Loading...
BAWA Resolution No. 2013-05 RESOLUTION NO. 2013-05 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE BAYTOWN AREA WATER AUTHORITY ACCEPTING THE BAWA POWER DISTRIBUTION IMPROVEMENT PROJECT; AUTHORIZING FINAL PAYMENT OF THE SUM OF SIXTY-TWO THOUSAND EIGHT HUNDRED FORTY-THREE AND 47/100 DOLLARS ($62,843.47) TO T & C CONSTRUCTION, LTD., FOR SAID PROJECT; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. ****************************************************************************** WHEREAS, the Baytown Area Water Authority ("BAWA") contracted with T & C Construction, Ltd., for the BAWA Power Distribution Improvement Project (the"Project"); and WHEREAS, all of the said improvements, as provided in the plans and specifications heretofore prepared by BAWA's engineer have been performed and completed in full accordance with all of the terms and conditions of the aforesaid contract; and WHEREAS, BAWA's engineer in the manner provided by the terms of the said contract and the plans and specifications thereof, has approved and accepted the BAWA Power Distribution Improvement Project and has heretofore issued his Certificate of Final Acceptance and has certified same to BAWA's Board of Directors and recommended that it accept and receive said work and improvements as constructed and completed by the contractor; and WHEREAS, there remains due and owing to T & C Construction, Ltd., the sum of SIXTY-TWO THOUSAND EIGHT HUNDRED FORTY-THREE AND 47/100 DOLLARS ($62,843.47);NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE BAYTOWN AREA WATER AUTHORITY: Section 1: That the Board of Directors of the Baytown Area Water Authority hereby accepts and approves the above-described work and improvements, and finds and determines that all of said improvements have been completed as provided in the plans and specifications thereof, and in full accordance with all of the terms and provisions of the aforesaid contract. Section 2: That the Certificate of Final Acceptance heretofore issued by the Baytown Area Water Authority's engineer and certified to the Board of Directors of the Baytown Area Water Authority is hereby accepted and received. Section 3: That final payment to T & C Construction, Ltd., in the amount of SIXTY- TWO THOUSAND EIGHT HUNDRED FORTY-THREE AND 47/100 DOLLARS ($62,843.47) is hereby authorized. Section 4: This resolution shall take effect immediately from and after its passage by the Board of Directors of the Baytown Area Water Authority. INTRODUC'F„D, RBAD and PASSED by the affirmative vote of the Board of Directors of the Baytown Amt Water Authority this the 19"' day of June,2013. p /J e z BRENDA BRADLBY MI H, President All I _,. l.F'I7CIA l3RY$C13, Assisi i Secretary APPROVED AS TO FORM: 4-1 CIQ M1RI/_, tiR (.i'naratl��Counsel R h i E;IcsNAtt Adi s J i�lon12019 It i elrinolPRyl3�N l l o¢ p,mhii ii Pr,ca&c