Loading...
Ordinance No. 14,501ORDINANCE NO.14,501 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN,TEXAS, AUTHORIZING THE FIRST AMENDMENT TO THE CONSULTING SERVICES AGREEMENT WITH ARKK ENGINEERS,LLC,FOR THE 2020 THE STREET RECONSTRUCTION PROJECT;AUTHORIZING PAYMENT BY THE CITY OF BAYTOWN IN AN AMOUNT NOT TO EXCEED ONE HUNDRED THIRTY-NINE THOUSAND EIGHT HUNDRED FIFTY-SIX AND NO/lOO DOLLARS ($139,856.00); MAKING OTHER PROVISIONS RELATED THERETO;AND PROVIDING FOR THE EFFECTP/E DATE THEREOF. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN,TEXAS: Section 1:That the City Council of the City of Baytown,Texas,hereby authorizes and directs the City Manager to execute and the City Clerk to attest to the First Amendment to the Consulting Services Agreement with ARKK Engineers, LLC., for the 2020 Street Reconstruction Project. A copy of said amendment is attached hereto as Exhibit "A" and incorporated herein for all intents and purposes. Section 2: That the City Council of the City of Baytown authorizes payment to ARKK Engineers,LLC, in an amount not to exceed ONE HUNDRED THIRTY-NINE TFIOUSAND EIGHT HUNDRED FIFTY-SIX AND NO/IOO DOLLARS ($139,856.00)for consulting services in accordance with the amendment authorized in Section I hereinabove. Section 3: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED,READ and PASSED by the affirmative vote of the Cit; Baytown this the 10"'day of September,2020. ouncil of Jthe City of NDON CAPETILLO,lMayor ATTBST: LBTICIA BRYSCH,City Ct6rk APPROVED AS TO FORM: L.HORNER,Interim City Attorney R:\Karen Homer\Documcnts\Filcs\City Council\Ordinances\2020\Scplember 10\AARKPSA42020StreetsAmenclment.doc Exhibit "A" Consulting Services Contract Amendment Bluebill Bay Dr. & Aneel Fish Dr., Fairway Drive, Savell Drive) Date of Issuance: Sea#ember 10, 2020 Consultant: ARKK Engineers. LLC BAYTOWN Amendment No: 01 Project No: RW2002/RW2003/RW2004 PO#: 2007782 Explanation: This Amendment encompasses the following: The scope of work for Savell Drive will be extended from Gulfway Drive to Lonely Pine Drive (an additional 1,800 LF) due to similar, poor sidewalk and roadway pavement conditions. The extension to the scope of work warrants additional engineering fees to capture additional survey, geotechnical and design costs for time and effort. The budget for this project will be able to support the required changes to the scope of work. Costs to be assigned to RW2004. Description of Work 1. Design Phase Services 2. Topographic Surveying 3. Geotechnical Investigation 4. Urban Forestry Services 5. Construction Phase Services 6. As Built Drawing Production Budget Cost Time 109,454.00 0 Days 7,496.00 0 Days 2,860.00 0 Days 2,635.00 0 Days 15,640.00 0 Days 1,771.00 0 Days Scope/Schedule: The additional scope of work and the schedule associated with the same, are attached hereto as Exhibit "A" and incorporated herein for all intents and purposes. Cost & Time Change Summary: LW Time Original Contract: $ 497,935.00 462 Days Previous Amendment(s): $ N/A N/A Days Net increase (decrease) from this Amendment: $ 139,856.00 0 Days Revised Contract: $ 637.791.00 Q Days Remainder of Page Purposely Left Blank] Design 1 of 2 D6. Revised 04: 20 Consultant agrees to perform chaunge(s) included in this Contract Amendment for the price and time indicated. The prices for changes included all costs associated with this Contract Amendment. No work is to be done until this Amendment is executed. No payment to the Consultant shall be made for work included in the Atmendtment until this Aniendntent is executed. Unless a different meaning clearly appears from the context, words and phrases as used in this Amenchuent, the terns and phrases as used herein shall have the same meanings as it the Agreement. The provisions of this Amendment and the Agreement and all previous amenchments. if any, shall be read together and construed as one agreement provided that, it the event of any conflict or inconsistency between the provisions of this Amendment and the provisions of the Agreement and any previous amendment, the provisions of this Amendment shall control. This Amendment has been jointly negotiated by the patties hereuunder and shall not be construed against a patty hereunder because that party may have assumed primary responsibility for the drafting of this Amendment. By this Amendment, the City does not consent to litigation or suit, and the City hereby expressly revokes any consent to litigation that it may have granted by the terms of this Amendment. the Agreement or any other contract or agteenuent or addenda, any charter, or applicable state law. Nothing contaimed ill this Amendment or in the Agreement shall be construed in any way to limit or to waive the City's sovereign immunity. The persons executing this Agreement hereby represent that each party has the full power and authority to enter into and perform pursuant to this Amendment, and that each has been properly authorized and empowered to enter into this Amendment. t'pon execution by all parties, the following changes identified for the Contract Value and/or Contract Time shown, are made part of the Contract. APPROVED: By: k&J4 t4-4 &W-J4,. Consultant Madhu Kilambi Pivtted ?value Principal Title 99191932:10 Date: 09/02/2020 By: Y RICHARD L DAVIS. City Manages Date: APPROVED AS TO CONTENT: By: t Date: 09/03/2020 FFLAIvIi O. SIMOfNEAUY. JR . P E . P\vE Director APPROVED AS TO FUNDING: Date: VICTOR BROW\LEES. Finance Director Design 2 of 2 D6. Revised 04/20 Exhibit "A" SCOPE OF SERVICES ATTACHMENT "A' (Contract Amendment No. 1) The scope of services in this Attachment "A" shall amend and supplement the existing Contract between the City of Baytown and ARKK Engineers, LLC for the "2020 Streets Reconstruction Project". The contract was approved by City of Baytown City Council at the City Council Meeting on June 25, 2020. This amendment incorporates the additional engineering and construction phase services associated with the increase of the Savell Drive reconstruction project limits. The additional street reconstruction extends from Gulfway to Lonely Pines (approximately 1,800 feet extension). The scope of work is concrete roadway reconstruction with curb, underground drainage system, and sidewalk improvements. Water and sanitary sewer improvements for the above streets will be added to the design on a case -by -case basis if they are determined to be in need of replacement by the City. Driveways will be replaced up to the right-of-way line or as needed to accomplish the street reconstruction. Drainage improvements beyond replacement of storm sewers, culverts, inlets, and roadside ditch regrading will be addressed in areas of known problems, and will be limited to on -site storm sewer replacements and outfalls located within 150 feet of the project streets. If a clear need for offsite drainage improvements is identified during the design phase, ARKK will promptly notify the City and provide a cost estimate and proposal for the offsite drainage design work. A formal drainage study is not part of the scope of work for this project, as the improvements will be to replace the existing street drainage infrastructure up to current City standards. This proposal also includes the additional services associated with this design such as Surveying, geotechnical investigation and urban forestry services. Following is a breakdown: Topographic Survey: Topographic survey of approximately 1,975 L.F. of streets includes Savell plus intersecting side streets). Geotechnical Investigation: Four (4) additional soil borings at 10 vertical feet each will be taken along the proposed extension. This proposal is based on taking 4 bores at a depth of 10 feet deep for a total additional vertical footage of 40 feet. Urban Forestry: Additional Urban Forestry services, including a tree protection plan, for the proposed extension shall be provided in accordance with the attached proposal from C.N Koehl Urban Forestry Inc. 7322 Southwest Fwy Suite 1040 • Houston, TX 77074 • (713-400-ARKK • www.arkkengineers.com • TX PE Firm No. 13872 Exhibit "A" LEVEL OF EFFORT Attachment 6 - Contract Amendment No. 1 PER Phase Sr. Project Senior Graduate Sr. CADD CADD Manager Designer Engineer EIT Operator Operator Summary HOURLY RATE: 184.00 145.00 115.00 137.00 95.00 1. Coordination Prepare For and Attend 1 Public Meeting a 600 m_mm-__-.........- min..... ..... Project Planning and Scheduling Total Coordination Hours 0 0 0 0 0 0 Total Coordination Engineering Fee 2. Data Collection Obtain and Review As -Built Drawings and GIS m_..__._._.__ Field Veri Existin Conditions incl Photosh.......__.._ ._._...._...._.......i.._._..............._..?._........._....._..........._........_...._. 2 3 Collect Public/Private Utility Information Total Data Collection Hours 2 2 3 0 0 7 Total Data Collection Engineering Fee 36B 290 345 1,003 3. Develop Design Criteria Create Existing Conditions Base Map 2 2 4 4 Identify / Define Problems and Develop Design Criteria 2 2 4 0 4 12TotalDesignCriteriaHours Total Design Criteria Engineering Fee 368 290 460 380 1,498 4. H&H Analysis Establish Proposed Drainage Areas ........................................... P'repare'D airiage Calcul'atioris"' 6 6' 6 0 6 0 0 12TotalHydraulicISitePlanHours Total Hydraulic I Site Plan Engineering Fee 1,104 690 1,794 5. Engineering Evaluation and Recommendations Comparative Analysis of Alternatives Develop and Recommend Drainage Utility. Roadway Improve: 3 2 2_._.._..._.._ Develop and Recommend Required Utility Relocation 2 .......... 2 ....................._.........._.........._................._.............._....,._.... 1 W.. betermine and Recommend Required ROW/Easement Acquisition 2 Total Evaluation I Recomm Hours 7 4 3 1 0 0 14 Total Evaluation / Recomm Engineering Fee 1,288 580 345 1 $ 2,213 Exhibit "A" LEVEL OF EFFORT Attachment B - Contract Amendment No. 1 PER Phase Sr. Project Senior Graduate Sr. CADD CADD Manager Designer Engineer EIT Operator Operator Summary HOURLY RATE: 184.00 145.00 115.00 137.00 95.00 6. 30% Submittal Prepare Preliminary Plan Sheets (7 P&P's) 28 52 32 84 Prepare Preliminary Cost Estimates 3 4 3 DevelopEreliminaryConstructionPhases Prepare-SRecification Outline 2 Progress Meetings with City (4 meetings) 5 Internal QA / OC Review of Project 4 30% Submittal to Cit r Incorporate Comments from City 3 3 3 Finalize 30%Submittal 4 4 3 Total PER Hours 51 1 62 1 38 1 2.50 1 96 1 250 Total PER Fee 9.384 8,990 1 4,370 343TJ 9,120 1 S 32,207 SUBTOTAL FOR PER PHASE BASIC SERVICES: $ 38,715 Additional Topographic Surveying $7,496 Additional Geotechnical Investigation $2,860 Additional Urban Forestry Services 699 SUBTOTAL PRELIMINARY DESIGN PHASE $49,770 Exhibit "A" LEVEL OF EFFORT Attachment B - Contract Amendment No. 1 Final Design and Bid Phase HOURLY RATE: Sr. Project Manager 184.00 Senior Designer 145.00 Graduate Engineer EIT 115.00 Sr. CADD Operator 137.00 CADD Operator 95.00 Summary 1. Coordination and Data Collection Coordinate with Sub consultants 1 1 Coordinate with Private Utilities & governmental entities 2 2 8 5 Prepare For and Attend Public Meetings 2 2 2 Pro'ect Planning and Scheduling 4 Field Visits and Data Collection 4 9 9 lrnoices & ice ssistance Subtotal Hours Subtotal Fee 2. Design - Construction Plans - Package 1 13 11 20 2 5 51 2,392 1,595 2,300 274 475 7,036 Cover Sheet with Vicinity Map General Notes Overall Map and Sheet Layout 2 3 Review and Insert Survey Control Map 1 (provided by Surveyor) Review and Insert Survey Control Map 2(provided by Surveyor) Plan & Profile (7 sheets) 86 92 48 98 SWPPP Layout 1 2 7 SWPPP Layout 2 2 3 3 SWPPP Details 2.0 Review and include Tree Protection plans Review and include Cit s Standard Water Details 1 4 1 Review and include Citys Standard Wastewater Details Review and include Citys Standard Pavement Details Prepare Project Specific Pavement Details Custom Sheet 2 3 3 Review and include Citys Standard Drainage Details Prepare Project Specific Drainage Details Custom Sheet 2 3 3 Subtotal Hours Subtotal Fee 17,480.00 16,820.00 5,520 1 $ 1 $ 10,545 50,365 Exhibit "A" LEVEL OF EFFORT Attachment B - Contract Amendment No. 1 Final Design and Bid Phase HOURLY RATE: Sr. Project Manager 184.00 Senior Designer 145.00 Graduate Engineer EIT 115.00 Sr. CADD Operator 137.00 CADD Operator 95.00 Summary 3. Design - Project Manual Construction Cost Estimates incl with all milestone submittals) 8 8 16 Contract Documents Prepared By City except Bid Form, SWPPP Doc, TOC, Cover) 3 Technical Specifications Subtotal Hours Subtotal Fee 4 8 15 16 16 0 0 47 2,760 2,320 1,840 6,920 4. Review and Approval Additional Meetings 4 4 60% Submittal Review Meeting 90% Submittal Review Meeting TRC Submittal Review Meeting 1 2 QA/QC 4 4 2 Final Submittal (incl Plans and Project Manual) Subtotal Hours Subtotal Fee SUBTOTAL FINAL DESIGN BASIC SERVICES 4 6 8 4 13 16 2 8 4 43 2,392 2,320 230 1,096 380 6,418 70,739 SUMMARY Subtotal Final Design Phase Basic Services: 70,739 Tree Protection Plan $1,936 SUBTOTAL FINAL DESIGN PHASE $72,675 Exhibit "A" LEVEL OF EFFORT Attachment B - Contract Amendment No.1 Construction Phase HOURLY RATE:1 Sr. Project Manager 184.00 Graduate Engineer 115.00 Construction Manager 136.00 Summary 1. Construction Phase (With Inspection By City) (Package 1) Attend Precon Meeting and Prepare Agenda & Minutes Attend Construction Progress Meetings Additional 60 days = 2 mths X 1 mtgs/mth X 5hr/mtg) 8 8 Prepare Construction Progress Meeting Minutes Routine Construction Site Visits Additional 60 days = 2 mths X 1 mtgs/mth X 5hr/mtg) 8 8 Special Construction Site Meetings Additional 60 days = 2 mths = 2 X 5 hr) 8 8 Review and Respond to Submittals 8 8 Review and Respond to RFIs 4 4 Review Pay Applications 2 additional 6 8 Prepare/Review Change Orders if requested by City 4 8 Substantial Completion Walk-Thru 2 2 Final Construction Walk-Thru 2 2 Prepare Contract Close Uut Documents Subtotal Hours Subtotal Fee 3. As Built Drawings As -Built / Record Drawings Subtotal Hours Subtotal Fee 50 56 0 106 9,200 4 6,440 15,640 1 g 4 1 9 1 0 13 736 1,035 1,771 Subtotal Construction Phase $15,640 SUBTOTAL CONSTRUCTION PHASE $ 17,411 11 TOTAL CONTRACT AMENDMENT NO. 1 $139,856