Ordinance No. 14,534ORDINANCE NO. 14,534 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AUTHORIZING AND DIRECTING THE CITY MANAGER TO EXECUTE THE STANDARD UTILITY AGREEMENT WITH THE TEXAS DEPARTMENT OF TRANSPORTATION FOR THE RELOCATION OF CITY MAINTAINED UTILITIES ALONG THE EASTBOUND AND WESTBOUND INTERSTATE 10 FRONTAGE ROAD BETWEEN SPUR 330 AND THOMPSON ROAD; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. ****************************************************************************** BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council of the City of Baytown, Texas, hereby authorizes and directs the City Manager to execute the Standard Utility Agreement with the Texas Department of Transportation for the relocation of City maintained utilities along the eastbound and westbound Interstate 10 frontage road between Spur 330 and Thompson Road. A copy of said agreement is attached hereto, marked Exhibit "A," and made a part hereof for all intents and purposes. Section 2: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 8th day of October, 2020. `� (a, i BRANDON CAPETILLO, ayor ATTBST: LETICIA BRYSC , Ci Clerk �o SjkYTOryt, APPROVED AS TO FORM: y tkg 9rF OF'�� EN L. HORNER, City Attorney R:1Karen HomerlDocuments\Files\City Council•.Ordinances\2020 October 8 TxDOTStandardUtilityAgreement.docx Exhibit "A" Forth ROW-U.95 (Rev. 08/19) Page 1 STANDARD UTILITY AGREEMENT U-Number: 00003021 District: Houston County: Harris Federal Project No.: TBD Highway: IH 10 ROW CSJ: 0508-01-380 From: Spur 330 Highway Project Letting Date: Oct 2020 To: Thompson Road This Agreement by and between the State of Texas, acting by and through the Texas Transportation Commission, ("State"), and City of Baytown , ("Utility"), acting by and through its duly authorized representative, shall be effective on the date of approval and execution by and on behalf of the State. WHEREAS, the State has deemed it necessary to make certain highway improvements as designated by the State and approved by the Federal Highway Administration within the limits of the highway as indicated above (the "Highway Project"); WHEREAS, the proposed Highway Project will necessitate the adjustment, removal, and/or relocation of certain facilities of the Utility as indicated in the following statement of work: Proposed Water Facilities along EBFR & WBFR: 495 LF of WATER MAIN PIPE (PVC)(101N), 2,585 LF of WATER MAIN PIPE (PVC)(121N), and related appurtenances; Proposed Sanitary Sewer Facilities along EBFR: 80 LF of SANITARY SEWER (81N)(PVC)(SDR26), 7 EA of ADJUSTING MANHOLE, 2 EA of CONNECTION TO EXIST MANHOLE, 1 EA of 4' DIA MANHOLE, 5 EA of MANHOLE REHABILITATION, and related appurtenances. and more specifically as shown in the Utility's plans, specifications and estimated costs, which are attached hereto as Attachment "A". WHEREAS, the State will participate in the costs of the adjustment, removal, and relocation of certain facilities to the extent as may be eligible for State and/or Federal participation. WHEREAS, the State, upon receipt of evidence it deems sufficient, acknowledges the Utility's interest in certain lands and facilities that entitle it to reimbursement for the adjustment, removal, and relocation of certain of its facilities located upon the lands as indicated in the statement of work above. NOW, THEREFORE, BE IT AGREED: The State will pay to the Utility the costs incurred in adjustment, removal, and relocation of the Utility's facilities up to the amount said costs may be eligible for State participation. All conduct under this agreement, including but not limited to the adjustment, removal, and relocation of the facility, the development and reimbursement of costs, any environmental requirements, and retention of records will be in accordance with all applicable federal and state laws, rules and regulations, including, without limitation, the Federal Uniform Relocation Assistance and Real Property Acquisition Policies Act, 42 U.S.C. §§ 4601, et seq., the National Environmental Policy Act, 42 U.S.C. §§ 4321, et seq., the Buy America provisions of 23 U.S.C. § 313 and 23 CFR 635.410, as amended, Texas Transportation Code § 223.045, the Utility Relocations, Adjustments, and Reimbursements provisions of 23 CFR 645, Subpart A, and the Utility Accommodation provisions of 23 CFR 645, Subpart B. The Utility shall supply, upon request by the State, proof of compliance with the aforementioned laws, rules, regulations, and guidelines prior to the commencement of the adjustment, removal, and relocation of the facility. Initial Date Init)al Date TOOT Utility Forth ROW-U-35 (Rev. 08119) Page 2 The Utility shall not commence any physical work, including without limitation site preparation, on the State's right of way or future right of way, until TxDOT provides the Utility with written authorization to proceed with the physical work upon TxDOTs completion and clearance of its environmental review of the Highway Project. Any such work by the Utility prior to TxDOT's written authorization to proceed will not be eligible for reimbursement and the Utility is responsible for entering any property within the proposed limits of the Highway Project that has not yet been acquired by TxDOT. This written authorization to proceed with the physical work is in addition to the authorization to commence work outlined below. Notwithstanding the foregoing, the provisions of this paragraph are required only when TOOT has not obtained completion and clearance of its environmental review of the Highway Project prior to the execution of this Agreement by the State and the Utility. The Utility shall comply with the Buy America provisions of 23 U.S.C. § 313, 23 CFR 635.410, as amended, and the Steel and Iron Preference provisions of Texas Transportation Code § 223.045 and, when products that are composed predominately of steel and/or iron are incorporated into the permanent installation of the utility facility, use domestically manufactured products. TxDOT Form 1818 (Material Statement), along with all required attachments, must be submitted, prior to the commencement of the adjustment, removal, and relocation of the facility, as evidence of compliance with the aforementioned provisions. Failure to submit the required documentation or to comply with the Buy America, and Steel and Iron Preference requirements shall result in: (1) the Utility becoming ineligible to receive any contract or subcontract made with funds authorized under the Intermodal Surface Transportation Efficiency Act of 1991; (2) the State withholding reimbursement for the costs incurred by the Utility in the adjustment, removal, and relocation of the Utility's facilities; and (3) removal and replacement of the non -compliant products. The Utility agrees to develop relocation or adjustment costs by accumulating actual direct and related indirect costs in accordance with a work order accounting procedure prescribed by the State, or may, with the State's approval, accumulate actual direct and related indirect costs in accordance with an established accounting procedure developed by the Utility. Bills for work hereunder are to be submitted to the State not later than one (1) year after completion of the work. Failure to submit the request for final payment, in addition to all supporting documentation, within one (1) year after completion of the work may result in forfeiture of payment for said work. When requested, the State will make intermediate payments at not less than monthly intervals to the Utility when properly billed. Such payments will not exceed 90 percent (90%) of the eligible cost as shown in each such billing. Intermediate payments shall not be construed as final payment for any items included in the intermediate payment. The State will, upon satisfactory completion of the adjustment, removal, and/or relocation and upon receipt of final billing prepared in an approved form and manner and accounting for any intermediate payments, make payment in the amount of 90 percent (90%) of the eligible costs as shown in the final billing prior to audit and after such audit shall make an additional final payment totaling the reimbursement amount found eligible for State reimbursement. Alternatively, the State agrees to pay the Utility an agreed lump sum of $ N/A as supported by the attached estimated costs. The State will, upon satisfactory completion of the adjustments, removals, and relocations and upon receipt of a final billing, make payment to the Utility in the agreed amount. Upon execution of this agreement by both parties hereto, the State will, by written notice, authorize the Utility to perform such work diligently and to conclude said adjustment, removal, and relocation by the stated completion date which is attached hereto in Attachment "C". The completion date shall be extended for delays caused by events outside the Utility's control, including an event of Force Majeure, which shall include a strike, war or act of war (whether an actual declaration of war is made or not), insurrection, riot, act of public enemy, accident, fire, flood or other act of God, sabotage, or other events, interference by the State or any other party with the Utility's ability to proceed with the work, or any other event in which the Utility has exercised all due care in the prevention thereof so that the causes of other events are beyond the control and without the fault or negligence of the Utility. Initial Date Initial Dale TxDOT uglily Form ROW-U-35 (Rev. 08119) Page 3 This agreement in its entirety consists of the following elements: Standard Utility Agreement — ROW-U-35; • Plans, Specifications, and Estimated Costs (Attachment "A"); • Accounting Method (Attachment "B"); • Schedule of Work (Attachment "C"); • Statement Covering Contract Work — ROW-U48 (Attachment "D"); • Utility Joint Use Acknowledgment — ROW-U-JUAA and/or Utility Installation Request — Form 1082 (Attachment "E"); • Eligibility Ratio (Attachment "F"); • Betterment Calculation and Estimate (Attachment "G"); and • Proof of Property Interest — ROW-U-1A, ROW-U-1 B, or ROW-U-1 C (Attachment "H"). All attachments are included herein as if fully set forth. In the event it is determined that a substantial change from the statement of work contained in this agreement is required, reimbursement therefore shall be limited to costs covered by a modification or amendment of this agreement or a written change or extra work order approved by the State and the Utility. This agreement is subject to cancellation by the State at any time up to the date that work under this agreement has been authorized, and such cancellation will not create any liability on the part of the State. However, the State will review and reimburse the Utility for eligible costs incurred by the Utility in preparation of this Agreement. The State Auditor may conduct an audit or investigation of any entity receiving funds from the State directly under this contract or indirectly through a subcontract under this contract. Acceptance of funds directly under this contract or indirectly through a subcontract under this contract acts as acceptance of the authority of the State Auditor, under the direction of the Legislative Audit Committee, to conduct an audit or investigation in connection with those funds. An entity that is the subject of an audit or investigation must provide the state auditor with access to any information the state auditor considers relevant to the investigation or audit. The Utility by execution of this agreement does not waive any of the rights that the Utility may have within the limits of the law. It is expressly understood that the Utility conducts the adjustment, removal, and relocation at its own risk, and that the State makes no warranties or representations regarding the existence or location of utilities currently within its right of way. Initial Date Initial Date TxDOT Utility Form Row-u-35 (Rev. 08/19) Page 4 The signatories to this agreement warrant that each has the authority to enter into this agreement on behalf of the party represented. UTILITY Utility: City of Baytown Name of Utility By: Authorized Signature Print or Type Name Title: Date: Initial Date TxDOT Initial Date Utility EXECUTION Director o/ TP&D (or designee), Houstca District THE STATE OF TEXAS Executed and approved for the Texas Transportation Commission for the purpose and effect of activating and/or carrying out the orders, established policies or work programs heretofore approved and authorized by the Texas Transportation Commission. By: District Engineer (or designee) Date: Form ROW-U-35 (Rev.08119) Page 5 Attachment "A" Plans, Specifications, and Estimated Costs All material items that must meet Buy America or Steel and Iron Preference Provision requirements must be indicated with an asterisk ('). Initial Date Initial Date TOOT Utility - � W a� • -¢ 4�� i� V i� V I z e} O PIT Flutl 1 t AUVVMS Al 1N•110 W*'OSSS'01-NI\ .••0 OA9 20\•al;l ORR S\ i- -3 7M,n !0\00-sc.s, t.3. • t33IJ nd POW. 0t03/OCR 13110 n� I I .0.3N[1 d3m3S -- -------- ... ... .... .. V 'All Xt > j ""U'-' C) ................ ------- --- -------------- 55 ......... OD m•wa"All- I= Cc) S3NVl ... .............. ............ -------- ON3331 Liiiiin 11, 7 Ott o S e v 6 t o - o o �•► r 00+888 ;IS 3NI-1 HDIM x I - •d i5 �N1� p0,Z88 � s; a•33� 11 � t' r p. 1 A,• ;`z: �daiylii 9 Y � � Q � � Q �� � Q S [V� <`itf as o 1/14 J Ld r= ]O LIP N � pr 4 1 �1 !1 rI I vl 1 I'I I'I S II . II II 1i 1i • I1 1: -W 1 11 11. gg Ir n p I t _o=g III 11• $ rl 1 II 11 •� � II s _ pl �•,W zg NW �W��� r - � � j 3�m 11 It g �` 6, e y �i-ia>- d w• a a. re, otat+et+e � C s r 1_ qq S Y 00•1768 'diS 3NIl HDiVVY i 1 I oY 14V 4 r I; nu ` a l; t , o Lj ;jlfF z m f 1 La ' W IA " I o— I I, l - I 1 I I _ C .. r. ; I i I 4 I 1 l I 1 �.:8L11 1 i 4 I I i La t� O 1 1 p I 4 {W7 H Z I 1 I O ^j m 1 e W 0. o O. • bl S 3NI l Hal b`y D-97-tfl0,c l-tl3.35-0([S'DI-III:�a•a5, !aa0 41nB i 4 IF In �I —? ^' az ------------ I IF ivrowawoc •I-r10"-vn�::w I In at :D2 �.i OLE216tl1 � [ \\us•n9.,• a9 noun. lxal f Odr[enopsn� 0ocvron •,\ Irpns00r�a• : M\5175.09\0 -• o v v O� v i .. � gam• g� �n i - m >- ut p frn �y ij C ft P c W Oi O � \S-NIN-[0-S330,SE-1 P-t a IDUI -CB-0a-8u3. OOn MATCH LINE STA. 894+00 ---------• - OD -60 Wig, ' x�$g_ 3I I i �I In sFi ao gl � �i s� io •I� I � Jn _ MATCH LINE STA. 900,00 z n - �J�7L�;0'z' :�+1 000 N T\IIItiFFo- `, to 11 R • � ti _ _ I _ 8 3 O O r, ---------•--- --._._._. L __. m -----' IH 10 MAIN LANES UTILITY LEGEND -. •� -•� :ra��w• .aer.w- O O ....� ..ion..•_ CD us.nnu«cs �r a ratan: H ...................._._--- H t.lPitOF - IH 10 EB FRONTAGE RD w ._fir:.,+-�v a.fU. �,i •!'�,.t ]L`Y�__�_7 �.i._._.— Jr3*S-: �i.::.R2L.: ���-'�.,. _ _ _ �o . ...,on .... ,.y. U U r,arouo unssnn d Q Q —� rE.1 �w*t z+ 3t 1-10 AND SPUR 330 _ 8 EAST80UND FRONLGE SEWER RELOCATION mm Al .. ' � _ -- --' _-_--_ --' .-_--_--' �.--_- ^ . -�-`--- - ---'-----'-''---' - -'---'�r'-'-'-` A TRIP .. --- � � � | � ID 0 v . S E s a 00+816 'VIS 3NII HDIdW I I ' 1 I •,Y,I�`t� 8 I i I i oz I e ►- � m-1 ���ka I rs•,,.s a 'lQl �-1 �� t� �h �� 1 I I != o I III a] z I , x,�lm I - - :I - o i I 'T'•y1,i ! j L 50+Zl6 -VIS 3NII HOIdW T 1 1 I I ' I�� �nn AN I 1 till. 1 1 1 i I I 1 1 I I 1 � 1 1 , i , I 1 I I `v 1 I I i ' I I • 1 1 1 I I I , I I 1 1 1 I , I i 1 1 1 I I 1 1 I 1 ) , , 1 I I 1 I I 1 I 1 ;• � } < e ] 1 1 , 1 I I I i 1 1 1 i I 1 1 1 ) I I 1 1 1 � i 1 1 - -_ 1 _______ I 1 i l I I i I 1 ,n Zs:2S:0i OZOZ/6Z/, � - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - or--------------------------- - - ------------------------------------------------------ ---- ------------- 4, �-F J Ll 19 OH DVINOUJ 83 01 HI d0kid ------------- ----- ------ ";7--- ------ ---------------------------------------------- I ...... .IWI� ---------- ------------- ON3231 AilliLn NOliv70138 U31vm 30' lMWJ ONr*OLSW3 Oct Bus GNV 0 1 - I W f.7.7. ............. ....... .... It zi uunun °noaau _I __ ___:Sh:!'-„__b_r_�Q ` -'c. r. I .°�• IJa rn suros 'oa ro, rl m I I it I it It 11 1 ;;7 ------ -- — -------- .. . ........... �,: -------- --- )7 H It I . . ...... I It It 1 :7, It co It it I A� a —L.ULU F— I It I 53NVl NlVn 01 HI ------------------ 0N3033 ......... .... ............... ................... L ----------------- i In. NOI1V0013ti ?131VIA 3011110111 OW*GxSV3 0 cc unds aNV 01-1 --- ............. - ----- -- >- / ...... ... . ...... --- ----------- --------- .-- -koz Ga 30VLNOtIJ 83 01 HI " .63 --- 2 . .................................................. z z z m m ................... 11 Ln (A co CO - ------------- 0 a -._--------------- ------------------ ----------------- 7 --------------- ----- --------------- 0 S3NVI NIVIPI Of HI T Q6. ------ ....... ---------- L ------------------ ------------------- .................. L. ---------------- ---------------- T ------------------ r ------------------ I ------------- T. ------ I ------- IN 10 MAIN LANES !" .......... E --------- ---------------------------- ------- I ............. o ............ ------------------------------------ ... .... ......................... O co F- Ln LLI _j X u d� IN 10 EB FRONTAGE RD ------ — --------- --------- 0 cc) Dun ll, '"Et c— ul La! z _j � _ � . -. —_- - -- ' ' -_ " � � ~°°- 10 , - � " ------------ ---------- - - ' o°� "/`m«' "/ | ` | ' | � -�� |� _ � � -_---_-_- _-_-___ �����_-- _ __-_-_- _______- ----_-_-- ~ ~~ ~~~~~~~ z � ' � � ' � � I ' i i :' ' � ��y: a} �i {t',�1. I o x�? , a a V v3• fl W I I d �O•�I' }.p N;4/ _.-S.:_! a C13} O W i - I If 1 W- i i- -i I I 8 1 •c f�` � �: 0 1 8 N 81 8 1 �� J cot I � � I I of ✓ 11 = I I<i cy o$ -- I I I I V - i i I i I o d3 I I I ^a 0 I I I I _ I I I c 00+Z06 'd1S 3NIl HDIVV4 �C'Bx0'SO'91-}OOAa 3'tl)}i�'OfCS'0+-Hla�+��) !>ta0 808 20�+a1}f .+a0 t\ .yawl v) .t!I lan �0�60•Sf+S��:+o}.o0ew�}��+�auvo0�urowww0:l o>013+/`oO+aunol0'4-nau•m)�:w :)tlf n. as :G011+ Ot02i62tt :3}.O or —~.~_ ~ ~ / ^ X r z A4-1 "Fill gal �0 —~.~_ ~ ~ / ^ X r z A4-1 "Fill gal �0 ' o 0 0 o e_-- - "l o w i a f eo u 3sW - .•+ -- » -�- Lo xw 00+6681 *ViS 3NIl H)ivVq n 00+b681 'd1S 3NIl HD1dW I� I sl 00+b681 'd1S 3NIl HD1dW I� I sl i I ti y ��1 ..�St►�L fie, p o g a o 0 o a �c u _ - u _ _ ' ` FPs•:• h3 ,!LLL` "' } I 5, 1- a.= Q w `9i ��w 7 � � � ��i w= 0 � 'e% 0. FIE - r 00+b06i 'V1S 3NII HO1VW 00+b061 'V1S 3NIl HO1 --=gym'---------- 4-4 I a _ I I §7 ------------�- I I � � I t- �-itl3 I I �-- ----- x a ( r o I t Jntln C[2Oy9tl'OCJ'a I _ r nu �! 3 07 Q I 'r + OIN S+u« no ,,, ry v v.._..-.1_.._.._.. - I W = I (V `' r I 1 1 o: .ia •S— W - N I F r as I W 'o. N `—i -i-1_ i= i ----------- - I- a a= - ' i � i a _j 14 I o� r.� -----------3-_- -x a v �'• _ 1— OE i _ _ _ — OE I n[•.nrxJ M1:n711ud r r•�. _s _ . e •.core ez for 'tllxw I til i I 8 00+6681 'V1S 3NIl HO1VW ' 00+6681 'V1S 3NIl HOlVW 4e'M1rrAYe-C� tllearl-Mrl rY-ec[S-el•MIV....\ IOe acre IO\fat iJ !+ rl uaa,f l N!t!M+er6e•CrthW,le.�ee+Wnr9waul1pOO\al,eauawen ueeOi VMC.auCD',Ob.nG,.+n.�t nV t: tAi tt. ororlUlt talra ae•ws: oo•w.: ao•,a. a-Ne, pn_wa, o.•raa • i r NOILT30130 U31YM 351ma! ounol IS3M --1 -4 Oti tlndS (INV 01 HI r) n Ln rrnn o< `cl y,,.�//f�`>OIA���✓% "iii,ii.l J O 3•,r,sr)11 ��.. •y3vs,� .� t G ... p ar 95695 i f..................... %...... HIi9 •ltlf]........� O.. Q 11'f4• � ••y=i — __)••x_—_............ Ga< J--._._._]__._._._1-._._._._._._.-._.L._._._._._._._._.J._._._._._._._-___I_._. a u ]a,.x] n+n n.,.ro el•.,vn 1S31dVA H101M) JOn,i�i'sn•o `�,i.'nai:`u`i 01 AVMHOIH 31VIS831NI •mxria)u w )a. ou p , oG •r• •.t:' Ot.GCv D a r.•• 0)tal.',.• --1 an IJ (�OYI 6a0���5 >,e, ])•, a:dnN)a•n :,w[„x;nanx) t,lJ •, it'H •.<•Is rW,: � ,n•W v, JO 1, sG pne r„•fSRI D � f313nl1n WSOI°W n -a:<.+-„m S _• -... _-_,o,<)__ __. ._.. _-._ _ -_-,aa .___.. __._ _ mnJ w-.•.x r•.,r Z vasm•x,w M —•,-i';—•—•—•— —— ---------—'�5-----'.. —•—•—•— —---•—•—•-----�—•— �..—-----•—•—'—•— I m Z m (A' \ Otl 39V1NON3 13M 01 HI aln»n n - wean nun .Y D _•;•_M7;Zde.•e•-mu;�=a_ _w_t•mrtWeq xcc<. >i�t _•. ror — •`�oc;,«i ,xn.n •o,niG� , xau,.avm . i•'.ibii��; O __ . „�...�—_,_� � / \ 4�,' ham\--__ A1i n)T.. �i -T_i—_r—_� __o_"_)_ wiw°i - ,.m„x ,n ., r. /! �� ? , •.\ •e'e 7 1 ..a O -:m.»J-- v.rvnawan,• O rG- `.e�•r,i JJJ/dp • \ �d.v �V.''.e5. •• \ veyS`�o `iio;o� \\:�. \` � ��\ ahnim.n -rmu-. ,oi.,,w�.•]o.)rxex, nll•arnw iaha`--rtlO �O, �°�.�'.`»e+a : ]e,•°0tla :n>n.o � )"'0 ,• . r� .nr •rxn x)uouJ'umsl`wu.,.a ':+ii.)"`iaw �• • \ '.ion <, , 7 ..]on c: , ,»tio� ,o, �[ .wm is r ` ON3•!33 Ali 111r1 _ — — _ — \ :n]xro ; :n]xw �evM k � � }i C �i? 7� d0 U Vu--. i� Ua, 0 9 t Y„z// c14 2z 2 .. La 00+b16l 'tilS 311I1 HDIVV4 00+bL61 'd1S 3NI-I HDIVA - to cz ra.:. ezez.er., ii �vo-occs-o I -H I% ...... !"a sm zo,sal t j isa0 C,Out— to.) I! 'n P0N60.;f4s%w! I.— IN M-3-T, -,i Z"; NOIL335 BMW T--- -- - TVL30 0NU108 NON. SHAOD I L j F., Alqwass'V alisodLuoC) OOZE fa A'Aj Alqwassv Q IdVOCVLA idLZOZOLA P 40 11V130 3-10HNVIII D181N3 33 A Alqu-jessV SEWSVWdR-9LVLA v F-A T fa AjqwassVewes jpus jaAoo sausSoobZ 7 - V Utility Name- City of Baytown IH-10 from Spur 330 to Thompson Road RCSJ- 0508-01-380 Estimated TxDOT Construction Costs CCSJ: 0508-01-0345 (Joint Bid) WATER LINE CONSTRUCTION COSTS TxDOT BID ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE EXTENSION 4016001 FLOWABLE BACKFILL CY 81 S 233.64 S 18.924.84 4026001 TRENCH EXCAVATION PROTECTION LF 3080 S 2.90 S 8.932.00 7049 6006 WATER MAIN PIPE PVC 101N LF 495 S 125.00 S 61.875.00 ' GATE VALVE & BOXES see Note 2 7049.6007 WATER MAIN PIPE PVC 121N LF 2585 S 150.00 S 387,750.00 GATE VALVE & BOXES see Note 2 WATER TOTAL $ 477,481.84 SANITARY SEWER CONSTRUCTION COSTS TxDOT BID ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE EXTENSION 4016001 FLOWABLE BACKFILL CY 12 S 233.64 S 2,803.68 7017 6017 SANITARY SEWER 81N PVC SDR36 LF 80 S 150.00 S 12.000.00 7017 6055 ADJUSTING MANHOLE SANITARY SEWER EA 7 S 3 500.00 S 24.500.00 ' MANHOLE COVER AND FRAME see Nolo 2 REBAR see Note 2 7017 6098 CONNECTION TO EXIST MANHONE (SAN SWR EA 2 S 800.00 S 1.600.00 ' MANHOLE COVER AND FRAME see Note 2 REBAR see Note 2) 7017 6051 MANHOLE (SAN SEWER 4' DIA EA 1 S 3.000.00 $ 3.00000 MANHOLE COVER AND FRAME see Note 2 REBAR see Note 2 7017 6160 MANHOLE REHABILITATION EA 5 S 10.000.00 S 50.000.00 MANHOLE COVER AND FRAME see Nole 2 REBAR fseWftle 2 SEWER TOTAL $ 93,903.68 TOTAL CONSTRUCTION COSTS PROJECT TOTAL $ 571,385.52 NOTES 1. Items shown above are TxDOT Bid Items to be Joint Bid In TxDOT's PS&E 2 Appurtenances listed below TxDOT Bid Items are subsidiary to the TxDOT Bid item 3. TxDOT's Contractor will procure all materials. ' Materials Indicated with asterisk (') are to be "Buy Amenca" compliant. 992020 IH-10 WATER & SAN,TARY SEWER ESTiMATE.xis Utility Name: City of Baytown IH-10 from Spur 330 to Thompson Road RCSJ: 0508-01-380 Estimated Engineering Costs CCSJ: 0508-01-0345 Task Description project Manager g Senior Engineer 9 Protect Engineer 9 Engineer -In Training 9 Senior Engineering Tech. CADD Operator P Admin Sub- TOTAL HOURS Sub- TOTAL Vs $170.57 $164 37 $130.26 $89.94 $105.45 $83.74 $103.58 FC 130 RIGHT-OF-WAY DATA Task 1 Utility Adjustment Coordination 1.1 it lity, Coordination(City of Baytown) 16 8 16 8 48 Initial Project Meehn Dannenbaum) 4 4 a Pothole Action Plan 2 2 4 8 16 Meet wl Consultants 8 4 4 16 Review as-buills & Utility Matrix 4 4 4 12 Subtotal Task 1 - Hours 34 18 32 0 8 0 8 100 Total Task 1 $ $ 5.799.38 $ 2.958-66 $ 4,168.32 $ $ 843.60 $ $ 828-64 $ 14,598.60 FC 160 ROADWAY DESIGN Task 1 Utility Engineering 5 months 1.1 Coordination of Engineering Activities 12 4 8 24 1.2 Public & Individual Meetings 4 4 8 16 13 Review of Uldil s Proposed Adjustments 0 Update Utility Conflict Matrix 4 2 16 4 26 Evaluate Alternatives 8 2 16 16 8 50 Review Estimates and Schedules 4 2 8 14 R view Plans 8 2 12 8 8 38 1.6 Review PS&E for all Utilities 8 24 8 40 Subtotal Task 1 - Hours 48 40 76 24 16 0 4 208 Total Task 1 IS) $ 8.18736 S 6,57480 $ 9.899.76 $ 2,158.56 $ 1.687.20 $ $ 414.32 $ 28.92.2.00 FC 145 MANAGING CONTRACTEDIDONATED PE Task 1 Project Management and Administration 5 months 1.1 Protect Coordinal. m 16 a 8 32 1 2 Prole, t Mana em, nt 16 8 8 32 Progress reports c �rrespondence, meetings 12 a 16 36 Develop, document & maintain schedule 8 4 16 28 Prepare. distribute. & f le correspondence 8 4 16 28 Subtotal Task 1 - Hours 60 32 0 0 0 0 64 156 Total Task 1 (S) $ 10,234.20 $ 5.259.84 $ $ $ $ $ 6.629.12 S 22,123.16 FC 163 UTILITY DESIGN Task 1 Prepare PS&E 1.1 Data Collection 1.2 Pro are Sanita Sower unlit desi n Coordinate w/ City to identify referred allternative 4 8 16 28 Create Plan & Profile Sheets 4 8 12 8 80 112 Verify compliance wl utility accommodation rules 4 a 16 28 Evaluate & resolve conflicts wf other utilities 4 2 4 4 8 22 Review & verify that utility plans are consistent and compatible wl ROW, util:fies. & highway design 4 4 a 8 16 40 Meet and Coordinate with City 8 4 12 1 24 Obtain City approval 4 2 4 10 Develop standards and specifications 4 4 8 8 8 a 40 12 Pre are Water utility desi n Coordinate wI ty to identify preferred a8lernative 2 2 4 8 Create Plan & Profile Sheets 4 8 12 8 80 112 Verify compliance wI utility accommodation rules 4 2 8 14 Evaluate & resolve conflicts wl other utilities 4 2 4 1 4 8 22 Review & verify that utility plans are consistent and compatible wl ROW, utilities, & highway design 4 4 8 8 16 40 Meet and Coordinate with City 8 4 12 24 Obtain City approval 4 2 4 10 Develop standards and specifications 4 4 8 8 8 1 a 40 13 Estimates - Sanitary Sewer utility design 4 8 16 8 4 40 1.3 Estimates - Water utility design 4 8 16 1 8 4 40 Subtotal Task 1 - Hours 78 84 172 48 200 48 24 654 Total Task 1 IS) S 13,304.46 S 13,807.08 S 22,404.72 $ 4,317.12 $ 21,090.00 S 4,019.52 $ 2,485.92 $ 81.428.82 Other Direct Expenses Overhead Expenses Rate FfM Cost Mileage (5 trips) S 058 F S 1.15000 Hotel (5nights) S 11400 F $ 57000 Perdiem (10 days) S 5000 F S 50000 Photocopies BIW 11-x1T 4 Submittals 5 Copies) S 019 F 50 Sheets S 19000 Photocopies B/W 8.5'xI1* (500 Copies) S 009 F S 4500 Plots (B/W on Band) 100 Copies) S 075 F S 7500 Overnight Marl -Oversized Box (4 Submittals) S 45001 M S 180.00 Other Direct Expenses: TOTAL $ 2.710.00 Total Work Authorization 1 - Hours 220 174 1 280 72 224 48 i 100 1 118 [Total Work Authorization 1 $ 37,525.40 1 $ 28,600.38 1 $ 36,472.80 $ 6,475.68 $ 23,620.80 $ 4.019.52 1 S 10,358.00 $ 149,782.58 9/9/2020 12-81DP5019_WA 9-Exhibit D 2020.02-11.xlsx Utility Name: City of Baytown RCSJ: 0508-01-380 CCSJ: 0508-01-0345 IH-10 from Spur 330 to Thompson Road Estimated City of Baytown Direct Costs Engineer Manager Field "ctor Admin Estimated -Task Description Ins Totals $150.00 $150.00 $125.00 $12S.00 Plan Review, Coordination Meetings, 16 16 8 40 Design Support, and Agreement Review Field Inspection 120 8 128 Support with Test Cuts, Disinfection, and 60 8 68 Testing Total Estimated Hours 16 16 180 24 236 Total Direct Costs (City of Baytown) $2,400.00 $2,400.00 $22,500.00 $3,000.00 $30,300.00 9/9/2020 City of Baytown Cost Estimate.xlsx Utility Name: City of Baytown ROW CSJ: 0508-01-380 Construction CSJ: 0508-01-345. Etc. U-number: 00003021 Buy America Provisions Statement City of Baytown has received the latest Buy America Guidelines effective beginning October 3, 2019. Currently, all Buy America required materials planned for this project will be included in the TxDOT highway contract. Buy America compliance will be the responsiblity of the TxDOT highway contractor. In the event that materials requiring Buy America compliance are provided by City of Baytown during construction of this project, Buy America certification will be required. Utility Name: City of Baytown ROW CSJ: 0508-01-380 Construction CSJ: 0508-01-345, Etc. U-number: 00003021 Plans, Specifications, and Estimated Costs Utility Plans Along with plans needed for construction the following information should be included on each plan sheet: Cl New Utility Location and material type CSJ Exiting Utility Location and material type Q Existing ROW line Q Proposed ROW line (if applicable) Estimated Costs Each line on the summary of cost sheet should include backup documentation detailing how that total was calculated. Examples of back-up documentation 0 Breakdown of Utility Labor Q Contractor Estimate 2 Material List used for Estimate U Engineering/Consultant Fees Utility Name: City of Baytown ROW CSJ: 0508-01-380 Construction CSJ: 0508-01-345, Etc. U-number: 00003021 Summary of Cost Estimate .- Construction Costs to be included in TxDOT Highway Contract $ 571,385.52 Engineering Costs paid for by TXDOT Engineering Contract $ 149,782.58 Direct Costs for City of Baytown $ 30,300.00 TOTAL COST to be Reimbursed to Utility $ 30,300.00 Total Cost for the Adjustment: $ 751,468.10 LESS Betterment 0.00% % $ 0.00 SUB TOTAL $ 30,300.00 Salvage SUB TOTAL $ 30,300.00 Eligibility Ratio 100.00% Adjusted Amount of Estimated Reimbursement: $ 30,300.00 Buy America Provisions Statement * Materials indicated with asterisk -*- are to be "Buy America" compliant. Otherwise, materials with no asterisk are exempt from "Buy America" provisions. Utility agrees to comply with Buy America's provisions in accordance with TxDOT/FHWA guidance for all utility work performed and accomplished in furtherance of this agreement. Certification, where indicated, will be provided with the final billing Forth ROW-U36 (Rev. 08119) Page 6 Attachment "B" Accounting Method ❑X Actual Cost Method of Accounting The utility accumulates cost under a work order accounting procedure prescribed by the Federal or State regulatory body and proposes to request reimbursement for actual direct and related indirect costs. ❑ Lump Sum Method of Accounting Utility proposed to request reimbursement based on an agreed lump sum amount supported by a detailed cost analysis. Initial Date Initial Date TxDOT utility Form ROW-U-35 {Rev. 08119) Page 7 Attachment "C" Schedule of Work Estimated Start Date: 2/1/2021 (subject to physical work restrictions prior to the issuance of environmental clearance as required by the provisions of this agreement) Estimated Duration (days): 180 Estimated Completion Date: 8/1/2021 Initial Date Initial Date TxDOT utility Form ROW-U-35 (Rev.08119) Page 8 Attachment "D" Statement Covering Contract Work (ROW—U-48) (ROW—U-48-1, if applicable) Initial Date Initial Date TxDOT Utility ROW CS) Number: 0508-01-380 County: Harris Federal Project No.: TBD of U-Number: 00003021 District: Houston Highway No.: IH 10 , a duly authorized and qualified representative of , hereinafter referred to as Owner, am fully cognizant of the facts and make the following statements in respect to work which will or may be done on a contract basis as it appears in the estimate to which this statement is attached. It is more economical and/or expedient for Owner to contract this adjustment, or Owner is not adequately staffed or equipped to perform the necessary work on this project with its own forces to the extent as indicate on the estimate. Procedure to be Used in Contracting Work A. Solicitation for bids is to be accomplished through open advertising and contract is to be awarded to the lowest qualified bidder who submits a proposal in conformity with the requirements and specifications for the work to be performed. Associated bid tabulations will be provided to the State. ® B. Solicitation for bids is to be accomplished by circulating to a list of pre -qualified contractors or known qualified contractors and such contract is to be awarded to the lowest qualified bidder who submits a proposal in conformity with the requirements and specifications for the work to be performed. Associated bid tabulations will be provided to the State. Such presently known contractors are listed below: 2. 3. 4. 5. C. The work is to be performed under an existing continuing contract under which certain work is regularly performed for Owner and under which the lowest available costs are developed. The existing continuing contract will be made available to the State for review at a location mutually acceptable to the Owner and the State. If only part of the contract work is to be done under an existing contract, give detailed information by attachment hereto. j� D The utility proposes to contract outside the foregoing requirements and therefore evidence in support of its proposal is attached to the estimate in order to obtain the concurrence of the State, and the Federal Highway Administration Division Engineer where applicable, prior to taking action thereon (approval of the agreement shall be considered as approval of such proposal). E. The utility plans and specifications, with the consent of the State, will be included in the construction contract awarded by the State. In the best interest of both the State and the Owner, the Owner requests the State to include the plans and specifications for this work in the general contract for construction of Highway IH 10 in this area, so that the work can be coordinated with the other construction operations; and the construction contract is to be awarded by the State to the lowest qualified bidder who submits a proposal in conformity with the requirements and specifications for the work to be performed. if this option is chosen, attach form ROW-U-48-1, the terms of which are incorporated herein by reference. ature Date 48 -. A:_ 4m ROWU-48-1 (09/18) Page i of 2 Statement Covering Utility Construction Contract Work - In the State's Highway Construction Contract (As Referenced in Form ROW-U-48, Option E) Work Responsibilities A. The Utility shall provide the following services under this contract: i. Responsible for engaging the services of a Texas Registered Professional Engineer to prepare drawings and technical specifications for relocations and adjustments along IH 10 ii. Provide the plans and specifications to the State to include in the current planning specifications and estimate package being prepared by representatives of the Texas Department of Transportation's Houston Area Office. iii. Secure all necessary permitting as may be required for the installation of the water/sanitary sewer line. iv. Arrange and coordinate with the contractor, through the State, materials and equipment testing, rejection of all work not conforming to minimum requirements of the construction contract documents, maintenance of the proposed work area during construction, and the relocation of water/sanitary sewer and connection of services to customers. V. Advise the State of work that Utility determines should be corrected or rejected. vi. Arrange, observe, and inspect all acceptance testing and notify the State of the results of these activities. vii. Provide inspection services for the construction, notify the State of defects and deficiencies in the work, and observe actions of the contractor to correct such defects and deficiencies. viii. Assume all responsibility for the maintenance of the existing water/sanitary sewer lines during and upon completion of the construction contract. ix. Ensure all Texas Commission on Environmental Quality and all other regulatory rules, regulations and taws are strictly adhered to. X. Prepare and submit both a certificate of substantial completion and a list of observed items requiring completion or correction for the relocations and adjustments to the Project Engineer for concurrence. A. Coordinate all construction activities performed by Utility's staff for the relocations and adjustments through the Project Engineer. ROW-U 48-f 109/18) Page 2 of 2 B. The State shall provide the following services under this contract: i. Combine the water/sanitary sewer relocation and adjustment plans with the plans being prepared for the Project. ii. Review and approve the final construction plans prior to any construction - related activities. In order to ensure federal and/or state funding eligibility, projects must be authorized by the State prior to advertising for construction. iii. Advertise for construction bids, issue bid proposals, receive and tabulate the bids, and award and administer the contract for construction of the Project. iv. Negotiate and administer all field changes and change orders required for the Project. All change orders increasing construction costs for Utility's Project shall be submitted to Utility for review and approval together with an evaluation. Utility agrees to review and either approve or disapprove all change orders within five (5) business days after receipt of such order unless Utility Board's approval is necessary in which case Utility shall bring the item to Utility Board as soon as reasonably possible. V. Provide overall project management to supervise the day-to-day activities of the construction and monitor the activities of the contractor to promote the timely and efficient completion of the Project in accordance with the approved Plans and Specifications and construction schedule. vi. Conduct field observations and coordinate with Utility's inspectors and the contractor to cure defects and deficiencies in the construction prior to final acceptance. vii. Make timely payment to the contractor for work performed in connection with the Project. viii. Ensure access and permit Utility's inspectors and other authorized representatives to inspect the waterline construction at all times. ix. Conduct and coordinate final inspection of the Project in the presence of Utility's Engineer and Inspector, transmit final list of items to be completed or repaired and observe contractor correction of same. x. Maintain job file. Forth Row-U-35 (Rev. 08119) Page 9 Attachment "E" Utility Joint Use Acknowledgment — (ROW-U-JUAA) and/or Utility Installation Request — (Form 1082) ❑ Utility Joint Use Acknowledgment (ROW—U—JUAA) ❑✓ Utility Installation Review/Permit Number: Initial Date Initial Date TxDOT Utility Farm ROW-U-35 (Rev.08119) Page 10 Attachment "F" Eligibility Ratio Eligibility Ratio established: loo.00 % ❑ Non -interstate Highway (Calculation attached) ✓❑ Interstate Highway Initial Date Initial Date TxDOT Utility Utility Name: City of Baytown ROW CSJ: 0508-01-380 Construction CSJ: 0508-01-345. Etc. U-number: 00003021 Eligibility Ratio Eligibility is established at 100.00% Interstate Projects On Interstate highways, Texas Transportation Code section 203.092 provides that utility reimbursement for facility relocation is dependent upon whether the relocation costs are eligible for federal participation. Pursuant to current state and federal law, federal participation is 100% of all eligible costs; therefore, an elgibility ratio will be 100%. Non -Interstate Projects The key determining factors for eligibility ratio are: • line length for underground pipelines and cables, and • main line pole location for power and overhead communication facilities. Guy poles, push braces, and down guys must be excluded from the ratio as these items are considered as supporting structures. If a facility is outside of existing right of way, in conflict, and within an easement (PUE or private); then that facility is eligible. Any facilities in existing right of way, in conflict; would not be eligibile. To determine eligibility; total the Iine length or number of locations eligible for reimbursement and divide by the total number of required relocations. Please include a breakdown sheet showing each location and whether they are considered eligible or not (inside ROW or outside ROW). Forth ROW-U-35 (Rev. 08119) Page 11 Attachment "G" Betterment Calculation and Estimate -f Elective Betterment Ratio established: 0.00% % (Calculation attached) Forced Betterment (Provide supporting documentation) X❑ Not Applicable Initial Date Initial Date TxDOT utility Utility Name: City of Baytown ROW CSJ: 0508-01-380 U-number: 00003021 Construction CSJ: 0508-01-345, Etc. Betterment Calculation and Estimates I Betterment does not exist in this agreement. (J 0.00% 9.0' Betterment U Non -elective Betterment exists in this agreement. Procedures for Computing Elective Betterment Credit 1.) Prepare a plan and estimate of cost for replacement of the existing facility in the most economical manner, as required by the transportation construction project. (A) 2.) Prepare a second plan and estimate including the betterments that the utility elects to build. (B) 3.) Subtract the two (above items) from one another to arrive at the difference: B - A = X 4.) Compute a betterment credit percentage based upon the ratio : X/B = Elective Betterment Betterment Calculations Description IAmount Estimated Total Cost of Relocation (8) Non -betterment Estimate (A) Difference 0.00 Elective Betterment Percentage P I NaN Please include detailed estatmates and supporting documentation for both estimates. Non -Elective Betterment Please provide%uslircalion for each location of non -elective beltermenl (use slalion #s) Forced betterments: also known as non -elective betterments; those necessitated by transportation project construction, as shown below; this type is usually a reimbursable cost item. The following are reimbursable items and must be properly documented by the utility: ❑ non -stocked items that are uneconomical to purchase: ❑ items to comply with governmental laws and ordinances; ❑ appropriate regulatory commission codes: ❑ published, current design practices regularly followed by the utility in its own work; ❑ installment of replacements of equivalent standard, although not identical; ❑ betterments for which there are direct benefits to, and /or are required for. the transportation project. Form ROW-U-35 {Rev. 08119) Page 12 Attachment "H" Proof of Property Interest ❑ Supporting documentation of compensable property interest that establishes reimbursement eligibility as referenced in Texas Transportation Code §203.092. ❑ Property interest documented through applicable affidavits and required attachments. ❑ ROW-U-1A and ❑ ROW-U-113 Ism ❑ ROW-U-1 C ❑X The roadway improvement project is designated as an Interstate Highway project; therefore, no supporting documentation of compensable interest is required. Initial Date Initial Date TxDOT Utility