Loading...
Ordinance No. 11,858ORDINANCE NO, 11,858 AN ORDINANCE OF THE CITY COUNC,11, OF THE CITY OF BAY OWN, TI-.'XAS, AUTHORIZING CHANGE' ORDFR NO. 2 WITH BAY1'OWN EU."C"I"RIC COMPANY, FOR. THE CDBG NON-FIOUSING WASTF"A'ATER EMERGENCY POWER LIFT' STATION GENERATORS PROJECT SUBJECT TO REVIEW BY THE TEXAS GE;'NERAL LAND OFFICE-; AUTHORIZING PAYMEN'r BY THE CITY OF BAYTOWNJI- IE SUM OFTHREE, HUNDRIED TWENTY- FIVE THOU SAND ONE HUNDRED SEVEN'T'Y -ONE AND NO/100 DOLLARS ($325,171.00); AND PROVIDING FOR THE EFFECTIVE DATE TI 11.LREOF. * * * * * * * * ** * ** 4: ** * ** * ** * ** * * * * ** * * * *** * ***** * * 4, * * * * * ** * * * * *** ** * *** * * * * * * * * * * ** BE H` ORDAINED BY TH]-",crrY COUNCIL OF `FHE CITY OF BAYTOWN,TEXAS: Section 1: That subject to review by the Texas General I.,and Oftice or its successor, the City Council does hereby authorize Change Order No. 2 with Baytown Electric Company, for the CDT G Non-l-lousing Wastewater Emergency Power: Lift Station Generators Project. A copy ot'said change order is attached hereto, marked Exhibit "A" and made as part hereofflor all intents and purposes, Section 2: "chat the City Council of the City of Baytown hereby authorizes payment in (lie amount oCTI- IREE HUNDRED TWENTY-FIVE THOUSAND ONFJIUNDRED SEVENTY-ONE AND NO/I 00 DOLLARS ($325,17 1.00) to Baytown Electric Company for Change Order No. 2 for the CDBG Non-l-lousing Emergency Power: Lift Station Generators Project. Section 3: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown, INTRODUCED, READ and PASSID by the affirmative of Baytown this the 9"' (lay of F'ebruary, 2012. .711(l orthe City Council ofthe City DONCARLOS, M J* IA B I Z YSCI ", r"t1tv Clerk APPROVF"D AS TO 17ORM: EC' -ie ACID RAMIRFZ, SR., City t! rnev Pit y. 1, Oybk() I ]egaM aren\Files'City Com ici 1\0i cfimmcn1,2012%l:ebrmD, 91 ChangeOr (let No2 C DBO 1A S I afionGencramt qPro) co Am Exhibit "A" CATER 9 CO\ TRACT' AA11:N1) M t- .N't:S F()rm y -q Cowstruction Contract Change Order Approval Request Owner: Contract For: Date : January 9, 2012 City of Baytown CDBG Non - Housing 2401 Market St. Wastewater Emergency Power Baytown, TX 77520 Lift Station Generators Project No. Phone #: 281 -422 -8281 5466 -006B Contractor: Engineer: -- DR Contract No. — i Baytown Electric Company, Jones & Carter, Inc. 010220 Inc. ' 6335 Guliton, Suite 100 2106 Beaumont Houston, TX 77081 Baytown, TX 77520 ' Change Order No. 002 g Phone #: 713 - 777 -5337 Agreement Date: July 7, 2011 Engineer's Project No: Phone #: 281- 427 -8196 5466 -006B You are hereby requested to comply with the following changes from the contract plans and specifications: _ Item Description of Changes - Quantities, Units, Unit Prices, Decrease in Increase in No. Change in Completion Scheduled. Etc. Contract Price Contract Price 2.9 Provide and install Pump Saver Power Monitors and Pump Saver Communications Modules and all $1,680.00 accompanying wiring, conduits, junction boxes, fittings etc. 2.10 Additional labor involved with additional SCADA 1� $5,316.00 — and Industrial Pressure Transmitter equipment. 2.14 Provide and install new Industrial Pressure Transmitter with all necessary conduit, wiring and ' $4,348.00 fittings. ` 3.9 Provide and install Pump Saver Power Monitors and Pump Saver Communications Modules and all $1,680.00 accompanying wiring, conduits, junction boxes, fittings etc. ........-- _-- _ ............ I ; Disaster Reco%,ery Progr.un Project Implementation ' lanual Page 1 or 10 01' R�yy',,z�) CHAPTER 9 CONTRACT ANIF.NDN1 1ENI'S 3.10 Additional labor involved with additional SCADA, I Industrial Pressure Transmitter and Submersible $5,316.00 Wet Well Level Transmitter equipment. 3.14 Provide and install new Industrial Pressure Transmitter with Submersible Wet Well Level $5,990.00 Transmitter and all necessary conduit, wiring and fittings. 4.13 Provide and install Pump Saver Power Monitors Y and Pump Saver Communications Modules and all $1,680.00 accompanying wiring, conduits, junction boxes, fittings etc. 4.14 Additional labor involved with additional SCADA, Industrial Pressure Transmitter and Wet Well Level $5,316.00 Transmitter equipment. 4.18 Provide and install new Industrial Pressure Transmitter with Submersible Wet Well Level $10,038.00 Transmitter and all necessary conduit, wiring and ' I fittings. i 5.9 Provide and install Pump Saver Power Monitors _ j and Pump Saver Communications Modules and all I $2,510.00 accompanying wiring, conduits, junction boxes, fittings etc. j I i 5.10 Additional labor involved with additional SCADA $5,316.00 and Industrial Pressure Transmitter equipment. 5.14 Provide and install new Industrial Pressure Transmitter with all necessary conduit, wiring and $9,470.00 fittings. 6.9 Provide and install Pump Saver Power Monitors and Pump Saver Communications Modules and all $2,510.00 accompanying wiring, conduits, junction boxes, fittings etc. 6.10 Additional labor involved with additional SCADA, Industrial Pressure Transmitter and Wet Well Level i $5,316.00 E Transmitter equipment. i Disaster ReroverN, Program Project Implementation 111-utual Page 2 of 10 N01 /t!i �! XSs' CHAPTER 9 CON*I'1tAC'1' AIViI NDi1.tI- :N'i'S 6.12 Provide and install new Industrial Pressure Transmitter with Submersible Wet Well Level $8,007.00 Transmitter and all necessary conduit, wiring and fittings. 7.9 Provide and install Pump Saver Power Monitors and Pump Saver Communications Modules and all $1,680.00 accompanying wiring, conduits, junction boxes, fittings etc. 7.10 Additional labor involved with additional SCADA, Industrial Pressure Transmitter and Wet Well Level $5,316.00 Transmitter equipment. 7.14 Provide and install new Industrial Pressure Transmitter with Submersible Wet Well Level $7,240.00 Transmitter and all necessary conduit, wiring and fittings. 8.13 Provide and install Pump Saver Power Monitors and Pump Saver Communications Modules and all $1,680.00 accompanying wiring, conduits, junction boxes, fittings etc. 8.14 Additional labor involved with additional SCADA, Industrial Pressure Transmitter and Wet Well Level $5,316.00 Transmitter equipment. 8.18 Provide and install new Industrial Pressure Transmitter with Submersible Wet Well Level $10,038.00 Transmitter and all necessary conduit, wiring and fittings. 9.3 Increase size of generator slab. I f $3,400.00 9.13 Provide and install Pump Saver Power Monitors and Pump Saver Communications Modules and all $3,365.00 accompanying wiring, conduits, junction boxes, fittings etc. 9.14 Additional labor involved with additional SCADA _ ^~ $5,316.00 and Industrial Pressure Transmitter equipment. 9.18 Provide and install new Industrial Pressure Transmitter with all necessary conduit, wiring and $17,450.00 fittings. Disaster Recovery N- ogi-am N- 4).ject Implementation Manual Page 3 of 10 CHAPTER 9 CONrRAC t• All ENDNI EINIS 10.9 Provide and install Pump Saver Power Monitors and Pump Saver Communications Modules and all $1,680.00 accompanying wiring, conduits, junction boxes, fittings etc. 10.10 Additional labor involved with additional SCADA $5,316.00 j and Industrial Pressure Transmitter equipment. ' 10.12 Provide and install new Industrial Pressure Transmitter with all necessary conduit, wiring and $6,222.00 fittings. 11.13 Provide and install Pump Saver Power Monitors and Pump Saver Communications Modules and all $1,680.00 accompanying wiring, conduits, junction boxes, fittings etc. _ I 11.14 Additional labor involved with additional SCADA $5,316.00 and Industrial Pressure Transmitter equipment. 11.16 Provide and install new Industrial Pressure Transmitter with all necessary conduit, wiring and $8,723.00 fittings. 12.10 Provide and install Pump Saver Power Monitors and Pump Saver Communications Modules and all $1,680.00 accompanying wiring, conduits, junction boxes, fittings etc. i 12.11 Additional labor involved with additional SCADA, Industrial Pressure Transmitter and Wet Well Level I $5,316.00 Transmitter equipment. 12.15 Provide and install new Industrial Pressure Transmitter with Submersible Wet Well Level $6,290.00 Transmitter and all necessary conduit, wiring and fittings. 13.9 Provide and install Pump Saver Power Monitors and Pump Saver Communications Modules and all $1,680.00 accompanying wiring, conduits, junction boxes, fittings etc. 13.10 Additional labor involved with additional SCADA, Industrial Pressure Transmitter and Wet Well Level $5,316.00 Transmitter equipment. Disaster Recovery Program Project Implementation Manual Page 4 of 10 A C-H-APTER 9 CON'T'RACT AMENDNII•.N'T:S 13.14 Provide and install new Industrial Pressure ^� Transmitter with Submersible Wet Well Level $5,990.00 Transmitter and all necessary conduit, wiring and fittings. 14.13 Provide and install Pump Saver Power Monitors and Pump Saver Communications Modules and all $2,510.00 accompanying wiring, conduits, junction boxes, fittings etc. 14.14 Additional labor involved with additional SCADA, Industrial Pressure Transmitter and Wet Well Level $5,316.00 Transmitter equipment. 14.16 Provide and install new Industrial Pressure Transmitter with Submersible Wet Well Level $8,007.00 Transmitter and all necessary conduit, wiring and fittings. 15.9 Provide and install Pump Saver Power Monitors and Pump Saver Communications Modules and all $1,660.00 accompanying wiring, conduits, junction boxes, fittings etc. 15.10 Additional labor involved with additional SCADA $5,316.00 and Industrial Pressure Transmitter equipment. 15.14 Provide and install new Industrial Pressure Transmitter with all necessary conduit, wiring and $6,222.00 fittings. 16.13 Provide and install Pump Saver Power Monitors and Pump Saver Communications Modules and all $1,680.00 accompanying wiring, conduits, junction boxes, fittings etc. 16.14 Additional labor involved with additional SCADA, Industrial Pressure Transmitter and Wet Well Level $5,316.00 Transmitter equipment. 16.16 Provide and install new Industrial Pressure Transmitter with Submersible Wet Well Level $10,038.00 Transmitter and all necessary conduit, wiring and fittings. Disaster Recovery Program Project Implementation Manual Page 5 of 10 t ` Of /ii/ CHAPTER 9 CONTRACT ANIENDNIFNITS 17.9 Provide and install Pump Saver Power Monitors and Pump Saver Communications Modules and all $1,680.00 accompanying wiring, conduits, junction boxes, fittings etc. 17.10 Additional labor involved with additional SCADA $5,316.00 and Industrial Pressure Transmitter equipment. 17.14 Provide and install new Industrial Pressure Transmitter with all necessary conduit, wiring and t $4,348.00 i I fittings. 18.9 Provide and install Pump Saver Power Monitors and Pump Saver Communications Modules and all $1,680.00 accompanying wiring, conduits, junction boxes, fittings etc. 18.10 Additional labor involved with additional SCADA, Industrial Pressure Transmitter and Wet Well Level $5,316.00 Transmitter equipment. 18.12 Provide and install new Industrial Pressure Transmitter with Submersible Wet Well Level $6,290.00 Transmitter and all necessary conduit, wiring and 1 fittings. 19.9 Provide and install Pump Saver Power Monitors and Pump Saver Communications Modules and all $2,510.00 accompanying wiring, conduits, junction boxes, i fittings etc. i 19.10 Additional labor involved with additional SCADA, Industrial Pressure Transmitter and Wet Well Level $5,316.00 Transmitter equipment. 19.12 Provide and install new Industrial Pressure _ Transmitter with Submersible Wet Well Level $8,007.00 Transmitter and all necessary conduit, wiring and fittings. 20.9 Provide and install Pump Saver Power Monitors and Pump Saver Communications Modules and all $1,680.00 accompanying wiring, conduits, junction boxes, fittings etc. Disaster Recovery 1'ro};ra111 I'roject lmplementatinn \1,11111.11 Page 6 of 10 Of 4 Z; C. `'9�_t CHAPTER 9 CON "I'IZAC7' Ai%ll?.Nl)i1-IhN'I'S 20.10 Additional labor involved with additional SCADA, Industrial Pressure Transmitter and Wet Well Level $5,316.00 Transmitter equipment. I 20.14 Provide and install new Industrial Pressure Transmitter with Submersible Wet Well Level j $6,912.00 Transmitter and all necessary conduit, wiring and I fittings. 21.9 Provide and install Pump Saver Power Monitors and Pump Saver Communications Modules and all $2,510.00 accompanying wiring, conduits, junction boxes, fittings etc. 21.10 Additional labor involved with additional SCADA $5,316.00 and Industrial Pressure Transmitter equipment. 21.12 Provide and install new Industrial Pressure Transmitter with all necessary conduit, wiring and $9,335.00 fittings. 22.3 Install new antenna pole at East District Plant. $7,765.00 23 Provide programming, startup, testing and $4,643.00 troubleshooting operations of SCADA system at Mayo Lift Station. 24 Provide programming, startup, testing and $4,643.00 troubleshooting operations of SCADA system at Point Royal Lift Station. Change in Contract Price Change in Contract Time Original Contract Price: 51.562.706.00 Original Contract Time: 237 days Previous Change Order(s) Net Change From Previous No. 000 to No. 001 $24,480.00 Change Orders 30 days Contract Price Prior to Contract Time Prior to this Change Order $1,587,186.00 this Change Order 267 days Net Increase /Decrease of Net Increase /Decrease of this Change Order $325,171.00 this Change Order 240 days Disaster Recovery Program Project Implementa Ilion Nianttal Page 7 of 10 { OF I{GR CHAPTER 9 CON'1'RAC'I' Aibl EN1)MI :N'I :S Contract Price With all Approved Change Orders $1,982,359.00 Contract Time With all Approved Change Orders 507 days Cumulative % Change in Contract Price: 22.4% DR Division reimbursement of costs approved by this change order is subject to approval by TDRA. RECOMMENDED: By: ENGINEER: Jones & Carter, Inc: Gregory S. Baird. P.E. Date: I bo APPROVED: By: OWNER: City of Baytown: Jose Pastrana. P.E. Date: ACCEPTS : By: I CONTRACTOR: Baytown Electric Company, Inc. Date: i' 1— ZOI Grantee: City of Baytown JUSTIFICATION FOR CHANGE DRS Contract No.: 010220 Change Order No. 002 1. Will this Change Order increase or decrease the number of beneficiaries? ❑ Increase ❑ Decrease If there is a change, how many beneficiaries will be affected? Total 2. Effect of this change on scope of work: N Increase D Decrease N No Change UM ❑ No Change Disaster Recovery I'i -ogi- un Ili-giect Implementation 1N1 .-inual Page 8 of 10 'Of Ali r1: -XS5 CHAPTER 9 COMMAC'I' AIM t:NDA11- -- MIS 3. Effect on operation and maintenance costs: M Increase O Decrease O No Change 4. Are all prices in the change order dependent upon unit prices 3 found in the original bid? O Yes No If "No'. explain: The addition of SCADA was not part of the original bid. 5. Will this change be completed within the contract period? O Yes No It "No ", expected completion date: 11 -28 -12 6. Has this change created new circumstances or environmental conditions which may affect the project's impact, such as concealed or unexpected conditions discovered during actual construction? O Yes No I If "Yes ", is an Environmental Re- assessment required? O Yes C] No 7. Is the Texas Commission on Environmental Quality (TCEQ) clearance still valid? M Yes O No 18. Is the TCEQ permit approval still valid? (sewer projects only) 0 Yes O No Disaster Itecovei -y Prngra ni Pru,jecl Implementation Nllanttut Page 9 of 10 Of CHAPTER 9 CON RAC'I' A1V EM)y1 EXITS 9. Are the handicapped access requirements /approval still valid (if applicable)? ❑ Yes ❑ No 10. Are other Disaster Recovery contractual special condition clearance still valid? Yes ❑ No (If no, specify): I NOTE: * Generally, a cumulative change in the contract price in excess of 25% cannot be approved. * Generally, items not included or identifying unit costs in the original bid documents cannot be approved as change order items. Disaster Recovery Program Pr(kiect implementation Manual Page 10 of 10