Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
BAWA Resolution No. 2009-08 RESOLUTION NO.2009-08
A RESOLUTION OF THE BOARD OF DIRECTORS OF THE BAYTOWN
AREA WATER AUTHORITY ADOPTING A BUDGET FOR THE ENSUING
FISCAL YEAR.BEGINNING OCTOBER 1,2009,AND ENDING
SEPTEMBER 30.2010:MAKING OTHER PROVISIONS RELATED
THERETO:AND PROVIDING FOR THE EFFECTIVE DATE THEREOF.
WHEREAS,the General Manager of the Baytown Area Water Authority("BAWA")has
submitted to BAWA's Board of Directors a budget estimate of the revenues of BAWA and the
expense of conducting the affairs thereof for the ensuing fiscal year,beginning October 1,2009,
and ending September 30,2010:and
WHEREAS.the Board of Directors of BAWA(the"Board")received the General
Manager's estimate and held a public hearing thereon:and
WHEREAS.after full and final consideration of the information contained in the
proposed budget and the input received at the public hearing,it is the opinion of the Board that
the budget attached hereto should be approved and adopted;NOW THEREFORE
BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE BAYTOWN AREA
WATER AUTHORITY:
Section 1:That the Board of Directors of the Baytown Area Water Authority hereby
adopts the budget.which is attached hereto as Exhibit"A"and incorporated herein for all intents
and purposes for BAWA's 2009-10 fiscal year.
Section 2:This resolution shall take effect immediately from and after its passage by
the Board of Directors of the Baytown Area Water Authority.
INTRODUCED,READ and PASSED,by the affirmative vote of the Board of Directors
of the Baytown Area Water Authority this the 10 day of August,2009.
-(a/x,-
JOI-IN SANDHOP,resident
ATTEST:
L TICIA GARZA,Inte m s4ant Secretary
APPROVED AS TO FORM:
ACIO RAMIREZ.SR..Ge�r I Counsel
R.\Karen\f i Ies\13AWA�Resolution\2009WdopL'009-I OBudget.doc
pW A
Baytown Area Water Authority
(BAWA)
ANNUAL PROGRAM OF SERVICES
2009-10
PROPOSED BUDGET
IIII
Submitted To Baytown Area Water
Authority Board
July 15,2009
Garry Brumback General Manager
Darryl Fourte Plant Manager
Cynthia Pearson Director of Finance
BAYTOWN AREA WATER
AUTHORITY
BOARD OF DIRECTORS
JOHN R.SANDHOP,President
DAN M.MUNDINGER,Vice President
VACANT,Secretary
WAYNE BALDWIN,Board Member
BRENDA BRADLEY SMITH,Board Member
BAYTOWN AREA WATER AUTHORITY
7425 Thompson Road,Baytown,Texas 77521-1056(281)426-3517 FAX(281)426-3519
�q�Fo wut�°�`�
July 15,2009
President and Members of the Baytown Area Water Authority Board
Baytown Area Water Authority
Baytown,Texas
It is my pleasure to present the 2009-10 Proposed Budget for the Baytown Area Water
Authority(BAWA).The Budget sets forth the revenues and appropriations for the fiscal
year October 1,2009 through September 30,2010.The financial guidance provided by
the Board has resulted in BAWA's ability to maintain a system that consistently provides
a dependable and high quality water supply to the City of Baytown and surrounding
communities.
BAWA's largest recent project,the construction of a second water supply line serving
the City of Baytown,is funded partially from non-recurring revenues to reduce the
amount of debt issued.This project,which was completed early 2009,will provide
reliability to BAWA's largest customer,the City of Baytown,which currently constitutes
approximately 88%of BAWA's water sales.
BAWA utilized a loan from the Texas Water Development Board(TWBD)for funding of
the second water supply line and Phase II improvements.The loan received from the
TWDB Drinking Water State Revolving fund has interest rates ranging from 2.25%to
3.15%as compared to a range of 4.00%to 6.00%interest rate for insured bonds sold
on the market.Since TWDB's loan program reimburses BAWA as funds are expended,
the full debt payments will not occur until the project is complete.As of June 30,2009,
$9,130,000 of the total$13,290,000 has been funded.Funding requests are submitted
to TWDB as invoices are received from the contractor.
The City of Baytown Water and Sewer Fund paid for the cost of the City to tie-in to the
new BAWA supply line to pay for their portion of the project.The City's portion of the
project cost is approximately$1,000,000.A continuing transfer from the City's water
and sewer fund is included for that portion of the debt payment.
In January of 2006,the EPA approved the Long Term 2 Enhanced Surface Water
Treatment(LT2)Rule and the Stage 2 Disinfection Byproducts(DBP)Rules.
With respect to the LT2 rule,systems that serve a population of less than 100,000
began the monitoring schedule in January 2007.The schedule is as follows:
Submit Sampling Plan January 1,2007
Begin source water monitoring April 1,2007
Report bin classification October 1,2009
Comply with additional treatment requirements(Ozone)October 1,2012
3
The data collected during the 2 year monitoring period will determine if Ozone treatment
should be implemented at the BAWA surface water treatment plant.The Stage 2 DBP
rule pertains to the City of Baytown distribution system only.BAWA has received the
Small System waiver and does not have to monitor the by-products listed in the rule.
We have completed the first two steps in this process.
The City of Houston notified BAWA of a rate increase effective April 1,2009 for
untreated water purchased from the City of Houston.The rate increased 5.09%,which
includes a 3.3%change in the CPI and a 1.79%increase for population growth.The
rates increased from$0.4314 to$0.4533 per 1,000 gallons.Future annual rate
adjustments will also be relative to the CPI and population growth.
Revenue estimates for water sales in the proposed budget are based upon sales in a
typical year.The proposed budget includes a$0.16 per 1,000 gallon rate increase
(approximately 10%)for BAWA's customers to adjust for the untreated water rate
increase and debt associated with the capital program.Rates will be adjusted in future
budgets to reflect funding needs based on actual operational needs including debt
service requirements.
The capital improvements and efficient 24/7 operations at BAWA are designed to
provide the foundation for growth in sales and continued reliable service of the highest
quality water for our customers.I look forward to reviewing this document with you.
Sinc Y.
Garry rumback
Ge ral Manager
4
MAJOR BUDGET ISSUES
Flaeal Year 2009-10
BAYTOWN AREA WATER AUTHORITY
This fund accounts for the activities of the Baytown Area Water Authority(BAWA).BAWA
is a water authority created by the Texas Legislature to supply water for the City of
Baytown(City)and surrounding communities.BAWA services a total of eight customers
with the City as the largest customer,generating approximately 88%of BAWA's annual
sales.BAWA is a separate legal entity;however,it is considered a component unit of the
City.Since it began operating,BAWA has not experienced shortages of raw water supply
to the plant nor interruptions to service to its customers.
REVENUES
The 2009-10 proposed budget estimates sales of$7,195,000 for an average of 11.5
million gallons per day(MGD).Fluctuations to rainfall amounts can significantly impact
actual sales.A$0.16 rate increase is in the 2009-10 proposed budget.The current rate
structure of$1.55 per 1,000 gallons for the City of Baytown and$1.58 per 1,000 gallons
for customers outside the city will increase to$1.71 and$1.74 respectively.This will cover
the increased cost of operations,including debt service and the purchase of raw water.
This increase in rates is expected to generate$677,677 in additional revenue.
EXPENDITURES
Total operating expenditures for the proposed 2009-10 budget are$5,081,466,an
increase of$338,666 from the 2008-09 budget.The proposed 2009-10 budget includes a
transfer to General Fund for an indirect cost allocation,which is to reimburse the City for
administrative services such as Human Resources,Fiscal Operations,Legal and
Information Technology Services.Highlights of major operating changes were as follows:
•Decrease in personnel services$(53,391)
•Increase in supplies(Primarily raw water rate increase)310,483
•Decrease in maintenance(6,200)
•Increase in services 87,774
•Increase in capital(Facility improvements)71,748
Raw Water Supply Cost-BAWA purchases raw water from the City of Houston.The
raw water supply contract with the City of Houston is in effect through the year 2040 and
sets the maximum amount of raw water to be delivered to the BAWA plant at 15.8 MGD,
without penalties.BAWA received notice of a 5.09%rate increase from$0.4314 to
$0.4533 effective April 1,2009.The surcharge for water purchased over the 15.8 MGD is
nominal at this time.
Debt Service-The transfer to cover the debt service requirement for existing debt for the
proposed 2009-10 budget is$1,996,706.
5
MAJOR BUDGET ISSUES
Fiscal Year 2008-09
CAPITAL IMPROVEMENT PROGRAM
The Capital Improvement Program for BAWA is funded primarily through the debt
issuances.
•Phase II of BAWA's plant improvement is on hold pending the Texas Commission
on Environmental Quality(TCEQ)study to develop new recommendations
pertaining to disinfection programs(Ozone).Phase II was originally estimated at
$6,000,000.Final costs will be developed after TCEQ issues final regulations.
Implementation will be planned in the fiscal year following the issuance of final
regulations that will enable the BAWA Board to review implementation plans during
the annual budget process.
•Previously there was one line supplying water to BAWA's major customer,the City
of Baytown.The BAWA board approved a contract for the design for the second
line in 2004.The project was approved by TWDB and the BAWA Board and the
City Council awarded the contract in the Spring of 2006.The project is partially
funded from non-recurring revenues and CIP funds to reduce the amount of debt
that is issued.TWDB debt has been issued for the balance.The total estimated
cost is$10.5 million for the BAWA line with$1,000,000 funded by the City of
Baytown for extending their lines to connect with the new supply line.This project
was completed in early 2009.
WORKING CAPITAL
In order to maintain fiscal stability,governmental entities maintain a working capital
balance to meet daily liquidity needs.Appropriate levels of working capital vary from entity
to entity based on the relative impact of particular circumstances or financial conditions.
The goal for working capital is 60 to 90 days.Working capital is defined as current assets
(e.g.,cash,investments and accounts receivable)less current liabilities(e.g.,accounts
payable).The working capital in the proposed budget Is estimated to be 47 days as of
September 2010.A rate study is currently underway that will develop a plan to adjust
rates in the future to strategically elevate the working capital balance to the preferred level.
6
BAYTOWN AREA WATER AUTHORITY FUND 510
BUDGET SUMMARY BY FUND
Actual Budget Estimated Base Proposed
2007-08 2008-09 2008-09 2009-10 2009-10
Revenues
Sale of Water-Baytown$5,345,177$5,989,595$5,860,735$5,870,021$6,475,000
Sale of Water-Other 697,865 814,877 717,890 647,302 720,000
Interest Revenue 22,812 24,100 2,190 2,000 2,000
Mineral Royalties 13,268 13,000 230--
Miscellaneous 528-100-
Transfer From Water&Sewer Fund 68,000 68,000 68,000 68,000 68,000
Total Revenues 6,147,650 6,909,572 6,649,145 6,587,323 7,265,000
Expenditures
Personnel Services 921,015 973,839 864,355 920,448 920,448
Supplies 2,464.931 2,604,235 2,745,000 2,914,718 2,914,718
Maintenance 231,329 265,500 278,600 259,300 259,300
Services 733,038 899,226 827,826 987,000 987,000
Total Operating 4,350,313 4.742.800 4,715,781 5.081,466 5,081,466
Capital Outlay 13,078-71,748 74,668
Transfers Out-Debt Service 1,981,611 2,168,527 2,168,527 1,996,706 1,996,706
Transfers Out-General Fund 50,000 50,000 50,000 50,000 50,000
Contingency-20,000 20,000 40,000 40,000
Total Expenditures 6,395,002 6,981,327 6,954,308 7,239,920 7,242,840
Excess(Deficit)Revenues
Over Expenditures(247,352)(71,755)(305,163)(652,597)2-2,160
Working Capital-Beginning 1,465,495 1,290,479 1,218,143 912,980 912,980
Working Capital-Ending$1,218,143$1,218,724$912,980$260,383$935.140
No.of Working Capital Days 70 64 48 13 47
7
I
BAWA-CAPITAL IMPROVEMENT PROGRAM FUND 518
BUDGET SUMMARY BY FUND
Carried-New Total
Actual Carried-forward Adopted Adjustments Total Allocation Estimated forward Allocation Allocation
Revenues 8-0
2007-08 2007-08 2008-09 2009 2008-09 2008-09 2008-09 2009-10 2009-10
Interest Revenue$54,962$-$25,000$-$25,000$11,450$-$4,800$4,800
Total Revenues 54,962-25,000-25,000 11,450-4,800 4,800
Expenditures
BAWA Admin Bldg-A/C Repairs 182,724 32,171--32,171 4,200---
BAWA Second Supply Line 137.643 120,065--120,065 120,065--
BAWA Raw Waterline 76,460-------
Pump Replacement-Summer 08 21,024--------
Thompson Rd Utility Relocation--500,000-500,000-500.000-500,000
Capital Assets--23,000-23,000 11,390 11,610-11,610
New Capital Project Initiatives 14,091 703.636 25,000-728.636-728.636 19,221 747,857
Total Expenditures 431,942 855,872 548,000-1,403.872 135,655 1,240.246 19,221 1,259,467
Excess(Deficit)Revenues
Over Expenditures(376,980)(855,872)(523,000)(1,378,872)(124,205)(1,240,246)(14,421)(1,254,667)
Retained Earnings-Beginning 1.755.852 1,378.872 523,000-1.378,872 1.378.872 1,254,667 14,421 1,254.667
Retained Earnings-Ending$1,378,872$523,000$-$-$-$1,254,667$14,421$-$
CITY OF BAYTOWN
PROGRAM SUMMARY
3070 BAYTOWN AREA WATER AUTHORITY BAWA
Program Description Major Goals
Operate and maintain a 26 MGD design capacity.Maintain water quality necessary to be classified
surface water treatment facility with a projected flow as"Meeting Optimum Corrosion Control"by
of 11.5 MGD in fiscal year 2009-2010 which currently TCEQ.
serves 8 customers with the City of Baytown using.Maintain"Superior Public Water System"status.
88%of production.Follow and comply with the.Maintain Optimization Standards as classified by
Texas Commission on Environmental Quality TCEQ's Texas Optimization Program.
(TCEQ)Rules and Regulations for Public Water.Develop and maintain a staff of highly trained
Supplies adopted 1992,National Primary Drinking water professionals to better serve customers.
Water Regulations,Safe Drinking Water Act,and
Surface Water Treatment Rule.Provide BAWA's Major Objectives
customers with high quality,safe drinking water and Produce 11.5 MGD of water.
consistent water pressure for fire protection..Maintain finished water turbidity consistently less
than 0.1 NTU.
•Provide QA/QC and mathematical training for
personnel.
Actual Budget Estimated Projected
Workload Measures 2007-08 2008-09 2008-09 200940
1.Customer Connections 8 8 8 8
2.Average MGD of water produced 11.27 12.5 12 11.6
3.Customer Service calls 5 10 5 10
Performance Measures
1.Days without interruption of service 365 366 365 365
2.Days finished water<0.1 NTU 365 366 365 365
3.Customer Service Calls Investigated 5 10 5 10
4.Maintain Distribution Cl2 Residual<4.0 365 366 365 365
mgl
9
CITY OF BAYTOWN
SERVICE LEVEL BUDGET
3070 BAYTOWN AREA WATER AUTHORITY
Actual Budget Estimated Base Proposed
Acct#Acct Descri tion 2007-08 2008-09 2008-09 2009-10 2009-10
7100 Personnel Services
71031 Contract Personnel Services$921,015$973.839$864.355$920,448$920,448
Total Personnel Services 921,015 973,839 864.355 920,448 920.448
7200 Supplies
72001 Office 3,360 4,000 4,000 4,000 4,000
72002 Postage 2,812 1,650 900 900 900
72007 Wearing Apparel 4,397 5,000 5,000 5,000 5,000
72016 Motor Vehicle 17,770 12,000 5,500 12,000 12,000
72021 Minor Tools 988 1,400 1,200 1,400 1,400
72026 Cleaning&Janitorial 1,653 2,000 1,800 2,000 2,000
72031 Chemical 509,746 558,000 805.000 812,100 812.100
72032 Medical 651 1,000 800 1,000 1,000
72041 Educational 806 1,300 800 1,300 1,300
72051 Untreated Water 1,891,750 1,987,885 1,900,000 2,045,018 2,045,018
72055 Laboratory Supplies 30,998 30,000 20,000 30,000 30,000
Total Supplies 2,464,931 2,604,235 2,745,000 2,914,718 2,914,718
7300 Maintenance
73011 Buildings 2,062 2,500 2,100 6,300 6,300
73021 Filtration Plants 38,493 10,000 7,500--
73025 Streets Sidewalks&Curbs 217 8,000 2,000 8,000 8,000
73027 Heating&Cooling System 8,832 2,000 2,000 2,000 2,000
73028 Electrical Maintenance 79,572 84,000 84,000 84,000 84,000
73041 Furniture&Fixtures 666 2,500 2,900 2,500 2,500
73042 Machinery&Equipment 99,195 150,000 175,000 150,000 150,000
73043 Motor Vehicles 2,182 6,000 3,000 6,000 6,000
73045 Radio&Testing Equipment 110 500 100 500 500
Total Maintenance 231,329 265,500 278,600 259,300 259,300
7400 Services
74001 Communication 3,684 4,700 4,000 4,300 4,300
74002 Electric Service 621,965 709,500 645,000 675,000 675,000
74011 Equipment Rental 6,350 10,000 8,000 10,000 10,000
74021 Special Services 50,526 119,300 119,300 241,900 241,900
74022 Audits 13,647 13,149 13,149 13,150 13,150
74036 Advertising 443 700 500 700 700
74041 Travel&Reimbursables 3,906 6,100 3,500 6,100 6,100
74042 Education&Training 6,898 8,200 7,000 8,200 8,200
74071 Association Dues 222 800 600 800 800
74210 General liability Insurance 3,387 3,489 3,489 3,500 3,500
74220 Errors&Omissions 4,781 4,961 4,961 5,000 5,000
74240 Auto Liability 514 581 581 600 600
74242 Auto Catastrophic 26 27 27 30 30
74271 Mobile Equipment 347 365 365 400 400
74272 Real&Personal Property 16,240 17,052 17,052 17,000 17,000
74280 Bonds 102 10 10 20 20
74281 Employee Fraud-292 292 300 300
Total Services 733,038 899,226 827,826 987,000 987,000
Total Operating 4,350,313 i8,742,800 4.715,781 5,081,466 5,081,466
CITY OF BAYTOWN
SERVICE LEVEL BUDGET
3070 BAYTOWN AREA WATER AUTHORITY
Actual Budget Estimated Base Proposed
IA cct#Acct Description 2007-08 2008-09 2008-09 2009.10 2009-10
8000 Capital Outlay
80001 Furniture&Equip.<$5,000$-$-$-$-$2,920
84042 Machinery&Equipment 13,078---
86011 Capital Lease Purchases---71,748 71,748
Total Capital Outlay 13,078--71,748 74,668
9000 Other Financing Uses
92101 To General Fund 50,000 50,000 50,000 50,000 50,000
91511 To BAWA Debt Service 1.981.611 2,168,527 2,168,527 1,996,706 1,996.706
Total Other Financing Uses 2,031,611 2,218.527 2,218,527 2,046,706 2.046.706
9900 Contingencies
99001 Contingencies-20,000 20,000 40,000 40,000
Total Contingencies-20,000 20,000 40,000 40,000
TOTAL DEPARTMENT$6.395,002$6.981,327$6,954,308$7.239,920$7,242,840
ti
BAYTOWN AREA WATER AUTHORITY REVENUE BONDS
LONG TERM DEBT AMORTIZATION SCHEDULES
Principal Requirements Principal
Revenue Amount of Outstanding Fiscal Year 2009-10 Outstanding
Bonds Issue Oct.1 2009 Principal Interest Total Sept.30,2010
Series,1999$9,095,000$1,195,000$585,000$60,360$645,360$610,000
Series,2002 3,800,000 2,790,000 195,000 140,999 335,999 2.595,000
Series,2006 13,290,000 11,625,000 550,000 324,935 874.935 11.075,000
Series,2007 6,505,000 6,425.000 45,000 261,413 306,413 6,380,000
Total$22,035,000$1.375,000$787,706$2,162,706$20,660.000
Combined BAWA Debt,All Series
Debt Requirements to Maturity
Fiscal Principal Total Total
Year 5101 Interest Requirement
2010$1,375,000$787,706$2,162,706
2011 1,425.000 733,281 2,158,281
2012 1,490,000 676,126 2,166,126
2013 1,535,000 624,301 2,159,301
2014 1,590,000 569,911 2,159,911
2015 1,645,000 512,621 2,157,621
2016 1,710,000 452,691 2,162,691
2017 1,765,000 389,961 2,154,961
2018 1,830,000 324,799 2,154,799
2019 1,900,000 254,346 2,154,346
2020 1,030,000 180,658 1,210,658
2021 735,000 143,588 878,588
2022 755,000 122,273 877,273
2023 775,000 100,000 875,000
2024 800,000 76,750 876,750
2025 825,000 52,350 877,350
2026 850,000 26,775 876,776
Total$22,035,000$6,028,138$28,063,138
Combined BAWA Debt,All Series 13Interost
Debt Requirement to Maturity
2.500■Principal
„2.000
1.500
o 1.000
Q 0.500 1 41
0.000
2010 2011 2012 2013 2014 2015 2016 2017 2016 2019 2020 2021 2022 2023 2024 2025 2026
Fiscal Year
12
BAYTOWN AREA WATER AUTHORITY REVENUE BONDS
DETAIL DEBT AMORTIZATION SCHEDULES
Fiscal Interest Principal Interest Interest Annual Principal Total
Year Rate Due 6/01/10 Due 6101/10 Due 11101/09 Requirement Outstanding Outstandin
Revenue Bond,Series 1999 Date of Issue-November 1,1999 Term-20 Years
$2,612,145
2007 7.000%$245,000$63,705$-$308,705$2.010,000 2,303,440
2008 7.000%265,000 55.130 55,130 375,260 1,745,000 1,928,180
2009 5.700%550,000 45,855 45,855 641,710 1,195,000 1,286.470
2 110 5.000%585,000 30,180 30,180 645.360 610,000 641,110
2011 5.100%610,000 15,555 15,555 641.110--
$2,255,000$210,425$146,720$2,612,145
Revenue Bond,Series 2002 Date of Issue-January 10 2002 Term-19 Years
$6,040,949
2002$-$81,895$-$81,895$3,800.000 5,959,054
2003-98,274 98,274 196,549 3,800.000 5,762,505
2004 5.500%150,000 98,274 98,274 346,549 3,650,000 5,415,956
2005 5.500%155,000 94,149 94,149 343,299 3,495,000 5,072,658
2006 5.500%165,000 89.887 89,887 344,774 3,330,000 4,727,884
2007 5.500%170,000 85,349 85,349 340,699 3,160,000 4,387,185
2008 5.500%180,000 80,674 80,674 341,349 2,980,000 4,045,836
2009 5.500%190.000 75.724 75,724 341.449 2,790,000 3,704.388
2 110 5.500%195,000 70.499 70,499 335.999 2.595,000 3,368.389
2011 5.350%205,000 65,137 65,137 335,274 2,390,000 3,033,115
2012 4.700%215,000 69,653 59,653 334,306 2,175,000 2,698,809
2013 4.800%230,000 54,601 54,601 339,201 1,945,000 2,359.608
2014 4.900%240,000 49,081 49.081 338,161 1,705,000 2,021,446
2015 5.000%250,000 43.201 43,201 336,401 1,455,000 1,685,045
2016 5.000%265,000 36,951 36,951 338,901 1,190,000 1,346,144
2017 5.000%275,000 30,326 30.326 335,651 915,000 1,010,493
2018 5.100%290,000 23,451 23,451 336.901 625,000 673.591
2019 5.125%305,000 16,056 16,056 337,111 320,000 336,480
2020 5.150%320,000 8,240 8,240 336,480--
$3.800,000$1.161,422$1,079,527$6,040,949
13
BAYTOWN AREA WATER AUTHORITY REVENUE BONDS
DETAIL DEBT AMORTIZATION SCHEDULES
Fiscal Interest Principal Interest Interest Annual Principal Total
Year Rate Due 5/01110 Due 6/01/10 Due 11/01109 Requirement Outstandina Outstanding
Revenue Bond,Series 2006 Date of Issue-June 14 2006 Term-20 Years
$17,537,835
2007 2.250%$595.000$283,082$-$878,082$12.695,000 16,659,753
2008 2.250%530,000 174,640 174,640 879,280 12,165,000 15,780,473
2009 2.300%540.000 168,678 168,678 877.355 11,625,000 14,903,118
2010 2.300%550.000 162,468 162,468 874,935 11.075.000 14,028.183
2011 2.350%565,000 156,143 156,143 877,285 10,510,000 13.150,898
2012 2.400%580.000 149,504 149,504 879,008 9.930,000 12,271,890
2013 2.500%590,000 142,544 142,544 875,088 9,340,000 11,396,803
2014 2.600%605,000 135,169 135.169 875,338 8,735,000 10.521,465
2015 2.650%620.000 127,304 127.304 874,608 8,115,000 9,646,858
2016 2.700%640,000 119,089 119.089 878,178 7,475,000 8,768,680
2017 2.750%655,000 110,449 110,449 875,898 6,820,000 7,892,783
2018 2.800%675,000 101,443 101,443 877,885 6,145,000 7.014,898
2019 2.850%695,000 91,993 91.993 878,985 5,450.000 6,135,913
2020 2.900%710,000 82,089 82,089 874,178 4,740,000 5,261,735
2021 2.900%735,000 71,794 71,794 878,588 4,005,000 4,383,148
2022 2.950%755,000 61,136 61.136 877,273 3.250,000 3,505,875
2023 3.000%775,000 50,000 50,000 875,000 2,475,000 2,630,875
2024 3.050%800,000 38,375 38,375 876.750 1,675,000 1,754,125
2025 3.100%825,000 26,175 26.175 877,350 850.000 876,775
2026 3.150%850,000 13,388 13.388 876,775--
$13,290,000$2,265,458$1,982,376$17.537,835
Rev.Refunding Bond Series 2007 Date of Issue-February 1 2007 Term-13 Years
$8,842,941
2007$-$66,153$-$66,153$6,505.000 8,776,788
2008 4.000%40.000 132,306 132,306 304,613 6.465,000 8,472,175
2009 4.000%40.000 131.506 131,506 303,013 6,425,000 8,169,163
2010 4.000%45,000 130.706 130,706 306,413 6,380.000 7,862,750
2011 4.000%45.000 129.806 129.806 304,613 6,335,000 7,558,138
2012 4.000%695,000 128,906 128,906 952,813 5,640,000 6,605,325
2013 4.000%715,000 115,006 115,006 945,013 4,925,000 5.660,313
2014 4.000%745.000 100,706 100,706 946,413 4,180,000 4,713,900
2015 4.000%775,000 85,806 85,806 946,613 3,405,000 3,767,288
2016 4.000%805,000 70,308 70,306 945,613 2,600,000 2,821,675
2017 4.000%835,000 54,206 54,206 943,413 1,765,000 1,878,263
2018 4.250%865,000 37,506 37,506 940,013 900,000 938,250
2019 4.250%900,000 19,125 19,125 938,250--
$6,505.000$1,202.047$1,135.894$8,842,941
14
City of Houston
Untreated Water Rates
Year Rate
04/81.22142
02/83.24157
10/86.25123
10/87.28022
01/88.26691 FIRST 150 MGD/PER 1,000,.26113 NEXT 150 MOD
08/88.28426 FIRST 300 MGD/PER 1,000,.27915 NEXT 300 MOD
07/89.29344 FIRST 300 MGD/PER 1,000,.28817 NEXT 300 MOD
08190.31178 FIRST 300 MGD/PER 1,000,.30618 NEXT 300 MOD
02/92.31820 FIRST 300 MGD/PER 1,000,.31249 NEXT 300 MOD
10/93.32907 FIRST 300 MGD/PER 1,000,.32316 NEXT 300 MOD
10/94.37192(GRACE UP TO 13.1 MOD.IF WE GO OVER,THEN 5%ADDED TO
ANYTHING OVER 11.9
06/04.385(GRACE UP TO 13.1 MOD.IF WE GO OVER,THEN 5%ADDED TO
ANYTHING OVER 11.9)
04/05.398(GRACE UP TO 17.38 MOD.IF WE GO OVER,THEN 5%ADDED TO
ANYTHING OVER 15.8)
04/06.4123(GRACE UP TO 17.3E MOD.IF WE GO OVER,THEN 5%ADDED TO
ANYTHING OVER 15.8)
04/07.4238(GRACE UP TO 17.38 MOD.IF WE GO OVER,THEN 5%ADDED TO
ANYTHING OVER 15.8)
04/08.4314(GRACE UP TO 17.38 MOD.IF WE GO OVER,THEN 5%ADDED TO
ANYTHING OVER 15.8)
04/09.4533(GRACE UP TO 17.38 MOD.IF WE GO OVER,THEN 5%ADDED TO
ANYTHING OVER 15.8)
Baytown Area Water Authority
Treated Water Rates
Increase
Year Rate Amount Comments
1981$0.97 COB
1985-1987$0.97 COB,$1.00 Other
Result of rising operating cost.(Raw
1988-1992$1.07 COB,$1.10 Other$0.10 water rates up 25%)
1993-1998$1.18 COB,$1.21 Other$0.11 Result of increase in raw water rates.
1999-2006$1.26 COB,$1.29 Other$0.08 Funding for plant expansion debt
Funding for new water line debt and City
2007$1.39 COB,$1.42 Other$0.13 of Houston rate increase.
Funding for new water line debt and Ci
2008$1.46 COB,$1.49 Other$0.07 of Houston rate increase.
Funding for new water line debt,other
operating increases and City of Houston
2009$1.55 COB,$1.58 Other$0.09 rate increase.
Funding for new water line debt,other
operating increases and City of Houston
2010$1.71 COB,$1.74 Other$0.16 rate Increase.
IS
�f
CITY OF HOUSTON etuWhits
Public Works and Engineering mam
Department r<l(i*W a.Motou.P.E.D.WRE.OGEE
thaw
P.O.am 41103
ttouann.Tv=mta4sa3
wwr.howtenbLpv
IMPORTANT NOTICE
NOTIFICATION OF WATER RATE ADJUSTMENT
Effective April 1.2009,water and sewer rates were adjusted upward by 8.09%.The
City of Houston's Code of Ordinances provides that water and sewer rates be adjusted
automatically each year In April to reflect the previous years percentage change to the
Houston-Galveston Area Consumer Price Index(CPI).This year the rate Includes the
change in the CPI of 3.3%and an increase of 1.70%for population growth In the region
as approved by City Council.These new rates win appear on your April 2009 bil(Ing
which you will receive In May.
NEW RATES AND CHARGES
Claselficatlon Rats
Contract Treated Water P x$1.884 plus(P-M)x$Al l
Untreated Water Rates where them Is no cortract
First 10,000,000 allons$1.134 per 1,000 nallons
Next 10,000,000 aallone$1.010 per 1,000 cations
Next 30,000,000 gallons$0.981 nor 1,000 callons
Next 100,000,000 callons$0.903 per 1,000 aallarks
Excess of 150,000,000 naflons$0.874 Per 1,000 oallons
Untreated Water Rates under wrttten contracts$0.4833 per 1,000 gallons
•P■Total water delivery durfng the month in thousand gallons,except if the minimum
monthly specified In the customer's contract is greater than P,P shall equal M.
M v Minimum monthly amount of waterspecifted In the customer's contract expressed in
units of one thousand gallons.
For further information,please:•
•Refer to the Rates and Prices or the fllilinat and Payment section of your contract
•Malt:(8ecWne 47.81 and 47.84 at seq.)
Please contact Maria Carrillo at Utility Customer Service at(713)371-1072 If you have specft
questions about your bill.
16