Ordinance No. 14,618ORDINANCE NO. 14,618 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AUTHORIZING CHANGE ORDER NO. 4 WITH COMEX CORPORATION FOR THE FIRE TRAINING FACILITY PHASE 3 PROJECT; AUTHORIZING PAYMENT BY THE CITY OF BAYTOWN IN THE AMOUNT OF FORTY THOUSAND FIVE HUNDRED NINETY-THREE AND NO:100 DOLLARS ($40,593.00); AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 4 with Comex Corporation for the Fire Training Facility Phase 3 Project. A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. Section 2: That subject to funding from the Baytown Municipal Development District, the City Council of the City of Baytown authorizes payment to Comex Corporation, in an amount not to exceed FORTY THOUSAND FIVE HUNDRED NINETY-THREE AND NOI100 DOLLARS ($40,593.00) in accordance with the change order authorized in Section 1 hereinabove. Section 3: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 1 Oth day of December, 2020. BtM>DOt4 CAPETILL , Mayor 4' ATTEST: BRYSCH, C'ty Jerk APPROVED AS TO FORM: KAREN L. HORNER, City Attorney �.• •.0,� M� 'm n RAKaren HomeADocumentsTiles City CouncillOrdinances\2020\December 10'•ChangeOrderNo4forFireTrainingFacilityPhase3Project.doc EXHIBIT "A" CITY OF BAYTOWN Baytown Fire Training Facility Phase 3 ly ;, ;- ;• < Change Order No. 4 BAYTOWN PO: 1906779 Date: November 9, 2020 Synopsis: The landscaping needs to meet the City's landscaping requirements thus, with this change order the contractor would design and install the irrigation lines, hydromulch 2 acres, and plant the shrubs and trees which will be provided by the City to the contractor, a welder and his equipment for one day, mobilization for the steel erectors. Brief Description of Changes: Item 4.1: The first item of work is for an increase of $36,417.00 to design and install landscaping and irrigation, hydro mulch for 2 acres, and labor to install plantings provided by the City. This addition will allow the project to meet the City's landscaping code requirements. Item 4.2: The second item of work is for an increase in the amount of $1,176.00 for the required welder and equipment to weld the fire training structure "fin fan" to the foundation at its final location. Item 4.3: The third item is an increase in the amount of $3,000.00 for mobilization for the steel erectors to install handrails and grating that were added for the safety of the fire fighter training. Add or Delete Items: Item Description Unit Qagntity Unit Price Total 4.1 Revised Landscaping& Irrigation LS 1 $ 36,417.00 $ 36,417.00 4.2 Welder for welding fin fan to Final Location LS 1 $ 1,176.00 $ 1,176.05 4.3 Mobilization for Steel Erectors LS 1 $ 3,000.00 $ 3,000.00 Total $ 40,593.00 1 10rieinal Contract Price 4 1 Revised Contract Price 1 1 $7,438,000.00 I :]�n� I K/ ons tant Project Manager T� M 11-24-2020 40,593.00 NTP Date 7/15/19 Driginal Complete Date 10/7/20 545 Revised Duration Date j 01/10/21 11 /25/2020 Director: Frank O. Simo; eaux, Jr., P.E. Date City Manager Date Documentation for Item 4.1 Comex Corporation Page 1 of 2 9841 Spencer Highway LaPorte, TX 77571 (281) 479-2322 Change Order 11 /18/2020 Project: Baytown Fire Training To: Contract : 1061 Change Order: 29 Owner/GC CP: Reference: Section: RE: Landscaping Requested Respond Scope of Work: Installation of landscaping, 2 acres of hydro mulch, and irrigation per attached Landscape drawing emailed on 11/11/20. Landscaping $ 16,582.00 Irrigation $ 4,900.00 Boring $ 5,000.00 Hydromulch $ 3,800.00 B&Ins. $ 606.00 supervision $ 2,500.00 OH&P $ 3,029.00 Total $ 36,417.00 Total Proposed Amount: $36,417.00 The Contract time Will be extended by: 0 days Please indicate your approval by returning a change order for the work specified. Comex Corporation 9841 Spencer Highway LaPorte, TX 77571 (281) 479-2322 Distribution: ez-�� Rickey Trant Sincerely, Page 2 of 2 Vista Landscape Services 11-16-2020 PROPOSAL: Baytown fire training revision Nov 2020 Planting Trees and Shrubs (Trees and shrubs to be provided by owner) $2,268.00 Includes mulch, soil, stakes, tractor, labor • Bullrock cost Includes bull rock, filter fabric • Bullrock installation Includes excavation, fabric and rock installation, tractor • Gravel cost Includes gravel, filter fabric . SEE NOTE #1 Y Gravel installation Incicludes fabric and gravel installation SEE NOTE #1 • Sprinkler System Design • Sprinkler System Installation C Metal Edging cost SEE NOTE #1 • Metal Edging installation SEE NOTE #1 Irrigation Design, permit, installation, certify 2 zones. Bubblers for trees, drip for shrubs. Meter by others. Boring by others $8,181.00 $3,118.00 $965.00 $325.00 $100.00 $4,800.00 $1,150.00 $575.00 NOTE #1 The limits of gravel and edging were loosely defined. Directions were "make a large curve so it is easy for them to mow." Cost is a best guess. NOTE #2: NG NCLUDED. Budget number — , 0.00. The am of boring nee is under the minimun for two contractors contacted. PROPOSAL good for 60 days from above date. BY OTHERS UNLESS OTHERWISE NOTED. water meter/electrical'sleeving/boring demo I ition4ree protection/maintenance/rough grade to .10 ft NO WARRANTY ON NON -IRRIGATED PLANTINGS OR GRASS. 12535 Cutten Road Houston, Tx 77066 346-363-7359 jake@vistals.com 1'.wm.ams= — � ll� ............ WA, M-1 EdgYV . . . . . . . . . . . . . . ........... M Ro ............ 3 .... ........ ---------------------- cr U- � L1.1 Documentation for Item 4.2 Comex Corporation Page 1 of 1 9841 Spencer Highway LaPorte, TX 77571 (281) 479-2322 Change Order 10/20/2020 Project: Baytown Fire Training To: Contract : 1061 Change Order: 28 Owner/GC CP: Reference: Section: RE: Welder Fin Fan Requested Respond Welder Fin Fan Scope of Work: Cost of Welder to Weld Fin Fan Base during fin fan installation per attached Day Rate. Welder was on site for over 10 hours. Welder Sub Total $1,050.00 GC OH&P $ 105.00 Ins and Bond $ 21.00 Total $ 1,176.00 Total Proposed Amount: $1,176.00 The Contract time Will be extended by: 0 days Please indicate your approval by returning a change order for the work specified. Distribution: Sincerely, Rickey Traant iG / Zal?z' Rickey Trant From: Nathan Rasberry Sent: Monday, October 19, 2020 8:28 PM To: Rickey Trant Subject: Fwd: Metro Erectors Day Rate Sent from my Phone Begin forwarded message: From: Matt Parmer <matt@metroerectors.com> Date: October 12, 2020 at 7:40:34 AM CDT To: Nathan Rasberry <nrasberry@comexcorp.com> Subject: Metro Erectors Day Rate Here is our day rate for the welder, welding machine, and iron worker that you asked me for. Welder, Welding Machine, and Iron Worker Day Rate- $1,050 Sent from Mail for Windows 10 Documentation for Item 4.3 Comex Corporation Page 1 of 1 9841 Spencer Highway LaPorte, TX 77571 (281) 479-2322 Change Order 08/12/2020 Project: Baytown Fire Training To: Contract : 1061 Change Order: 25 Owner/GC CP: Reference: Mobilization Section: RE: Mobilization Requested Respond Scope of Work: Due to Steel submittal delays we are requesting a Re Mobilization fee to install Grating and handrails. This submittal has been submitted for almost a month and a half now. Because of this delay we will have to pay our steel erector a mobilization fee to come back and install handrails and grating after the stairs are already finished. We also may need extra days to install grating and handrails past the latest completion date of 12/16/20 if this is pushed any further. If another Crane is needed a crane Fee maybe requested at a later date as well. See attached Backup. Mobilization Fee $3,000.00 Total Proposed Amount: $3,000.00 The Contract time Will be extended by: 20 days Please indicate your approval by returning a change order for the work specified. Distribution: Sincerely, Rickey Trant gIkZJZG Fwd: BFT - 05 51 00.02 Gratings & Handrails Shop Drawings Kailum Flores <KailumF@comexcorp.com> Wed 8/12/2020 6 33 AM To: Rickey Trant <RickeyT@comexcorp com> D 1 attachments (i MB) 05 5100.02 Gratings & Handraii Shop Drawings.pdf; Get Outlook fir ifl$ From: Kailum Flores Sent: Wednesday, July 1, 2020 4:12:22 PM To: Caitlin Regan <caitlin@tovanihart.com>; Todd Tovani <todd@tovanihart.com> Cc: Tommy Fire Training Lead Architect Abercrombie <tommy@abercrombiedesign.com>; Andrea.Brinkley <Andrea.Brinkley@baytown.org>; Juan.Macias <Juan.Macias@baytown.org>; John Blacker <JBlacker@hartgaugler.com>; Don Scherer <DScherer@laalp.com>; Dale.Hughes <Da le. Hughes@ baytown.org> Subject: BFT - 05 5100.02 Gratings & Handrails Shop Drawings See attached Platform (ALT#3)- Grate & Handrails — For Review & Approval. Thank You, Kailum Flores Comex Corp. 9841 Spencer Hwy LaPorte, TX, 77571 (a) 281-479-2322 Ext. 111 (c) 281-726-7696 1 Spec Sec _. Submittal Description 105 31 00 Steel Decking Shop Dravnngs Product Data Samples i 05 40 00 Cold -Formed Metal Framing Product Data i Shop Drawings 1 05 50 00 Wtal Fabrications Anchor Bolt Drawings Metal Classroom Build ng ' l i Prop Structure Shop Drawings - Sunshade Resubmttal r Steel Supports for Vanity 05 6100 Meta' Stars Shop Drawings ry0tdrad Draw gs i + D17C.5 +r061213 Structural Panel Concrete Sub Product Data • Cnm.dn• b Date Exp • Submittal * • Date Sena • Date Ret - Approved • Approved A - Revise & R Subcontractor 53100 01 08/1212019 08114/2019 X MSD 53100 02 02on.r1020 03110M20 X 64000 01 09/23/2019 10/09/2019 X 64000 02 10/0212019 10/09/2019 X Texas Premier 55000.01 07/19/2019 08/1612019 X MSD 6500002 09MM019 10/08/2019 X 055000.02.R1 10116/201910/2812019 X 55000 03 ON23/2019 10/0912019 X 6600004 10M412019 10/09/2019 X I -MG 055000.04.R1 11/04/2019 12/06/2019 X 6600006 04M3/2020 04/0712020 X 65100.01 06126/2020 07/09/2020 X MSD 55100 02 (Q11Qjj 61213 01 10/1612019 11/27/2019 X ci71Z n9 inmcmnia 14"W Pnia r USG RE: Elivaated Grating and handrails Steven Rogers <SRogers@hartgaugler.com> Thu 7/9/2020 10:21 PM To: Rickey Trant <RickeyT@comexcorp.com> Cc: Nathan Rasberry <nrasberry@comexcorp.com>; Kailum Flores <KailumF@comexcorp.com>; John Blacker <1Blacker@hartgaugler.com> Thanks, Rickey. This is the first I have seen of this submittal. We will get started with our review and return asap. Best, Steven Steven Rogers, PE I Principal ra HART GAUGLER + ASSOCIATES 12801 N. Central Expressway Suite 1400, Dallas TX 75243 0: 972.239.5111 (x210) I M: 214.923.8583 From: Rickey Trant <RickeyT@comexcorp.com> Sent: Thursday, July 9, 2020 5:10 PM To: Steven Rogers <SRogers@hartgaugler.com>; John Blacker <JBlacker@hartgaugler.com> Cc: Nathan Rasberry <nrasberry@comexcorp.com>; Kailum Flores <KailumF@comexcorp.com> Subject: Elivaated Grating and handrails The elevated handrails and grating submittal was sent separate from the stairs. Have you reviewed it? see attached if you missed it. Thank You Rickey Trant Project Manager Comex Corp. 9841 Spencer Hwy La Porte, TX 77571 (C) 713-829-2187 (0) 281-479-2322 x110 t J 4- Re: 8607-ALT#3- S2.57- Added Gratings & Handrails - For Review & Approval Rickey Trant < RickeyT@comexcorp.com > Mon 8/10/2020 4:37 PM To: Todd Tovani <todd@tovanihart.com> Cc: John Blacker <JBlacker@hartgaugler.com>; Nathan Rasberry <nrasberry@comexcorp.com>; Caitlin Regan <caitlin@tovanihart.com>; Steven Rogers <srogers@hartgaugler.com>; Tommy Abercrombie < tommy@abercrombiedesign.com >;'Andrea. Brinkley' <Andrea.Brinkley@baytown.org>; '1uan.Macias' <1uan.Macias@baytown.org>; David Walker <DavidAW@comexcorp.com>; Kailum Flores <KailumF@comexcorp.com> We need this to be released asap. Current steel stairs are projected to be finished August 24th but this delay for the grating and handrails are going to cause someone a mobilization fee as everything wasn't released at the same time. Thank You Rickey Trant Project Manager Comex Corp. 9841 Spencer Hwy La Porte, TX 77571 (C) 713-829-2187 (0) 281-479-2322 x110 From: Rickey Trant <RickeyT@comexcorp.com> Sent: Thursday, August 6, 2020 9:20 AM To: Todd Tovani <todd@tovanihart.com> Cc: John Blacker <JBlacker@hartgaugler.com>; Nathan Rasberry <nrasberry@comexcorp.com>; Caitlin Regan <caitlin@tovanihart.com>; Steven Rogers <srogers@hartgaugler.com>; Tommy Abercrombie <tom my@a bercro m bled esign.com> Subject: Re: 8607-ALT#3- S2.57- Added Gratings & Handrails - For Review & Approval Ok, Thanks. Tommy have you verified this with Kirilla? Thank You Rickey Trant Project Manager Comex Corp. 9841 Spencer Hwy La Porte, TX 77571 (C) 713-829-2187 (0) 281-479-2322 x110 From: Todd Tovani <todd@tovanihart.com> Sent: Thursday, August 6, 2020 9:18 AM To: Rickey Trant <RickeyT@comexcorp.com> Cc: John Blacker <JBlacker@hartgaugler.com>; Nathan Rasberry <nrasberry@comexcorp.com>; Caitlin Regan <caitlin@tovanihart.com>; Steven Rogers <srogers@hartgaugler.com>; Tommy Abercrombie <tommy@abercrombiedesign.com> Subject: Re: 8607-ALT#3- S2.57- Added Gratings & Handrails - For Review & Approval My understanding was Tommy was coordinating with Kirilla who may have input on the final configuration of the railings. Todd Tovani, AIA Tovani Hart 609 A Columbia St SW Olympia, WA c 360.791.0115 p 360.339.8274 On Thu, Aug 6, 2020 at 7:16 AM Rickey Trant <Ricke-J,wcomexcor() com> wrote: Has Tovani Hart answered Steven's Last question per his email back to Caitlin? Thank You Rickey Trant Project Manager Comex Corp. 9841 Spencer Hwy La Porte, TX 77571 (C) 713-829-2187 (0) 281-479-2322 x110 From: John Blacker <J Blacker@ hartau ler.com> Sent: Thursday, August 6, 2020 9:00 AM To: Nathan Rasberry <nrasberry@comexcorp.com>; Rickey Trant <RickeyT@comexcorp.com> Subject: FW: 8607-ALT#3- S2.57- Added Gratings & Handrails - For Review & Approval John Blacker, PE I Principal HART GAUGLER + ASSOCIATES 12801 N Central Expressway 3 *� d- Suite 1400, Dallas TX 75243 0: 972.239.5111 (x218) I M: 972.345.5227 Celebrating 20 Years From: Steven Rogers <SRQcIets a hartgaugler.cam> Sent: Thursday, August 6, 2020 8:45 AM To: John Blacker <JBlacker@hartga!jgler,com> Cc: Todd Tovani <toAd @tovanihar .com>; Caitlin Regan < v i a c m> Subject: RE: 8607-ALT#3- 52.57- Added Gratings & Handrails - For Review & Approval John — These were returned on 7/21. Steven Rogers, PE I Principal HART GAUGLER + ASSOCIATES 12801 N. Central Expressway Suite 1400, Dallas TX 75243 0: 972239.5111 (x210) 1 M: 214.923.8583 From: Nathan Rasberry <nrasberrv@comexcor.ccom> Sent: Thursday, August 6, 2020 8:35 AM To: John Blacker <J Blacker& hartgau ler.c m>; Steven Rogers <SRogers@hartgaugler.com>; Rickey Trant < i k o excor .c m> Subject: Fwd: 8607-ALT#3- 52.57- Added Gratings & Handrails - For Review & Approval We are still missing the grating and handrail submittal for the extra at prop 9, when can I expect this Sent from my Whone Begin forwarded message: From: Nisar MSD <nisar msdbuildingcory.com> Date: July 13, 2020 at 1:44:41 FM CDT To: Rickey Trant <RickevT@comexcorp.com>, Nathan Rasberry <nrasberry�u �omex�pr�.com> Cc: Kailum Flores <Kai)umF@cgmexcorrp,com>, "Joshua L. Hanson, Sr." < o h it c r ry co >, Ryan Wood <an a)msdbuild,inacorp.com>, Sandra Gonzalez <sandra@msdbuildingcoro.com> Subject: RE: 8607-ALT#3- 52.57- Added Gratings & Handrails - For Review & Approval Rickey, Could you please let us know when we can expect these submittals back? Thank you, Nisar Ahmed, 713-477-8335 (Work) 713-922-9995 (Cell) From: Nisar MSD Sent Tuesday, June 30, 2020 9:44 AM To: Rickey Trant <Ri comexcor .com>; Nathan Rasberry <nr@sberryPcomexcorV.cgm> Cc: Kailum Flores < ilumF com x r .com>; Joshua L. Hanson, Sr. <loshPmsdbuildingcorp.com>; Ryan Wood <Wn@msdbuildingcorn com>; Sandra Gonzalez <ondra@m5dbuildingcorp.com> Subject 8607-ALT#3- S2.57- Added Gratings & Handrails For Review & Approval Rickey, Please find attached Platform (ALT#3)- Grate & Handrails — For Review & Approval. Thank you, Nisar Ahmed, 713-477-8335 (Work) 713-922-9995 (CELL) Fwd: BFT - 05 51 00.02 Gratings & Handrails Shop Drawings Kailum Flores <KailumF@comexcorp.com> Mon 8/10/2020 3:11 PM To: Rickey Trant <RickeyT@comexcorp.com>; David Walker <DavidAW@comexcorp.com>; Nathan Rasberry <nrasberry@comexcorp.com> Is this the last place the handrails were talked about?? Get Outlook f r i S From: Bob McCollum <bob@kirilafire.com> Sent: Monday, July 27, 2020 2:46:19 PM To: Tommy Abercrombie <tommy@abercrombiedesign.com>; Jim Bobby <jimb@kirilafire.com> Cc: Todd Tovani <todd@tovanihart.com>; Caitlin Regan <caitlin@tovanihart.com>; Andrea.Brinkley <Andrea.Brinkley@baytown.org>; Juan.Macias <luan.Macias@baytown.org>; Blacker John <JBlacker@hartgaugler.com>; Scherer Don <DScherer@laalp.com>; Dale.Hughes <Dale.Hughes@baytown.org>; Kailum Flores <KailumF@comexcorp.com>; Steven Rogers <S Roge rs @ h a rtga ug l e r. co m> Subject: RE: BFT - 05 5100.02 Gratings & Handrails Shop Drawings Tommy, Sorry for the delay. I was on vacation last week. We are waiting on information regarding the fuel arms per our conference call back on 4-9-20. We are not providing these arms. It would be great to have some details or even a picture of the fueling arms if you could help with this. Thanks, Bob McCollum Kirila Fire Training Facilities, Inc. www.kirilafire.com 724 718-2429 ********************CONFIDENTIALITY NOTICE************************************** The information contained in this email and any attached files is legally PRIVILEGED, CONFIDENTIAL and PROPRIETARY, and is intended for the exclusive use of the individual(s) named above. If you are not the intended recipient, you are hereby notified that any review, printing, copying, forwarding, retention, dissemination, distribution, disclosure or storing of this email and/or any files that have been transmitted with it is strictly prohibited and may be a violation of law. If you have received this email in error, please immediately delete this message and all attachments from any device/media where the message is stored, and notify the sender by telephone at _724 718-2429 From: Tommy Abercrombie <tommy@abercrombiedesign.com> Sent: Tuesday, July 21, 2020 6:00 PM To: Bob McCollum <bob@kirilafire.com>; Jim Bobby <jimb@kirilafire.com> Cc: Todd Tovani <todd@tovanihart.com>; Caitlin Regan <caitlin@tovanihart.com>; Andrea.Brinkley <Andrea.Brinkley@baytown.org>; Juan.Macias <Juan.Macias@baytown.org>; Blacker John <J Blacker@ hartga ugler.co m>; Scherer Don <DScherer@laalp.com>; Dale.Hughes <Dale.Hughes@baytown.org>; Kailum Flores <KailumF@comexcorp.com>; Steven Rogers <SRogers@hartgaugler.com> Subject: Re: BFT - 05 5100.02 Gratings & Handrails Shop Drawings Bob, Can you take a look at this submittal and make sure you don't see anything that will conflict with the fuel arms and fire you are building for the rail and tanker? Your quick response would be appreciated. Thanks, Tommy L. Abercrombie, Ph.D. abercrombie planning+design 3508 Overton Park Dr W Fort Worth, TX 76109 office 817-920-9198 cell 817-229-2646 On Jul 21, 2020, at 4:32 PM, Steven Rogers <SRogers@hartgaugler.com> wrote: Todd, That's correct, there is X-bracing on both sides. See photo below. <image002.png> Steven Rogers, PE I Principal HART GAUGLER +ASSOCIATES 12801 N. Central Expressway Suite 1400, Dallas TX 75243 :image001.png>O: 972.239.5111 (x210) l M: 214.923.8583 From: Todd Tovani <todd@tovanihart.com> Sent: Tuesday, July 21, 2020 2:06 PM To: Steven Rogers <SRogers@hartgaugler.com_> Cc: Caitlin Regan <caitlin tovanihart.com>; Tommy Fire Training Lead Architect Abercrombie <tmmy@abercrombiedesi n.com>; Andrea.Brinkley <Andrea.Brinkley@baytown.org>; Juan.Macias <Juan.Maciaseba ttown.o[g>; John Blacker <JBlacker@hartgauglercom>; Don Scherer <DScherer@laalp.com>; Dale.Hughes 3 vi <Dale.Hughes@baytown.or,9>; Kailum Flores <KailumF@comexcorp.com> Subject: Re: BFT - 05 5100.02 Gratings & Handrails Shop Drawings Hi Steven, I just wanted to confirm ... One side of the platform has a section that is open to the future rail prop right? I may have missed it in the documents but it appears as though there is no opening and that there is x bracing on the east side of the raised platform. Todd Tovani, AIA Tovani Hart 609 A Columbia St SW Olympia, WA c 360.791.0115 p 360.339.8274 On Tue, Jul 21, 2020 at 11:51 AM Steven Rogers <SRo�ersVhartgauglercom> wrote: Caitlin, I've attached our comments on the referenced submittal. There is one comment we've requested your verification. Let me know if you have any questions. Sincerely, Steven Steven Rogers, PE I Principal HART GAUGLER + ASSOCIATES 12801 N Central Expressway Suite 1400, Dallas TX 75243 < rnage001.png>0: 972.239.5111 (x210) I M• 214.923.8583 From: Caitlin Regan <caitlin tovanihart.com_ > Sent: Wednesday, July 15, 2020 3:02 PM To: Steven Rogers <SRogers@hartgaugler.com> Cc: Todd Tovani <todd tovanihart.com>; Tommy Fire Training Lead Architect Abercrombie <tommv@abercrombiedesign.com>; Andrea.Brinkley <Andrea.Brinkley@baytown.org>; Juan.Macias <J ua n. Macias@ ba town.o >; John Blacker <JBlacker@hartgaugler.com>; Don Scherer <DScherer@laalp_com>; Dale.Hughes <Dale.Hughes @ ba town.or >; Kailum Flores <KailumF@comexcorp.com> Subject: Re: BFT - 05 5100.02 Gratings & Handrails Shop Drawings Good afternoon Steven, We have completed our review of the grating and guardrail shop drawings and are sending to you for your review. When you are complete please return to Kailum at Comex. Thank you,