Loading...
MDD Resolution No. 17 t RESOLUTION NO.17 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE BAYTOWN MUNICIPAL DEVELOPMENT DISTRICT AUTHORIZING THE GENERAL /-,,1..4-`1------/ MANAGER TO EXECUTE AND THE ASSISTANT SECRETARY TO ATTEST TO AN AGREEMENT BETWEEN THE TEXAS DEPARTMENT OF TRANSPORTATION AND THE BAYTOWN MUNICIPAL DEVELOPMENT DISTRICT FOR FUNDING FOR CONSTRUCTION OF THE MAIN LANES OF SPUR 330(DECKER DRIVE):AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE BAYTOWN MUNICIPAL DEVELOPMENT DISTRICT: Section 1:That the Board of Directors of the Baytown Municipal Development District hereby authorizes the General Manager to execute and the Assistant Secretary to attest to an agreement between the Texas Department of Transportation and the Baytown Municipal Development District for funding for construction of the main lanes of Spur 330(Decker Drive). A copy of the Agreement is attached hereto as Exhibit"A,"and made a part hereof for all intents and purposes. Section 2:This resolution shall take effect immediately from and after its passage by the Board of Directors of the Baytown Municipal Development District. INTRODUCED,READ and PASSED by the affirmative vote of the Board of Directors of the Baytown Municipal Development District,this the 13`h day of December,2001. PETE C.ALFARO,resident ATTEST: W SMITH,Assistant Secretary APPROVED AS TO FORM: ACIO RAMIREZ,.,General Counsel E:jyMy Documents\Council\MDD\ApproveAgreementWithTxDOT4Spur330MainLanes.doc t CSJ 0508-07-21 Project Number NH 2O01(947) County Harris Location City of Baytown ADVANCE FUNDING AGREEMENT FOR VOLUNTARY TRANSPORTATION IMPROVEMENT PROJECTS(ON-SYSTEM) For SPUR 330 From 1H-10 to 2.0 miles north of SH 146 THE STATE OF TEXAS§ THE COUNTY OF HARRIS§ THIS AGREEMENT IS MADE BY AND BETWEEN the State of Texas,acting through the Texas Department of Transportation,hereinafter called the"State,"and the Baytown Municipal Development District,hereinafter called the"District." WITNESSETH WHEREAS,Transportation Code,Chapter 201 and Transportation Code,Chapter 221 authorize the State to lay out,construct,maintain,and operate a system of streets,roads,and highways that comprise the State Highway System;and WHEREAS,Commission Minute Order Number 1-08653,authorizes the State to undertake and complete a highway improvement generally described as the construction of six(6)main lanes of Spur 330 from IH-10 to 2.0 miles north of SH 146;and WHEREAS,the District has requested that the State allow the District to participate in said improvement by funding that portion of the improvement described as the construction of six(6) main lanes of Spur 330 from IH-10 to 2.0 miles north of SH 146,hereinafter called the"Project"; and WHEREAS,on July 26,2001,the District passed a resolution authorizing the expenditure of funds in the amount of Two Million Five Hundred Thousand and No/100 Dollars ($2,5000,000.00)for the construction of this Project;and WHEREAS,the State has determined that such participation is in the best interest of the citizens of the State; NOW,THEREFORE,in consideration of the premises and the mutual covenants and agreements of the parties hereto,to be by them respectively kept and performed as hereinafter set forth,the State and the District do agree as follows: EXHIBIT A CSJ 0508-07-21 Project Number NH 2O01(947) `County Harris Location City of Baytown AGREEMENT Article 1.Time Period Covered This agreement becomes effective when signed by the last party whose signing makes the agreement fully executed,and the State and the District will consider it to be in full force and effect until the Project described herein has been completed and accepted by all parties or unless terminated,as hereinafter provided. Article 2.Project Funding and Work Responsibilities The State will authorize the performance of only those Project items of work which the District has requested and has agreed to pay for as described in Attachment A,"Payment Provision and Work Responsibilities,"which is attached to and made a part of this contract. In addition to identifying those items of work paid for by payments to the State,Attachment A, "Payment Provision and Work Responsibilities,"also specifies those Project items of work that are the responsibility of the District and will be carried out and completed by the District,at no cost to the State. Article 3.Right of Access If the District is the owner of any part of the Project site,the District shall permit the State or its authorized representative access to the site to perform any activities required to execute the work.The District will provide for all necessary right-of-way and utility adjustments needed for performance of the work on sites now owned or to be acquired by the State. Article 4.Responsibilities of the Parties The District acknowledges that while it is not an agent,servant,nor employee of the State,it is responsible for its own acts and deeds and for those of its agents or employees during the performance of the work on the Project. Article 5.Document and Information Exchange The District agrees to electronically deliver to the State all general notes,specifications,contract provision requirements and related documentation in a Microsoft®Word or similar document. If requested by the State,the District will use the State's document template.The District shall also provide a detailed construction time estimate,including types of activities and month in the format required by the State.This requirement applies whether the local entity creates the documents with its own forces or by hiring a consultant or professional provider. Article 6.Interest The State will not pay interest on funds provided by the District.Funds provided by the District will be deposited into,and retained in,the State Treasury. Article 7.Inspection and Conduct of Work Unless otherwise specifically stated in Attachment A,"Payment Provision and Work Responsibilities,"to this contract,the State will supervise and inspect all work performed CSJ 0508-07-21 Project Number NH 2O01(947) County Harris Location City of Baytown hereunder and provide such engineering inspection and testing services as may be required to ensure that the Project is accomplished in accordance with the approved plans and specifications. Al]correspondence and instructions to the contractor performing the work will be the sole responsibility of the State.Unless otherwise specifically stated in Attachment A to this contract, all work will be performed in accordance with the Standard Specifications for Construction and Maintenance of Highways,Streets,and Bridges adopted by the State and incorporated herein by reference,or special specifications approved by the State. Article 8.No Increased Costs This is a fixed price agreement;therefore,the District shall not be obligated to pay more than the amount specified in Attachment A,"Payment Provision and Work Responsibilities,"unless otherwise expressly agreed to in writing by the District. Article 9.Maintenance Upon completion of the Project,the State will assume responsibility for the maintenance of the completed Project unless otherwise specified in Attachment A to this agreement. Article 10.Termination This agreement may be terminated in the following manner: •By mutual written agreement and consent of both parties; •By either party upon the failure of the other party to fulfill the obligations set forth herein; •By the State if it determines that the performance of the Project is not in the best interest of the State. If the contract is terminated in accordance with the above provisions,the District will be responsible for the payment of Project costs incurred by the State on behalf of the District up to the time of termination. A.Upon completion of the Project,the State will perform an audit of the Project costs.Any funds due to the District,the State,or the federal government will be promptly paid by the owing party. B.In the event the Project is not completed,the State may seek reimbursement from the District of the expended funds.The District will remit the required funds to the State within sixty(60)days from receipt of the State's notification. C.The State will not pay interest on any funds provided by the District. D.The State will not execute the contract for the construction of the Project until the required funding has been made available by the District in accordance with this agreement. 3 r CSJ 0508-07-21 Project Number NH 2O01(947) County Hams Location City of Baytown 11.Notices All notices to either party by the other required under this agreement shall be delivered personally or sent by certified or U.S.mail,postage prepaid or sent by electronic mail,electronic notice being permitted to the extent permitted by law at the following addresses: State:Texas Department of Transportation P.O.Box 1386 7721 Washington Avenue Houston,Texas 77251-1386 Attn:District Engineer District:Baytown Municipal Development District P.O.Box 424 Baytown,Texas 77522-0424 Attn:General Manager All notices shall be deemed given on the date so delivered or so deposited in the mail,unless otherwise provided herein.Either party may change the above address by sending written notice of the change to the other party.Either party may request in writing that such notices shall be delivered personally or by certified U.S.mail and such request shall be honored and carried out by the other party. Article 12.Sole Agreement In the event the terms of the agreement are in conflict with the provisions of any other existing agreements between the District and the State,the latest agreement shall take precedence over the other agreements in matters related to the Project. Article 13.Successors and Assigns The State and the District each binds itself,its successors,executors,assigns,and administrators to the other party to this agreement and to the successors,executors,assigns,and administrators of such other party in respect to all covenants of this agreement. Article 14.Amendments By mutual written consent of the parties,this contract may be amended prior to its expiration. Article 15.Signatory Warranty The signatories to this agreement warrant that each has the authority to enter into this agreement on behalf of the party they represent. 4 r CSJ 0508-07-21 r Project Number NH 2O01(447) County Harris Location City of Baytown IN WITNESS WHEREOF,THE STATE AND THE LOCAL GOVERNMENT have executed duplicate counterparts to effectuate this agreement. THE STATE OF TEXAS Executed for the Executive Director and approved for the Texas Transportation Commission for the purpose and effect of activating and/or carrying out the orders,established policies or work programs heretofore approved and authorized by the Texas Transportation Commission. By:Date: Gary K.Trietsch,P.E.,District Engineer THE BAYTOWN MUNICIPAL DEVELOPMENT DISTRICT By:Date: Monte Mercer,General Manager Attest: By: Gary W.Smith,Assistant Secretary 5 CSJ 0508-07-21 Project NumberNH 2O01(947) County Harris Location City of Baytown ATTACHMENT A Payment Provision and Work Responsibilities For SPUR 330 From 114-10 to 2.0 miles north of SH 146 1.DESCRIPTION OF THE COST OF THE ITEMS OF WORK A.Preliminary Engineering and Plan Preparation: The State will be responsible for the re-evaluation of environmental documents, wetlands permitting and completion of PS&E. B.Construction The State will advertise for construction bids,issue bid proposals,receive and tabulate the bids and award a contract for the desired construction in accordance with applicable laws and procedures. 2.SCHEDULE OF PAYMENTS The District will contribute$2,500,000.00 as a fixed price local share,toward the construction of this Project. Prior to thirty days before the Project is let,the District shall present a check or warrant made payable to the Texas Department of Transportation in the amount of 52,500,000.00 to cover project costs. 3.ACTUAL COST AGREEMENT The District will contribute a fixed sum,in the amount of$2,500,000.00,toward the construction of this Project. The State will let the Project at a total construction cost of$25,800,000.00. R:Ueanene\My Documents\ContractsWgrcementMDD&State4Spur330[mprovement.doc 6 CSJ 0508-07-21 Project Number NH 2O01 (947) County Harris Location City of Baytown ADVANCE FUNDING AGREEMENT FOR VOLUNTARY TRANSPORTATION IMPROVEMENT PROJECTS (ON-SYSTEM) For SPUR 330 From IH-10 to 2.0 miles north of SH 146 THE STATE OF TEXAS § THE COUNTY OF HARRIS § THIS AGREEMENT IS MADE BY AND BETWEEN the State of Texas, acting through the Texas Department of Transportation, hereinafter called the "State," and the Baytown Municipal Development District, hereinafter called the"District." WITNESSETH WHEREAS, Transportation Code, Chapter 201 and Transportation Code, Chapter 221 authorize the State to lay out, construct, maintain, and operate a system of streets, roads, and highways that comprise the State Highway System; and WHEREAS, Commission Minute Order Number 1-08653, authorizes the State to undertake and complete a highway improvement generally described as the construction of six (6) main lanes of Spur 330 from IH-10 to 2.0 miles north of SH 146; and WHEREAS, the District has requested that the State allow the District to participate in said improvement by funding that portion of the improvement described as the construction of six (6) main lanes of Spur 330 from IH-10 to 2.0 miles north of SH 146,hereinafter called the"Project"; and WHEREAS, on July 26, 2001, the District passed a resolution authorizing the expenditure of funds in the amount of Two Million Five Hundred Thousand and No/100 Dollars ($2,5000,000.00) for the construction of this Project; and WHEREAS, the State has determined that such participation is in the best interest of the citizens of the State; NOW, THEREFORE, in consideration of the premises and the mutual covenants and agreements of the parties hereto, to be by them respectively kept and performed as hereinafter set forth, the State and the District do agree as follows: CSJ 0508-07-21 Project NumberNH 2O01 (947) County Harris Location City of Baytown AGREEMENT Article 1. Time Period Covered This agreement becomes effective when signed by the last party whose signing makes the agreement fully executed, and the State and the District will consider it to be in full force and effect until the Project described herein has been completed and accepted by all parties or unless terminated, as hereinafter provided. Article 2. Project Funding and Work Responsibilities The State will authorize the performance of only those Project items of work which the District has requested and has agreed to pay for as described in Attachment A, "Payment Provision and Work Responsibilities,"which is attached to and made a part of this contract. In addition to identifying those items of work paid for by payments to the State, Attachment A, "Payment Provision and Work Responsibilities," also specifies those Project items of work that are the responsibility of the District and will be carried out and completed by the District, at no cost to the State. Article 3. Right of Access If the District is the owner of any part of the Project site, the District shall permit the State or its authorized representative access to the site to perform any activities required to execute the work. The District will provide for all necessary right-of-way and utility adjustments needed for performance of the work on sites now owned or to be acquired by the State. Article 4. Responsibilities of the Parties The District acknowledges that while it is not an agent, servant, nor employee of the State, it is responsible for its own acts and deeds and for those of its agents or employees during the performance of the work on the Project. Article 5. Document and Information Exchange The District agrees to electronically deliver to the State all general notes, specifications, contract provision requirements and related documentation in a Microsoft® Word or similar document. If requested by the State, the District will use the State's document template. The District shall also provide a detailed construction time estimate, including types of activities and month in the format required by the State. This requirement applies whether the local entity creates the documents with its own forces or by hiring a consultant or professional provider. Article 6. Interest The State will not pay interest on funds provided by the District. Funds provided by the District will be deposited into, and retained in, the State Treasury. Article 7. Inspection and Conduct of Work Unless otherwise specifically stated in Attachment A, "Payment Provision and Work Responsibilities," to this contract, the State will supervise and inspect all work performed 2 CSJ 0508-07-21 Project Number NH 2001 (947) County Harris Location City of Ba own hereunder and provide such engineering inspection and testing services as may be required to ensure that the Project is accomplished in accordance with the approved plans and specifications. All correspondence and instructions to the contractor performing the work will be the sole responsibility of the State. Unless otherwise specifically stated in Attachment A to this contract, all work will be performed in accordance with the Standard Specifications for Construction and Maintenance of Highways, Streets, and Bridges adopted by the State and incorporated herein by reference, or special specifications approved by the State. Article 8. No Increased Costs This is a fixed price agreement; therefore, the District shall not be obligated to pay more than the amount specified in Attachment A, "Payment Provision and Work Responsibilities," unless otherwise expressly agreed to in writing by the District. Article 9. Maintenance Upon completion of the Project, the State will assume responsibility for the maintenance of the completed Project unless otherwise specified in Attachment A to this agreement. Article 10. Termination This agreement may be terminated in the following manner: • By mutual written agreement and consent of both parties; • By either party upon the failure of the other party to fulfill the obligations set forth herein; • By the State if it determines that the performance of the Project is not in the best interest of the State. If the contract is terminated in accordance with the above provisions, the District will be responsible for the payment of Project costs incurred by the State on behalf of the District up to the time of termination. A. In the event the State determines that additional funding is required by the District at any time during the development of the Project, the State will notify the District in writing. District will make payment to the State within thirty (30) days from receipt of the State's written notification. B. Upon completion of the Project, the State will perform an audit of the Project costs. Any funds due to the District, the State, or the federal government will be promptly paid by the owing party. C. In the event the Project is not completed, the State may seek reimbursement from the District of the expended funds. The District will remit the required funds to the State within sixty(60)days from receipt of the State's notification. D. The State will not pay interest on any funds provided by the District. E. The State will not execute the contract for the construction of the Project until the required funding has been made available by the District in accordance with this agreement. 3 CSJ 0508-07-21 Project Number NH 2O01 947) County Harris Location City of Baytown 11. Notices All notices to either party by the other required under this agreement shall be delivered personally or sent by certified or U.S. mail, postage prepaid or sent by electronic mail, electronic notice being permitted to the extent permitted by law at the following addresses: State: Texas Department of Transportation P. O. Box 1386 7721 Washington Avenue Houston, Texas 77251-1386 Attn: District Engineer District: Baytown Municipal Development District P. O. Box 424 Baytown, Texas 77522-0424 Attn: General Manager All notices shall be deemed given on the date so delivered or so deposited in the mail, unless otherwise provided herein. Either party may change the above address by sending written notice of the change to the other party. Either party may request in writing that such notices shall be delivered personally or by certified U.S. mail and such request shall be honored and carried out by the other party. Article 12. Sole Agreement In the event the terms of the agreement are in conflict with the provisions of any other existing agreements between the District and the State, the latest agreement shall take precedence over the other agreements in matters related to the Project. Article 13. Successors and Assigns The State and the District each binds itself, its successors, executors, assigns, and administrators to the other party to this agreement and to the successors, executors, assigns, and administrators of such other party in respect to all covenants of this agreement. Article 14. Amendments By mutual written consent of the parties,this contract may be amended prior to its expiration. Article 15. Signatory Warranty The signatories to this agreement warrant that each has the authority to enter into this agreement on behalf of the party they represent. 4 CSJ 0508-07-21 Project Number NH 2O01 (947) County Harris Location Ci, of Baytown IN WITNESS WHEREOF, THE STATE AND THE LOCAL GOVERNMENT have executed duplicate counterparts to effectuate this agreement. THE STATE OF TEXAS Executed for the Executive Director and approved for the Texas Transportation Commission for the purpose and effect of activating and/or carrying out the orders, established policies or work programs heretofore approved and authorized by the Texas Transportation Commission. By: Date: /Z _/g—p / Gary K. ' tsch, P.E., District Engineer THE BAYTOWN MUNICIPAL DEVELOPMENT DISTRICT By: _ Date: Dec ems" ham✓13 200/ Monte Mercer, General Manager r Attest: By: GW W. 961th, Assistant Secretary 5 CSJ 0508-07-21 Project Number NH 2O01 (947) County Harris Location City of Baytown ATTACHMENT A Payment Provision and Work Responsibilities For SPUR 330 From IH-10 to 2.0 miles north of SH 146 1. DESCRIPTION OF THE COST OF THE ITEMS OF WORK A. Preliminary Engineering and Plan Preparation: The State will be responsible for the re-evaluation of environmental documents, wetlands permitting and completion of PS&E. B. Construction The State will advertise for construction bids, issue bid proposals, receive and tabulate the bids and award a contract for the desired construction in accordance with applicable laws and procedures. 2. SCHEDULE OF PAYMENTS The District will contribute $2,500,000.00 as a fixed price local share, toward the construction of this Project. Prior to thirty days before the Project is let, the District shall present a check or warrant made payable to the Texas Department of Transportation in the amount of $2,500,000.00 to cover project costs. 3. ACTUAL COST AGREEMENT The District will contribute a fixed sum, in the amount of$2,500,000.00, toward the construction of this Project. The State will let the Project at a total construction cost of$25,800,000.00. d:jyMyDocuments\Contracts\AgreementMDD&State4Spur330Improvements 6 COUNTY ►AIM PRW.No. M 2001 W47) HWY.RD. SPUR 330 LBTTMQ DATE DATE ACCEPTED m Z ty m 6 i 1 y = x If p �� m 11a A > --I 9 � N° BURNE77 pR, JIM D 0 l G2 .,14 oil > N 3-,4. r I- j � P IR j N 41 •� ; ; �y n O O SR � � I I� z � N C N.C.F. f7 0 a 0 0 _ C7 CD f7 o p F�M Z N m 0 � I I p 6�1 mvN 11 ►►yy S N O N N y CRgIGMON7 BL VD. C f� 0 rc m T Z x y I a O t/1 0 0 2 C t')m It � m vtIoI+�mc ? oz cII�0 > -0 cn cm � � N ®y CA It pN n^' Z ONOO R FARWAY ST. Dn ON . Z y] Ln zc � oo oo Zoo y > mm 0rn O -or OC Wm�M> 5) >� o Ow p� o C SHADY Npy m LA Z G tta o O �' NZm rou Nrn $ z m a o -n; � sawsa CREEK -0 c > ' u M�rM P �>= - 11 <m v m Xmm mz > a m c ROLLINWOOK O Z i Z S -' 9P m v 0 0 E _q z c 0 8 0 22 m m rD N z A � � 0 y o m XCOC i ` rn �8N AxAIRHART v^v 146 LA $' 9 � x z I 0 0 0 �, m 0 rAn v �S r _ O 1 011 z a oy to t� � `•:sue a -- � � Q) z Z ~ W r C N i N � u, Z ro Z a}�~ D (AO i •. m ..•* v > zi 0