BAWA Resolution No. 2006-12 RESOLUTION NO.2006-0012
A RESOLUTION OF THE BOARD OF DIRECTORS OF THE BAYTOWN AREA
WATER AUTHORITY AUTHORIZING CHANGE ORDER NOS.1 AND 2 WITH
REYTEC CONSTRUCTION RESOURCES.INC..FOR THE BAWA 304NCH WATER
TRANSMISSION LINE PROJECT SUBJECT TO THE APPROVAL OF THE CITY
COUNCIL OF THE CITY OF BAYTOWN:AUTHORIZING PAYMENT IN THE
AMOUNT OF ONE HUNDRED TWENTY-SEVEN THOUSAND ONE HUNDRED
FIFTY-SIX AND NO/100 DOLLARS(S127.156.00);AND PROVIDING FOR THE
EFFECTIVE DATE THEREOF.
BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE BAYTOWN AREA WATER
AUTHORITY:
Section 1:That subject to the approval of the City Council of the City of Baytown,Texas,the
Board of Directors of the Baytown Area Water Authority hereby authorizes Change Order Nos.I and 2 with
Reytec Construction Resources,Inc.,for the BAWA 30-inch Water Transmission Line Project.A copy of
Change Order Nos.I and 2 are attached hereto,marked Exhibits"A"and"B"respectively,and made a part
hereof for all intents and purposes.
Section 2:That subject to the approval by the City Council of the City of Baytown,Texas,of
the change orders referenced in Section I hereof,the Board of Directors of the Baytown Area Water
Authority hereby authorizes the payment of ONE HUNDRED TWENTY-SEVEN THOUSAND ONE
HUNDRED FIFTY-SIX AND NO/100 DOLLARS(S127,156.00)to Reytec Construction Resources.Inc.,
for such change orders.
Section 3:This resolution shall take effect immediately from and after its passage by the Board
of Directors of the Baytown Area Water Authority.
INTRODUCED,READ and PASSED,by the affirmative vote of the Board of Directors of the
Baytown Area Water Authority this the 10h day of November,2006.
ROBERT L.GILLETTE,President'
`'T:
DY,Assistant Secretary
APPROVED AS TO FORM:
ACIO RAMIREZ,SR..Gee I Counsel
R:\KarenU'iles\BA WA\Resolution\20061BA\%IA301ncliTransniissionLineProjectCliangeOrder I.doc
Page 1 of I
PATE•ENGINEERS
CONTlZakCI'CIIANGI:ORDER
Project:30"/16"WaterTransmission Main Date:11/7/2006
Change Order No.:I
!oh No.:1329-003-00
Contract No.:1
Client.Baytown Area\\,ater Authority
Contractor:Reytec Construction Resources,Inc.
REVISE.[)CO,\TRACT'AMOUNT
Original Contract Amount:S9,06S,660.0c
Previous Contract Amount:SOAM
Amount This Chansw Order:S-[.3>6.00
Revised Contract Amount:S9,073,016.00
Percent of Original Contract amount I wO.Od"o
1.GENERAL.STATEMENT OF CHANGE:
Repair 6"waterline in'lTtompson Road not shown on the drawings.The line serves water to the I Iighlands
EST'.Iteytec worked with BAWA to have valves closes[and then made necessary repairs.
3.TIME:E:I day
fhc work covered by this change order shall he pet formed under the same terms and conditions as included in the original
construction contract.
['Ranges Recommended:Changes Approval:
►E.m�uineer-Pate Engineers,Inc.1 Baytown Area Waler Authority
r/Owner
BV.�Q Q�u(m)�
Bv:
(l.)atc)
Reytec Construction Resources,Inc.
Contrac
By:cat_l 1 6 O(c
(Dale)
ADDITIONAL.ITEMS
3.CO\'TRACT DliAW1NG REVISIONS:NONE-(To he addressed(in As-Builts)
•1.CONTRACT DOCUMENTS REVISIONS:NONE
i.CONTRAC l'PRICE REVISIONS:
Repair broken 6"water line.S 11.350
TOTAL AMOUNT Or•CUANGE ORDER NO.I S 4,356.00
EXHIBIT A
Pace 1 of l
PATE•�ENGINEERS
CONTRACT CHANCE.ORDEIR
Pn>jc:t:.10"16"Water Tralrmission Main Date:1 1•7i2006
Chanec Order No.:2
Jot)No.:1 329.00 3-00
Contract No.:I
Client:flaytoisn Area Water Authority
Contractor:Reytec Construction Resources,Inc.
1C WISED CONTRACT AMOUNT
Original Conuact Amount:S9,06S.660.00
I'rcciou�Cuntrlct:\mount S9.07 3,016.00
Amount I ills Chain-,c Order:S 122.500,00
Re%iscd Conliact Amount:$').195.816.00
Percent of Original Contract Amount 101.40%
I he c\isting 12"naterline shcmn on the plans along I llotllpsim kmcen stations 2S-?110 and•15*00 is not
constructed as shops.It is"est of the location shown and must he nwsed to acconmlodate the pro►x)sed 30"line.
Connect 12"and 30"%utcrlincs%%ith 12"line and g atc sahc.
3.TIMI{:10 days
The%%ork conned b%this change order shall be fkr6orincd under tl)c Name terms and conditions as included in the original construction
contract.
Challges Recultlnlended:Changes Approved:
Engilu•er-fate Enuincers,Inc.Baytown Area 1\'nler Authority
I)lcnrr
(Dater Ry:
(Date)
Rcytec Construction Resources,Inc.
Contract:I ly:/A
r%
(Date)
ADDITIONAL ITEMS
_.CON 1RACl DPAWIN(l REVISIONS:NONF I'o tv addressed on As-Ituilts)
4.CON I RACI'DOCIAME\I'S REVISIONS:NON
C)N I RACE PRICE REVISIONS:
Install new 12"isatcrlin-,and abandon c\Wien-.Connect 12":md
30"lines%%ith tees and eau:calk.S 122.S00
TOTAL AMOUNT OF CI IA\GK ORDER No.2 S 122,800