Loading...
Ordinance No. 12,024ORDINANCE NO. 12,024 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, ACCEPTING THE BID OF COX COMMERCIAL CONSTRUCTION LLC, FOR THE FIRE TRAINING CENTER PROJECT; AUTHORIZING AND DIRECTING THE CITY MANAGER AND CITY CLERK TO EXECUTE AND ATTEST TO A CONTRACT WITH COX COMMERCIAL CONSTRUCTION LLC, FOR SAID CONTRACT; AUTHORIZING CHANGE ORDER NO. 1 WITH COX COMMERCIAL CONSTRUCTION LLC, FOR SAID PROJECT; AUTHORIZING TOTAL PAYMENT NOT TO EXCEED THE SUM OF ONE MILLION FIVE HUNDRED SEVENTEEN THOUSAND SEVEN HUNDRED NINETY AND NO 1100 DOLLARS ($1,517,790.00); MAKING OTHER PROVISIONS RELATED THERETO; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. *********************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** WHEREAS, the City Council of the City of Baytown did advertise for bids for the Fire Training Center Project to be received on August 28, 2012; and WHEREAS, notice to bidders as to the time and place, when and where the bids would be publicly opened and read aloud was published pursuant to provisions of Texas Local Government Code Annotated § 252.041; and WHEREAS, all bids were opened and publicly read at City Hall 2:00 o'clock p.m., Tuesday, August 28, 2012, as per published notice to bidders; NOW THEREFORE BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That subject to the Change Order authorized in Section 2 hereof, the City Council of the City of Baytown hereby accepts the bid of Cox Commercial Construction LLC, for the Fire Training Center Project according to the plans and specifications set forth by the City's Engineer, along with Bid Alternate No. 3 and that portion of Bid Alternate No. 2, which includes the confined space prop, and the City Manager and the City Clerk of the City are hereby authorized and directed to execute and attest to a contract with Cox Commercial Construction LLC, for the above - described project, said contract containing the plans, specifications, and requirements of the City's Engineer and appropriate bond requirements in accordance with the provisions of Texas Government Code, Chapter 2253. Section 2: That the City Council does hereby authorize Change Order No. 1 with Cox Commercial Construction LLC, for the Fire Training Center Project. A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. Section 3: That the City Council of the City of Baytown, Texas hereby authorizes payment of an amount not to exceed ONE MILLION FIVE HUNDRED SEVENTEEN THOUSAND SEVEN HUNDRED NINETY AND NO /100 DOLLARS ($1,517,790.00) based upon the unit prices specified in the bid plus Bid Alternate No. 3 and that portion of Bid Altnerate No. 2, which includes the confined space prop, together with the additions and reductions in Change Order No. 1 authorized in Section 2 hereof. Section 4: That pursuant to the provisions of Texas Local Government Code Annotated § 252.048, the City Manager is hereby granted general authority to approve any change order involving a decrease or an increase in costs of FIFTY THOUSAND AND NO /100 DOLLARS ($50,000.00) or less, subject to the provision that the original contract price may not be increased by more than twenty -five percent (25 %) or decreased by more than twenty -five percent (25 0/6) without the consent of the contractor to such decrease. Section 5: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. 12 INTRODUCED, READ and PASSED by the affirmative vote e City Council of the City of Baytown this the 13" day of September, 2012. le APPROVED AS TO FORM: NACTO RAMC E , SR., City [ mey R.\Karen \Files \City COuncil!Ordine .UO125 ,te.b , pWwardFireTrainingCcn terNojcctContra l.doc Brief Description of Changes: Exhibit "A" CITY OF BAYTOWN Change Order No.1 Baytown Fire Training Facility .September 5, 2012 Adjustments to quantities based on alternatives not selected - removal of a portion of the sanitary sewer line because the outdoor classroom alternate was not selected; removal and redesign of the storm sewer 42 because the laydown area alternate was not selected (designed to drain through a ditch rather than a box system); removal of chalnlink fencing along the north because facility is secure without the additional fencing; removal of the truck bulk head because It Is not needed for the tank selected; inclusion of the confined space tralner portion of Alternate #2; inclusion of Alternate N. Add or Delete Items: Item Description Unit Quantity Unit Price Total 7 Removal & Haul Off of Chain Unk Fence FF •338 $1.38 -$466.44 9 Installation of Ume Stabilized SUbgrade Under 7" Pavement SY - 431 $4.42 - $1,905.02 10 Installation of Ume Stabilized Subgrade Under 5" Pavement SY -9 $4.42 - $39.78 14 Installation of 5" Pavement and Sidewalk includes 3' pilot channel SF 1 995 $3.42 $3,402.90 15 Installation of 7" Pavement SF - 3317 $4.52 -$14.992.84 16 Installation of 6" Stands Curb LF -136 $6.03 - $820.08 17 Installation of Barrier Free Ramp EA -1 $276.40 -$276.40 25 Installation of 6' Black Vinyl Coated Chain Unk Fence with Privacy Slats LF -995 $28.75 - $28,606.25 31 lInstallafion of 2' x 2' Grate Drain EA -1 $438.70 - $438.70 32 Installat on of 12" RCP LF -55 $43.91 - 2 415.05 33 Installation of 4' x 2' RCB LF -432 $171.38 - 74,036.16 34 Installation of Hea 1 for 4' x 2' RCB EA -1 $9,163.16 - $9,163.16 35 Installation of Connection to Existing Storm Sewer and 4'x 2' RCB EA -1 $8 490.96 •$8,490.96 36 lExcavation and Earthwork CY 1600 $6.91 $11,056.00 38 Installation of Connection to Existing Manhole EA -1 $5,788-00 - $5,788.00 39 Installation of 8" SDR35 Sanitary Sewer LF •760 $32.84 -$24,958.40 40 Installation of 8" SDR35 Sanitary Sewer Plug EA 2 $268.88 $537.78 41 Installation of Sanitary Sewer Double lCleanout I EA -1 $467.00 - $467.00 42 Installation of 4' Diameter Sanitary Sewer Manhole EA -1 $2,63 .20 -$2,532.20 60 Installation of 6' Diameter Manhole for Confined Space Trainer EA -1 $6,694.66 - $6,594.65 61 nstatlation of 36" RCP for Canfln Space Trainer LF 28 $98.42 $2,755.76 62 1 Subtract truck bulkhead fill station from Item 54 EA -1 1150.00 - $11150.00 63 Installation of 12" sloR4 headwafl EA 1 2 875.00 2,875.00 64 Installation of Headwall or 96" RCP LF 1 $4,025.07 $4,025.07 65 Installation of Connection to s ng Storm Sewer and 36" RCP EA 1 $3.500.00 $3,600-00 2 all 2 lInstallation of Confined -Space Trainer EA 1 $50252.80 $50,252.80 3 alt 2 Installation of 6" HDPE Drain Pipe LF 210 $31.20 P$1,040.00 ,552.00 4 alt 2 Installation of 6" Slope Headwall EA 1 $1,040.00 1 all 3 Installation of Decorative Pavement In the Intersection Instead of Normal Pavement SF 2505 $8.76 $18,933.80 rotas Contract Summary: Or anal Contract Price $1,598 000.00 Previous Chan a Orders $0.00 is Change Order Revised t.:ontract tone lip i ,o If If UV.VV Original ntract Duration - Calendar Days240 Previous Time Extensions 0 This Change Order Hevlseo Uontract uurauon - c:aienoar uays cyu i;eai E bitC `l 5 l�► ontr c to r Date Director of Engineering Date Cox Commercial Construction LLC Director of Finance Date CovPltant t t, Gaugler & Associates, Inc. City Manager Date