Loading...
Ordinance No. 12,090ORDINANCE NO. 12,090 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AUTHORIZING CHANGE ORDER NO. 1 WITH T &C CONSTRUCTION, LTD., FOR THE RACCOON ROAD LIFT STATION REHABILITATION AND 12 -INCH FORCE MAIN PROJECT; AUTHORIZING PAYMENT BY THE CITY OF BAYTOWN, THE SUM OF TWO HUNDRED TWENTY -FOUR THOUSAND THREE HUNDRED SEVENTY -THREE AND NO /100 DOLLARS ($224,373.00); AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. **+** �* tt***** w* rr* tr t* s* sr****t*+ �** r* rtrt►****++***+*+*** * *r�� *rr * * *� ++ * * *t *t * * *t� *� + + ++ BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section l: That the City Council does hereby authorize Change Order No. 1 with T &C Construction, Ltd., for the Raccoon Road Lift Station Rehabilitation and 12 -inch Force Main Project. A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. Section 2: That the City Council of the City of Baytown hereby authorizes the payment of TWO HUNDRED TWENTY -FOUR THOUSAND THREE HUNDRED SEVENTY -THREE AND NO /100 DOLLARS ($224,373.00) to T &C Construction, Ltd., for Change Order No. 1 for the Raccoon Road Lift Station Rehabilitation and 12 -inch Force Main Project. Section 3: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the ic ouncil of the City of Baytown this the 25th day of October, 2012. y k'Y �• S, �cY. 00�� NACIO RAMIREZ, SR., gy Attorney R:\Kar n\Files \City Coun61\0rdinanees\2012\October 25 \Change0rderNo1 T& CCons" ction4RaccoonRoadLiftStationRchabilitation .doc Brief Description of Changes: Exhi bid- "A" CITY OF BAYTOWN Change Order No. 1 RRop'p Raccoorli3ce Lift Station Rehabilitation & 12" Force Main Project 10/12/2012 This change order is created to authorize T&C Construction, LTD. To perform the following work that is outside of the current contract: 1) Install a 16" proposed force main in lieu of the 12" force main; 2) install a surge tank foundation and associated piping. Add or Delete Items: Item Description Unit Quantity Unit Price Total 1 16" Force Main LS 1 S 194,380.00 S 194,380.00 2 Surge Tank Foundation 8 piping LS S 26,000.00 S 26,000.00 F3ful Contract Summary: $ 220,380.00 Original Contract Price S 2.565.810.00 Previous Change Orders S This Change Order S 22.0.380 1 tcevisee comract Trice 5 2,186.190.00 Or final Contract Duration - Calendar Days 240 Previous Time Extensions 0 This Change Order 45 nuveieu uonudcr uurauun - �aienuar uays TE construction, LTD Date Director of Finance Date HD Claunch 8 Miller Date 0.111 Director of Engineering Date City Manager Dale CITY OF BAYTOWN Change Order No.1 Raccoon Drive Lift Station Rehabilitation & 12" Force Main Project Summary of items -i I mown a id__ ro osea Tome main in neu oT the -iz-- Torce main 41 Bid Item Description Unit Quantity Unit Price Total 23 12" PVC SDR 26 Class 160 San Swr. Force 80 $200.00 $16.000.00 43 12' plug valve Main by open cut or auger const., including 1 $3,000.00 $3,000.00 44 11w hose bib including 1' PVC pipe pvmt. repair LF -3680 $155.00 - $570.400.00 24 12" PVC SDR -26 Class 160 San Swr. Force Irepair Main, mandatory auger const., including pvmt. LF -250 $169.00 - $42.250.00 25 Connect 12" proposed force main to exist. 12" force main, including 2 -12" plug valves and fittings LS -1 $15.000.00 - $15.000.00 26 12" Force Main Aerial Crossing at Cary Bayou, Incl. structural piers. LS -1 $65,000.00 465,000.00 27 Connect 12" force main to lift station LS -1 $1.000.00 41,000.00 23A 16" PVC SDR -26 Class 160 San Swr. Force Main by open cut or auger const.. Including pvmt. re it LF 3680 $199.00 $732,320.00 24A 16" PVC SDR 26 Class 160 San Swr. Fong Main, mandatory auger const., including pvmt. repair LF 250 $265.00 $66,250.00 26A Connect 16" proposed force main to exist. 12" force main, including 12" and 16" plug valves and fittings LS 1 $15,000.00 $15,000.00 26A 16" Force Main Aerial Crossing at Cary Bayou. incl. structural piers LS 1 $73,360.00 $73,360.00 27A lConnect 16' force main to lift station LS 1 $1,100.001 $1.100.00 Total $1949380.00 zi instan a surge tanK Tounaauon ana associates pipa n 41 ISewage Surge Tank foundation LS 1 $6,000.00 $6,000.00 42 12' PVC force main. including fittings and restraints LF 80 $200.00 $16.000.00 43 12' plug valve EA 1 $3,000.00 $3,000.00 44 11w hose bib including 1' PVC pipe I LS 1 $1,000.00 $1.000.00 Total $269000.001 Total Change Order No.1 Amount: $220,380.00 T & C CONSTRUCTIO1111 LTD. 5411 KILLOUGH HOU&ON aT TX 7708s -4011 (281) 445.1828 FAXV 281.445~3768 October 121 2012 City of Baytown c/o HDR Engineering, Inc. 4635 Southwest Freeway, Suite 1000 Houston, TX 77027.713 ATIN:' Mr. Jose Maldonado, PE RE: Upgrade; to 16 -Inch Force Main Raccoon Drive Lift Station Rehabilitation & 12" Force Main Project T &''C Job #586 At. your request we are providing pricing to increase the size of'the,proposed force main from 12 -Inch as originally bid to 16 -Inch as now .required. We request a 'Change Order with the following pay items: 23 12" Force Main (3680)LF @ $.155.00 ($570,400.00) 23A 16 Force Main 3680LF @ $199.00 $732,320.00 24 '12r�Force,Main(Man. Auger) (Z50)LF`@ $169.00 ($42,250.00) 24A 16"-Force Main(1VMan Auger) 250LF @ $265.00 $66,250.00 25 Conn to exist force main 1 LS ($15,000.00) 25A Conn to exist force main 1 LS $159000.00 26" 12" DI force main crossing 1 LS ($65,000.00) 26A 16" DI force main crossing 1 LS $732360.00 27 Connect 12" to LS I LS ($1,000.00) 27A Connect 16" to LS 1 LS $1,100.00 NET ADDITION $194,380.00 Additionally, we request a time extension of 45 days while the change order decision process is consummated. If we can be of further service, please advise. T +& C CONSTRUCTION, LTO N 5411 MLLOUGH . HOUSTON TX 7, wo 4o11 - (281),445 -1828" FAX # 281.445-3758 October 12i,2012 City of Baytown c/o HDR, Engineering,. Inc. `4b3S Soutitiwest Freeway, Suite 1000 Houston, TX- 77027 -7139 ATIN: Mr.10se'Maldonado,,PE RE: Surge Tank, Installation Raccoon Drive,Lifft Station Rehabilitation& 12" Force Main Project T &C Job #586 At your request we sire providing pricing to add facilities to accommodate a future surge tank. We request a Change Order as follows: 141, x 14' Concrete slab for vessel $6,000.00 12" PVC Force; Main $OLF Q $200.00 162000.00 12" Plug Valve 31000.00 1" PVC Hose Bib & Line 1.000.00 NET ADDITION $26,000.00 If we can bn of further service, please advise. X Sin rely, omas N: Rumney President of T & C Iding, LLC its 'GeneraT Partner Racaoova?