Ordinance No. 12,104ORDINANCE NO. 12,104 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AUTHORIZING CHANGE ORDER NO. 4 WITH NUNN CONSTRUCTORS, LTD, FOR THE CDBG NON - HOUSING WASTEWATER EMERGENCY POWER PROJECT: AUXILIARY PUMPS AND LIFT STATION SUBJECT TO REVIEW BY THE TEXAS GENERAL LAND OFFICE; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That subject to review by the Texas General Land Office or its successor, the City Council does hereby authorize Change Order No. 4 with Nunn Constructors, Ltd, for the CDBG Non - Housing Wastewater Emergency Power Project: Auxiliary Pumps and Lift Station. A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. Section 2: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City C of the City of Baytown this the 8`h day of November, 2012. r• / Tern ACIO RAMIREZ, SR ity Attorney R, Caren\piles \City Council \OrdinenccsW 2Wovember 8\ ChanB e0rderNo44CDB1Non- HousinBWestewmer8mer8 encyl' owerProjeet- AuxillaryPumps&LiflSUiion.doc o %� . LL > :O j ETICIA BR ';.Q.... APPROVED AS TO FORM: ACIO RAMIREZ, SR ity Attorney R, Caren\piles \City Council \OrdinenccsW 2Wovember 8\ ChanB e0rderNo44CDB1Non- HousinBWestewmer8mer8 encyl' owerProjeet- AuxillaryPumps&LiflSUiion.doc 0,1171MAN Texas General Land Office Disaster Recovery Construction Contract Change Order Request Form Engineer: Owner: Contractor: Jones & Carter, Inc. City of Baytown Nunn Constructors, Ltd. 6335 Gulfton, Suite 100 2401 Market St. 23602 Botkins Houston, TX 77081 Baytown, TX 77520 Houston, TX 77447 Agreement Date: July 7, 2011 Phone No.: (713) 777 -5337 Phone No.: (281) 422 -8281 Phone No.: (281) 351 -8383 Engineer's Project No.: 5466 -006A Date: October 2, 2012 Contract For (Project Description): GLO Contract No.: Project Code No.: CDBG Non - Housing 10 -5290- 000 -5298 Wastewater Emergency Power Auxiliary Pumps and Lift Station Bid Package No.: Change Order No.: 004 You are hereby requested to comply with the following changes from the contract plans and specifications: Item Description of Changes: Quantities, Units, Unit Prices, Decrease in Increase in No. Change In Completion Scheduled, Etc. Contract Price Contract Price 12.7 Contractor to perform exploratory excavation at $8,720.00 Roseland and re -set elevated slab piers in locations that will not conflict with existing facilities and structures. 12.8 Piping modifications (material & labor) necessary $5,350.00 due to relocation of elevated slab. 12.9 Form rental $1,500.00 Construction Contract Change Order Request Form CDBG Disaster Recovery Program Page 1 of 4 October 2012 8.7 Site Work: New Fence and Landscaping $59250.00 (Lonely Pine) 15.1A Site Work: Remove Fence/Temproary Fence $500.00 (Walnut Ridge) 15.26 Site Work: New Fence $3100.00 (Walnut Ridge) 15.2 Concrete: Labor and Material for Pump Pad and $3000.00 Walk (Walnut Ridge) 15.3 Protective Coatings $19600.00 (Walnut Ridge) 15.4A Mechanical: Piping $9900.00 (Walnut Ridge) 15.48 Mechanical: Auxiliary Pump (Including Delivery and $49,800.00 Installation) (Walnut Ridge) 1505 Electrical $2,200.00 (Walnut Ridge) Qange in Contract Price Chanae in Contract Time (Calendar+ Days) Original Contract Price: $1,435,300.00 Original Contract Time: 237 days Previous Change Order(s): Net Change From Previous No. i to No. 3 $312,338.00 Change Orders: 285 days Contract Price Prior to Contract Time Prior to this Change Order. $1,747,638.00 this Change Order. 522 days Construction Contract Change Order Request Form Page 2 of 4 CDBG Disaster Recovery Program October 2012 Net Increase of Net Increase of this Change Order: ($49,280.00) this Change Order: 30 days Contract Price With all Contract Time With all Approved Change Orders: $1,698,358.00 Change Orders: 552 days Cumulative Percent Change in Contract Price ( + / -): Grantee Contract End Date: 18.3% (mm /dd /yy) 12/10/2012 Construction Contract Start Date: Construction Contract End Date: (mm /dd/yy) 07/07/2011 (mm /dd /yy) 01/09/2013 Reimbursements of costs included in this change order are subject to review by the GLO -DR program. This document may be executed prior to submission for GI-0-DR program review, but all parties involved will be held responsible if the change order or the amendment warranted as a result of this change order is not in compliance with CDBG or HUD requirements. RECOMMENDED: By: I ENGINEER: Jones & Carter, Inc. Gregory S. Baird, P.E. Date: Io /d t APPROVED: By: OWNER: City of Baytown Date: Nunn Constructors, Ltd. t Date: 1V' tS- Construction Contract Change Order Request Form Page 3 of 4 CDBG Disaster Recovery Program October 2012 s 1. Will this Change Order increase or decrease the number of beneficiaries? 0 Increase O Decrease ■ No Change If there is a change, how many beneficiaries will be affected? Total UM 2. Effect of this change on scope of work: O Increase O Decrease ■ No Change 3. Effect on operation and maintenance costs: O Increase O Decrease ■ No Change 4. Are all prices in the change order dependent upon unit prices found in the original bid? O Yes ■ No If "No", explain: 5. Has this change created new circumstances or environmental conditions which may affect the project's impact, such as concealed or unexpected conditions discovered during actual construction? O Yes ■ No If "Year, Is an Environmental Re- assessment required? 6. Is the Texas Commission on Environmental Quality (TCEQ) clearance still valid? (if applicable) ■ Yes O No 7. Is the TCEQ permit approval still valid? (sewer projects only) ■ Yes O No S. Are the handicapped access requirements/approval still valid? (If applicable) O Yes O No 9. Are other Disaster Recovery contractual special condition clearance still valid? ■ Yes O No (If no, specify): NOTE: * Generally, a cumulative change in the contract price in excess of 25% cannot be reviewed (18% decrease for counties). Construction Contract Change Order Request Form CDBG Disaster Recovery Program Page 4 of 4 October 2012