Ordinance No. 14,646ORDINANCE NO. 14,646 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AUTHORIZING CHANGE ORDER NO. 5 WITH COMEX CORPORATION FOR THE FIRE TRAINING FACILITY PHASE 3 PROJECT; AUTHORIZING PAYMENT BY THE CITY OF BAYTOWN IN THE AMOUNT OF FORTY-SIX THOUSAND SEVEN HUNDRED EIGHTY-NINE AND NOI100 DOLLARS ($46,789.00); AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. ****************************************************************************** BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council of the City of Baytown, Texas, does hereby authorize Change Order No. 5 with Comex Corporation for the Fire Training Facility Phase 3 Project. A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. Section 2: That subject to funding from the Baytown Municipal Development District, the City Council of the City of Baytown authorizes payment to Comex Corporation, in an amount not to exceed FORTY-SIX THOUSAND SEVEN HUNDRED EIGHTY-NINE AND NO./ 100 DOLLARS ($46,789.00) in accordance with the change order authorized in Section 1 hereinabove. Section 3: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 141h day of January, 2021. BRANDO CAPETILL , Mayor KAREN L. HORNER, City Attorney RAKaren HorneADocumentsTiles.City Council Ordinances\202lVanuary 14 ChangeOrderNo5forF reTrainingFacilityPhase3Project.doc Exhibit "A" CITY OF BAYTOWN Baytown Fire Training Facility Phase 3 Change Order No. 5 BAYTOWN PO: 1906779 Date: January 3, 2021 Synopsis: The relocation of two power outlets for the Indoor Classroom Building training room ceiling so that the projector power is closer to the units, a fire alarm autodialer needs to be added to meet code, split wire loom added to conceal the data cable within the exposed ceiling of the Indoor Classroom Building, add seven valves that control a fire suppression system located around the fire training structure, and changes for a revised concrete pad for the larger 12,000 gallon propane tank and protective bollards. Brief Description of Changes: Item 5.1: The first item of work is for an increase of $2,125.00 to relocate two power outlets for the Indoor Classroom Building training room ceiling mounted projectors so that the project power is closer to the units, and not exposed on the ceiling. Item 5.2: The second item of work is for an increase in the amount of $2,598.00 for a Fire Alarm Auto -dialer for the indoor classroom building to ensure communication between the fire alarm panel and the City's fire monitoring service as required by code. Item 5.3: The third item is an increase in the amount of $5,368.00 for a split wire loom, added to conceal the data cable within the exposed ceiling of the Indoor Training Room building. Item 5.4: The fourth item is an increase in the amount of $26,806.00 for seven valves that control a fire suppression system located around the fire training structure to extinguish the training fire similar to what is used in the industry. These water valves will provide a realistic training experience for firefighters. Item 5.5: The fifth item is an increase in the amount of $9,892.00 for a revised concrete pad for the larger 12,0000 gallon propane tank and protective bollards, relocation of tank controls and of emergency shut off controls. The propane tank size was increased from the original design, and will allow the training to occur for longer periods of time minimizing interruptions and enables the City to obtain wholesale pricing when purchasing propane Add or Delete Items: Item Description Unit QU4ntily Unit Price Total 5.1 Relocating power for projectors LS 1 $ 2,125.00 $ 2,125.00 5.2 Autodialer for Fire Alarm LS 1 $ 2,598.00 $ 2,598.00 5.3 Conceal Data Cable with White Split Wire Loom LS 1 $ 5,368.00 $ 5,368.00 5.4 Seven Valves at monitors at the Fire Training Structure LS 1 $ 26,806.00 $ 26,806.00 5.5 Revised Concrete Pad for 12,000 gallon Propane Tank, Protective Bollards, and Related Work I LS 1 1 $ 9,892.00 $ 9,892.00 Total $ 46,789.00 ungnai 1 Original Contract Price $7,438,000.00 $ 7,438,000.00 2 Owner Contingency Previous Change Orders This Change Order Remaining Contingency 3 Change Orders Previous Change Orders $ 178,271.01 This change order $ 46,789.00 4 IRevised Contract Price $7,438,000.00 $7,663,060.01 Original Contract Duration 450 NTP Date 7/15/19 10/7/20 Previous Extensions 95 Original Complete Date This Change Order 42 Revised Duration - Calendar Days 587 Revised Duration Date 02/21/21 01 /04/21 , �,,1 �'� °� r-- - 01 /06/2021 Contract Date: G Director: Frank O. Simmeaux, Jr., P.E. Date L� , Cons ant Project Manager .J ,tom, M -WV'A 1-4-2021 City Manager Date Documentation for Item 5.1 Comex Corporation Page 1 of 1 9841 Spencer Highway LaPorte, TX 77571 (281) 479-2322 Change Order 12/01 /2020 Project: Baytown Fire Training To: Contract : 1061 Change Order: 30 Owner/GC CP: Reference: Section: RE: Power for Projectors Requested Respond Scope of Work: Relocate power to new Projector locations as installers didn't mount per architectural drawings. Electrician $ 1,450.00 Supervision $ 500.00 OH&P $ 145.00 Bond &Ins $ 30.00 Total $ 2,125.00 Total Proposed Amount: $2,125.00 The Contract time Will be extended by: 0 days Please indicate your approval by returning a change order for the work specified. Distribution: Sincerely, -may r Rickey Trant ,�pidentia! .#ONuff Coast Commercial Industrial Lir° �* 4p � qE L18185 2005 Pecos @ Fourth • Beauiwnt, Texas 77701 November 18, 2020 Comex Corp 9841 Spencer Hwy La Porte, TX 77571 RE: Baytown Fire Training — Relocate boxes We are submitting pricing to relocate four junction boxes located in the ceiling by 10'. The price includes labor and miscellaneous material. The price excludes overtime and sales tax. Material — $ 150 Labor - $ 1,300 Total - $ 1,450 The price is based on regular working hours of Monday through Friday from 7:00am to 3:30pm. If you have any questions or comments, please contact the office. Sincerely, Gulf Coast Electric Co., Inc. .f Kevin J. icard Vice President Kjp/jmh Cc:files IGWT 409833 2828 • fax409833-4308 • unimp fcoaste/ectric.com Jr i r Documentation for Item 5.2 Comex Corporation Page 1 of 1 9841 Spencer Highway LaPorte, TX 77571 (281) 479-2322 Change Order 12/15/2020 Project: Baytown Fire Training To: Contract : 1061 Change Order: 32 Owner/GC CP: Reference: Section: RE: Auto Dialer Requested Respond Scope of Work: Provide and Install Auto Dialer per attached sub proposal. Monitoring is not included and cellular service is provided by others. Firetron $ 980.00 Supervision $ 1,500.00 GC OH&P $ 98.00 Ins And Bond $ 20.00 Total $ 2,598.00 Total Proposed Amount: $2,598.00 The Contract time Will be extended by: 21 days Please indicate your approval by returning a change order for the work specified. Distribution: Sincerely, Rickey Trant i IFE SAFETY SOLUTIONS Tuesday, December 15, 2020 To: Comex Construction Attn: Ricky Trant Project: Baytown Fire Training Facility Re: Cellular Dialer Pricing FIRE ALARM TOTAL Price: S 980.00 (excludes tax) Scope of Work: FireTron shall provide, install, and program a cellular dialer for the facility. Note 1: Monitoring is not includes in this pricing. Note 2: Cellular service by others. Exclusions: Fire alarm system devices not shown on the contract drawings, bonding fees, providing and installing conduit, standard conduit boxes and stub ups, any costs associated with asbestos, 120 VAC wiring and interlocks, sleeving, fire stopping, overtime, ceiling work, patching, painting, millwork modification (if required), and cutting or repair of wall coverings. FireTron Inc. appreciates the opportunity to quote this project. Please feel free to contact me if you have any questions concerning this quotation. Sincerely, 9e z"qe Daniel Keene Account Manager (281) 924-1 155 Approval Signature: Date: Printed Name: Documentation for Item 5.3 Comex Corporation Page 1 of 1 9841 Spencer Highway LaPorte, TX 77571 (281) 479-2322 Change Order 12/01 /2020 Project: Baytown Fire Training To: Contract : 1061 Change Order: 31 Owner/GC CP: Reference: Section: RE: Data Cable Clean Up Requested Respond Scope of Work: Conceal existing data cabling with white split wire loom per attached sub proposal. Data sub $ 3,900.00 Supervision $ 1,000.00 Oh&P $ 390.00 Bond & ins $ 78.00 Total $ 5,368.00 Total Proposed Amount: $5,368.00 The Contract time Will be extended by: 0 days Please indicate your approval by returning a change order for the work specified. Distribution: Sincerely, Rickey Tran A CCUrEK DATE DECEMBER 01, 2020 REFERENCE BAYTOWN FIRE STATION PROJECT NEW TRAININIG FACILITY CABLE PATHWAY Accutek Technologies is pleased submit our proposal for the following reference above. Pathways Provide all materials, labor, tools, to install a SPLIT WIRE LOOM tubing through the open are cable pathways We will provide and install a 2"in Polyethylene WHITE loom around the main data cable pathway b We will provide and install a 1/4"in Polyethylene WHITE loom around the data cable pathway off of the main pathway to the drop location WORK NOT INCLUDED Furnishing and installation of aW network equipment, patch cords, wireless access points, workstation computer devices, IP telephones and all similar equipment Testing or re -terminating jacks New j-hooks Existing AV cable pathway Qj ALIFICATIONS & EXCEPTIONS All work within our proposal is based work hours Monday -Friday 8AM - 4PM ■ Proposal does NOT INCLUDE overtime or weekends ■ Proposal does INCLUDE sales taxes n All workmanship is backed with a one (1) year warranty from the date of substantial completion of the project terms Access to area where work is to be performed for the duration of the installation period and clear of any debris Material and Labor: $3,900.00 ACCUTEK TECH 2O17 13150 FM 529 ROAD. STE 122 HOUSTON TX 77041 281.970.60991mm myaccutek com Rv 2017 0200 1 P91 of 2 V ' .HUB A CCIMEK DATE DECEMBER2020 REFERENCE BAYTOWN FIRE STATION STATION PROJECT NEW TRAININIG FACILITY CABLE PATHWAY ? ; If this proposal is accepted, please sign below and email back a signed copy. We will not mobilize until we have received a signed copy or an email of acceptance. If you should have any questions, please feel free to contact me by email;1O.h�r Respectfully, Royall Hernandez, Accutek Technologies ACCEPTED BY: NAME COMPANY SIGNATURE DATE PURCHASE ORDER NO ACCUTEK TECHNOLOGIES, ROYALL HERNANDEZ DATE ACCUTEK TECH • 2017 13150 FM 529 ROAD, STE 122 HOUSTON, TX 770411 281.970.60991 Am myaccutek oom Rv 2017 0200 1 P92 of 2 Documentation for Item 5.4 Comex Corporation Page 1 of 1 9841 Spencer Highway LaPorte, TX 77571 (281) 479-2322 Change Order 12/15/2020 Project: Baytown Fire Training To: Contract : 1061 Change Order: 33 Owner/GC CP: Reference: Section: RE: Monitor valves Requested Respond Scope of Work: Provide and Install 7 Monitor control Valves per Sub Proposal. Plumber $ 20,854.00 Supervision $ 3,450.00 OH&P $ 2,085.40 INS and Bond $ 417.00 Total $ 26,806.00 Original Contract: $7,438,000.00 Net Change by Previous Change Orders: $187,038.97 Contract Sum Prior to this Change Order: $7,625,038.97 Total Proposed Amount: $26,806.00 Revised Contract: $7,651,844.97 The Contract time Will be extended by: 21 days Please indicate your approval by returning a change order for the work specified. Distribution: Sincerely, ��— Rickey Trant D E R R Y B E R R Y' S 4�A 10 P1s3M us to. Llt MECHANICAL I M3 December 14, 2oso Job # Baytown Fire Training Facility CPR/RPP # Proposal # 4827 vavies at monitors Quantity Description Unit Total Unit cost Total Unit Total Labor Labor Material Material Equipment Equipment 1 Fu-Fm--oterial 0.00 $ 16,472.82 $ - $ - $ - $ - $ $ $ 1 labor 50.00 0.00 0.00 0.00 $ $ - 0.00 $ $ 0.00 $ $ - 0.00 $ $ - 0.00 $ $ - 0.00 $ - $ - 0.00 $ - $ - 0.00 $ - $ - 0.00 $ - $ - 0.00 $ - $ - 0.00 $ - $ - 0.00 $ - $ 0.00 $ - $ 0.00 $ - $ 0.00 $ - $ 0.00 $ $ - 0.00 $ $ 0.00 $ $ 0.00 $ $ 0.00 $ - $ 0.00 $ - $ 0.00 $ - $ - 0.00 $ - $ 0.00 $ - $ 0.00 $ - $ 0.00 $ - $ 0.00 $ - $ Contractor Our price to add the valves at the seven monitors will be $20,854.00. The material quote is attached. If you have any questions feel free to give me a call. Total Man Hours 50.00 Labor Rate 35 00b $ 1,750.00 Labor W/ Burden ;�4M.!'• $ 2,485.00 Total Material $ 16,472.82 Total Equipment $ - Contractor Total Cost Contractor OH&P 10% $ 18,9S7.82 $ 20,853.60 Subcontractor Sheet Metal Sub. Insulation Sub. Controls Sub. Electrical Sub. Water Treatment Sub. $ _ $ - $ - $ - Sub Contractor Total Cost Sub Contractor W/ OH&P 5% $ $ Proposal Subtotal 20,853.60 Tax °0:00W $ - Mike Broz - Project Manager Bond 10.00% 0.00% $ $ Permit Total Bid $ 20,853.60 Page 1 DERRYBERRY'S LP Bid Date: 12/31/2020 Core & Main 1590880 Seq# Qty Bid Proposal for BB BAYTOWN FIRE ADD ON Description Core & Main 4053 Homestead Rd Houston, TX 77028 Phone: 713-672-1472 Fax: 713-672-8111 Units Price Ext Price j 10 i 7 L 30 — 6 3006P DI STARGRIP RESTR. (I)W/ACC - SGDPPK06 — FLANGE KITS ARE 300# OR 1S0# EA 43.85 — 306.95 � 0 �F _ CONTRACTOR TO CONFIRM _ 416.92 J 60 j 14 4X1 8 3000 FLG ACC RR FF ZINC BOLT NUT & GASKET SET EA 29.78 169.96 80 3 4X1 8 FLG ACC RR FF EA 12.141 100 _9-11 WEEK LEAD TIME 110 7 4" FLG POTTER FP10560 — — — -j —� EA �. 2.205.288 Su _ — 55,441.16 16,334.99 _ 137.83 0.00 ' 16, 274 8 12 Branch Terms: UNLESS OTHERWISE SPECIFIED HEREIN, PRICES QUOTED ARE VAUD IF ACCEPTED BY CUSTOMER AND PRODUCTS ARE RELEASED BY CUSTOMER FOR MANUFACTURE WITHIN THIRTY (30) CALENDAR DAYS FROM THE DATE OF THIS QUOTATION. CORE & MAIN LP RESERVES THE RIGHT TO INCREASE PRICES UPON THIRTY (30) CALENDAR DAYS' NOTICE TO ADDRESS FACTORS, INCLUDING BUT ! NOT LIMITED TO, GOVERNMENT REGULATIONS, TARIFFS, TRANSPORTATION, FUEL AND RAW MATERIAL COSTS. DELIVERY WILL ! COMMENCE BASED UPON MANUFACTURER LEAD TIMES. ANY MATERIAL DELIVERIES DELAYED BEYOND MANUFACTURER LEAD j TIMES MAY BE SUBJECT TO PRICE INCREASES AND/OR APPLICABLE STORAGE FEES. THIS BID PROPOSAL IS CONTINGENT UPON BUYER'S ACCEPTANCE OF SELLER'S TERMS AND CONDITIONS OF SALE, AS MODIFIED FROM TIME TO TIME, WHICH CAN BE FOUND i AT: hUsWcoreandmain.com/TandC/ 12/03/2020 11:11 AM Actual taxes may vary Page 2 of 2 Documentation for Item 5.5 Comex Corporation Page 1 of 2 9841 Spencer Highway LaPorte, TX 77571 (281) 479-2322 Change Order 12/17/2020 Project: Baytown Fire Training To: RE: Propane Pad Requested Respond Contract : 1061 Change Order: 34 Owner/GC CP: Reference: Section: Scope of Work: Compact existing Soil, provide and Install 12 bollards with cross bracing, then frame and pour a 15'x56' concrete Pad for Propane tank and Skid provided by others. Exclusions Existing Estop and new Estop to be moved and installed By others. Suburban to tie Tank into existing Liquid and Vapor Lines. Comex Excludes any extension of Liquid and or Vapor lines. No manifolds or fill stations will be provided or installed by Comex. Setting of Tank and skid will be By others. No fencing is required Permits if required will be pulled and paid for by others. Original Propane tank and pad credit ( $ 12,000.00) Revised Concrete Pad and bollard infill $ 12,200.00 Bollard material and welding $ 3,992.00 Supervision $ 4,950.00 OH and P Bond and Ins. $ 750.00 Total $ 9,892.00 Total Proposed Amount: $9,892.00 Comex Corporation Page 2 of 2 9841 Spencer Highway LaPorte, TX 77571 (281) 479-2322 The Contract time Will be extended by: 0 days Please indicate your approval by returning a change order for the work specified. Distribution: Sincerely, Rickey Trant / Z / 1'F I 'ZG COMMERCIAL CONCRETE SUBCONTRACTORS 13326 Ralph Culver Rd, Suite 110, Houston, TX 77086 B" Office: 281-784-3070 — Fax: 281-791-0117 Al.�. www.botellobuilders.com December 16, 2020 Company: Comex Contractors Project: Baytown Fire Training Facility Location: 7022 Bay Way Drive, Baytown, TX 77520 Description: Boteilo Builders Corporation to Provide: Revised Propane Pad I Y X 56' Propane Pad 6" Thick with r 3 Rebar @ 18" w/ 12" X 18" Perimeter Grade Beam w Cont. ##4 Rebar Includes Compaction of Soil Beneath Slab Rebar Placement, Concrete Pouring, Finishing and Form Wrecking Installation of 12 Pipe Bollards and filled with Concrete (Steel Bollard Pipes must be Furnished by General Contractor and Installed by Subcontractor) Excluded Items: ■ Any Type or Brand of Joint Sealant (Must be Done by Others) • Colored, Stamped, Textured, or Any Type of Decorative Concrete (May be Included as a Change Order) • Removal or Placement of any type of subgrade fill materials such as select fill, aggregate base, or bank sand from/into property ■ Permits, Engineering, Testing, and/or Inspections (Must be Obtained by GC . Owner if Needed) • Surveying (GC Must Provide Surveyor to Mark Building Comers Prior to Starting Foundation Form Work) ➢ Subcontractor not to be liable for unavoidable surface cracks that mi ht appear on concrete slabs even after following all engineered specifications Provided. ➢ All footage quantities provided on this proposal are approximate to exact dimensions. ➢ Any other work or material that mieht arise and that is not mentioned on this proposal will be added to the total bid amount as a change order. Y Warranty to be provided for all proposed Concrete will be One (1) Year from date of Substantial Completion Extended warranties may be provided for an additional fee New Propane Pad ----•------------------------------------------------------------------------------------- Total $ 12,200.00 er S . Ft. Rate: n/a Grand Total: $ 12 00.0 * Prices on this Proposal are valid for 30 days Terms and Conditions: 1. Scope of Work. Subcontractor agrees to furnish all labor, services, materials, installation, supplies, insurance, equipment, tools and other facilities required for the prompt and efficient execution of the work described herein in a professional and workmanlike manner. 2. Quote Amount. General Contractor agrees to pay Subcontractor for the strict performance of his work, the sum as indicated above subject to additions and deductions for changes in the scope of work as may be subsequently agreed upon. This work will be started within three days after confirmation has been received that you agree with what has been presented to you in this proposal. The parties hereto have executed this Agreement for themselves, their heirs, executors, successors, administrators, and assignees on the day and year written below. Signed By: Eleazar G. Botello Botello Builders Corporation President Date: Accepted By: General Contractor Title: Date: ill li-)r('r?I)OMWILIIIders.com 2