BAWA Resolution No. 2007-0008 RESOLUTION NO. 2007-0008
A RESOLUTION OF THE BOARD OF DIRECTORS OF THE BAYTOWN AREA
WATER AUTHORITY AUTHORIZING CHANGE ORDER NO. 4 WITH REYTEC
CONSTRUCTION RESOURCES, INC., FOR THE BAWA 30-INCH WATER
TRANSMISSION LINE PROJECT SUBJECT TO THE APPROVAL OF THE CITY
COUNCIL OF THE CITY OF BAYTOWN; AUTHORIZING PAYMENT IN THE
AMOUNT OF NINETY-SEVEN THOUSAND NINE HUNDRED FIFTY-ONE AND
NO/100 DOLLARS ($97,951.00); AND PROVIDING FOR THE EFFECTIVE DATE
THEREOF.
*************************************************************************************
BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE BAYTOWN AREA WATER
AUTHORITY:
Section 1: That subject to the approval of the City Council of the City of Baytown, Texas,
the Board of Directors of the Baytown Area Water Authority hereby authorizes Change Order No. 4 with
Reytec Construction Resources, Inc., for the BAWA 30-inch Water Transmission Line Project. A copy
of Change Order No. 4 is attached hereto, marked Exhibit "A" and made a part hereof for all intents and
purposes.
Section 2: That subject to the approval by the City Council of the City of Baytown, Texas,
of the change order referenced in Section 1 hereof, the Board of Directors of the Baytown Area Water
Authority hereby authorizes the payment of NINETY-SEVEN THOUSAND NINE HUNDRED FIFTY-
ONE AND NO/100 DOLLARS ($97,951.00) to Reytec Construction Resources, Inc., for such change
order.
Section 3: This resolution shall take effect immediately from and after its passage by the
Board of Directors of the Baytown Area Water Authority.
INTRODUCED, READ and PASSED, by the affirmative vote of the Board of Directors of the
Baytown Area Water Authority this the 16th day of May, 2007.
1
RO8ERT L. GILLETTE, President
L ODY, Assistant Secretary
APPROVED AS TO FORM:
dZXACIO RAMIREZ, SR.,G al Counsel
R:1KarenlFiles\BA WA\Resolution120071BA WARcytecChangeOrderNo,4.doc
W.'6 S I t*Z.,:it I.,I I)tit it rimmo:t vs%%I o wil to ill;sr9�,.i-,I will
itirld V,%\%:jI ultslsa ayt of ui,ippw miod ItIl of tIo1Ir.qIq'()j%
I N()1%, �SNOISLVIII S-1 NAM 1.10(11.)VIII No .) I
411) lNt)N :S\i)ISIADI I)NI\\VMI
� y r d:,�
1.1i N, it%%ol wil all"I-Jamil'.111"I
Intil'ilio.1111 tit p.11311pul st,Stll)llllllltl,,1,111.xttivl.1111IN.1111 1.111tin 111tulop.1d Ikl Ilegs J.111jo x-mull.-I sly S(j 11.1jaw.)lion.1111
oc I,
.11mix-fill)J.1till.)lit"..11111pq.11111'141.1sv.1 III ll%%I)l ivjl jo i11.1.1111 111 1.111!1l sliolilluo.s jqj.111!wid of�t.1,1111,1P
,till lit.1%ticlind att I -mill ..9c;-4111mvi mll It-I tivill 111111 tiIIII.I.ItI110.1 I.IN%.1111.10 11.111 to Japray mll Io 1111.1 Illioll.1111 it--"I III
tiol 1.1.111(It):'I I I lit I od a111,-1 ilm.sl I Ito I intp j I,I 1.1111 till v lull 4, iq i Ito.,N\ilq uou,auIit to lit I(sd attI satttrotu•.30 til't I I t I I
ltlt)OLII\'1.111JItIo.)11311"11.10jo Ill. I
:Itillottiv oluitio.) %.III
MY I WL6S *41(11 ItIllottl\.,
:Itillottl\'. 1,11!jltllv.)
00*099*89O*6S Pluillo')11,10I.I()
Ilopfulstloj x1lial1
1001 L 9 ddV HAMM
ilp(oil III v lumv limoril-11
(IN'I'll
t try j1IIJ()xitluti.)
111IM: ki'llssliusill-11 JaIlUM..91/..Of
11HUM)
SU 3 El N 10 N A 3 1Vd
Reytec Construction Resourcesq Inc.
1901 Hollister
Houston.Texas 77080
Office 713.957.4003
w �.w -�• wwr�
March 30, 2007
Pate Engineers
13333 Northwest Freeway. Ste. 300
Houston.TX 77040
Attn: Paul C.Wallick P.E
Re: Subject:Cost Proposal for the 30" Waterline to the Pump Station Header
Project: 2076- 30"!16" Water Transmission Man {BAWA}
Pate Proj 9: 1329-003-00
Mr. Wallick:
Proposal to connect the proposed 30" Waterline to the Pump Station Header is as follows:
Step 1:
Remove and Salvage as follows:
• 30" Waterline - 68 It'
Access Manhole - 1 ca
• Air Release Manhole ._ 1 ea
• Butterfly Valve tilanhole - I ca
• 30" Butterfly Valve %v/Fittings- 1 ea
Step 2:
Installation of the following:
• 30" Waterline w!Restrained Joints- 190 1f
• Access Manhole- I ea
• :fir Release Manhole - 1 ea
• Butterfly Valve Manholes- 1 ea
• �U" l3uttertly Valve ��!related fittings and thrust blocking
Step 3:
Removal of the following:
• Remove concrete thrust black at the end of'the 48" header
• Remove 48" Blind Flange and install 48"x 30" Reducer Fittings[requires pump
station shut down]
Remove existing Valves and Access Manholes
Description Q Units Unit Price Total
Labor and Equipment 2 days $ 3,495.00 $ 699000
Haul of broken stabilized sand 36 cy $ 5.00 $ 180.00
Backfill and Grade Site 1 day $ 3,495.00 $ 3.4
Subtotal $ 10,665.00
Remove of Concrete Thrust Block/Tie back to Puma
Station
Labor& Equipment 2 da s $ 3.495.00 $ 6,990.00
Install Manhole 2 ea $ 3,495.00 $ 6,990.00
Install Butterfly Valve �v/fittin&s 1 ea $ 3.495.00 $ 3.495.00
Haul of broken concrete 10 c $ 4.00 $ 40.00
Cement Stabilized Sand 36 tons S 15.00 $ 540.00
Concrete Thrust Block 12 c $ 80.00 $ 960.00
30"x 90 deg MJ DI Bends 1 ea $ 4.300.00 $ 4.300.00
30" Solid Sleeve 1 ea $ 2.600.00 $ 2,600.00
30" Start Grip Restraint for fittings 3 ea $ 682.50 $ 2.047.50
30" Pipe Restraints 12 ea $ 850.00 $ 10 200.00
48"x 30" Steel x 90 degree reducing blind flange 1 ea $24.600.00 $ 24 600.00
Install 30"Waterline 190 I 1 day $ 3,495.00 $ 3,495.00
30" PVC Pie 190 If $ 70.65 $ 13 423.50
Trucking Haul surplus etc.. 180 c $ 4.40 $ 792.00
Bank Sand for Bedding 280 c $ 6.50 $ 1,820.00
Remove and Replace Concrete Slab 56 SY 70.00 $ 3,920.00
Remove and Replace exist Asphalt 22 s $ 55.00 $ 1.210.00
Restore Grass 1 EIs $ 1,000.00 $ 1,000.00
Total $99 088.00
15% Profit&Overburden $ 14,863.20
Subtotal $ 113,951.20
Credit:
Delete Item#23[Wet Connections for exist 36'
Waterline] is $16,000.00 $06.000,000
Total $97,951.00
UdIJU/ZWOf 1b:OV 114WILWOf! Mr-TIG9.► , nun Y`ffY•1
,i
Should you need any more additional ini'onnation,please feel free to contact us.
'hank you.,
wheuely
Reytea Construction Resources,Inc.
C ;" .ed?m 4
Ramesh Pavalud
Project Manager
'Q1-25-2006 01:511`11 FR014-PATE ENGINEERS +T13-462-1631 T-050 P-011/024 F-313
Item Section Description of Item with Unit Total
H& om Unit UnitPrice Wmi}tmem in Words Price gs
23 02SI1 I fiA. Wet Commmm orlon to Bxisdag 36"Waterline using
02S H 36"x30"Cut in Teo with Split Butt Bttaps,Complete in
Place:
® S Ty � vjn.� $ /G, 000� $Per Ei&cn
-
DoL�y
24 02511 1 and x 12-inch Tapping Blom
02525 and VaW%Complete in Placer
® StL✓.C� 'Tito aJl A,fS 7 d D� 3 7 OOa
rJ0 L."44
Per Each
25 01578 6,000 L.F. Famish and Install Well Pointing System,Complete in
Place:
® f/- o Gt rnA.) $ /S 7 $ �o Ars a
Per Linear Foot
26 M260 31,300 L.F. Famish and Install Tremh SOW System for Water Line
Consnaction,Complete in Plum
® OuX 17yw•sh $ S Y/300 Per Linear Foot
27 01160 1 L.S. Preparatory Work inolndimlg MobWtation and
Monitoring Assoolated with Potentially Contantianted
3oi1/0roundwater per Specifications,Complete in Place:
@ �iF r. -� Tim•n�.�� $
00 L&O A4
Per Lump Sum
28 01160 1,500 C.Y. Handling,Transportation,Trca==and Disposal of
Impacted Soil and Ground Water from Open Cut or
Auger Construction,Methods per Spacificatl=%
Including All Material,13"menr,and Labor.Complete
in Place:
Per Cubic Yard
Bid Sheet Must Be Ldtfaled By Some Potion As Proposal ot/ S of 1 S ADDFNDUM NO.I