Loading...
Ordinance No. 11,936ORDINANCE NO. 11,936 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AUTHORIZING CHANGE ORDER NO. 1 WITH ANGEL BROTHERS ENTERPRISES, LTD., FOR THE 2007 STREET BOND PROJECT - YEAR 3; AUTHORIZING PAYMENT BY THE CITY OF BAYTOWN, THE SUM OF ONE HUNDRED SEVENTY -SIX THOUSAND EIGHT HUNDRED NINETY -FOUR AND 60/100 DOLLARS ($176,894.60); AND PROVIDING FOR THE EFFECT VE DATE THEREOF. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No.1 with Angel Brothers Enterprises Ltd., for the 2007 Street Bond Project - Year 3. A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. Section 2: That the City Council of the City of Baytown hereby authorizes the payment of ONE HUNDRED SEVENTY -SIX THOUSAND EIGHT HUNDRED NINETY -FOUR AND 60/100 DOLLARS ($176,894.60) to Angel Brothers Enterprises, Ltd., for Change Order No. I for the 2007 Street Bond Project - Year 3. Section 3: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote f the City Council ofthe City of Baytown this the 10" day of May, 2012. APPROVED AS TO FORM: NACIO RAMIREZ, SR., ity Attorney ICobff0ldegNl( Tdu',CO irOdw 1a012NM2y IOC geIXd NaI0002ShMam jMYU3do[ Mayor CITY OF BAYTOWN Change Order No.1 Baytown 2007 Street Bond Program - Year 3 April 11, 2012 Brief Description of Changes: This change order Is prepared In order to address the costs associated with the RFIs (see attached RFI Summary) Add or Delete items: Item Description Unit Quantity Unit Price Total 14 1 Remove Gravel Driveway SY 10 9 $ 90.00 16 Mill Asphalt Pavement SY 183 2.25 $ 411.75 18 I Remove Existing Concrete Pavement SY 223 $2.75 $ 613.25 19 lRe move Existing Concrete Driveways SY 25 $2.75 $ 68.75 20 1 Remove Existing Concrete Sidewalks SY 4 $2.75 $ 11.00 21 Remove Concrete Curb LF 371 $1.00 $ 371.00 22 Ad Just Existing Manhole EA -3 $350.00 $ 1,050.00 24 Roadway Excavation CY 75 $11.00 $ 825.00 25 Borrow CY 304 $25.00 $ 7,600.001 27 Cr Lime Stabilized Subgrade SY 465 $3.00 $ 1,395.00 28 11.1me TON 7 $150.00 $ 1050.00 29 160 Reinforced Concrete Pavement SY 223 $32.00 $ 7136.00 30 Ir Reinforced Concrete Pavement SY 183 $35.00 $ 6,405 00 31 4" Relftmed Concrete Sidewalks SY 4 $44.00 $ 176.00 34 6" Concrete D&ewW SY 35 $43.00 $ 1,505.00 38 6" Reinforced Concrete Curb LF 20 $2.30 $ 46.00 37 14r Mcnolithlc Concrete Curb LF 351 $2.30 $ 807.30 39 1 Remove Existing 12" Pipe LF 452 $12.00 $ 5,424.00 40 1 Remove Existing 18" Pie LF -404 $10.00 $ 4,040.00 41 1 Remove Existing 24" Pipe LF 377 $10.00 $ 3,770.00 43 Remove Existing Type C Inlet EA -1 $350.00 $ 350.00 44 Remove Existing Type E Inlet EA 1 $350.00 $ 350.00 45 Remove Existing Manhole EA 1 $400.00 $ 400.00 45A 12" RCP Class M LF 50 $46.00 $ 2,300.00 47 18" RCP Class LF 449 $53.00 $ 23 797.00 48 12,r RCP Class LF 392 $64.00 $ 25,088.00 49A 30" RCP Class III LF 30 $80.00 7-2.400.00 50 1 B-B Inlet EA 1 $1750.00 $ 1,750.00 54 Storm Manhole EA 2 $1,850-00 $ 3,700.0D 55 Extra D2pth Storm Manhole VF 7 $25.00 $ 175.00 56 Trench Safetv System LF 874 $0.10 $ 87.40 67 Pipe Collar EA 3 $400.00 $ 1,200.00 67 1 Block Soddina SY 8824 $3.50 $ 30,884.00 80 8" Gate valve EA -3 $1,100.00 $ 3,300.00 85 r Wet Connection EA 2 $600.00 $ 1,200.00 86 8" Wet Connection EA 2 $650.00 $ 1,300.00 94 1 Long Service Connections EA 7 $550.00 $ 3,850.00 Change Order 1- New Items 41A lRemove Existing 30" Pipe I LF 1 35 $14.00 1 $ 490.00 51A Rebuild Existing Type C Inlet EA 1 $1,200.00 $ 1,200.00 136 Brick Headwall EA 4 $600.00 $ 2,400.00 137 Concrete Headwall EA 6 $500.00 $ 3,000.00 136 Monolithic Curb above Driveway Culvert LF 40 $10.00 $ 400.00 139 Asphalt Transitions SY 1157.69 $35.00 $ 40,526.15 140 Curb and Gutter LF 112 $36.00 $ 4,032.00 Total Contract Summary: 176,894.60 Ori inet Contract Price $ 2,860,166.55 Previous Chan a Orders $ This Change Order Revised Contract Price $ 3,037,061.15 Ori inal Contract Duretion - Calendar Days 365 Previous Time Extensions 0 This Change rder =aedct Duration - Calendar Days ;7" Brothers Enterprises Date irecto of Finance t� \1�J � Date I L, 01 u tners Date Director of Engineering Date City Manager Date 3bb