Loading...
Ordinance No. 11,905ORDINANCE NO. 11,905 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AUTHORIZING CHANGE ORDER NO.2 WITH ANGEL BROTHERS ENTERPRISES, LTD., FOR THE PINEHURST SUBDIVISION SANITARY SEWER AND DRAINAGE IMPROVEMENT PROJECT; AUTHORIZING PAYMENT BY THE CITY OF BAYTOWN, THE SUM OF SIX HUNDRED FIFTY -EIGHT THOUSAND ONE HUNDRED FORTY -FOUR AND 37/100 DOLLARS ($658,144.37); AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 2 with Angel Brothers Enterprises Ltd., for Change Order No. 2 to the Pinehurst Subdivision Sanitary Sewer and Drainage Improvement Project. A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. Section 2: That the City Council of the City of Baytown hereby authorizes the payment of SIX HUNDRED FIFTY -EIGHT THOUSAND ONE HUNDRED FORTY -FOUR AND 37/100 DOLLARS ($658,144.37)) to Angel Brothers Enterprises, Ltd., for Change Order No. 2 for the Pinehurst Subdivision Sanitary Sewer and Drainage Improvement Project. Section 3: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote gA'the City Council of the City of Baytown this the 19a' day of March, 2012. 1 DONCARLOS, Mayor ATTE T: LETICIA BRYSCH, Ci Clerk APPROVED AS TO FORM: CfMACIO RAMIREZ, SR., i y Attorney \ \CobfsO NegaMuenTiles \City CouneihOrdinances\2012VNnrch 19\ CbangeOrderNo2PinehursiSnbdivisionSanilarySewer &DminagelmprovemenlProjecl.doc Brief Description of Changes: Exhibit "A" CITY OF BAYTOWN Change Order No. 2 SANITARY SEWER AND DRAINAGE IMPROVEMENTS TO SERVE PINEHURST SUBDIVISION SECTION 1 March 15, 2012 Additional pavement, beyond the limits shown in the construction plans, was necessary to ensure driveway drainage and /or to de in new pavement to existing pavement that Is in good condition. Additional length of sanitary sewer leads was required due to unknown clean out locations. Additional storm sewer pipe was needed to replace storm sewer pipe that was not salvagable. Add or Delete Items: Contract Summary: Original Contract Price $ 4,819,356.50 Previous Change Orders $ 18,451.55 This Change Order I 4i 658,144.37 Revised Coniraci Pdce 5,495,952.42 Original Contract Duration - Calendar Des 400 Previous Time Extensions 0 This Change Order Revised Contract Duration - Calendar Days 400 Contractor Date Director of Finance Date sultant Date Director of Engineering Date City Manager Date CHANGE ORDER TWO - PROPOSAL ENGINEER: ATTN: CONTRACTOR: OWNER: Cobb,Fendley & Associates, Inc. 13430 NW Frwy, Suite 1100 Houston, Texas 77040 Alexander Van Duzer Angel Brothers Enterprises, Ltd. 5210 West Road Baytown, Texas 77521 City of Baytown Date: Estimate No.: Estimate Period: Project No.: ABE Job No.: February 8, 2012 100% Complete 1/1/11 - End 0912 - 001-00 1041 CONTRACT FOR: Pinehurst Section One - Sanitary & Driainage Improvements PAYMENTS February 1 $ 204,354.98 Original Contract Amount: $4,819,356.50 March 2 $ 288,332.36 Change Orders: $18,451.55 April 3 $ 616,978.69 Current Contract Amount: $4,837,808.05 May 4 $ 146,188.13 June 5 $ 559,738.82 TOTAL AMOUNT OF WORK COMPLETED: 113.2% $5,495,952.42 (including COP) July 6 $ 487,359.02 current contract amount $4,837,808.05 August 7 $ 406,547.99 Change Order 2 amount $658,144.37 September 8 $ 407,190.66 TOTAL AMOUNT OF WORK COMPLETED: 113.2% $5,495,952.42 October 9 $ 359,877.57 RETAINAGE (5 %): $ (274,797.62) November 10 $ 648,769.96 SUBTOTAL: $5,221,154.79 December 11 $ 460,654.53 LESS PREVIOUS ESTIMATES: - $4,585,992.71 $ 4,585,992.71 TOTAL AMOUNT DUE FOR PAYMENT: $635,162.08 CONTRACTOR: Angel Brothers Enterprises, Ltd. OWNER: City of Baytown SIGNED: SIGNED: (NAME) (NAME) DATE: DATE: ENGINEER: Cobb, Fe dley & Associates, Inc. SIGNED: DATE: �1 (NAME) DATE: CHANGE ORDER 2 - QUANTITIES ESTIMATE NO.: FINAL PROJECT: CITY OF BAYTOWN - PINEHURST SANITARY & DRAINAGE IMPROVEMENTS ESTIMATE PERIOD: 2/1/11 -END �- Denotes COame DNMltdn Im xl PoO IIBI &BCRPRD•I CONTRACTAMWNTS Feb 1, M11 -Jen 31, 2012 gIANi11Y AMWM 1A0% pUAN11TY TOTAL......_...%• AMOUJT cOeal£lE JADDI p1A111RES Am /DEWCf VwCHANGE AMOIlNi3 Sf �� OUAN1n�5 CHANGE CIIDER TIM AbdlHt mmBID . UNR Itdf PR11'E TOTAL AMWNf ERA! RDIS 1 MOB012ATION 1 is 53].mOm 53].05&05 t A7.Om.05 1 A],004m 1 S 100 537.005.05 2 CONTROL t LS 31 00000 218000.00 1 318.050.05 1 21800505 t S 1.00 518.000. 3 1SWPPP 1 LS X10.m0.m 50500.05 1 WOOm.m 1 m0A05.m 1 S 1.00 505.050. TOTAL MOBILIZATION a TRAFFIC c 285 050. mO.m 00&05 IOWA .m NITARYSEPIERIIEMS 4 REMOVEANDOISNSEOF SnNGSANMT YMANHOLE DEATHS 21 FA SSmm ss,= 21 m.=. 21 05105.05 100% .W W.M.W. 5 RE MOVEANDDSNWOFSGSNNGSANRARYSEWER DEPM3 3500 LF 53.05 510710.05 - m. 0 WJx m V. e DIAMETER PRECAST SAMTARY MANKKE 75 EA im.m $W7 . 83 5174.305. W $174,3m.m 111 &m m $174305.05 ] 'DIAMETER NANMOLE OEPTMGRATER THAN 105 VF 51]5.05 SmAO IM 311505.05 92 sii,= 51 WW .m Sit S 15.9DRMPJC 1381 LF S85.m Sffi,Sm. 1 31040&5. Im 5104.06 &m 11 mm VS2 I.m 31MM.m 9 1S SORM PVC IX+EH me LF mm 205932!0 57d s41.iB1.m 572 541.181.05 3M.m m U1184. 10 1TSORWIV UGERED 1211 Lf mem 057,818. 8817 537055205 W17 $370,58200 5,405.00 .05 $370,71M LF VD.m 5498020 2,M1 5194,8]0.0 2781 $194810.05 39% d345.m .05 $190670.05 12 10.80RM PVC AOOERFJ3 ]BO LF X18.0 530020. 837 221 .0 837 $24205.05 81 53.05 S 501 05 837.05 SZA2018.m 13 1P SURM PVC (OPEN CUT) 2103 LF mm 5]B,91d. 2 M 055 a 2TM $853 107% 141.0 5 5,358.05 .m 28527105 14 ff` R PVT: UGERED 1900 LF Smm 257.905. I.4e $74405,05 2483 374,40500 131% 58305 5 17.490.05 24X105 574,405. 15 SSOR26 PVC C 4773 LF X6.05 5157.SW. 6305 S1MM..m 4383 S1M.83B.m S 12870. 1383.05 S1M.&6.m 15 17 'SORMLONGSW4H Indu4e451MS AK WROW 'SORMSHORTSa laW a%IWea SMW MI b 192 EA 5805110 5120050.05 187 S124110.m 19] S124.11MM tm% 5.05 S 31m.m 197.m $124.110.05 210 EA 54mm S98.m0.m 211 5970mm 211 W.WO W 10516 1.05 5 4m.m 211.0 m7.Om.m 18 19 SCH40 PNvere SwwrLea Sa ntlueesm Onev PaueneMbSNVb MIMMMeI 13]50 V 521.0 SIM.7m.m M=D mmeM.m 26M 555219500 111 2.565.05 S 53445.00 M20.m 555219500 5]05 LF 514.75 SB98m.m 22m8 mM.3]OM 22059 5325,370]5 383% 16 .m S 24041015 22.058.05 SSM,37025 M 16 PVC Fq n, DR-2i OW all 240 1 LF I 3140.m 5347m.m 40 m39m.m 405 M.Wom Iml mim S m940.m 459.05 585.505.05 21 IlutellcC Dula W1 dMein Ores Ilcubmr dwnouLWMn ddllne MBnHOW 055000 24000. 0500 0 m.m 0% 18. S dOm m. m T.n S i Demol uplo MaMngl,!BMOxE h l)- hIsCwpwaWan6FIAMnNdexiBl QljHA arm BeMtll UP to EUSOng NBOaM Gasq in 6!185 Canp80 &10595 %31dMM0 Pntdor OMaBy) 214918� Sl.m 270005 S14918,m SM mO. 10104 40 510,te0.m SMOmm 10181 b $10184.05 SM.050.W 454 S 4733 24 flasea l6 RCP CJM 52400 547 .1,880 597520.0 190 567,5M.0 100% S 19050 567.520. CHANGE ORDER 2 - QUANTITIES ESRMATENO.: FINAL PROJECT: CITY OF BAYTOWN - PINEHURST SANITARY & DRAINAGE IMPROVEMENTS ESTIMATE PERIM: 211111 -END &D I1ER OESCRIPi1ON CWIRACi AYWNTS Feb 1.2011 -Jen J1. 2612 OIIAN1111' ANOIMT tOJf{•_ WANIIIY IQML••V•%- gMJIMT COePIETa IDEW pJA1l111� Mpp1DEWCf AMWNiS R cMAVGE C1�FA lYlD 01NNi11E5 CIKHGC OROER tyq AMOUNT &D OIY. 6!/T ULT P10CE TOTAL AMOU6i 25 Reut1S RCP CUVert 5200 lF SZ7.W 5160,400.00 8.031 5182,83].01 8011 2152,61].00 ilm 611.01 S 22.037,00 9,W1.W $102,83].00 29 Re 24 RCP CWa6 2892 LF $30.00 580,761. 1.352 561,450.00 1582 $11460,00 51% 30 W 930000 1.392.00 561600.00 27 Res WRCP CW 150 LF 535.00 55530.00 9] 533%.00 9/ 395.00 81 100 2135.00 9]00 $3.395. 28 RmtWRLP 0 LF 542.0 Wm 86 32.]7.2.60 01 W, S 98.00 32.712. 19 Pua 1S RCP G1vMMAllneoDVe lnHtlon 852 LF 52].0 S28S14. 50.00 0 $0.00 982. 28514.00 S0. 30 Irene Newl9-RW C 112 LF 2]9.01 M 112 $6.388.00 112 34989.0 100% 5 11201 $6359. 31 IA11aI114.2PRCP C 18]5 LF 114.01 592.932. 1422 582568.00 1622 552,55&00 45800 S 20056.00 tp2201 92 Iea IN WRCP CWmt 49 LF 55&01 7 ". - f0. 0 50.0 49.00 3 27".00 E0. 33 Re " SCalDae 3� SY 5)0.0 528960. 395 528950. m 528950.00 100% $ 3ffiW 528850.00 31 Remve aM Lavau /SMewYb 5510 SY 36&50 5256215.00 9,]99 5154139.00 990121 $1644)SZ1 i91% 445721 5 271 2] 996)21 3493,4]521 95 R®41Mmm of Pod Lm644o 51Me A I EA 5300.0 S210W. 13 5l9W.W 14 I 58. E 16900. 14.W 512). 38 L31C1 3 MGeYP 1 Rmv Sine FIV644ie 740] LF tl01 W.M. 1.135 55975,01 766! 61.035.01 100% E 74W.W 33]035. 37 O9ara T "Bald 3 AC 51401.01 $42w.m 1 51600. 3 542W.W 1 5 9.00 34201. W far Sever 1VW& 1.111E Y ]ft52 SY 5150 527547.29 7052 W34& 250DD 893601.01 34016 19349.01 $ 5&052.90 28.00100 SW,80& 9S 5006 fa Service lae0s ]'YM6e 31.F Y ]917 SY 58.25 .$85,31525 3,901 532175.01 ]000 357,750.01 917.01 E 7585.25 7.00.W $57.750,W 5'+ro Sewer 9ema 5uMOtal 9570/1.5 5336718&86 S3A4S.WM ll S 480MW W 987.52 41e1 Saws5lme 40 Rnet1S RCP Wvml 1009 LF S24.W 528084. 1,013 5 1312W 1019 84.31201 93 W 1]5200 1.013.01 $24,312.01 41 Rea41S RCP CWM 5979 LF 52%.01 $1581W. 50]8 5159.70101 59]9 $158,709.0 100% $ 5.6]9.01 $155.]01.01 42 ReN6 N'RCP CMVen 5915 LF 530.01 5169.401. 5.915 5189.45801 5615 5169.450.0 101% 5 5.815.01 5199401.01 43 Resa13SRCP . Calvet 77 LF S42W 53 n 53236.0 77 S3234.W 101% S 7/01 53234. " Res WRCPOWMI 324 LF 54201 $135W.W SD. 0 SOHO .W 3 13901. W. 45 Res WRCP CWVa1aLAAemefieeLxe9m 1329 LF S .W 335561.01 m 0 W.W 1 W E &5593 f0 w " 1,. New l9-RCP W. S2 LF mm o79.W 1201 348.010.01 1200 Eb.BW.W 1.14&01 $ ",7RW 12W.W 515.9LI0. w 47 In:WI New 24-RCP CWe11 509 lF 545.01 3908]0.01 32D1 51 ",190.01 3201 51 ",190.01 16]96 2,51 &W S 113,3WW 3206.01 Sl "101.01 49 Inea0 New39'RCP CUuve 952 LF 573.01 535�6.W 920 523.3W.W 320 523.901.01 9t% 3201 5 336 320.01 R3.3W.W 49 W1a0New36'CMPO allA 26 tF 5115.01 fS220.W W 53601.01 01 53,0.50.01 107% 2.01 5 230.01 30.01 53.401.01 CHANGE ORDER 2 - QUANTITIES PROJECT: CITY OF 13AYTO WN - PINEHURST SANITARY 8 DRAINAGE IMPROVEMENTS ESIIMATENO.: FINAL ESTIMATE P 013: 2/1111 - END L'- DMIdG9 G1fM QEM iCT IIOTAL COMPLETE TO G(tlEl .IGB TOT1 LS t0O %Pfl2F[TI(MI I MLNfF fIW1FG TM'1 01D RBI DFSCGPnoN GM4IRACTAMWNTS Feb t ,1011 -Jtm 31, 2012 gYMRiY AYp11M 191% pUANRIY TOTAL AMJIMT % COMPLETE D70EDIlc O11ANn�3 Applpl]1pCT AMp11M15 SS cNANC,E ORpFR l97p QIIPNnl1E5 ONaxGEafmlx TMp AMWMT EID OTY. 1118 UM1 RKE IIRAI AM'1.. IHi W Ytsmll N6w4i'RCP DN C91uM 37 LF 583.0 529.83,. 413 $341'19.0 413 50219.0 116% 95.0 S 4.WB.W 413.0 534.279.0 51 WtMNew RCP Cdval 537 LF. simwi $85.514. 88l W0.6QM 661 5008620 123% 124.W 5 15.1280 881.0 S90W2.0 52 lmml NewT PVC Sppm s8 15 LF 518.00 5210. MM 0 $0.50 1S S 240.0 $0. 53 aqT d98'CMP Priorm vMIGPP 1550 LF W.Ml SIZ4MM 1.505 siz988 w 150 512.388W 9ft 13 5 150, 1.50.50 S1 380. W MMT d24'CMP PVm wMGPP 250 LF S1.W 51.820. 250 51.0]D.W 280 $1 B2p.00 im S 250.00 si.m, W P 11 Scmm T ad Al es mBAUeIVtrM by tlM EM, 1D EA 3300W [10.000. VM 0 50.50 100 $ 300M.W 50. 01 GPPm 48'CMPa 1558 LF SZW.O "lI,mM ,518 wm=M1 1510 WM2WW. ,3. =I 9 f28MMl 1.50MI 33020.0 57 YpMlINI6Lenn GPPVIEVtli 20WP(P 250 LF $110.0 52980. Z57 328.270.0 257 #0270.00 3.0 S 330. 257.0 $29.270M 59 Pm wl d48'GPP AfprRdleb40390n 155) LF 91.W 515511.0 1,519 $1518.0 150 $1,W.0 9996 13.0 S 130 15O.W 51518. od SB PwINI d24'CIFPARS Retubd0a54n 250 LF E1.W 5200. 25/ 575790 257 5257.0 99% 90 S 3 525/0 l W She Resmme4nAM ImWM4andCIPP ITN 1 IS 53.00.0 E30W. 1 53000.0 1 5300.0 100% 3 1.0 $300.0 l 81 RIRdMPJnlez Cam on48'CIPP ImWle9ian 4 EA 5120.00 U.". 3 53.800.0 3 WAW.W 7 t. 5 120. 3.W 5380000 82 ImWlrO n9 n 1 EA $3000 $30. 50. 0 50.0 1.0 S WOM f0. W Pepep2XAS-Gmm0Wtm91 243 FA 53500 270975. 183 552.875.0 183 552975.0 8/% W. 5 0WW 1W.W 552.975. d W Re0dM 23Yt5'GmIe lNd al DtM Pi 47 EA $305.W s10005.W 75 520.8750 75 $79.875.0 180% 550 S 10.M..W 75.00 520075. 85 OmW T ' lml 11 EA $21000 3231W.W 12 525.20.0 12 W5200.W 150% I.M. 5 2tW90 12W 52520. 88 kmWNmT WIN61 24 EA 31 00 3432W00 31 i55000.W 31 555.800.0 129% 7.W 5 12000.0 31.0 555850. 87 'GMaNde Wm Gm ImiT t EA 000 00.0 1 22000 t 5200.0 ilm 3 ,.W WOMM . 88 PIem415bm Medlole 1 EA 53.5000 33.50. 1 33.500 1 235W.W 113m 1.50 SW. OB Gm, 6 ImA,dm vte 11 Raw dS'4p FSANC 8273 LF SS.W Mt .W 9 54,.3650 8713 mmm 10% 500.0 5 Zsw.w 9T75W 885 70 Remove R 8'Ca R 338 SY $M.W MAW .W 2N 51893400 241.92 $1 931.40 m 16555W 24192 $18931. 71 Remove atlR Camels /SlaewalSS 2024 SY S w 5131.318.0 B= 3398.079.50 8303 Vamm 5.539.W S 257.563.50 UW.W 538887950 72 DS 'n Tw dNenks 3 AC S1.40i.W 54250.0 5090 3 p2w.m 1W% S 300 M SoddftWg Se 10N AILF Y 18111, 53.W $57,889.0 18.431 $59151.0 2MMI M.M. 181% 9,08990 $ 35.60.40 20.00p.W 583,500. 71 Remove atlR Eves CJ HeehwJ. mE At CaNNCm lWtl Lbm185M RNa 81 EA SSW.W 54050.0 19 5950.0 18 SB=..W m 3 1DJ3.0 19.0 59.500.0 75 Remove rq DS Etl Strom R .A9 Sims ar T 1 LS 515.500.0 51550.0 1 515.50.0 1 $15,5M, 10096 S 1.50 $1 500.0 76 Remove B D U, Stain Mm9wlel aitl JU2tian 0pms. All S�,> 13 EA WaW W225.W 11 53.575.00 t1 I 58675.0 "As (oso-ml 11.0 $9,575. CHANGE ORDER 2 - QUANTITIES PROJECT: CITY OF BAYTOWN - PINEHURST SANITARY & DRAINAGE IMPROVEMENTS m!.= �...x�...x. ESTIMATE NO.: FINAL ESTIMATE PERIOp: 2/1/11 -END Om YFSWlA7.1 RBA CONTRACT AYOONiS Feb t, 3011 -Jan J1, 3013 pDAMtr1Y AMpONT 1p mUANR1Y I TOTAL AMOIWT % coxttElE /D®00 � ADO /OQCMCT AMOIIM9 LNANC'E OFDER IWO ODANRDES tlfANGE ORDER TYO AMpI� W CTY. mnr mT RECE TDTAI AWIINf Storm Setw kertu SuMObI 31 M5.250.m $1750729.50 51 791 Hll.m 126 i fiZ/.m 51.791 87/.90 ree PMarSan Mara 7/ R. TmOW11. wPNm Tree 0 EA slaw 56715.m W. 2 $210.00 2 100 E 505.m 2.m $2t0.m 70 Remove Tme12m33.BP 67 EA $32500 Sts 5. 3 $275.00 3 SWS.m ",m 163m.m 3,00 E.975.m 70 PW4 YTWe WOeIWICOm . 130 EA 5725,m fm .m $0.0 2 5650.m 2 200 S (28 mm 2.00 Wmm m YYaltt Tree'f ut Yea 130 EA 5108m 5f3&50.m f0. 0 EO.m 130 t38m. SOm 81 Ckarmre P. T. 652 EA 5/5.m S3T 5m. 220 5185m.m 220 S16.Smm s 174m.m 220.m 516.5m.m W ImtlO Trrflotxtion Feme m5m0 5070 LF W.m tm2m. 5.0ro $20250.m 5010 =0 ..m 100% S SOTO.m $20.2m.m W InaNll Trap PMeobn Fen 50m 10120 LF 53.60 538.633. 10.120 338632m 10120 fm.632.m 1m% f 10130.m Sb632m W InU0 ROO1P Tra 12D10 LF 5/.& 5561mm 12.090 556 tmm 12000 559.tm.m 10096 i 1 060.m W.t50.m ss . Prune 68 EA sim..m 56615. 50. 0 mm 65. S 8815. m BB Root StlnvYeon et EA Wa $254. et V.L .m 61 saeea.m tm% S 51.m 52.BW. 67 NN 5evlu 7815 LF $2.m 586.535. 6W 58.158m Im 58.15mm mt.m S W37B.m mom $8.155. T. Pmbsean l6enu SUMebI Sb9 16, f1J1 .m 513/587/10 S 151 WB.m 137 .m W..M1 88 ImW Nm 1W RCP Chat tm LF O&m 53= m 0 W. 1mm S 36m.m f0. 89 ItsWl New 24 RCP DtMt tm LF W.m Sbbm. M 0 mm tm.m 3 46m. W. W Its WI New 3B RCP CJwt tm LF 572.m 572m.m m. 0 W.m 1mm S f0. 51 ImWl New IW RCP Ch o .MYMY tm LF mso $22m, ED.m 0 mm 1m S 250. SD. B3 Immll New 24 RCPCWr1 Ofl .MYaiel tm LF tmm 50. 0 SO.m tmm S 500. 30. 93 It New RCPC1 o Dan ,Melaiels 1m LF S55.m >S .m WA4 0111111 W.m m tm 55m S0. W PoSOeW R (As Nema m SLwer Tre lm tm 5Y EIO.m W.m0.m 75 =..m 75 S3.00.m S Ii'mw 75.m n000m. 115 RanpN Trae 0'm 11.89's Palm TM 1 EA 5110m 5110.m - W 0 W= 1. m 110. W. W Renmw Tme tZb25.9B' 1 EA f9mm 53m.m S0m 0 SO.m 100 SO >n Rart2 TrSe wtmmGYbn COnMitw t EA 5 ..m �w Ww 0 Worm m OW) 98 Webr Tae's tal Yea =Tree 1 EA Stm.m flaw 10. 0 W= 0% t. 10. S0. 99 Cloak 10 EA A5m 5750. f0. 0 W.m 10.m 750. f0. PROJECT: CITY OF BAYTOWN - PINEHURST SANITARY & DRAINAGE IMPROVEMENTS CHANGE ORDER 2 - QUANTITIES ESTIMATE NO.: FINAL ESTIMATE PERIOD: 211/11 -END BID 1181 OE50MlP CDNIRGCTAMOIINiS FeE I, ]Ott -tan 31. 2012- G11411TItt AEIOIl4T t00%•V WAI411tt TDTA AMWMT W1 %• coeetcTE 1 �NTIISes GDDIDEDOCf AMOUNTS Sf �NCN1INDE O�ERTWO Q1IANIN6� CIIANGEOROER 11Y0 Bm Ott. OMT OMT PRICE roTAL AMOUNT 100 atlas Tree RPN�on Ftsm bS,0m tm IF 54.m 510000 00. S 400. W. 101 Inf1AlIT1¢Pr0beim Fetm S.mO lm IF 53.m wIffi= Wa a SO.m fim,om S 3m.m1 50. 102 IN RMPWW4TI91NA 1m /F s5.m 55m.m — so.01 0 am 100. S Sm. ro. 1m R 1 EA s135.m slum - W.0 0 MW ft (1,W) 5 (in ow 101 ROmssrlMesm 1 EA WI'm MIX) so.a 0 s0.m ft ItOD) 5 fm ro. 165 Hab DNft,S I lm IF 315.m St"m - W.a 0 Wm 1m. S 15m S0. 105 R. aM RebeMO CI lick Form lm LF sm.m 54000 327 Sl3.Om. 327 $130mm 227.m s 9Am.m 927.m 513,08D. t0l Remove NM ReirNGRE Y✓m Ferm tm IF WIM $4.=W 243 ".mm NO m.]ZO.m 1UW 5 5,TN.m 243.m �.T2D E'er' Wqk IIArn4 $OOIaW m sxBOOM 51 % fmmw m Oreerl bane -s tm TER gRNCE ADIIISTMENTS SIZES sivm St850. 26 IMMIX) B50.m t lt.m s 1 tom 2B.m uee0. lm TER MAINAmUSiA03415 JIIWDLVF 51t2.m 51 Bm. 40 $4.4m 54,4m.m 110 E t 320 AIM 54,4m. s18450.m ST010m A310m E 11,110 $7.3 m 110 CLEAN STORM DRAINAGE PIPE 175 DIRECTED BV THE CRYIN6FEC! f23f0.m S2.2m. SO.W 1 52,2m.m 1 5 1.m 52,200. NdintlWe4 in aotaR mr6aG anIOwM1 -� 52 ](p SO.m 52200,m 100% SO.m 52.2mm TOTALS $4,M7,BDB.05 55,313,266.1d $5,495,952.42 113.M 5655,944.37 55.495.95242