Ordinance No. 11,936ORDINANCE NO. 11,936
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN,
TEXAS, AUTHORIZING CHANGE ORDER NO. 1 WITH ANGEL BROTHERS
ENTERPRISES, LTD., FOR THE 2007 STREET BOND PROJECT - YEAR 3;
AUTHORIZING PAYMENT BY THE CITY OF BAYTOWN, THE SUM OF ONE
HUNDRED SEVENTY -SIX THOUSAND EIGHT HUNDRED NINETY -FOUR
AND 60/100 DOLLARS ($176,894.60); AND PROVIDING FOR THE EFFECT VE
DATE THEREOF.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS:
Section 1: That the City Council does hereby authorize Change Order No.1 with Angel
Brothers Enterprises Ltd., for the 2007 Street Bond Project - Year 3. A copy of said change order is
attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes.
Section 2: That the City Council of the City of Baytown hereby authorizes the payment
of ONE HUNDRED SEVENTY -SIX THOUSAND EIGHT HUNDRED NINETY -FOUR AND
60/100 DOLLARS ($176,894.60) to Angel Brothers Enterprises, Ltd., for Change Order No. I for
the 2007 Street Bond Project - Year 3.
Section 3: This ordinance shall take effect immediately from and after its passage by the
City Council of the City of Baytown.
INTRODUCED, READ and PASSED by the affirmative vote f the City Council ofthe City
of Baytown this the 10" day of May, 2012.
APPROVED AS TO FORM:
NACIO RAMIREZ, SR., ity Attorney
ICobff0ldegNl( Tdu',CO irOdw 1a012NM2y IOC geIXd NaI0002ShMam jMYU3do[
Mayor
CITY OF BAYTOWN
Change Order No.1
Baytown 2007 Street Bond Program - Year 3
April 11, 2012
Brief Description of Changes:
This change order Is prepared In order to address the costs associated with the RFIs (see attached RFI Summary)
Add or Delete items:
Item
Description
Unit
Quantity
Unit Price
Total
14
1 Remove Gravel Driveway
SY
10
9
$ 90.00
16
Mill Asphalt Pavement
SY
183
2.25
$ 411.75
18
I Remove Existing Concrete Pavement
SY
223
$2.75
$ 613.25
19
lRe move Existing Concrete Driveways
SY
25
$2.75
$ 68.75
20
1 Remove Existing Concrete Sidewalks
SY
4
$2.75
$ 11.00
21
Remove Concrete Curb
LF
371
$1.00
$ 371.00
22
Ad Just Existing Manhole
EA
-3
$350.00
$ 1,050.00
24
Roadway Excavation
CY
75
$11.00
$ 825.00
25
Borrow
CY
304
$25.00
$ 7,600.001
27
Cr Lime Stabilized Subgrade
SY
465
$3.00
$ 1,395.00
28
11.1me
TON
7
$150.00
$ 1050.00
29
160 Reinforced Concrete Pavement
SY
223
$32.00
$ 7136.00
30
Ir Reinforced Concrete Pavement
SY
183
$35.00
$ 6,405 00
31
4" Relftmed Concrete Sidewalks
SY
4
$44.00
$ 176.00
34
6" Concrete D&ewW
SY
35
$43.00
$ 1,505.00
38
6" Reinforced Concrete Curb
LF
20
$2.30
$ 46.00
37
14r Mcnolithlc Concrete Curb
LF
351
$2.30
$ 807.30
39
1 Remove Existing 12" Pipe
LF
452
$12.00
$ 5,424.00
40
1 Remove Existing 18" Pie
LF
-404
$10.00
$ 4,040.00
41
1 Remove Existing 24" Pipe
LF
377
$10.00
$ 3,770.00
43
Remove Existing Type C Inlet
EA
-1
$350.00
$ 350.00
44
Remove Existing Type E Inlet
EA
1
$350.00
$ 350.00
45
Remove Existing Manhole
EA
1
$400.00
$ 400.00
45A
12" RCP Class M
LF
50
$46.00
$ 2,300.00
47
18" RCP Class
LF
449
$53.00
$ 23 797.00
48
12,r RCP Class
LF
392
$64.00
$ 25,088.00
49A
30" RCP Class III
LF
30
$80.00
7-2.400.00
50
1 B-B Inlet
EA
1
$1750.00
$ 1,750.00
54
Storm Manhole
EA
2
$1,850-00
$ 3,700.0D
55
Extra D2pth Storm Manhole
VF
7
$25.00
$ 175.00
56
Trench Safetv System
LF
874
$0.10
$ 87.40
67
Pipe Collar
EA
3
$400.00
$ 1,200.00
67
1 Block Soddina
SY
8824
$3.50
$ 30,884.00
80
8" Gate valve
EA
-3
$1,100.00
$ 3,300.00
85
r Wet Connection
EA
2
$600.00
$ 1,200.00
86
8" Wet Connection
EA
2
$650.00
$ 1,300.00
94 1
Long Service Connections
EA
7
$550.00
$ 3,850.00
Change
Order 1- New Items
41A lRemove
Existing 30" Pipe
I LF
1 35
$14.00
1 $ 490.00
51A
Rebuild Existing Type C Inlet
EA
1
$1,200.00
$ 1,200.00
136
Brick Headwall
EA
4
$600.00
$ 2,400.00
137
Concrete Headwall
EA
6
$500.00
$ 3,000.00
136
Monolithic Curb above Driveway Culvert
LF
40
$10.00
$ 400.00
139
Asphalt Transitions
SY
1157.69
$35.00
$ 40,526.15
140
Curb and Gutter
LF
112
$36.00
$ 4,032.00
Total
Contract Summary:
176,894.60
Ori inet Contract Price
$ 2,860,166.55
Previous
Chan a Orders
$
This Change
Order
Revised Contract Price
$ 3,037,061.15
Ori inal Contract Duretion - Calendar Days
365
Previous Time Extensions
0
This Change rder
=aedct Duration - Calendar Days
;7" Brothers Enterprises Date
irecto of Finance t� \1�J � Date
I L, 01
u tners Date
Director of Engineering Date
City Manager Date
3bb