Loading...
MDD Resolution No. 21-LoneStarStriping Rollingbrook SidewalkConstructionProj. RESOLUTION NO.21 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE BAYTOWN MUNICIPAL DEVELOPMENT DISTRICT AUTHORIZING CHANGE ORDER NO.1 WITH LONE STAR STRIPING AND PAVING,L.L.C.,TO ADJUST THE FINAL UNIT BID QUANTITIES FOR THE ROLLINGBROOK SIDEWALK CONSTRUCTION PROJECT;AUTHORIZING FINAL PAYMENT OF THE SUM OF SIX THOUSAND SEVENTEEN AND 28/100 DOLLARS($6,017.28)TO LONE STAR STRIPING AND PAVING,L.L.C.,FOR SAID PROJECT;AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. ****************************************************************************** WHEREAS,the Board of Directors of the Baytown Municipal Development District(the "District")contracted with Lone Star Striping and Paving,L.L.C.,for the Rollingbrook Sidewalk Construction project(the"Project');and WHEREAS,a deduct change order in the amount of EIGHTEEN THOUSAND SEVEN AND 20/100 DOLLARS($18,007.20)to adjust the final unit bid quantities is necessary to reflect the actual quantities used in the Project;and WHEREAS,all of the said improvements,as provided in the plans and specifications heretofore prepared by the District's Engineer and as approved and adopted by the District's Board of Directors have been performed and completed in full accordance with all of the terms and conditions of the aforesaid contract;and WHEREAS,the District's Engineer in the manner provided by the terms of the said contract and the plans and specifications thereof,has approved and accepted the Rollingbrook Sidewalk Construction project and has heretofore issued his Certificate of Final Acceptance and has certified same to the District's Board of Directors and recommended that it accept and receive said work and improvements as constructed and completed by Contractor;and WHEREAS,there remains due and owing to Lone Star Striping and Paving,L.L.C.,the sum of SIX THOUSAND SEVENTEEN AND 28/100 DOLLARS($6,017.28);NOW THEREFORE BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE BAYTOWN MUNICIPAL DEVELOPMENT DISTRICT: Section 1:That the Board of Directors of the Baytown Municipal Development District does hereby authorize deduct Change Order No.1 with Lone Star Striping and Paving,L.L.C.,to adjust the final unit bid quantities for the Rollingbrook Sidewalk Construction project.A copy of said deduct change order is attached hereto,marked Exhibit"A,"and made a part hereof for all intents and purposes. Section 2:That the Board of Directors of the District hereby accepts and approves the above-described work and improvements,and finds and determines that all of said improvements r •have been completed as provided in the plans and specifications thereof,and in full accordance with all of the terms and provisions of the aforesaid contract. Section 3:That the Certificate of Final Acceptance heretofore issued by the District's Engineer and certified to the Board of Directors of the District is hereby accepted and received. Section 4:That final payment to D&W Contractors,Inc.,in the amount of SIX THOUSAND SEVENTEEN AND 28/100 DOLLARS($6,017.28)is hereby authorized. Section 5:This resolution shall take effect immediately from and after its passage by the Board of Directors of the Baytown Municipal Development District. INTRODUCED,READ and PASSED by the affirmative vote of the Board of Directors of the Baytown Municipal Development District this the 9`h day of May,2002. �,�(2.� PETE C.ALFAR,President ATTEST: Y-W SMITH,Assistant Secretary APPROVED AS TO FORM: I NACIO RAMIREZ,General Counsel F:\Karen\Files\City Council\Municipal Development District\Resolutions\ChOrderI Final Pay4RoIIingbrookSidewalk.doc •2 CITY OF BAYTOWN Rollingbrook Sidewalk Project •CHANGE ORDER#1 April 23,2002 This change order is requested to balance the difference of the originally estimated quantities and actual quantities used to complete the project.The project consisted of installation of a four-foot wide concrete sidewalk with handicap access ramps on the north side of Rollingbrook Drive between Garth Road and North Main Street.Additional contract days are required due to rain and excessively wet conditions.The contractor requested an additional 12 days but only 7 days were needed in order to complete the project. Orig.Final Cost Item Description Unit Quant.Quaint.Diff.Price Difference 1 4"concrete sidewalk SY 1775 1664-111$25.20$(2,797.20) 2 4"sidewalk ramps EA 16 17 1$455.00$455.00 3 6"wheelchair ramps EA 5 5 0$1,500.00$- 4 Draina a cut-out construction EA 3 1-2$1,475.00$(2,950.00) 5 Relocate existing fire hydrant EA 2 0-2$1,655.00$(3,310.00) Remove exist manhole&replace 6 w/pre-cast conc.manhole EA 3 0-3$3,175.00$(9,525.00) Adjust manhole tops,inlets,water 7 meters&G.V.to final elevation EA 8 9 1 1$120.00$120.00 8 Remove/replace traffic signs EA 3 3 0$150.00$- Total Change Order#1$(18,007.20) Change Order Summary: Final Construction Cost$60.172.80 Original contract time 90 calendar days Initial Estimate$78,180.00 Change order No.1-add 7 calendar days Change Order#1$(18,007.20)Amended contract time 97 calendar days Lone Star Striping and Paving,L.L.C.Date Director of Engineering Date Finance Date City Manager Date �$R'A