BAWA Resolution No. 2013-05 RESOLUTION NO. 2013-05
A RESOLUTION OF THE BOARD OF DIRECTORS OF THE BAYTOWN
AREA WATER AUTHORITY ACCEPTING THE BAWA POWER
DISTRIBUTION IMPROVEMENT PROJECT; AUTHORIZING FINAL
PAYMENT OF THE SUM OF SIXTY-TWO THOUSAND EIGHT HUNDRED
FORTY-THREE AND 47/100 DOLLARS ($62,843.47) TO T & C
CONSTRUCTION, LTD., FOR SAID PROJECT; AND PROVIDING FOR THE
EFFECTIVE DATE THEREOF.
******************************************************************************
WHEREAS, the Baytown Area Water Authority ("BAWA") contracted with T & C
Construction, Ltd., for the BAWA Power Distribution Improvement Project (the"Project"); and
WHEREAS, all of the said improvements, as provided in the plans and specifications
heretofore prepared by BAWA's engineer have been performed and completed in full
accordance with all of the terms and conditions of the aforesaid contract; and
WHEREAS, BAWA's engineer in the manner provided by the terms of the said contract
and the plans and specifications thereof, has approved and accepted the BAWA Power
Distribution Improvement Project and has heretofore issued his Certificate of Final Acceptance
and has certified same to BAWA's Board of Directors and recommended that it accept and
receive said work and improvements as constructed and completed by the contractor; and
WHEREAS, there remains due and owing to T & C Construction, Ltd., the sum of
SIXTY-TWO THOUSAND EIGHT HUNDRED FORTY-THREE AND 47/100 DOLLARS
($62,843.47);NOW THEREFORE,
BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE BAYTOWN AREA
WATER AUTHORITY:
Section 1: That the Board of Directors of the Baytown Area Water Authority hereby
accepts and approves the above-described work and improvements, and finds and determines
that all of said improvements have been completed as provided in the plans and specifications
thereof, and in full accordance with all of the terms and provisions of the aforesaid contract.
Section 2: That the Certificate of Final Acceptance heretofore issued by the Baytown
Area Water Authority's engineer and certified to the Board of Directors of the Baytown Area
Water Authority is hereby accepted and received.
Section 3: That final payment to T & C Construction, Ltd., in the amount of SIXTY-
TWO THOUSAND EIGHT HUNDRED FORTY-THREE AND 47/100 DOLLARS
($62,843.47) is hereby authorized.
Section 4: This resolution shall take effect immediately from and after its passage by
the Board of Directors of the Baytown Area Water Authority.
INTRODUC'F„D, RBAD and PASSED by the affirmative vote of the Board of Directors
of the Baytown Amt Water Authority this the 19"' day of June,2013.
p /J
e z
BRENDA BRADLBY MI H, President
All I
_,.
l.F'I7CIA l3RY$C13, Assisi i Secretary
APPROVED AS TO FORM:
4-1
CIQ M1RI/_, tiR (.i'naratl��Counsel
R h i E;IcsNAtt Adi s J i�lon12019 It i elrinolPRyl3�N l l o¢ p,mhii ii Pr,ca&c