Loading...
Ordinance No. 12,314ORDINANCE NO. 12,314 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AUTHORIZING CHANGE ORDER NO.7 WITH LEM CONSTRUCTION COMPANY, INC., FOR THE WEST DISTRICT WASTEWATER TREATMENT PLANT EXPANSION PROJECT; AUTHORIZING PAYMENT BY THE CITY OF BAYTOWN, IN THE AMOUNT OF SIX HUNDRED THIRTY -TWO THOUSAND SIX HUNDRED SIXTY - THREE AND 64/100 DOLLARS ($632,663.64) AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. µ►►►++► t» t**: rtt++++ t..::+**+++++.+ s* rr �.*** r�* t* ��:: r* r* + + + + +.�rrr�r�>t<�r� « *r * *.er *w *w BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 7 with LEM Construction Company, Inc., for the West District Wastewater Treatment Plant Expansion Project. A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. Section 2: That the City Council of the City of Baytown hereby authorizes the reduction of retainage from five percent (5 %) to two and one -half percent (2.5 %) for the West District Wastewater Treatment Plant Expansion Project. Section 3: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 8th day of August, 2013. APPROVED AS TO FORM: e-MNACIO RAMIREZ, SKPity Attorney RAKaren\ Files \City Counci1\0rdinances\2013Wugust 8\ ChangeOrderNo7WestDistrietWWTPProject.doc Brief Description of Changes: Exhibit "A" CITY OF BAYTOWN Change Order No. 7 West District WWTP Expansion 7/30/2013 This change order is issued to add the work as described in RFI 18, which is attached hereto and incorporated herein for all intents and purposes, in exchange for the retainage reduction from 5% to 2.5 %. Add or Delete Items: Item Description Unit Quantity Unit Price Total 1 Work for RFI #18 LS 1 $0.00 I oral Contract Summary: Ori inal Contract Price 1 $ 18,893,900.00 Previous Change Orders 1 $1,089,233.03 This Change Order Is r CVMcu uvnu au ricc I V.bJ61 "I 33.U3 Original Contract Duration - Calendar Days 730 Previous Time Extensions 177 This Change Order Revised Contract Duration - Calendar Days ic- .CVAJ 7 so 13 LEM bn traction Inc., Dat Director of Finance Dab Atkins, Project Manager Date Director of Engineering Date City Manager Date 907 I I I T To: Dominick Trupla Atkins 1250 Wood Branch Park Drive Suite 300 Houston, TX 77079 Ph: (281)529-4273 Fax: (281)493-1047 CC: Subject Storm Sewer Existing Elevations at Grade Drawing: Cost Impact: None LEM Construction Company, Inc. 10849 Kinghurst, Suite 150 Houston, TX 77099 Ph : 281 -495 -9550 Fax: 281 -495 -9995 RFl RFI #: 18 Date: 6/2/2011 Job: 2011 -02 Baytown West District WWTP Exp Phone: Spec Section: Schedule Impact: None Request: Date Required: 6/9/2011 The existing elevations at grade that are shown on the drawings on sheet 5 of the drawings do not mach the actual existing elevations in the field. I have attached a drawing showing the actual elevations at points on the drawing. Is lowering the flow line of the storm sewer acceptable? Please advise on new flow line elevations. See Attached Drawing. Also please provide a standard baytown/harris . county detail of the outfall structure. Requested by: Hunter Howard LEM Construction Cc, Inc. Response: Lo,,,4& -Lvvfo TNrz F:Lou, —UOE OF TH6 5T0[2v� SEWt� Mw�a 15 Ac-c E P TA t3 t_9 tit v V i pG b Tt: ek' l5 No E,4 IS -r-i06 1JrILl1 -ES or` A 0 Y 7.- t- rlLIT"1 E5 CnSE(ti9� �"fA. 1116 d ra>\t 0 aVCjrA�ll G� DE 1!5- AA, 5-(= To bE S u l2. e- `f b1 E G&AZC REe D Iz DE IJ IS C.Oi2 TW-C-r CttEe lZ hAAN CovrZ EL4rW.4 -t"1 vP0 eA5 10 wc.H SToiL�AA, t= C i RC LE 0 AA3Z WtziTTa A5 T�)O W N in to T'HE ATfA, c,HE'D 5t49 S) . C-1 r--VA, 6 olr4 0T--W. 6- i'I+E E�tsTlw►� E-Lev��o- �l�•��u �AVcr M�Qk LSi� vID SA4001 --iSi5CAUcze T1415 AREA F'EC.4rtSL IT tU/�S DqLTSt DF o F �16NCt=L� A�Ea Answered Answered byd Company G/r Date Page 1 of 1 � ®. K %� �. Exist. EL. @Grade � .14.26 �- . � - s.� .� _ ,�s+�saoo �`. `�,`�� ,r -1 ��; x�� R,�• � %'•�" Exist. EL. @Grade �-� ,.��,�, �_ -- -,� 15.45 r --�- -� k� j a i r r i �� ,� 1� i, � � f t iP�71�23 i I + rrl �� �— o -�� � , �. �_ 'yl�li `4 6�FOD.UO � ' � t s+ao �,� � 1 � /� _ 240 ���� lF. o �j '� 1� (n'E�i _ X5.12- 1 " ilfiCl -'� 7"'i_J �I I �• e 1 �• ExistrEL. @Grade �� dl--L� —14- �w F�LNd�AIRiF�It _ _ �� f✓�°' �TAtiK 7 l' 1�i��? %I Il flfWAlidt cTtIOLLCCSttis.7ntY�fiv I �iY »�,�: "H'c"Kpy! �i2G ELer!///Lrio�v� �F ,U�J'- rTif��f ����- MH 23.50 70 L. „ W) w0 IE RIFY I �I 3 I \ \ 6 . EN E ,, EFF x x x F? x sp x- — 18" S @ 0.2� %� ^� o I c14 c III III st , — — — �eM — OZ 2 a �- �Z DI H 20.00 � �;;? b, 16 20.00ti ZZ 7+79.09-N TS 1.5 1 6+ NII .00 I III FL N a E FLU NT I �N II P P 10 e" T�TI N P ti fy Gmle Inlet , b Effl t /� Orate EL - 20.57 FL 10- (E)-'B.99 II T 2 .0 Po 28.85 48; f 0.� FL 10• (yy(0) II fb I II III aZ b Crate Inlet I Gmte M. - 21.49 ri i0 920 i097 az DITCH II z rZ 30 L.F. 0 II 68% w/ II z :1 MAX. A Q DE SLOP a I I C,II Effluent MFi EUm 0-28.91 FL 448' '� 81 Orate Inlet 2�A~ e FI. -23.19 FL 0 21.72 I + O FL 1 ' -21.91 W II N II °' N �_ 9zl I II v 0 DITCH 25.3 11� GRADE BREAK 5 7 +79.00 N 4 +00.00 I 10- -254" I FL N � NII �z II b 3 a W w1 01 r. m an. n . nnge)e 11 200 0ILF. ® I +r rr i II II 268% w/ x 5:1 MAX. SIDE SLO I 1 III e.m. w II x I n eaa I II x WCHB25.3 4 A' 4+00 w_ " I W x100.00 I n er I I I p x I PROP. FENd I , o x+00 w I I I 1.0 Fit r= IN L w6►� a1 MAX. SIDE SLOT DITCH 25.00 1 J _ j WE F T F TC 610 • • BAYTOWN Brief Description of Changes: CITY OF BAYTOWN Change Order No. 7 West District WWTP Expansion 7/30/2013 This change order is issued to add the work as described in RFI 18, which is attached hereto and incorporated herein for all intents and purposes, in exchange for the retainage reduction from 5% to 2.5%. Add or Delete Items: Item Description Unit Quantity Unit Price Total 1 Work for RFI #18 LS 1 $0.00 ota $ Contract Summary: Original Contract Price $ 18,893,900.00 Previous Change Orders $1,089,233.03 This Change Order Revised Contract Price $ 19,983,133.03 Original Contract Duration - Calendar Days 730 Previous Time Extensions 177 This Change Order 0 Revised Contract Duration - Calendar Days LEM ruction Inc., -' 70 r3 Dat- gZ0 13 Director of Finance ngineering Dati City Manager Atkins, Project Manager Date 1 do-