.00
$0.0
26
Extra Length point repair. all depths
LF
0
1- 0
1 0
0
1 0
1 0
5 60.00
$0.0
27
Well Point set up. up to 121t
E A
1 2
0
0
0
0
1 0
S 2.800.00
SO.0
28
Well Point. Extra length over 12 If
LF
20
I 0
0
0
0 1
0
S 20.00
50.0
29
Trench Safe • 0' to 8' deep
LF
1 200
0
1 0
20
0
20
Is 1.00
$20.0
30 1
Trench Safety. 8' to 15' deep
LF
1 225
110
1 123
0
0
233
IS 1.00
5233.0
311
Trench safety. 8' to 15' deep
LF
0
0
0
I 0
0
0
1 $ 1.00
SO.0
32
Clean 6- to 12' Sewer
L=
0
I 0
989
0
0 1
989
15 3.00
$2.967.0
33
Clean 15' to 21" Sewer
LF
1 0
0
0
0
0 1
0
Is 5.00
50.0
34
Clean 24' to 36' Sewer
LF
1 0
1 0
0
1 0
0 1
0
is 10.00
S0.0
35
TV Inspection of Sewer
LF
0
0
1 989
0
0 1
989
is 1.00
5989.0
381Bvpass
Pumpi • 3' pump
Dav
1 0
1 3
6
1 0
0 1
9
s 1.00
$9.0
37
B yam Pumping, 4' pumo
Bev"
i 0
1 0
1 0
0
1 0 I
.0
5 1.00
SO.0
38
El pass Pumping. 6' pump
Dav
1 0
1 0
1 0
0
0
0
S
SO.0
391
Bypass Pumping. 8' pump
I Dav
1 0
1 0
1 0
1 0
0 1
0
$
$0.0
40
PL Repair. 6' -1Z'. V - 8' deep, up to 12 It
EA
1 0
1 0
1 3
1 0
0 1
3
S 1250.00
53.750.0
aft4l IPt.
Repair. 6' -12'. 8'- 15' deep, up to 12 If
EA
t 0
I 0
1 6
1 0
0 1
6
S 1.750.00
$10.500.0
PL Repair. G'- 17 . over 15' deep, uo to 12 it
EA
1 0
1 0
1 0
j 0
0 1
0
5 2.500.00
SO.0
d
PL Repair. l5' - 18'. 0'- 8' deep, uo to 12 if
I EA
0
0
0
1
0
1
S 2.250.00
$2.250.0
441PL
Repair, l5 -18', a'- 15' deep. uo to 121f
EA
0
I 0
0
0
0
0
S 2.900.00
$0.0
45
PL Repair. 15' -18'. aver 15 oeep. uo to 12 Il
EA
O
0
0
0
0
0
13 3.500.00
SO.0
48
PL Repair. 21' - 3L=". W - 8' deea. uo to 121f
EA
1 0
0
1 0
1 0
0
0
is 4.000.00
$0.0
pe4wol final
Project: ANNUAL SANITARY
P.M. Const ucHan and Rehabilitation. LP.
n Beam n, Toas 77012
Pay Esgmate No. a final
Pay Barrette Cutca date Novembert 62000 (invoice Daul
Work Order 01 rev., Total Time Allownd: 60 W.rkin0 Day.
Total Time Used: 52 Working Days
CITY OF BAYTOWN
ACT - Year 2000
Item
Description
Unit
OuantOt
Ouanllllea
Ouamtea
OuantlOes Ouantiuva 10 Oale
Ural
Price
Total
E.Onute
47IPL
Repair. 21'- ]6'.8'- 15' deep. uo to l2U
EA
0
0
1 0
1 0
1 0
1 0
IS 0.000.00
W,W
48
PL Repair. 21'- 36'. over l5'do0. uo 10121(
FA
0
0
0
0
0
0
5 8.00.00
$0.00
a0
E tca ten PL udder. all svgs. 0' -8' deep
LF
0
0
0
1 0
0
0
5 00.00
$0.o0
W
E¢pa lornot OL Fooeu, all wit. 5' -15 deep
LF
I 0
0
1 0
1 0
0
0
S 120.00
50,00
51
Beat, len0x P. Repair, all sues. overly dean
LF
0
0
0
0
0
0
5 180.00
50,00
52
RnN/Rpup r - IT' ncan es trood"
becdvq, 0- a'dop. 90 LF. min.
LF
0
0
0
0
0
0
$ 6&00
50.00
53
Rmv/Rp4ce 8 - -12, ina.des mwd�ed
pe0ding, B' -15' dao.90 LF =
LF
0
0
0
0
0
0
5 75.00
SOHO
54
RmvlRplace 0- -IT. included mWlted
peddle , over 16 deep, SO LF. min.
LF
0
0
0
I 0
0
0
5 1,000.00
SON
SS
Rmvl::.OA 15 -18', mctudva mcol del
peadplp. 0' • 0' dn0. W LF. min.
LF
0
0
0
0
0
0
S 75.00
50.00
W
RmaRplap w -10 -. connote mWlrad
bedd'm0.V- 1Sdeep.WLF. min.
LF
0
0
0
I 0
a
0
E 100.00
$0.00
57
Rmv/Rp1aM 15-18', iW LF. mooned
ddin0, 15' deep. W LF. min.
0
0
0
0
0
0
S 123.00
00
50
Au ncr
d Enmse 8--1o', all adrom
LF
0
0
0
0
0
0
S 100.00
w
30.00
SB
Au nut, Encoutr -t S. all depma
LF
0
0
0
0
0
0
$ 100.00
50.00
RmWmpfaw up te5- txnwu
¢HewalFMnvewdy "wed saw[uldnB a
imancomen0
BY
0
0
O
0
0
0
$ 45.0
50.00
Amvoeplen up 105- concrete
s'devalWadvevay 0rcludes a...." a
61rexormcidnt)
BY
0
a
0
0
0
0
S 00.00
W.00
62
Romfred up to T HMAC, Type 0. grad. Saw
CM1bG maL pub repair)
SY
0
0
mn
0
0
22.28
S Sam
L867.W
W
1'roG with ro fitna Ixbnditp (napdotal m
nlerand
TON
ID
0
0
0
D
8
5 00.00
5120.00
M
Annukr eM wid ¢pace Breupn
CY
B
0
0
0
0
0
$ 100.00
00.00
85
Fwg.. for direction or traMC
MHR
0
0
0
0
0
0
S 20.0
00.00
BB
tdnuM 5aedinp
BY
"a
180
240
0
0
420
S 3.00
51200.00
57
B ash FUm0ing•5 Or hater
De
2
0
0
0
0
0
5 1.00
Sa.W
w
Rope d wiew4ted, remowl, 5 -17
LF
0
0
0
0
0
0
S 10.00
00.00
6g
Root d Woercrruppn removal, IT • 24'
LF
0
0
0
0
0
0
S 20.0
W.w
70
Steel Casing, up to IT. above pncrod, coxed
am vmpped, including support
LF
0
0
0
0
0
0
5 100.00
W.00
71
DAO manMe a u. to B' deep
EA
0
0
0
1 0
0
0
S 2.900.00
00.00
72
Drop mannxs assempry. aver 8' am
VF
0
0
0
d
0
0
S 500.00
W.00
n
Enreme ..talvapon
EA
0
0
0
0
0
0
S 1.000.00
30.00
Tool
_
0 'T.^
08 225
Leda OY. ReOlnage
iA4AF.2QY
r
t
{rvJ�plpiG
E
Los Total Previous Payments on WO 1
lyre -s�c;g
•
�F.i�61g
wwomasm
s=85 M) )
payment Due This Eaumab
a
2t1�.°°"-.
S 57.884.71
Comm ctsummary:
,ollill-ummt WOrk Order at Amount
3296,Se625
4u 5%Rxalnage
5
Leu P.E- 1
S (85.91.5])
Lies P£ 2
S 1171.016.72)
Lau P£ 2
S (24,32225)
CurvenlAmpunt DUe
WT,BB4.T1
Asst Director pr EnBineerinp
peawptfitul
I •l
CRY OF BAYTOWN
ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000
Change Order 01 on Work Order #2
11!2212000
This work order included pipe bursting, service reconnections, well pointing, manhole wail rehabilitation and misceilaneous Items
related to work on Greenbrier North side, Greenbriar South Side, Lary lane. Neal Street and Nolan Road.
EXHIBIT B
Co1wo2 Mal
Orig.
Final
Cost
Item
Description
Unit
Guant
Quant.
Dlff.
Price
Difference
1
Pipe bursting 6.8 8" with 8-
HOPE min. SDR 17, 0'-8' deep
LF
2570
3613
1043
S 38.00
S 39.634.00
Pipe bursting 6" 8 8' with 8'
HOPE man. SDR 117. V-15'deop
LF
1100
0
-1100
$ 40.00
5(44,000.00)
3
Pipe bursting 6' 8 8" with 8'
HDPE min. SDR 17, over 15
deep
LF
01
0!
0
S 45.00
S -
4
Pipe bursting 8.8 10' with 10'
HOPE min. SDR 17, 0'-8' deep
LF
0
0
0
S 42.00
S
5
Pipe Wrsfing 8" 810' with 10'
HOPE min. SDR 17, 8' -15' deep
LF
0
285
285
S 45.00
S 12,825.00
6
Pipe bursting 8" 8 10' with 10"
HOPE min. SDR 17, over 158'
deep
LF
al
0
0
$ 60.00
$
7
Pipe bursting 10" 8 12' with 12"
HOPE mkh. SDR 17, 0'-8' deep_
LF
0
0
0
S 55.00
S
8
Pipe burs" 10' 3 12' wtth 12"
HDPE min. SDR 17, 8 =15' deep
LF
0
0
0
$ 60.00
S
9
Pipe bursting 10' 8 12' with 12'
HDPE min. SDR 17, over 15
deep
LF
0
0
S 75.00
$
10
Pipe bursting 12' 8 15" with 15"
HOPE min. SOR 17, min, PVC
SDR 28.0' -8' dee p
LF
0
0
0
S 75.00
$
11
Pipe bursting 12" 8 15" with 15'
HOPE min. SDR 17, min, PVC
SOR 26.8' -15 deep
LF
0
0
0
$ 85.00
$
12
Pipe bursting tY a 16' with 16'
HDPE min. SDR 17, min, PVC
SDR 26, over 15 deep
LF
0
0
0
S 100.00
$
13
Remove existing sliplbher, all
sizes and depths
LF
500
480
-20
$ 5.00
S (100.00)
14
Reconnect service - short side,
10'-a' deep
EA
72
91
19
$ 500.00
S 9.500.00
15
Reconnect service - short side,
over 8' deep
EA
23
2
-21
S 700.00
S 14,700.00)
16
Reconnect service - long side. 0'
8' deep
EA
0
0
0
S 1,200.00
S
17
Reconnect service - long side,
over IF deep
EA
0
0
0
S 1,500.00
S
18
Manhole Wall Seating
VF
57
38.75
-20.25
S 85.00
S (1,721 25
19
Replfuhstall new manhole. 0'-8'
deep
EA
2
4
2
$ 1.500.00
S 3.000.00
20
New Manhole, over 8' deep
VF
01
0
0
$ 200.00
S
21
ReplaceAnstall ring and cover
EA
0
1
1
S 300.00
S 300.00
22
Extra cement stawtujed sand
badc69.2 skJton
TON
0
218.1
218.1
S 20.00
S 4.362.00
23
Point Rpr lobs! mry - pipe
bursting. 0' - V deep
EA
0
11
11
$ 300.00
S 3.300.00
24
Point Rpdabst mw - pipe
bursting. 8'- 15* d eep
EA
0
1
1
$ 400.00
S 400.00
25
Point Rpdabst mw - pipe
over 15'deep
EA
0
0
0
$ 500.00
$
28
Extra Length paint repair, all
depths
LF
0
0
0
$ 80.00
$
27
Well Point set up, up to 121
EA
0
0
0
$ 2.800.00
S
28
Well Point, Extra length over 12
N
LF 1
0
0
01S
20.00
S
29
Trench Safety, V to B'deep
LF 1
2001
2551
551S
1.00
S 55.00
EXHIBIT B
Co1wo2 Mal
CITY OF BAYTOWN
ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000
t Change Order 01 on Work Order 02
M
bd
11/22/2000
This work order included pipe bursting. service re0onnections, well pointing, manhole wail rehabilitation and miscellaneous items
related to work on Greenbrier North side. Greenbriar South Side. Lazy lane. Neat Street and Nolan Road.
30
Trench Safety. V to 15' deep
LF
160
45
-115
S 1.00
$ (115.00)
31
Trench Safety. 8' to 1 S' deep
LF
0
01
0
S 1.00
S
32
Clean 6' to 12' Sewer
LF
1870
1617
-253
S 3.00
$ 759.00)
33
Clean 15' to 21" Sewer
LF
0
0
0
S 5.00
S
34
Clean 24" to 36' Sewer
LF
0
0
0
$ 10.00
S
TV Inspection of Sewer
LF
1870
1617
-253
S 1.00
$ (253.00)
361
Bypass Pumping. 3' pump
Day
0
0
0
S 1.00
S
37
Bypass Pumping, 4" pump
Day
0
0
0
$ 1.00
$ -
38
Bypass Pumping, 6' pump
Day
0
0
0
$
S -
39
B Pumping. 8' pump
Day
0
0
0
S -
S -
40
PL Repair, 6' -12', 0' - V deep.
up to 12 If
EA
2
0
-2
S 1,250.00
S 2.500.00
41
PL Repair, 6' -12', 8'- IS'
Ideep. up to 12 N
EA
31
1
-2
S 1.750.00
S (3.500.00)
42
PL Repair, 6' -12', over 15'
deep, up to 12 If
EA
0
0
0
S 2.500.00
$
43
PL Repair, 15' - 18', 0' - 8'
deep, up to 12 If
EA
0
0
0
S 2.250.00
S
44
PL Repair, 1S- -18'. 8' -1S
deep, up to 12 If
EA
0
0
0
S 2.900.00
S
45
PL Repair, 15" -18', over 15'
deep. up to 121f
EA
0
0
0
$ 3.500.00
S
46
PL Repair, 21' - 36. V - V
deep. up to 12 If
EA
0
0
0
$ 4,000.00
$
47
PL Repair, 21" - 36', 8' -1S
up to 12 If
EA
0
0
0
S 6.000.00
S
48
PL Repair. 21' - 36". over iS
deep, up to 12 If
EA
0
0
0
$ 8.000.00
S
49
Extra length pt. Repair, all sizes,
o' - 8' deep
LF
0
0
0
$ 60.00
$
50
Extra length pt. Repair, all sizes,
8' -1S deep
LF
0
1
1
S 120.00
S 120.00
51
Extra length pl. Repair, all sizes,
overl6 deep
LF
0
0
0
$ 160.00
$ -
52
Rmv /Rplace 8' - 12% incl, as
modified bedding. V - 8' deep.
50 LF, min.
LF
0
0
0
$ 65.00
S
63
Rmv/Rplace 6' - 12', includes
modified bedding, V -1 S deep.
50 LF. min.
LF
0
0
0
S 75.00
$ -
54
Rmv/RpI= 6- - 12'. includes
modified bedding, over IS
deep. 5D LF. min.
LF
0
0
0
S 11000.00
S
55
Rmv/Rplaos 15- - 18'. includes
modified bedding. Cr - 8' deep.
60 LF. min.
LF
0
0
0
S 75.00
S
56
Rmv/Rplaoe IS"- 18 ", includes
modified bedding. 8' -1 S deep,
50 LF. min.
LF
0
0
0
S 100.00
S
57
Rmv/Rpkm 16" - 181, Includes
modified bedding. over 15
deep. 50 LF. min.
0
0
0
$ 125.00
S
58
Auger & EnOase 8- -10', all
depths
LF
0
0
0
S 100.00
S
59
Auger & Encese 12' -16', all
depft
LF 1
0
0
0
S 150.00
S
60
Rnw/ epiace up toy" concrete
sidewalk/driveway (includes
Isawcutft
8 reinforcement )
SY
01
01
01S
45.00 IS
Cotwo2 page2
Co1wo2
CITY OF BAYTOWN
ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000
Change Order #1 on Work Order 02
11122/2000
This work order included pipe bursting , service reconnections, well pointing, manhole wan rehabilitation and miscellaneous items
related to work on Greenbrier North side, Greenbrier South Side, Lazy lane, Neal Street and Nolan Road.
61
Rmvheplaoe up toy' ooncrMe
Sidewakfdriveway (Includes
sawculft & reinforcement )
SY
0
0
0
$ 60.00
$ -
62
Rmv/repl up to 2' HMAC, Type
D, (Ind. Saw cut,tack coat. base
repw
SY
0
60.91
60.91
$ 30.00
$ 1.827.30
63
1' rock with no fines for bedding
(incidental to point repairs )
TON
0
0
0
S 20.00
$
64
Annular and void space grouting
CY
0
0
0
$ 100.00
$
65
Finman for direction of traffic
MHR
0
0
0
$ 20.00
S
66
Hydromulch Seeding
SY
500
400
-100
S 3.00
S (300.00
67
Bypass Pumping. 6' or greater
Day
0
0
0
S 1.00
S -
68
Root & tuberculation removal, 6'
- 12'
LF
0
0
0
$ 10.00
$
69
Root & tuberculation removal,
12'- 24'
LF
0
0
0
S 20.00
S
70
Steel Casing, up to 12', above .
ground. coated and wrapped.
Including supports
Drop manhole assembly, up to
8' deep
Drop manhole assembly. over 8'
deep
Emergency mobilization
LF
0
0
0
S 100.00
S -
71
EA
0
0
0
S 2,500.00
$ -
72
VF
0
0
0
$ 500.00
S -
73
EA
0
0
0
S 1,000.00
S -
Total Change Order
.ill
Finance Date
Work Order Summary.
Final Constniction Cost $ 228,570.05
Initial Work Order S 221.195.00
Change Order #1 $ 7,375.05
Director of Engineering Date
City manager Date
S 7.375.08
pagG3
CITY OF BAYTOWN
Project: ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000
Construction and Rehabilitation, L.P.
t East Erath
Houston, Texas 77012
Pay Estimate No. 2 (final)
Pay Estimate Cut-off date November 10, 2000 (Invoice Date)
Work Order #2, Total Time Allowed: 60 Working Days
Total Time Used: 18 Working Days
Item
I Description
Unit
Est. WO2
Quant.
P.E.1
Quantities
P.E. 2 1
Quantities I
Total
Quantities
Unit
Price
Total this
Estimate
I
1
Pipe bursting 6"& 8" with 8 "HDPE min. SDR
17, 0'-8' deep
LF
2570
3613
0
36131S
38.00
5137,294.0(
2
Pipe bursting 6" & 8" with 8' HDPE min. SDR
17, V -15' deep
LF
1100
0
0
0
S 40.00
50.0(
3
Pipe bursting 6' & 8' with 8" HDPE min. SDR
17, over 15' deep
LF
0
0
0
0
S 45.001
SO.O(
4
Pipe bursting 8" & 10" with 10" HOPE min.
SDR 17, 0'-8' deep
LF
0
0
0
0
S 42.00
S0.0(
5
Pipe bursting 8" & 10" with 10" HDPE min.
SDR 17, 8' -15' deep
LF
0
285
0
285
S 45.00
512.825.0(
6
Pipe bursting 8" & 10" with 10" HDPE min.
SDR 17, over 158' deep
LF
0
0
0
0
S 50.00
50.0(
7
Pipe bursting 10" & 12" with 12" HDPE min.
SDR 17, 0'-8' deep
LF
0
0
0
O
S 55.00
$0.0(
8
Pipe bursting 10" & 12' with 12" HDPE min.
SDR 17, 8' -15' deep
LF
0
0
0
0
S 60.00
$0.0(
t
Pipe bursting 10" & 12" with 12' HDPE min.
SDR 17, over 15' deep
LF
0
0
0
0
S 75.00
50.0(
10
Pipe bursting 12" & 15" with 15" HDPE min.
SDR 17, min, PVC SDR 26, 0'-8' deep
LF
0
0
0
0
$ 75.001
50.0(
11
Pipe bursting 12' & 15" with 15" HDPE min.
SDR 17, min, PVC SDR 26, 8' -15' deep
LF
0
0
0
0
S 85.00
50.0(
12
Pipe bursting 12' & 15' with 15" HDPE min.
SDR 17, min, PVC SDR 26, over 15' deep
LF
0
0
0
0
S 100.00
50.0(
13
Remove existing slipliner, all sizes and
depths
LF
500
480
0
480
S 5.00
52,400.0(
14
Reconnect service - short side, 0' -8' deep
EA
72
91
0
91
5 500.00
$45.500.00
15
Reconnect service - short side, over 8' deep
EA
23
2
0
2
S 700.00
51,400.0E
16
Reconnect service - long side, 0'-8' deep
EA
0
0
0
0
$ 1.200.00
$0.0(
17
Reconnect service - long side, over 8' seep
EA
0
0
0
0
$ 1,500.00
S0.0C
18
Manhole Wall Sealing
VF
57
15.25
21.5
36.751
S 85.001
$3.123.7;
19
Replfinstall new manhole, 0'-8' deep
EA
2
4
0
4
S 1,500.00
56,000.0E
201
New Manhole, over 8' deep
VF
0
0
0
0
$ 200.00
50.0E
21
Replace/install ring and cover I
EA
0
1
0
1
S 300.00
5300.0C
F]2431cement
stabilized sand backfill, 2
TON
0
218.1
0
218.1
S 20.00
54,362.0E
Paint Rpr /cbst rrnv - pipe bursting, 0' - 8'
EA
0
11
0
11
S 300.00
53.300.00
24
Point Rpr /obst rmv - pipe bursting. V -15'
EA
0
1
0
11S
400.001
5400.00
25
Point Rpr /obst rmv - pipe bursting, over 15'
deep
EA
0
0
0
0
S 500.00
S0.0c
26
Extra Length point repair, all depths
LF
0
0
0
0
$ 60.00
S0.0C
27
Well Point set up, up to 12 If
EA
0
0
0
0
S 2.800.00
SOW
28
Well Point Extra length over 12 If
LF 1
0
0
0
0
$ 20.00
50.0E
29
Trench Safety, 0' to 8' deep
LF 1
200
255
0
2551$
1.00
5255.0C
30
Trench Safety, 8' to 15' deep
LF
160
45
0
45
S 1.00 1
545.0E
311
Trench Safety, 8' to 15' deep
LF
0
0
0
0
$ 1.00 1
50.0E
Clean 6' to 12' Sewer
LF 1
1870
1617
0
1617
$ 3.00 1
54,851.0[
Clean 15" to 21" Sewer I
LF
0
0
0
0
$ 5.001
50.0E
34
Clean 24' to 36" Sewer
LF
0
0
0
0
S 10.001
$0.0C
35
TV Inspection of Sewer
LF
1870
1617
0
1617
$ 1.001
51.617.0E
36
Bypass Pumping, 3" pump
Day
0
0
01
$ 1.001
S0.0C
371
Bypass Pumping, 4' pump
Day
0
0
0
01$
1.00
S0.0C
pe 1 wo2partial
CITY OF BAYTOWN
Project: ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000
P. Construction and Rehabilitation, L.P.
ast Erath
H6- -ton, Texas 77012
Pay Estimate No. 2 (final)
Pay Estimate Cut -0H date November 10, 2000 (Invoice Date)
Work Order #2, Total Time Allowed: 60 Working Days
Total Time Used: 18 Working Days
Item
Description
Unit
Est WO2
Quant.
P.E.1
Quantities
P.E. 2 1
Quantities
Total
Quantities
Unit
Price
Total this
Estimate
38
Bypass Pumping. 6" pump
Day
0
0
01
0
5 -
$0.00
39
Bypass Pumping, 8" pump
Day
0
0
0
0
$ -
50.00
40
Pt Repair. 6" -12". 0' - 8' deep, up to 12 If
EA
2
0 I
0
0
S 1,250.00
$0.00
41
Pt. Repair, 6' -12", 8' -15' deep, up to 12 if
EA
3
1
0
1
S 1,750.00
51,750.00
42
Pt. Repair, 6' -12 ", over 15' deep, up to 12 If
EA
0
0
0
0
S 2,500.00
$0.00
43
Pt Repair, 15" -18 ". 0' - 8' deep, up to 12 If
EA
0
0
0
0
S 2,250.00
50.00
44
Pt. Repair, 15" -18', 8' -15' deep, up to 12 if
EA
0
0
01
0
S 2,800.00
50.00
451f
Pt. Repair, 15"- 18, over 15' deep, up to 12
EA
0
0
0
01S
3,500.00
$0.00
46
Pt. Repair, 21" - 36", 0' - 8' deep. up to 12 If
EA
0
0
0
0
$ 4,000.00
$0.00
47
Pt. Repair, 21" - 36", 8' -15' deep, up to 12 If
EA
0
0
0
0
$ 6,000.00
50.00
48,
Pt. Repair, 21' - 36", over 15' deep, up to 12
If
EA
0
0
0
0
S 8.000.00
$0.00
49
Extra length pt Repair, all sizes. 0'- 8' deep
LF
0
0
0
0
S 80.00
$0.00
50
Extra length pt Repair, all sizes, V - 15' deep
LF
0
1
0
1
S 120.00
5120.00
51
Extra length pt Repair, all sizes, overly'
deep
LF
0
0
0
0
$ 160.00
$0.00
Rmv/Rplace 6" -12". includes modified
bedding, 0' - 8' deep, 50 L.F. min.
LF
0
0
0
0
$ 65.00
$0.00
53
IRmv/Rplaoe 6"- 12% includes modified
bedding, 8'- IV deep, 50 L.F. min.
LF
0
0
0
0
$ 75.00
50.00
54
Rmv/Rplaoe 6' - 12', includes modified
bedding, over 15' deep, 50 LF. min.
LF
0
0
0
0
$ 1,000.00
50.00
55
Rmv/Rplace 15' - 18 ", includes modified
bedding, 0'- 8' deep, 50 L.F. min.
LF
0
0
0
0
S 75.00
$0.00
56
Rmv/Rplace 15" -18", includes modified
bedding, a' -15' deep, 50 L.F. min.
LF
0
0
0
0
$ 100.00
50.00
57
Rmv /Rplace 15' -18", includes modified
bedding, over 15' deep, 50 L.F. min.
0
0
0
0
S 125.00
$0.00
58
Auger & Encase 8" -10 ", all depths
LF
0
0
0
0
$ 100.00
50.00
59
Auger & Encase 12" -15', all depths
LF
0
0
0
O's
150.00
$0.00
60
Rmv /replace up toy" concrete
sidewalk/driveway (includes sawcutting &
reinforcement)
SY
0
0
0
O
S 45.00
$0.00
61
Rmv /replace up to5" concrete
sidewalk/driveway (includes sawcutting &
reinforcement)
SY
0
0
0
0
$ 60.00
$0.00
62
Rmv /repl up to 2' HMAC, Type D. (incl. Saw
cut,tack coat, base repair)
SY
0
60.91
0
60.91
S 30.00
51.827.30
63
V rock with no fines for bedding (incidental to
point repairs)
TON
0
0
0
0
$ 20.00
$0.00
64
Annular and void space grouting
CY
0
0
( 01
0
$ 100.00
50.00
65
Flagman for direction of traffic
MHR
0
0
01
0
$ 20.00
SO.00
66
Hydramulch Seeding
SY
500
400
0
400
$ 3.00
51.200.0C
67
Bypass Pumping, 6' or greater
Day
0
0
0
0
S 1.00
S0.0C
Root & tuberculation removal, 6' -12'
LF
0
0
0
0
S 10.00
$0.0C
Root & tuberculation removal. 12"- 24"
LF
0
0
0
01S
20.00
S0.0C
teel Casing, up to 12', above ground,
70 cSoated and wrapped, including supports
LF
0
0
0
0
$ 100.00
SO.01
711 Drop manhole assembly, up to 8' deep
EA
0
0
0
0
S 2.500.00
s0.00
72 Drop manhole assembly, over 8' deep
VF
0
0
0
0
S 500.001
S0.0C
pelwo2partiat
t.
r
CITY OF BAYTOWN
Project: ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000
P.M. Construction and Rehabilita 1cn, LP.
7704 East Ereth
Houston, Texas 77012
Pay Estimate No.2 (6ruq
Pay Estimate Cut-off date November 10, 2000 (Invoice Data)
Work Order #2, ToW Time Allowed: 60 Working Days
Total Tlma Used: 18 Working Days
Rem
Description
EaL WO2
Unit Oueni.
P.E.1
Ouentities
P.E.2
OL.Ittles
Total Un t
OuanUties Price
Total Nis
Estimate
73
Emergency mobilization
F?. 0
0
01
01 5 1,000.00
50.00
Total
5226.570.0'
Let OY. Ralainaga
Let Total Previous Payments on WO
5
5 (215,605.42
Payment Due This Estimate
5 13,184.6:
tin !1
Contract Summary
Current Work Order 82 Amount 5228,570.05
Lass 5%Retainage $
Leas Previous Payments 5 (215,465.42)
Currant Amount Due $ 13,164.63
pelwo2partia1
And. Director of Engineering Date
106Ed
� 1181NX�
• S
00' 1 s 0
oz
oz
dl
c"O.8 of .0 Dles ux+a+l 6Z
• S
001oz S 0
0
0
:11
8
Zt moo W! enx3 lu!od Dom 8z
• S
00'w08•Z S
0
0 0
V3
N Zt Ct an 'an les luiod naM LZ
- s
o0 09 s
o
0 0
dl
$49"
a= jedw Unm whol ej3x3 9z
• S
00'005 S
0
0 0
b3
asap ,9l joAc ' upwnq
adtd - Auu tsgatjdW lulod SZ
- S
00.00r s
0
0 0
v3
099P SL 6 .8
wild - Auu tKolidy Mod
tiZ
04'00£ S
00'00£ S
l
£
b�3
daeD .B • '
adld - etw ts0O lld!! lui0d
£Z
(00'006) S
o0'oZ S
SIP-
0 SP
NOl
u Z 'mpPe4
Dun DezJigm PSWJM a wB
zz
• S
00'00£ S
0
0 10
b'3
eau» PUB OUU neisuyaoeldaa
lZ
(00'OOi t S
00'OOZ S
9-
0 9
dA
0000 .9 ' alayueW MeN
OZ
- S
00'005'1 S
0
0 0
va
coop
.9-.0 'e104uew awu nelotoAdea
6 t
9Z' l£9 S 1
00'98 S
SZ•9
SZ'9 0
AA
e9S peM eio4uRW
8l
- S
00.009.1 S
0
0 0
va
amp's J8A0
ePis Buo! - eol%= pouuwea
Lt
- s
o4•ooz•1 S
0
0
0
V3
aw s
,0 'apls 6uo! • "Aias lKfeilu=a
9t
- S
00.00L S
0
0
0
d3
asap .B Deno
'eels vows •sows. iMuoMM
SL
- S
00.009 S
0
0
0
d3
daaP .O-,4
'Dais Mug - 0*!,% S pouuoOaa
bl
• S
00'9 S
0
0
0
dl
94mp Pus sezlS
11e 'isulldlls 6ullM "&AMU
£t
- S
00'001 S
0
0
0
dl
G"P St Jsro'9Z MOS
OAd VW L& ass •u8u 3daH
St 4llM St 4 .zl &MUIQ Odid
Zt
- s
oo s9 s
o
0
0
dl
OMP .s► -,8 '9Z ass
OAd %*U 'Ll W13S VP HdaH
St ta!MSt 9.zt &rims ed!!d
It
- S
04.5L S
0
0
0
dl
OMP.9- .0 '9ZHOS
OAd OUI 'Ll ass VP 3daH
.St %P%St 4.Z1 MMWA wild
Ot
- S
04'SL S
0
0
0
dl
coop
sl nano 'u ass -1— adaH
.Z1 4l!M.Zt ,a.ol edid
6
• S
04'09 S
0
0
dl
dBeASI- ,9'L12laS'ulu+3dOH
IO
Zt lalM.zl'B.Ot �s�A wild
B
• S
DO'S5 S
0
0
0
�
�P,B'.4 'Lt a0S 'u!w 3dOH
.ZL 4tw►.Zl g.Ot 6upsmq wild
L
- s
oo•os s
o
0
�
°tea
l
(0
,8St JDno 'L t aOS 'u!su 3dOH
.Ol 41iM .Ol 9.9 edict
9
- S
00'Sti S
0
0
dl
Dees St•.8 L1 >i0S 'u!u+ 3dOH
(O
.0 t UIiM .0 t F .8 6unsirt+a said
5
• S
00'Z9 S
0
0
0
dl
oeeD.B -A 'LttlOS'u!�uu3dOH
.Ot tAlM.Ot 4.86vltsmq said
>
- S
00'Sv S
0
0
dl
asap
IO
St �o 'Ll 2lOS 'u!u+ 3dOH
.B 41lM .8 4.9 $u!teJna wild
£
- S
00.Oti S
0
dl
asap St•.8 'Lt 2lOS 'uiu+ 3daH
IO
IO
.B Ut!M .8 9.9 6upsir>A wild
- S
00'8£ S
4
dl
OeaP,B-.0'Ll a0S'u!u+3dOH
�
IOLt
IOCt
.8 4l� .8'8.9 6unsmA ad!d
t
aauo�oulp
aat,Jd
'N!0 j 7uenp
I zuenp
3lufl
I uopolnsap
wail
3sop
I I lsuld
•bup
•awp Qnl7 titur+o•J B MBA Qn1O AuunoO uo woM of paleie�
swat snoauenaoslw Due uollel!1!ae4w net^ erouuew '6snwlod !lDN, •suol3�euuo� a�lnias ' 6ullsmq adld PePnpu! raAia xmM s!41
OOOZlZZ /L l
£� �awO >NoM uo lti �oWO o6ue4p
OOOZ Jean' 1O'd>;l1NO0 NOI1dll118MH3>i 2l3M3S AZlV11MIS lVf1NNV
NMOIJ.C'S dO 1.150
i
M
Colwo3
CITY OF BAYTOWN
ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000
Change Order 01 on Work Order #3
11122/2000
This work order included pipe bursting , service reconnections, well pointing, manhole wall rehabilitation and miscelllaanneous Items
related to work on Country Club View & Country Club Dhve.
30
Trench Safety. 8' to 15! deep
LF
0
0
0
$ 1.00
$ -
31
Trench Safety. 8' to 15' deep
LF
0
0
0
$ 1.00
S
32
Clean 6' to 12' Sewer
LF
0
0
0
S 3.00
$
33
Clean 15' to 21' Sewer
LF
0
0
0
S 5.00
S
34
Clean 24' to 36' Sewer
LF
0
01
0
S 10.00
$ -
35
Tv Inspection of Sewer
LF
0
01
0
$ 1.00
S
36
Bypass Pumping. 3- pump
Day
01
0
0
$ 1.00
$
37
Bypass Pumping, 4' pump
Day
01
0
0
$ 1.00
S -
38
Bypass Pumping. 6' pump
Day
0
0
0
$
S -
39
Bypass Pumping. 8' pump
Day
0
0
0
$
S -
40
PL Repair. 6'- 12'. 0'- 8' deep,
up to 12 If
EA
0
0
0
S 1.250.00
S
41
PL Repair, 6'- 12'. 8'- 15'
deep. up to 12 If
EA
0
0
0
S 1.750.00
S
42
PL Repair. 6'- 12% over 16
deep, up to 12 If
EA
0
0
0
$ 2.500.00
$
43
PL Repair. 15- -18', 0' - 8'
deep, up to 12 N
EA
0
0
0
S 2.250.00
$
44
PL Repair, 15' -18', 8' -15'
deep. up to 12 N
EA
Cl
0
0
$ 2.900.00
S
45
PL Repair. 15'- 18', over 15*
deep, up to 12 If
EA
0
0
0
S 3.500.00
$
46
PL Repair. 21' - 36'. 0' - 8'
deep, up to 12 tf
EA
0
0
0
$ 4.000.00
S
47
PL Repair. 21' - 36'. 8' -15'
deep. up to 12 If
FA
0
0
0
S 6.000.00
S
48
PL Repair. 21' - 36', over 1S
deep. up to 12 If
EA
0
0
0
$ 8.000.00
S
49
Extra length pt. Repair. all saes,
0' - 8' deep
LF
0
0
0
$ 80.00
S
50
Extra length pL Repair, all sizes.
8' - 1S deep
LF
0
0
0
$ 120.00
$
51
Extra length pL Repair. all sizes,
overly' deep
LF
0
0
0
S 160.00
S
52
Rmv/Rplace 6' -1 r. Includes
modified bedding. 0' - 8' deep.
50 LF. min.
LF
0
0
0
S 65.00
S
53
Rmv/Rptace V -12', includes
modified bedding, 8'. 15' deep,
50 LF. min.
LF
0
0
0
S 75.00
•S
54
Rmw/Rplaae 6' - 1r. includes
modified bedding, over 15'
deep, 50 LF. min.
LF
0
0
0
$ 1.000.00
S
55
Rmv/Rplaca IS"- 181. includes
modified bedding. 0' - 8' deep.
50 LF. min.
LF
0
0
0
$ 75.00
$
56
Rmv/Rpk= 15' -18'. includes
modified bedding, 8' -1 S deep,
50 LF. min.
LF
0
0
0
S 100.00
S
57
Rmv/Rplace t5' -18, includes
modified bedding, over 15'
deep, 50 LF. min.
0
0
0
S 125.00
S
58
Auger & Encase a - -10', ail
depths
LF
0
0
0
$ 100.00
S
59
Auger a Encase tr -15', all
depths
LF
0
0
0
$ 150.00
S
60
Raw/replace up toy' concrete
sidewaWdriveway (Iricfudes
Isawcutting a reinforcement )
SY
0
0
0
S 45.00
IS
page2
M
ia
CITY OF BAYTOWN
ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000
Change Order 01 on Work Order 03
11122/2000
This work order Included pipe bursting. service reconnections, well pointing. manhole wall rehabilitation and miscellaneous items
related to work on Country Club View a Country Club Drive.
61
Rmvlreplace up toy- concrete
sidewaWdriveway (Includes
sawcutting a reinforcement)
SY
0
0
0
S 60.00
S -
Rmvlrepl up to 2' HMAC, Type
D. (Intl. Saw cut,tack coat. base
repair)
SY
0
0
0
$ 30.00
S
63
V rock with no fines for bedding
('Incidental to point
TON 1
0
0
S 20.00
S
64
Annular and void space gfou#M
CY
0
0
0
S 100.00
5
65
Flagman for direction of traffic
MHR
0
0
0
S 20.00
S
66
Hydromulch Seeding
SY
0
50
50
S 3.00
S 150.00
67
Bypass Pumping. 6- or greater
Day
0
0
0
$ 1.00
S
68
Root a hmarcutation removal 6•
- 12*
LF
0
0
0
S 10.00
S
69
Root a tuberculatkm removal.
12• - 24•
LF
0
0
0
S 20.00
S
70
Steel Casing, up to 12', above
ground. coated and wrapped.
Including supports
Drop manhole assembly, up to
8- deep
Drop manhole assembly. over 8-
deep
Emergency mobilization
LF
0
0
0
S 100.00
$
71
EA
0
0
0
S 2.500.00
S
VF
0
0
0
S 500.00
S
73
EA
1
1
0
S 1.000.00
$
Co1wo3
Finance Date
Work drderSummary.
Final Construction Cost S 9.061.25
Initial Work Order S 10.180.00
Change Order 01 $ (1.118.75)
Director of Er9neenrng Date
City manager Date
$ (1.118.75)
page3
CITY OF BAYTOWN
Project: ANNUAL SANITARY SEWER REHABILITATION CONTRACT -Year 2000
F. onstruction and Rehabilitation. L.P.
cast Erath
Houston, Texas 77012
Pay Estimate No. 2 (final)
Pay Estimate Cut-of date November 16, 2000 (Invoice Date)
Work Order 03 Emergency, Total Time Allowed: 5 Working Days
Total Time Used: 3 Working Days
Item I Description
Unit
Est. W03 P.E.1
QuanL Quantities I
P.E.2
Quantities
Final Unit
Quantities Price
Total this
Estimate
I
I
1
Pipe bursting 6' & 8' with 8' HOPE min. SDR
17, 0'-8' deep
LF
170
170
0
170
S 38.00
56.460.00
21Pipe
bursting 5" 8 8" with 8' HOPE min. SDR
17. 8' -1S deep
LF
0
0
0
0
S 40.00
50.00
3
Pfpe bursting 6' 8 8' with 8' HOPE min. SDR
17, over 15' deep
LF
0
0
0
01S
45.00
$0.00
4
Pipe bursting 8" 8 10' with 10' HOPE min.
SDR 17. 0'-8' deep
LF
0
0
0
01S
42.00
$0.00
5
P1pe bursting 8' & 10" with 10' HOPE min.
SDR 17, 8' -15' deep
LF
0
0
0
0
S 45.00
50.00
6
Pipe bursting 8" & 10" with 10" HOPE min.
SDR 17, over 15V deep
LF
0
0
0
0
S 50.00
$0.00
7
Pipe bursting 10' 8 1Z"with 12" HOPE min.
SDR 17.0' -8' deep
LF
0
0
0
0
S 55.00
$0.00
8
Pipe bursting 10' 8 12" with 12" HDPE min.
SDR 17, V -1S deep
LF
0
0
0
0$
60.00
50.00
9
Pipe bursting 10" & 12" with 12" HOPE min.
SDR 17, over 15' deep
LF
0
0
0
0
$ 75.00
$0.00
I
Pipe bursting 12'& 15' with 15' HOPE min.
SDR 17, min, PVC SDR 26.0' -8' deep
LF
0
0
0
0
$ 75.00
50.00
11
Pipe bursting 12' 8 15" with 15" HOPE min.
SDR 17, min. PVC SDR 26, V -15' deep
LF
0
0
0
0
$ 85.00
$0.00
12
Pipe bursting 12" & 15" with 15" HOPE min.
SDR 17, min, PVC SDR 26, over 1S deep
LF
0
0
0
0
S 100.00
$0.00
13
Remove existing slipliner, all sizes and
depths
LF
0
0
0
0
5 5.00
50.00
14
Reconnect service - shon side, 0'-8' deep
EA
0
0
0
0
S 500.00
$0.00
15
Reconnect service - short side, over 8' deep
EA
0
0
0
0
S 700.00
$0.00
16
Reconnect service - bong side, 0'-8' deep
EA
0
0
0
0
$ 1,200.00
$0.00
17
Reconnect service - long side, over V deep
EA
0
0
0
0
S 1,500.00
$0.00
18
Manhole Wall Sealing
VF
0
0
6.25
6.25
S 65.00
$53125
19
Reptrmstail new manhole, 0'-8' deep
EA
0
0
0
0
$ 1.500.00
$0.00
20
New Manhole, over 8' deep
VF
6
0
0
0
S 200.00
$0.00
21
Replace/install ring and cover
EA
0
0
0
0
S 300.00
$0.00
22
Extra cement stabilized sand back i0, 2
TON
45
0
0
0
S 20.00
$0.00
23
Point RpHObst mnr - pipe bursting, 0'- V deel
EA
2
3
0
3
S 300.00
$900.00
24
Point Rpr /obst mw - pipe bursting, 8'- 15'
EA
0
0
01
0
$ 400.00
$0.00
25
Point Rpr /cost rtr v - pipe bursting, over 1S'
deep
EA
0
0
0
0
$ 500.00
$0.00
261
Extra Length point repair, all depths
LF
0
0
01
01
S 60.00
50.00
27
Well Point set up, up to 12 II
EA
0
0
0
0
$ 2.800.00
$0.00
28
Well Point. Extra length over 1211
LF
0
0
0
0
S 20.00
50.00
29
Trench Safety. 0' to 8' deep
LF
20
I 20
0
20
S 1.00
$20.00
30
Trench Safety, 8' to 15' deep
LF
0
0
0
0
S 1.00
$0.00
31
Trench Safety, 8' to 15' deep
LF
0
0
0
0
$ 1.00
$0.00
32
Clean 6" to 12' Sewer
LF
0
0
0
0
5 3.00
S0.00
33
Clean 15" to 21" Sewer
LF
0
0
0
0
$ 5.00
S0.00
34
Clean 24' to 36' Sewer
LF
0
0
0
0
S 10.00
$0.00
5
TV Inspection of Sewer
LF
0
0
0
0
S 1.00
$0.00
.6
Bypass Pumping. 3" pump
Day
0
0
0
0
$ 1.00
$0.00
37B
Pumping, 4" pump
Day
0
0
01
0
$ 1.00
50.00
38
Bypass Pumping. 6' pump
Day
0
0
0
0
$ -
50.00
39IBypass
Pumping, 8" pump
D'sy
0
0
0
0
$ -
S0.00
pe2wo3rinal
CITY OF BAMWN
Project: ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000
P.M. Construction and Rehabilitation, L.P.
Ty".ast Erath
in, Texas 77012
Pay Estimate No. 2 (final)
Pay Estimate Cut-off date November 16, 2000 (Invoice Date)
Work Order 03 Emergency, Total Time Allowed: 5 Working Days
Total Time Used: 3 Working Days
Item
I Description
Unit I
Est. WO3 P.EA
Quant Quantities I
P.E.2
Quantities I
Final Unit
Quantities Price
Total this
Estimate
$0.00
41
Pt. Repair. 6' - 12'. 8' - 15' deep, up to 12 If
EA
0
0
0
0
S 1.750.00
$0.00
42
Pt. Repair, 6' - 12', over IT deep, up to 12 If
EA
0
0
01
0
S 2.500.00
$0.00
43
Pt. Repair, 15- - 18% 0' - 8' deep, up to 12 K
EA
0
0
0
0
S 2.250.00
$0.00
44
PL Repair, IS'- 181. 8'- 15' deep, up to 12 if
EA
0
0
01
0
S 2.900.00
$0.00
45
Pt. Repair. 15' - 18. over 15' deep, up to 121
EA
0
0
T-o
S 3,500.00
50.00
46
PL Repair. 21' - 36'. 0'- 8' deep, up to 12 If
EA
0
0
0
0
S 4,000.00
$0.00
471PL
Repair. 21' - 36'. 8'- 15* deep, up to 12 N
EA
0
0
0
0
S 6.000.00
50.00
a8
PL Repair. 21' - 36', over 15' deep, up to 12
EA
0
0
0
0
S 8.000.00
$0.00
a9
Extra length pt. Repair, all sues, 0'- 8' deep
LF
0
0
0
0
$ 80.00
$0.00
50
Extra length PL Repair, all sizes. 8' -15' deep
LF
0
0
0
0
S 120.00
50.00
51
Extra length pt. Repair, all sizes, overISdeel
LF
0
0
0
0
$ 160.00
$0.00
52
Rmv /Rplace 6"- 12", includes modified
bedding. 0'- 8' deep, 50 LF. min.
LF
0
0
0
0
$ 65.00
$0.00
Rmv/Rplaae 6' - 12', includes modified
bedding, V -1S deep. 50 LF. min.
LF
0
0
0
0
S 75.00
$0.00
a4
Rmv/Rplace 6' - 12', includes modifed
bedding, over 15' deep. 50 LF, min.
LF
0
D
0
0
S 1.000.00
50.00
55
Rmv/Rplace IS"- 16', includes modified
bedding, Cr - 8' deep, 50 LF. min.
LF
0
0
0
0
$ 75.00
$0.00
56
Rmv /Rplace 15' - 18', includes modified
bedding, 8'- 15' deep. 50 LF. min.
LF
0
0
0
0
$ 100.00
$0.00
57
Rmv /Rplaoe 15' - 18', irtdutles modified
bedding, over 15 deep. 50 LF. min.
0
0
0
0
S 125.00
$0.00
58
Auger 3 Encase 8' -10', all depths
LF
0
0
0
0
S 100.00
$0.00
59
Auger 8 Encase 12"-15". all depths
LF
0
D
0
0
S 150.00
$0.00
60
Rmv /replace up toy' concrete
sidewalk/driveway (Includes sawautting 3
reinforcement)
SY
0
0
1 0
0
S 46.001
$0.00
611
Rmv /replace up toy' concrete
sidewalk/driveway (includes sawcutting d
reinforcement)
SY
0
0
0
0
5 60.00
$0.00
62
Rmv /repl up to 2- HMAC, Type 0, (ind. Saw
cottadc coat, base repair)
SY
0
0
1 0
0
$ 30.00
50.00
63
1' rock with no fines for bedding (incidental to
point repairs)
TON
0
0
01
0
S 20.00
50.00
64
Annular and void space grouting
CY
1 0
0
0
01
S 100.00
50.00
65
Flagman for direction of traffic
MHR
0
0
0
0
$ 20.00
$0.00
66
Hydromulch Seeding
SY
0
50
0
5o
S 3.00
5150.00
67
Bypass Pumping, 6' or greater
Day
0
0
0
0
S 1.00
$0.00
68
Root & tuberculation removal, 6' - 12
LF
0
0
0
0
$ 10.00
50.00
j4MMIRciot
70
8 tuberculation removal, tY - 24'
LF
0
0
0
0
$ 20.00
$0.00
Steel Casing, up to 1Y. above ground.
coated and wrapped, including supports
LF
0
0
0
0
S 100.00
SO.00
711
Drop manhole assembly, up to 8' deep
EA
0
0
0
0
S 2.500.00
$0.00
721
Drop manhole assembly. over 8' deep
VF
0
0
01
0
$ 500.00
$0.00
73
Emergency mobilization
EA
1
1
01
115
1.000.00
51,000.00
pe2wo3ftnal
CITY OF BAYTOWN
Project ANNUAL SANITARY SEWER REHABILITATION CONTRACT •Year 2000
P.M. Conebucllon and Rahablllt0on, L.P.
110a Eeat EraN
Houston. Two TT012
Pay Estimate N0. 2 (final)
Pay E Umste Cutoff Eats November 16, 2000 (Imolra Dab)
Work Ordar 03 Emerganry, Total Time Al .& 5 WorMng Days
TMI TIM Used: ] WorMng Days
V -4 ;%
Current Work Omer P2 Amount ]9.06115
lass 0% Retainage 5
Less Prevlous Payment S (0.103.50)
Current Amount Due - s 957.15
Ir
Asst Director of Engineering Dab
cc2 035wl
Est WO] P.E1 P.E2 FIne1 Unll Tobl Nis
Wm
Descrip0on
UnU Oumt OuanUUea Ouantltlea DWODDea PNa Ealimab
Tool
]9,06115
Leas 0%Reblre e
S
Leas TObI Pravlaus Payments on WO ]
5 (8,103.50)
P m Due This EsUmata
8 95].T5
V -4 ;%
Current Work Omer P2 Amount ]9.06115
lass 0% Retainage 5
Less Prevlous Payment S (0.103.50)
Current Amount Due - s 957.15
Ir
Asst Director of Engineering Dab
cc2 035wl
CITY OF BAY OWN
ANNUAL SANITARY SEWER REHABILITATION CONTRACT -Y00f 3000
Chenge Order %1 on Work Order p4
11122@000
This wwk ceder Inc]Wed GIOe bursting, service
mynnedims, well IwlnOng• mannde wall mha0illlagon end mism0aneous hems
__ ___ cnin V1. & G,untry Club Odve.
p(H[BIT D
page,
7
Co1WO4
CITY OF BAYTOWN
ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000
Change Order 01 on Work Order 04
1112212000
This work order included pipe bursting , service reconnections, well painting, manhole wall rehabilitation and miscellaneous items
related to work on Country Club View & Country Club Drive.
30
Trench Safety, 8' to 15' deep
LF
0
0
0
S 1.00
$ -
31
Trench Safety. 8' to 15' deep
LF
0
0
0
S 1.00
$ -
32
Clean 6" to 12" Sewer
LF
0
0
0
$ 3.OD
$
33
Clean 15" to 21" Sewer
LF
0
0
0
$ 5.OD
$ -
34
Clean 24' to 36" Sewer
LF
0
0
0
$ 10.00
$
36
TV Inspection of Sewer
LF
0
0
0
$ 1.00
$ -
361
Bypass Pum . 3' pump
Day
0
0
0
$ 1.00
$
37
Bypass Pumping, 4" pump
Day
0
0
0
$ 1.00
$ -
38
Bypass Pumping, 6" pump
Day
0
0
0
$
$ -
39
Bypass Pumping , 8' pump
Day
0
0
0
$ -
$ -
40
PL Repair, G'- 12', 0'- 8' deep,
up to 12 If
EA
0
0
0
$ 1,250.00
$ -
41
PL Repair, 6" -12 ", 8'- IS
deep. up to 12 If
EA
0
0
0
$ 1,750.00
$ -
42
PL Repair, 6' -12 ", over 15'
deep, up to 12 9
EA
0
0
0
$ 2,500.00
$ -
43
Pt. Repair, 15' -18', 0'- 8'
deep, up to 12 If
EA
0
0
0
$ 2,250.00
S
44
Pt. Repair, 15- -18 -, 8' -15'
deep, up to 12 If
EA
0
0
0
$ 2,900.00
$
45
Pt. Repair, 15" -18 ", over 15'
deep. up to 12 If
EA
0
0
0
S 3,500.00
$ -
46
PL Repair, 21" - 36%0' - 8'
deep, up to 12 If
EA
0
0
0
$ 4,000.00
$ -
47
Pt. Repair, 21'- 36', 8'- 15*
deep, up to 12 If
EA
0
0
0
$ 6,000.00
$ -
48
PL Repair, 21' - 36', over 15'
deep, up to 12 If
EA
0
0
0
$ 8,000.00
$ -
49
Extra length pt. Repair, all sizes,
0'- 8' deep
LF
0
0
0
$ 80.00
$ -
50
Extra length pt. Repair, all sizes,
V -1S deep
LF
0
0
0
$ 120.00
S
51
Extra length pt. Repair, all sizes,
overly' deep
LF
0
0
0
S 160.00
$
52
Rmv/Rplaca 6' -12% includes
modified bedding, 0'- 8' deep.
50 LF. min.
LF
0
0
0
$ 65.00
S -
53
Rmv/Rplace 6" - 12 ", includes
modified bedding, 8'- 16 deep,
50 LF. min.
LF
0
0
0
$ 75.00
$
54
Rmv/Rplace 6'- 12*, Includes
modified bedding, over 15'
deep, 50 L.F. min.
LF
0
0
0
$ 11000.00
$ -
55
Rmv/Rplace 15' -18", Includes
modified bedding, 0' - 8' deep,
50 LF. min.
LF
0
0
0
$ 75.00
$
58
Rmv/Rplace IS"- 18'. Includes
modified bedding, 8'- 16 deep,
50 LF. min.
LF
0
0
0
$ 100.00
S -
57
Rmv/Rplace 15'- 18". includes
modified bedding, over 15'
dee , 50 L.F. min.
0
0
0
$ 125.00
$
58
Auger & Encase 8"-10". all
de the
LF
0
0
0
S 100.00
$
59
Auger & Encase 12' -15 -, all
depths
LF
1 0
01
01$
150.00
$
60
Rmv/replace up toy' concrete
sklewaik/ddveway (includes
sawouttin & reinforcement )
Sy
0
0
01$
45.001$
pals
ka
Cotwo4
CITY OF BAYTOWN
ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000
Change Order #1 on Work Order 04
11122/2000
This work order included pipe bursting , service reconnections, well pointing, manhole wall rehabilitation and miscellaneous Items
related to work on Country Club Mew & Country Club Drive.
61
RMvIreplace up to5" ale
sidewalWdriveway pncludes
sawcuttling & reinforcement
SY
0
0
0
$ 60.00
$ -
62
Rmv /repl up to 2" HMAC, Type
D. Vncl. Saw cut.tack coat, base
re it
SY
0
0
0
$ 30.00
$ -
63
1" rock with no fines for bedding
oncl�andvold nt repairs)
TON
0
0
0
$ 20.00
$ -
64
Anns ce routi
CY
0
0
0
$ 1000065
Fla ction of trefflc
MHR -
-0
0—
- 0-$--
20.00
_r -
66
H dromulch Seeding
SY
120
200
80
$ 3.00
$ 240.00
67
13yppss Pumping, 6" or greater
pay
0
0
0
$ 1.00
$
68
Root & tuberculatton removal, 6"
-12"
LF
0
0
0
$ 10.00
$
69
Root & tuberculation removal,
12" - 24"
LF
0
0
0
$ 20.00
$ -
70
Steel Casing, up to 12 ". above
ground, coated and wrapped.
Including supports
Drop manhole assembly, up to
81 deep
Drop manhole assembly, over 8'
deep
EmegnM mobilization
LF
0
0
0
S 100.00
$
71
EA
0
0
0
$ 2,500.00
$ -
72
VF
0
0
0
$ 500.00
$
73 1
EA
0
0
0
$ 11000.00
$ -
Total Gnange uroer in
! 8�2c') °l
P.M Construction Date
Firkince Date
Work Order Summary.
Final Constnxdcn Cost $ 721853.45
Initial Work Omer $ 71.440.00
Change Order #1 $ 11413.45
Director of Engineering Date
CAy manager Date
i If11J.Ya
page3
CITY OF BAYTOWN
`roject: ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000
P. onstruction and Rehabilitation, L.P.
7 ., last Erath
Houston, Texas 77012
Pay Estimate No. 2 (final)
Pay Estimate Cut-off date November 16, 2000 (Invoice Date)
Work Order #4, Total Time Allowed: 10 Working Days
Total Time Used: 10 Working Days
Item
Description
Unit
Est. W04
Quaint.
P.E.1
Quantities
P.E.2
Quantities
Final
Quantities
Unit
Price
Total this
Estimate
1
Pipe bursting 6" & 8" with 8" HDPE min. SDR
17, 0'-8' deep
LF
1290
860 1
398
1258
S 38.00
S47,804.00
2
Pipe bursting 6" & 8" with 8" HOPE min. SDR
17, 8' -15' deep
LF
0
0
0
0
$ 40.00
$0.00
3
Pipe bursting 6' & 8' with 8" HDPE min. SDR
17, over 15' deep
LF
0
0
0
0
$ 45.00
$0.00
4
Pipe bursting 8" & 10" with 10" HDPE min.
SDR 17, 0'-8' deep
LF
0
0
0
0
$ 42.00
$0.00
5
Pipe bursting 8" & 10' with 10" HDPE min.
SDR 17, 8' -15' deep
LF
0
0
0
0
$ 45.00
$0.00
6
Pipe bursting 8" & 10" with 10" HDPE min.
SDR 17, over 158' deep
LF
0
0
0
01$
50.00
$0.00
7
Pipe bursting 10" & 12" with 12" HOPE min.
SDR 17, 0'-8' deep
LF
0
0
0
0
$ 55.00
$0.00
8
Pipe bursting 10" & 12" with 12" HOPE min.
SDR 17, 8' -15' deep
LF
0
0
0
0
$ 60.00
$0.00
d
Pipe bursting 10" & 12' with 12' HOPE min.
SDR 17, over 15' deep
LF
0
0
0
0
$ 75.00
$0.00
10
Pipe bursting 12"& 15" with 15" HDPE min.
SOR 17, min, PVC SDR 26, 0'-8' deep
LF
0
1 0
0
0
$ 75.00
$0.00
11
Pipe bursting 12" & 15' with 15" HOPE min.
SDR 17, min, PVC SDR 26, 8' -15' deep
LF
0
0
0
0
$ 85.00
$0.00
12
Pipe bursting 12" & 15" with 15" HDPE min.
SDR 17, min, PVC SDR 26, over 15' deep
LF
0
0
0
0
S 100.00
$0.00
13
Remove existing slipliner, all sizes and
depths
LF
570
1146
112
1258
$ 5.00
$6,290.00
14
Reconnect service -short side, 0'-8' deep
EA
31
31
0
31
$ 500.00
$15,500.00
15
Reconnect service - short side, over 8' deep
EA
0
0
0
0
$ 700.00
$0.00
16
Reconnect service - long side, 0'-8' deep
EA
0
0
0
0
$ 1,200.00
$0.00
17
Reconnect service - long side, over 8' deep
EA
0
0
0
0
$ 1,500.00
$0.00
18
Manhole Wall Sealing
VF
14
9
0.17
9.17
$ 85.00
$779.45
19
RepVinstall new manhole, 0'-8' deep
EA
1
0
1
1
$ 1,500.00
$1,500.00
20
New Manhole, over 8' deep
VF
0
0
0
0
$ 200.00
$0.00
21
Reptacelinstall ring and cover
EA
0
1
0
1
$ 300.00
$300.00
22
Extra cement stabilized sand backfill, 2
skJton
TON
0
0
0
0
$ 20.00
$0.00
23
Point Rpr /obst rmv - pipe bursting, 0'- 8' deep
EA
3
0
0
0
$ 300.00
$0.00
24
Point Rpr/obst rmv - pipe bursting, 8' -15'
deep
EA
0
0
0
0
$ 400.00
S0.00
25
Point Rpr /obst rmv - pipe bursting, over 15'
deep
EA
0
0
0
0
$ 500.00
$0.00
26
Extra Length point repair, all depths
LF
0
0
0
01
60.00
1 $0.00
27
Well Point set up, up to 12 If
EA
0
0
0
0
$ 2,800.00
$0.00
8
Well Point, Extra length over 12 If
LF
0
0
0
0
$ 20.00
$0.00
Trench Safety, V to V deep
LF
120
62.19
17.81
80
$ 1.00
$80.00
30
Trench Safety, 8' to 15' deep
LF
0
0
0
0
$ 1.00
$0.00
31
ITrench Safety, V to 15' deep
LF
0
0
01
0
$ 1.00
50.00
32
Clean 6" to 12" Sewer
LF
0
0
0
0
S 3.00
$0.00
33
1 Clean 15' to 21" Sewer
LF
1 0
1 0
01
01
S 5.00
1 S0.00
pe2wo4final
CITY OF BAYTOWN
J oject: ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000
P onstruction and Rehabilitation, L.P.
:ast Erath
Houston, Texas 77012
Pay Estimate No. 2 (final)
Pay Estimate Cut-off date November 16, 2000 (Invoice Date)
Work Order #4, Total Time Allowed: 10 Working Days
Total Time Used: 10 Working Days
Item
Description
Unit
Est. W04
Quant.
P.E.1
Quantities
P.E.2
Quantities
Final
Quantities
Unit
Price
Total this
Estimate
34
Clean 24" to 36" Sewer
LF
0
0
0
0
$ 10.00
$0.00
35
TV Inspection of Sewer
LF
0
0
0
0
$ 1.00
50.00
36
Bypass Pumping, 3' pump
Day
0
0
0
0
$ 1.00
$0.00
37
Bypass Pumping, 4" pump
Day
0
0
0
0
$ 1.00
$0.00
38
Bypass Pumping, 6" pump
Day
0
0
0
0
$ -
$0.00
39
Bypass Pumping, 8" pump
Day
0
0
0
0
S -
S0.00
40
Pt. Repair, 6" -12 ", 0'- 8' deep, up to 12 If
EA
0
0
0
0
S 1,250.00
$0.00
41
Pt. Repair, 6" - 12% 8' - 15' deep, up to 12 If
EA
0
0
0
0
S 1,750.00
$0.00
42
Pt. Repair, 6" -12 ", over 15' deep, up to 12 If
EA
0
0
0
0
$ 2,500.00
$0.00
43
Pt. Repair, 15" -18 ", 0'- & deep, up to 12 If
EA
0
0
0
0
S 2,250.00
$0.00
44
PL Repair, 15" -18 ", 8'-1 5 -deep, up to -12 -If
EA
0
0
0
0
S 2.900.00
$0.00
45
Pt. Repair, 15" -18% over 15' deep, up to 12
If
EA
0
0
0
0
$ 3,500.00
$0.00
46
Pt. Repair, 21" - 36", 0'- 8' deep, up to 12 If
EA
0
0
0
0
S 4,000.00
$0.00
47
Pt. Repair, 21" - 36 ", 8'- 16 deep, up to 12 If
EA
0
0
0
0
$ 6,000.00
$0.00
48
Pt. Repair, 21" - 36 ", over 15' deep, up to 12
If
EA
0
0
0
0
S 8,000.00
$0.00
49
Extra length pt. Repair, all sizes, 0' - 8' deep
LF
0
0
0
0
$ 80.00
$0.00
50
Extra length pt. Repair, all sizes, 8' -15' deep
LF
0
0
0
0
$ 120.00
50.00
51
Extra length pt. Repair, all sizes, overl5'
deep
LF
0
0
0
0
$ 160.00
$0.00
52
Rmv/Rplace 6"- 12", includes modified
bedding, 0'- 8' deep, 50 L.F. min.
LF
0
0
0
0
$ 65.00
$0.00
53
IRmv/Rplace 6" -1Y, includes modified
bedding, 8' -15' deep, 50 LF. min.
LF
0
0
0
0
$ 75.00
$0.00
54
Rmv/Rplace 6" -12 ", includes modified
bedding, over 15' deep, 50 L.F. min.
LF
0
0
0
0
$ 1,000.00
$0.00
55
Rmv/Rplace 15"- 18", includes modified
bedding, 0'- 8' deep, 50 L.F. min.
LF
0
0
0
0
$ 75.00
$0.00
56
Rmv/Rplace 15"- 18'. includes modified
bedding, 8'- IV deep, 50 L.F. min.
LF
0
0
0
0
S 100.00
$0.00
57
Rmv/Rplaoe 15" -18", includes modified
bedding, over 15' deep, 50 L.F. min.
0
0
0
0
S 125.00
$0.00
58
Auger & Encase 8" -10% all depths
LF
0
0
0
0
$ 100.00
$0.00
59
Auger & Encase 12" -15 ", all depths
LF
0
0
0
0
$ 150.00
$0.00
60
Rmv /replace up toy" concrete
sidewalk/driveway (includes sawcutting &
reinforcement)
SY
0
0
0
0
$ 45.00
$0.00
61
Rmv /replace up toy' concrete
sidewalk/driveway (includes sawcutting &
reinforcement)
SY
0
0
0
0
$ 60.00
$0.00
62
Rmv /repl up to 2" HMAC, Type D. (Incl. Saw
cut,tack coat, base repair)
SY
0
0
0
0
$ 30.00
$0.00
1" rock with no fines for bedding (incidental to
point repairs)
TON
0
0
0
0
$ 20.00
$0.00
1
Annular and void space grouting
CY
0
0
0
0
$ 100.00
$0.00
65
Flagman for direction of traffic
MHR
0
0
0
0
$ 20.00
$0.00
66
Hydromulch Seeding
SY
120
180
20
200
$ 3.00
$600.00
67
Bypass Pumping, 6" or greater
Day
0
0
0
0,$
1.00
$0.00
68
Root & tuberculation removal, 6" -12"
LF
0
0
0
0
$ 10.00
$0.00
pe2wo4final
CITY OF BAYTOWN
Project: ANNUAL SANITARY SEWER REHABILITATION CONTRACT • Year 2000
P.M. Construction and Rehabilitation, LP.
7704 East Erath
Houston, Texas 77012
Pay Estimate No. 2 (final)
Pay Estimate Cutoff data November 16, 2000 (Invoice Date)
Work Order 6Q Total Time Allowed: 10 Working Days
Total Time Used: 10 Working Days
Item
Description
Unit
Est. W04
Quart.
P.E.1
Quantities
P.E.2
Quantities
Final
Quantities
Unit
Price
Total this
Estimate
69RMt&h.berculation
removal, 12' -24'
LF
0
0
0
0
S 20.00
E0.00
70
Steel Casing, up to 12', above ground,
coated and wrapped, including supports
LF
0
0
0
0
E 100.00
50.00
71
Drop manhole assembly, up to F deep
EA
0
0
0
0
S 2,500.00
50.00
- 72
Drop manhole assembly, over Vdaep
VF
0
0
0
0S
500.00
$0.00
23
Emergency mobilization
EA
0
0
0
0
S 1,000.00
50.00
Total
872,853.45
Leas 0% Retainage
5
Less Total Previous Payments on WO 4
S (55,577.19)
Payment Due This Estimate
5 17,278.26
P.M. uction �Oate.
C atd I� Con ract S
Current Work Order g4 Amount $72,853.45
Lass 0 %Retainage S
Less Previous Payments $ (55,577.19)
Current Amount Due 5 17,276.26
pe2wo40nal
CITY OF BAYTOWN
BID TABULATION
TITLE: Rehabilitation
Bid Packet #00 -11 Item #00 -02
DATE 1103101
TIME: 10:OOam
Colts Develo ment Investment Grou
12109 Poulson P.O. Box 3618
Houston, TX 77031 Ba own, TX 77522
Descri tion Price Price Price Price Price
Bid Packet #00 -11
311 Avenue J No Bid $24,938
CITY OF BAYTOWN
BID TABULATION
TITLE: Rehabilitation
Bid Packet #00 -11 Item #00 -10
DATE 1103101
TIME: 10:OOarn
Colts Develo ment
12109 Poulson
Houston, TX 77031
Descri tion Price Price Price Price Price
Bid Packet #00 -11
308 Morrell $25,000.00
� c t
CITY OF BAYTOWN
TABULATION
TITLE: ANNUAL GASOLINE AND DIESEL FUEL CONTRACT
BID #: 024 -01
DATE: DECEMBER 19, 2000 @ 2:00 P.M.
Contract term: February 1, 2001, through January 31, 2002 (with 3 one -year renewal options)
NO.
QTY.
UNIT
DESCRIPTION
KING FUELS, INC.
New Contract:
% Decrease:
Regular
ANNUAL GASOLINE AND DIESEL FUEL CONTRACT,
$1.0305
.39%
Premium
$1.1077
per specifications. This is an Interlocal Contract including
1.45%
Diesel
$1.1688
$1.1682
Goose Creek Consolidated School District, Lee College,
Barbers Hill ISD, City of Seabrook and City of Baytown.
Quantities for all entities have increased. Baytown's portion
1
1
LOT
of this contract is$531.041.58.
$980,304.70
Location:
Houston, Texas
Delivery: 1
24 hours ARO
The following percentages increase for pricing
per gallon is based on December 1999 and
December 2000.
Fuel. % Increase
Regular 13%
Premium 10%
Diesel 26%
Mailed 15 bids. Received 6 bids and 3 no -bids from the Hurt company, O'Rourke, and Dunagan Fuels.
Reasons for other companies not bidding are because the market is too volatile to hold pricing for any length of time.
They are having supplier problems. Strict allocations of fuel by some suppliers does not allow daily reassurance of fuel
supply for various companies. Plants are running at 99% capacity and majority of shipping is up North, making supply
shortages locally.
Bids submitted (no taxes or fees included) as follows:
King Fuels, Inc. - S980,304.70
Apache Oil Company - $1, 013,245.30
Mansfield Oil Company - $999,398.10
Oil Patch - Brazos Valley - S985,669. 00
Petroleum Traders - $990,873.10
IMINSun Coast Resources - S985,018.30
slh /024 -01 GAS DIESEL council TABULATION 1- 11 -01.xls
12 -21 -00 Page 1 of 1
1/3/2001 11:49 AM
Current Unit Cost ComAarison
Fuel.•
Current Contract:
New Contract:
% Decrease:
Regular
$1.0345
$1.0305
.39%
Premium
$1.1077
$1.0916
1.45%
Diesel
$1.1688
$1.1682
.05%
Mailed 15 bids. Received 6 bids and 3 no -bids from the Hurt company, O'Rourke, and Dunagan Fuels.
Reasons for other companies not bidding are because the market is too volatile to hold pricing for any length of time.
They are having supplier problems. Strict allocations of fuel by some suppliers does not allow daily reassurance of fuel
supply for various companies. Plants are running at 99% capacity and majority of shipping is up North, making supply
shortages locally.
Bids submitted (no taxes or fees included) as follows:
King Fuels, Inc. - S980,304.70
Apache Oil Company - $1, 013,245.30
Mansfield Oil Company - $999,398.10
Oil Patch - Brazos Valley - S985,669. 00
Petroleum Traders - $990,873.10
IMINSun Coast Resources - S985,018.30
slh /024 -01 GAS DIESEL council TABULATION 1- 11 -01.xls
12 -21 -00 Page 1 of 1
1/3/2001 11:49 AM
�ND YEAR RENEWAL
I
CITY OF BAYTOWN
TABULATION
TITLE: ANNUAL CALCIUM HYPOCHLORITE CONTRACT
BID #: 020 -01
DATE: DECEMBER 10, 1998
Contract Term: February 1, 2001, through January 31, 2002
2ND YEAR RENEWAL
NO.
QTY.
UNIT
DESCRIPTION
HARCROS CHEMICALS, INC.
UNIT PRICE
EXT. PRICE
1
190
each
Calcium Hypochlorite
94.90 18,031.00
per 100 lb. container delivered
SUPPLY POINT:
HOUSTON,TX
DELIVERY:
3 DAYS ARO
Quantities remain the same this year as last year.
Harocros Chemicals, Inc., submitted a written request to renew the current contract for the same terms,
conditions, and same unit pricing.
sIh1020 -01 CALCIUM HYPOCHLORITE TABULATION 2nd yr renewal.xls Page 1 of 1 1/3/2001 11:49 AM
CITY OF BAYTOWN
TABULATION
TITLE: ANNUAL FORTY -YARD ROLL -OFF CONTAINERS SERVICES CONTRACT
BID #: 028 -01 2ND YEAR RENEWAL
DATE: FEBRUARY 9, 1999 @ 2:00 P.M.
Contract Term: FEBRUARY 1, 2001, through JANUARY 31, 2002 (2nd year renewal)
NO.
QTY.
UNIT
DESCRIPTION
WASTE MANAGEMENT
ANNUAL FORTY -YARD ROLL -OFF CONTAINERS
SERVICES CONTRACT, per specifications. Waste
Management submitted a written request to renew their current
contract for the same pricing, terms and conditions.
Quantities remain Me same. This contract is used to deliver
and furnish containers to haul and dispose of the contents of
forty-yard roll -off containers. These containers shall be used
1
lot
by the public for collection of junk, heavy trash, and building
materials.
$ 99,820.00
Location:
Pasadena, Texas
a
sth/028 -01 FORTY -YARD ROLL -OFF CONTAINERS TABLILAIIQH lWfyt ren.xls 1/3/2001 11:50 AM
CITY OF BAYTOWN
TABULATION
TITLE: ANNUAL PAVEMENT MARKINGS REPLACEMENT CONTRACT
BID #: 062 -01 1ST YEAR RENEWAL
DATE: JANUARY 4, 2000 @ 2:00 P.M.
Contract Term: February 1, 2001, through January 31, 2002 (1st year renewal)
NO.
QTY.
UNIT
DESCRIPTION
UNITED RENTALS HIGHWAY
TECHNOLOGIES
ANNUAL PAVEMENT MARKINGS REPLACEMENT
CONTRACT, per specifications. Pavement markings vary
from year to year dependent upon street requirements for the
I
I
lot
year.
549550.00
Location:
Houston, Texas
United Rentals Highway Technologies has submitted a written request to renew the current contract for the same pricine,
terms and conditions.
Quantities remain the same.
slh1062 -01 PAVEMENT MARKINGS 1st yr renewal.As Page 1 of 1 1/3/2001 1:48 PM
CITY OF BAYTOWN
TABULATION
TITLE: ANNUAL CONCRETE PIPE CONTRACT
BID #: 022 -01 "ALL OR NONE"
DATE: DECEMBER 2,1999 2:00 P.M. 1st Year Renewal
Contract Term: February 1, 2001, through January 31, 2002 (1st year renewal)
NO.
QTY.
UNIT
DESCRIPTION
Last Year
IlstYearRenewal
UNIT PRICE
EXT. PRICE
Unit pricing is
inclusive of 3.4%
Consumer Price
ANNUAL CONCRETE PIPE CONTRACT - includes 12" through 48" concrete
Index increase.
pipe in four foot lengths delivered and stock -piled at 3030 Ferry Road.
1
250
feet
12"
6.72 1,680.00
2
1000
feet
15"
8.27 8,270.00
3
1000
feet
18"
9.30 9,300.00
4
300
feet
24"
13.95 4,185.00
5
100
feet
30"
19.64 1,964.00
6
100
feet
36"
27.91 2,791.00
7
100
feet
42"
39.80 3,980.00
8
100
feet
48"
48.08 4,808.00
Grand Total.
36,978.00
Location:
Beaumont, Texas
Delivery:
24172 hours ARO
Quantities remain the same this year compared to last year's contract.
National Concrete Pipe Contract has submitted a written request to renew the current contract for a 3.4% allowable CPIU
increase.
The Consumer Price Index for all Urban Areas (CPIU) is an economic indicator most widely used to measure inflation for
prices of goods and services purchased for consumption by urban households. The CPIU is an average based on the
previous 12 months
I, ment prices fluctuate due to supply and demand.
Cement material sets the pricing for this product.
Last year's awarded total: $35,775.00.
s1h1022 -01 CONCRETE PIPE TABULATION council.As Page 1 of 1 1/3/2001 11:50 AM
CITY OF BAYTOWN
TABULATION
ANNUAL AMMUNITION CONTRACT FIRST YEAR RENEWAL
BID 018 -00
DATE: DECEMBERS, 1999 2:00 P.M.
Contract term: February 1, 2000, through January 31, 2001 (1st Year Renewal)
NO.
QTY.
UNIT
DESCRIPTION
BAtIEYS HOUSE OF
GUNS
OT DISTRIBUTORS,
INC .
OULF STATES
DISTRIBUTORS
BUCK HILLS
AMMUNITION
AWARDBDTOTAL•
ANNUAL AMMUNITION
CONTRACT to be utilized by
SWAT, Organized Crime,
Police Academy and Police
Department. All four suppliers
submitted written requests to
renew the current contract for
the same pricing, terns an
Items # I & 2 for
Items #3,7, & I I
Items 85, 6, 8, 9 &
Items 04 & 10 for
conditions. Quantities remain
total award of
for total award of
12 total award of
total award of
TOTAL AWARD OF
I
I
LOT
the same.
52.368.50
53.454.60
S7,542.00
545.318.50
S58,683.60
Montgomery,
Rapid City,
LOCATION:
Houston, Texas
Austin, Texas
Alabama
South Dakota
SMIS-01 AMMUNITION TABULATION c=scil 12- 14.00-)ds Pago T of 1 1/-11001 12:48 PM
CITY OF BAYTOWN
TABULATION
TITLE: ANNUAL BRASS FITTINGS CONTRACT
BID #: 019 -01
DATE: DECEMBER 12, 2000 2:00 P.M.
Contract Term: February 1, 2001, through January 31, 2002 (with 3 one -year renewals)
Mailed 5 bids and received 2 bids and one no -bid from US Filters. Municipal Pipe was unable to put together a bid in time for the
bid opening. The remaining company has not responded to phone inquiries.
Page 1 of 1
GOLDEN
TRIANGLE PIPE
HUGHES SUPPLY
NO.
QTY.
UNIT
DESCRIPTION
EXT. PRICE
EXT. PRICE
ANNUAL BRASS FITTINGS CONTRACT, per
specifications. Last year's contract award was for
$33,100.70. There has been no significant increase in total
contract award. Quantities have been adjusted to reflect
anticipated usage. This contract is used for water
rehabilitation, water distribution, water taps and utility
I
1
lot
construction projects.
339253.05
36,343.60
LOCATION:
Beaumont, Texas
Houston, Texas
Mailed 5 bids and received 2 bids and one no -bid from US Filters. Municipal Pipe was unable to put together a bid in time for the
bid opening. The remaining company has not responded to phone inquiries.
Page 1 of 1