Ordinance No. 14,429ORDINANCE NO. 14,429
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS,
APPROVING CHANGE ORDER NO. 10 TO THE BAYTOWN AREA WATER AUTHORITY 6
MGD SURFACE WATER TREATMENT PLANT PROJECT BETWEEN THE BAYTOWN AREA
WATER AUTHORITY AND PEPPER LAWSON WATERWORKS, LLC; AND PROVIDING FOR
THE EFFECTIVE DATE THEREOF.
WHEREAS, the Baytown Area Water Authority's enabling legislation requires that the City Council approve
certain agreements before Baytown Area Water Authority ("BAWA") enters into the same; and
WHEREAS, on June 17, 2020, the Board of Directors of BAWA approved Change Order No. 10 to the Baytown
Area Water Authority 6 MGD Surface Water Treatment Plant Project between the Baytown Area Water Authority and
Pepper Lawson Waterworks, LLC; and
WHEREAS, the City of Baytown desires to approve such change order; NOW THEREFORE,
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS:
Section 1: That the recitals set forth hereinabove are hereby found to be true and correct and are hereby
adopted.
Section 2: That the City Council of the City of Baytown, Texas, hereby approves Change Order No. 10 for
the Baytown Area Water Authority 6 MGD Surface Water Treatment Plant Project between the Baytown Area Water
Authority and Pepper Lawson Waterworks, LLC, which change order is attached hereto as Exhibit "A" and incorporated
herein for all intents and purposes.
Section 3: This ordinance shall take effect immediately from and after its passage by the City Council of
the City of Baytown.
INTRODUCED, READ and PASSED by the affirmative vote the City Council of the City of Baytown this the
25th day of June, 2020.
' C, r N - 0 %,,&, �f
B DON CAPETILLO, M ,or
ATTE
LETICIA BRYSCH, City C r
APPROVED AS TO FORM:
KAREN L. HORNER, Interim City Attorney
R:\KarenTiles�City CouncihOrdinances\2020Vune 25\ApprovingBAWAChangeOrderNo I O.doc
Exhibit "A"
BAYTOWN AREA WATER AUTHORITY
Change Order No. 10
BAYT 6.0 MGD SURFACE WATER TREATMENT PLANT
a D
Date:
Brief Description of Chanties:
1806021
9-Jun-20
CO 10.1 Correction of the air scour piping at Green Leaf Backwash Filter Cell No.4 (PCO #70)
CO 10.2 Addition of auto -dialer and programming for fire monitoring system (PCO #71)
CO 10.3 Addition of sample taps at the disinfection basin and additional piping modifications at the LLPS (PCO #72)
CO 10.4 Remaining 25% cost share for additional costs for Operations Bldg. CMU block and Steel beam modifications (PCO#19),
which were not paid via Change Order #7. These costs are to be paid by the Engineer of Record, following this change order
avnroval.
Add or Delete Items:
Item
Description
Unit
Quantity
Unit Price
Total
10.1
Revise Air Scour Piping at Green Leaf Filter
1
LS
10,542.15
$ 10,542.15
10.2
Addition of Auto -Dialer & Programming
1
LS
1,169.10
$ 1,169.10
10.3
Addition of sample taps & piping modifications
1
LS
56,248.55
$ 56,248.55
10.4
10ps Bldg. CMU block & Steel beam modifications -
1
LS
10,050.65
$ 10,050.65
FOR share
Total
Contract Summary
$ 78,010.45
Original Revised
1
10riginal Contract Price
$52,186,000.00
2
Owner Contingency
$0.00
Previous Change Orders
This Change Order
Remaining Contingency
3
Change Orders
Previous Change Orders
$ (3,370,811.21)
This change order
$ 78,010.45
4
Revised Contract Price
1 $52,186,000.00
$48,893,199.24
Original Contract Duration
1095
Previous Extensions
0
This Change Order
0
Revised Duration - Calendar Days
1095
l im
06/10/2020
Contractor: PLW Waterworks, LLC Date Director of Public Works Rt Engineering Date
Christopher F. Smith, Executive Vice President Frank O. Simoneaux Jr. P.E!
to- 110A0
Consultant: Jones I Carter, Inc. Date City Manager Date
Richard L. Davis, ICMA-CM
PLW
waterworks
June 8, 2020
Mr. Andrea Brinkley
Assistant Director
Baytown Area Water Authority
The City of Baytown
2401 Market St.
Baytown, TX 77520
Re: CPR No. 70
BAWA 6 MGD Surface Water Treatment Plant
BAWA Job No. 1806021
Mrs. Brinkley,
Please see attached proposal to revise the air scour piping in filter cell No.4 per RFP 10.
This change will result in a increase in the amount of $10,542.15
Please feel free to contact me at (713) 301-8637 with any questions or concerns.
Regards,
P�LWW Waterworks
74
Katy Drown
Project Manager
Page 1
Baytown Area Water Authority
BAWA 6 MGD Surface Water Treatment Plant
BAWA Job No. 1306021
Air Scour Piping in Filter Cell No. 4
Scone of Work
Remove and replace Air Scour Piping from Single Wall to Double Wall
CPR No.: #070
Date: 06/08/20
PLW Job No.: P3T
Non-Tased
Labor
Material
Subcontract
Tased Mat'VE ui
Unit
Total
Uml
Total
Unit
Total
Unit
Total
Item
No.
Description
s
Unit
Cost
Cost
Cost
Cost
Cost
Cost
Cost
Cost
1
Fiber Cell Prep
I 1
Pull Back Filter Media and Protect Media in Place (3 men 1 do))
16
HRS
S 3800
S
60800
E - E
-
- $
-
E -
S -
2
Remove and install Air Scour Piping
21
Cut 6" SS An Scour Piping (I loss Welder)
8
HRS
S 7500
S
60000
E - S
-
- S
S 25000
S '•
22
Install 8" Pipe and bolt down (3 men. I da))
24
HPS
$ 3900
S
91200
E 2 500 00 S
'' i 00 IM
- S
$ -
S
23
Weld flange Around 6" & 8" pipe and install thread-o-let and Schrader s ah
a
HRS
S 7500
S
60000
S - $
-
. S
$ -
$
24
Mmldl (2 da) s)
2
DAY
S -
E
S - S
-
- S
$ 33250
S
3
Install Anthracite in Filter No 4.
3 1
Mum[ Labor to tame and replace Anthracite (2 men 4 da) s to mmos a and repti,
64
HRS
$ 3800
E
2 43_ : ).',
5 - $
-
E
-
$ -
E -
Direct Cost Subtotal
5.15200
2.50000
91500
Small Tools a 5 0•.
25760
n/a
-
n/a
n/o
Equipment Burden o 500".
n/,1
da
W.
a/a
Tax o 8 250.
n/a
n/.
n/a
75 49
Subtotal 2
5 409 60
2-51a1 00
-
99049
Overhead & Profit a 15 (r.
91144
37300
14857
Subtotal 3
6 221 04
2 875 00
-
1.13906
Bonds & Insurance 1? 3 0".
19661
86.25
34 17
Subtotal 4
6.407 67
2 961 25
1 17323
Total of all column:
10.542 15
Other
Grand Total Cost 10,542.15
All k
JONES-CARTER RFP NO.:010
REQUEST FOR PROPOSAL (RFP)
1. PROJECT NAME: 6 MGD Surface Water Treatment Plant
2. J&C PROJECT NO.: 09986-0002-00
3. CONTRACTOR: Pepper Lawson Waterworks
4. SUBMITTED TO: Katy Drown
S. SUBJECT: Baytown Air Scour Piping in Filter Cell No. 4 of the
Self Backwash Filter
6. REFERENCE: RFI No. 176
7. REF. DWG. NO.: N/A
8. REF. SPEC. NO.:
9. DESCRIPTION OF WORK: (The Contractor is requested to furnish a price proposal for the below described work. Please complete, sign, date, and
return a proposal at your earliest convenience. Please attach a detailed cost breakdown to your proposal.
1. Cut the 6" SS Air Scour 90" bends at the top of wall of Filter Cell No. 4 of the Self Backwash Filter.
2. Place 8" Stainless Steel pipe around the 6" SS pipe.
3. Seal a gasket to the monoflor and to the 8" pipe flange. Bolt the 8" pipe to the monoflor.
4. Weld a piece of stainless steel plate to the top of the 8" SS pipe and to the 6" SS pipe in order to seal opening.
S. Tap the 8" SS pipe near the top of pipe and install a Schrader Valve to periodically pressure test the double wall pipe.
11. Requestor's Name & Signature: Larry Weppler
Date: 6/9/20
The Contractor acknowledges that this RFP is to be used to request pricing information only, and does NOT constitute a contract modification. The Contractor
is NOT AUTHORIZED/DIRECTED to perform this work UNTIL/PRIOR TO written notification that a contract modification is approved.
wp\docs\const\forms\rfi or rfp\rfpform.doc
REV • 14
e
—---------- NOTFS:
�r raw 9
n n n n
I I II II VALVE AND ACCESSORIES SCHEDULE
I I II II NO. DESCRIPTION
rrr rmn .rs!
I _ _
F ]
w.rtrol W -am)
I
� I I I
I I ' I I , r .wlmn. vx..v .luc.•c lcvAnw <.-.r-l.»
I I I I I I r-a MR
1 I I I I RIIER C0.L �.) • •• •Rlpstr vlLw: .ALmll.c ucwm. tliw-]4n
L_____________ J I I MrFli CFIL xe. ] I I . r .urm.tr vx.K .!4[ceK •CN•M (F.rv-M])
/ / ___6itAlEN1' � I A emwty wuw:.A[cP.c u:AumR s! (4vv-lal
/ � a.' rnms.r v.Lrt .lNcneC .clwmx r! (.-rv-mN
—A— r! Ir.rv-sl)
• � Z ar unosLr vrw:.A]c..c u: a (.-.Iv-wl)
r N Y vNac .ln.rnc •cvnw,
n"y)aOf Ir u.mwt. vN..e .luEel+e Ac. A—
rOrl� zz3 <.N[c.rc •nu•m•, r! 1.-.rv-w»
e� • _ I w..vl. z v wrt .N[eme .elu•nw fro-mq
����'llliii"' C IYm aoo. r!
weM _; � ; � � S IY �RIRs•. rx.w: .lC[CneC •Clu.ml r.
' I Y �A � � I � r s+N aca ./r avo• r! (.-uv-uo
n o-r. ti• 1..� - - r ®a. sur wrt vuc w (.-.n-.m)
IM)INT r.m.., vu�c r+IForv-Lm)
" RVINI
rd) r..• rcmin.c �r!
iwa a (Fwn D.rrorx� �.rtR nunlomrr�
asr i �� � ! ' �K.ra•cx.c .c,w.m�i r.v-m» .._
• / , •M nrtvww+ r:Ra v.Lrt 6 wG0 m..1 Puxvurw
r
rlmrE .oe•ra vlNwrrt. 1"'. Im . x-°°-a°n SELF BACKWASH FILTER
v ti m. naw+w... , I/!• Ir Reenaw.aLtt narcml (Fw,w-m» PLAN
!] o-� j __ _ u��K•rtw� C JON6B CARTER
lip 4--3L-7j
Y_Y ._ M1Ex CELL Ne ] MIER CEIL X
a
r•SELF RACKWASH it
Cad
SECTION F-F
1.
suet
o D
4..
bm
SECION !•E
His. 40F6 D B-< GREENLEAF FILTER
R000409 SNA ME 310 0100 DA 001 1
RFI #176
Jones & Carter, Inc. Project: 09986-0001-00 - BAWA 6 MGD Surface Water Treatment Plant
6330 West Loop S #150 Project
Bellaire, Texas 77401 5359 E Grand Parkway S
Phone: (713) 777-5337 Baytown, Texas 77520
Phone:2814228281
Double Wall Air Piping @ SBWF
TO:
Trevor Otter (JonesiCarter) FROM: Antonio Ibarra (Pepper Lawson Waterworks)
DATE INITIATED:
05/14/2020 3701 Kirby, Suite 1133
Houston, Texas 77098
LOCATION:
STATUS: Open
PROJECT STAGE:
DUE DATE: 05/19/2020
SUB JOB:
COST CODE:
COST IMPACT:
TBD
SCHEDULE IMPACT:
DRAWING NUMBER:
SPEC SECTION:
LINKED DRAWINGS:
REFERENCE:
RECEIVED FROM: Antonio Ibarra (Pepper Lawson Waterworks)
COPIES TO:
Question from• • lbarra (Pepper• • 19on 1 1 1
Per the City's request, it was brought to the attention of the contractor that there's a possibility the air piping installed around the Self Backwash Filter
must be double -walled in order to meet TCEQ requirements. Please verify and confirm if the system in place is acceptable per TCEQ's standards.
Awaiting an Official Response
All Replies:
BY
DATE
COPIES TO
Jones & Carter. Inc. Page 1 of 1 Printed On: 06/09/2020 06:35 PM
From: Herschel.Austin
Sent: Tuesday, May 12, 2020 4:50 PM
To: Trevor Otter (TOtter@jonescarter.com)
Cc: Dale.Hughes; Andrea.Brinkley; Sterling.Beaver
Subject: Double wall piping going to underdrain response from TCEQ
Trevor,
This is a response from TCEQ about another project that had a problem with
the air scour piping going thru the media to the underdrain.
This is the problem that filter number 4 has at BAWA east.
TCEQ does not allow a single wall conduit for aeration to penetrate through the
filter media. The pipe would need to be a dual wall pipe with a means of testing
the integrity of the space between the walls. This is usually done by the use of
a Schrader valve and pressurizing the dual wall chamber. Below are responses
to submittals where we found a conduit through the media filters:
1. In accordance with 30 TAC 290.42(d)(2)(B), no conduit or basin containing
raw water or any water in a prior stage of treatment shall be located directly
above, or be permitted to have a single common partition wall with another
conduit or basin containing finished water. Any connection above the media
needs to be higher than the flood level of the filter basin. The connection to
the underdrain system must be below the media as close to the underdrain
as possible. The dual wall pipe should be a closed system with a Schrader
Valve so that the integrity between the two walls may be periodically
pressure tested.
2. In accordance with 30 TAC 290.42(d)(2)(B), no conduit or basin containing
raw water or any water in a prior stage of treatment shall be located directly
above, or be permitted to have a single common partition wall with another
conduit or basin containing finished water. An air scour pipe that penetrates
the media of a filter treatment unit must be dual wall. Any connection above
the media needs to be higher than the flood level of the filter basin. The
connection to the underdrain system must be below the media as close to
the underdrain as possible. The dual wall pipe should be a closed system
with a Schrader Valve so that the integrity between the two walls may be
periodically pressure tested. As an alternative, the air scour pipe may be
installed through the sidewall of the filter basin in lieu of penetrating the
media.
The applicable rule is:
§290.42(d)(2)(B) No conduit or basin containing raw water or any water in a
prior stage of treatment shall be located directly above or be permitted to have
a single common partition wall with another conduit or basin containing
finished water.
Craig A. Stowell, P.E.
Texas Commission on Environmental Quality
Water Supply Division
Plan Review Team, MC-159
P.O. Box 13o87
Austin, Texas 78711-3087
Tel. 512-239-4633
Herschel Austin I BAWA Superintendent
City of Baytown — Public Works/Engineering/BAWA
Baytown Area Water Authority
7425 Thompson Rd.
Baytown, Texas 77522
ph: 281-420-5310 Ext. 8201
herschel.austin@baytown.org
Together We Enrich Lives & Build Community
www.baytown.org
The content of this email is confidential and intended for the recipient specified in message
only. It is strictly forbidden to share any part of this message with any third party, without a
written consent of the sender. If you received this message by mistake, please reply to this
message and follow with its deletion, so that we can ensure such a mistake does not occur in
the future.
P Liv
waterworks
June 8, 2020
Mr. Andrea Brinkley
Assistant Director
Baytown Area Water Authority
The City of Baytown
2401 Market St.
Baytown, TX 77520
Re: CPR No. 71
BAWA 6 MGD Surface Water Treatment Plant
BAWA Job No. 1806021
Mrs. Brinkley,
Please see attached proposal to provide a cellular auto dialer for the fire alarm system.
This change will result in a increase in the amount of $1,169.10
Please feel free to contact me at (713) 301-8637 with any questions or concerns.
Regards,
PLW Waterworks
Katy Drown
Project Manager
Page 1
Baytown Area Water Authority
BAWA 6 MGD Surface Water Treatment Plant
BAN A Job No. I806021
Fire Alarm Cellular Auto Dialer
Scone of Work
Provide a cellular auto dialer attena and progratnnung for cellular dialer
CPR No.: 9071
Date: 06/08/20
PLN Job No.: P3T
Non -Taxed
Labor
Material
Subcontract
Taxed Mat'VE ui
Unit Total
Unit Total
Unit
Total
Unit Total
Item
No.
Description
Qt,
Unit
Cost Coat
Cast Cost
Cost
Cost
Cost Cost
1 Fire Alarm Cellular Auto Dialer
I I Southeast Fire Proledion
I LS S - $ -
$ - S -
S 987 00
$ 98700
$ - $ -
Ducct Con Subtotal
-
-
99700
-
Small Tools d 5 0%
-
r✓a
-
n/a
da
Equipment Burden's' S0p4
n/a
n/a
n/a
n/a
Tm a 825`.
n/a
n/a
n/a
Subtotal
-
-
98700
-
Ovcncead & Profit ri IS 0%
14805
Subtotal 3
-
-
1 13505
-
Bonds R Into—, n; 3 0•.
3405
Subtotal T
1 16910
Total of all columns
1 169 10
Othcr
Grand Total Cost 1,169.10
F41SEFP
SOUTHEAST FIRE PROTECTION
SCR#0167
June 2, 2020
Attn: Dale Hughes
Re: Wireless Dialer
Dear Dale,
ACR#1675734
Southeast Fire Protection, L.P. is pleased to offer the following proposal note this would be for each individual
site/location, please review and approve. Listed below are the dialer and external antenna with cable below, I would
recommend on installing these to prevent potential signal issues in the future.
Note: Depending on where you would like to place external antenna a lift might be required. Also know that this
dose not include any additional programming if needed at that time we will notify you and asses price for approval.
• 01 AD-TG71- Verizon Dialer $400.00 $495.00
• 06 Service Tech/Installation $82.00 $492.00
Total $987.00
Existina Panel/Devices/Wire
• All existing wire andlor devices are not under warranty.
• Any programming issues due to normal wear and tear will not be covered.
• Obsolete system will not be covered.
• Existing/Outdated Batteries will not be covered.
• Any existing panels, power supplies, boards, circuits, modules, and keyboards are not covered.
Term Agreement assumes that the covered systems are operable and up to code as of the date of this agreement. If
after the initial inspection, it is determined that the covered systems need repairs due to code violations, Southeast
Fire Protection will notify customer and get approval to bring system back up to code. If system violations are not
corrected in a timely manner Southeast Fire Protection will be released from liability in this situation and at this
point Southeast Fire Protection will notify local authority that has jurisdiction for the area. (Fire Marshal's Office)
by law, a discrepancy letter will be sent to their office with code violations.
Price is based on work being performed during normal business hours. Any additional Time or Repairs to be
performed on a Time and Material basis. Price does not include tax. (If applicable)
Thank you,
Ramon Soliz
Fire Alarm Department
Sales Service & Inspections
Office: 713-844-8924
Direct: 832-267-6161
PLW
waterworks
June 9, 2020
Mr. Andrea Brinkley
Assistant Director
Baytown Area Water Authority
The City of Baytown
2401 Market St.
Baytown, TX 77520
Re: CPR No. 72
BAWA 6 MGD Surface Water Treatment Plant
BAWA Job No. 1806021
Mrs. Brinkley,
Please see attached proposal to provide additional sample taps at the disinfection basin and additional
piping modifications at the LLPS, per RFP #011.
This change will result in a increase in the amount of $56,248.55
Please feel free to contact me at (713) 301-8637 with any questions or concerns.
Regards,
PLW Waterworks
Katy Drown
Project Manager
Page 1
Ha) town Area M ater Authority
BAWA 6 MGD Surface W ater Treatment Plant
BAWA Job No. 1806021
Disinfection Basin Sample Lines & LLPS Modifications
Scope of Work
Additional sample Imes and LLPS modifications per RFP #011
CPR No.: #072
Date: 06/09.20
PLW Job No.: P3T
Non -Taxed
Labor
Material
Subcontract
Taxed Mat'1/E ui
Unit
Total
Unit
Total
Unit
Total
Unit
Total
Item
No.
Description
t
Unit
Cost
Cost
Cost
Cost
Cost
Cost
Cost
Cost
1
PLW Staff Support
11
Project Manager
40
HRS
S
9600 $
3 840 00
S
$
S
S
$
s
1 2
Project Superintendent
40
HRS
$
12100 S
4 840 00
S
$
S
s
$
s
2
Install Sample Lines on top of disinfection basin
21
PLW Foreman
40
HRS
S
6500 $
2 600 00
S
s
s
S
$
S
22
PLW Foreman 1 Saturday Tune)
8
HRS
S
9750 S
78000
S
- t
$
- $
-
$
s
23
Laborers (3 men I week)
40
HRS
$
3800 S
152000
S
3,08871 S
3.08871
S
1.63458 S
1 634 58
S
s
24
Laborers (Saturday Tune)
24
HRS
S
5700 S
1 368 00
S
- s
-
$
- $
-
$
S
25
Electrical & Instmmcntation
I
LS
s
- $
-
$
s
$
5,063 18 S
5 063 18
$
S
3
Install piping and supports underground
3 1
PLW Foreman
40
HRS
$
6500 S
2,600.00
S
$
$
- s
s
S
32
PLW Foreman (Saturday Tune)
8
HRS
S
97.50 S
780.00
S
s
$
S
$
S
33
Laborers (3 men.1 week)
40
HRS
$
38.00 S
1520 00
S
$
$
s
$
1.20000 S
1 200 00
34
Laborers (Saturday Tune)
24
HRS
S
57.00 $
1,36800
S
s
$
S
s
- $
-
3 5
Confined Space Pemuting and hiateriak Safety
l
LS
s
$
-
S
S
$
s
S
6.50000 $
6 500 00
36
Dewatermg
1
LS
$
s
-
s
$
s
s
$
80000 S
80000
4
Low Lift Pump Station Modifications
41
Install LAS injection and route above ground pipe
40
FT
S
1200 S
48000
S
700 S
28000
$
}
}
S
42
Insulate pipe
30
FT
S
1000 S
30000
$
1333 S
39990
S
5
S
- S
-
4 3
Chemical Injection Quill and Axessories
I
LS
s
- s
-
$
1.00000 $
1.00000
5
Forklift/Lull
5 t
Operator/Equipment
40
HRS
S
5000 $
2 000 00
$
5
-
$
S
$
1.50000 s
1 500 00
Direct Cost Subtotal
23,996 00
4,76961
6,69776
10,000 00
Small Tools n 5.0 %
1,199 80
n/a
n/a
nta
Equipment Burden @ 50.0 %
n/a
n/a
n/a
n/a
Tax (@ 8.25 %
n/a
tits
n/a
82500
Subtotal 2
25,195 80
4,76861
6,69776
10,825 00
Overhead & Profit a 15.0 %
3,77937
71529
1,00466
1,62375
Subtotal 3
28,975 17
5,48390
7,70242
12,448 75
Bonds & Insurance (a 3 0 %
86926
16452
23107
37346
Subtotal 4
29,844 43
5,64842
7,93350
12,822
Total of all columns
56,248 55
I
Other
Grand Total Cost 56,248.55
Page 2
J0NES'CART ER RFP NO.:011
REQUEST FOR PROPOSAL (RFP)
1. PROJECT NAME: 6 MGD Surface Water Treatment Plant
2. J&C PROJECT NO.: 09986-0002-00
3. CONTRACTOR: Pepper Lawson Waterworks
4. SUBMITTED TO: Katy Drown
S. SUBJECT: Chemical System Modifications
6. REFERENCE: R
7. REF. DWG. NO.: N/A
8. REF. SPEC. NO.:
9. DESCRIPTION OF WORK: The Contractor is requested to furnish a price proposal for the below described work. Please complete, sign, date, and
return a proposal at your earliest convenience. Please attach a detailed cost breakdown to your proposal.
1. Disinfection Basin Modification
a. Core through top slab of the disinfection basin where shown on the attached drawings.
b. Construct sample lines as shown on attached drawings.
c. Tie the proposed sample lines into the existing 1" sample line.
d. Install isolation valves on each 1" sample line before these tie in locations to allow for isolation of the lines.
e. Install a proposed sun shield or enclosure to house the relocated chlorine dioxide analyzer & transmitter.
f. Route conduit & wire from transmitter to local RTU.
g. Provide all terminal blocks, fuses, circuit breakers, 1/0, etc. As necessary in RTU enclosure to power the
transmitter and terminate all signals at the RTU.
h. The transmitter level shall be transmitted back to the SCADA system through the RTU Plc.
2. LAS Injection at Low Lift Pump Station Modifications
a. Install LAS injection quill in spool piece directly down stream of static mixer at low lift pump station.
b. Route above ground on LLPS metering slab to avoid trip hazards.
c. Insulate above ground piping per Specification Section 15226.
11. Requestor's Name & Signature: Larry Weppler
Date: 6/9/20
The Contractor acknowledges that this RFP is to be used to request pricing information only, and does NOT constitute a contract modification. The Contractor
is NOT AUTHORIZED/DIRECTED to perform this work UNTIL/PRIOR TO written notification that a contract modification is approved.
i-wp\docs\const\forms\rfi or rfp\rfpform.doc
REV 9114100
r("-n
r("
7
_46 -------
JJ
-Nti
ILI
----------- ---------- ------
----------- I
-----------
- - ----------
---- -
-------- u
-J.".
DISINF BASIN
PLAN
TI..
DISINFECTION !" _PP PLAN VALVE AND ACCESSORIES SCHEDULE
DISINFECIIIMP ,.�R PLAN
314" Ball Valve Core Drill
Double Link Seal
-:1C it 49 00
8
9" 314"PVC-5A
316 SS Pipe Supports
and Hardware (TYp)
IL
FL E142.00
0�
A 4
FF El 32.00 1< 1 1 ,j FF El 32 00
4 4 4
Section A -A
Section B-B
lope Supports and Hardware (Typ)
5A
• - 8t MAIN
Bid Proposal for Baytown Sample Line
PEPPER LAWSON WATERWORKS LLC Job
3701 KIRBY DR #1133 Baytown Sample Line
HOUSTON, TX 77098 Bid Date: 06/02/2020
Bid #: 1363473
Sales Representative Core & Main
Greg Arentz 7620 Grissom Rd
(M) 210-379-7606 San Antonio, TX 78251
(T) 210-657-1632 (T) 210-684-1150
(F) 210-657-2321
Greg.Arentz@coreandmain.com
06/02/2020 - 2:06 PM Actual taxes may vary Page 1 of 2
PEPPER LAWSON WATERWORKS LLC
Bid Date: 06/02/2020
Core & Main 1363473
Seq# Qty
=&MAIN
Bid Proposal for Baytown Sample Line
Description
Core & Main
7620 Grissom Rd
San Antonio, TX 78251
Phone:210-684-1150
Fax:210-684-5521
Units Price Ext Price
10 1
1
1" SAMPLE LINE
20
160
1 SCH80 PVC PIPE SWB 20'
FT
0.68
108.80
30
15
1 PVC 580 90 HXH 806-010
EA
2.41
36.15
40
6
1X3/4 PVC S80 TEE HXH 801-131
EA
3.64
21.84
50
2
1X3/4 PVC S80 BUSH SPXHUB 837-131
EA
1.94
3.88
60
1
1 PVC S80 TEE HXH 801-010
EA
4.32
4.32
80
3
1 T/U BALL VLV 2339-010 THREADED AND SOCKET ENDS
EA
79.40
238.20
100
(8) 3/4 SAMPLE LINE ASSEMBLY
110
160
3/4 SCH80 PVC PIPE SWB 20'
FT
0.48
76.80
120
24
3/4 PVC S80 90 HXH 806-007
EA
1.49
-- 35.76
130
16
-_
1 3/4 PVC S80 45 HXH 817-007
EA
3.35
53.60
140
8
3/4 T/U BALL VLV 2339-007 THREADED AND SOCKET ENDS
EA
66.60
532.80
160
32
i LINK SEAL LS-315-SS
EA
15.32
490.24
180
24
3/4 316SS AS1100 STRUT CLAMP
EA
3.48
83.52
190
30
1 316SS AS1100 STRUT CLAMP
EA
5.54
166.20
200
60
1-5/8 316SS AS200EH 12GA STRUT
EA
18.75
1,125.00
220
4
PRIMER- P68 PURPLE - QUART
EA
11.95
_ 47.80
-
230
4
_ _ _
1 CEMENT- PVC #717 GRAY - QUART
EA
15.95
63.80
Sub Total
3,088.71
Tax
0.00
- Total 31.088.71
Branch Terms:
UNLESS OTHERWISE SPECIFIED HEREIN, PRICES QUOTED ARE VALID IF ACCEPTED BY CUSTOMER AND PRODUCTS ARE RELEASED BY
CUSTOMER FOR MANUFACTURE WITHIN THIRTY (30) CALENDAR DAYS FROM THE DATE OF THIS QUOTATION. CORE & MAIN LP
RESERVES THE RIGHT TO INCREASE PRICES UPON THIRTY (30) CALENDAR DAYS' NOTICE TO ADDRESS FACTORS, INCLUDING BUT
NOT LIMITED TO, GOVERNMENT REGULATIONS, TARIFFS, TRANSPORTATION, FUEL AND RAW MATERIAL COSTS. DELIVERY WILL
COMMENCE BASED UPON MANUFACTURER LEAD TIMES. ANY MATERIAL DELIVERIES DELAYED BEYOND MANUFACTURER LEAD
TIMES MAY BE SUBJECT TO PRICE INCREASES AND/OR APPLICABLE STORAGE FEES. THIS BID PROPOSAL IS CONTINGENT UPON
BUYER'S ACCEPTANCE OF SELLER'S TERMS AND CONDITIONS OF SALE, AS MODIFIED FROM TIME TO TIME, WHICH CAN BE FOUND
AT: https://coreandmain.com/TandC/
06/02/2020 - 2:06 PM Actual taxes may vary Page 2 of 2
PFEIFFER & SON, LTD.
Electrical Contractors
PHONE - (281) 471-4222 * FAX - (281) 471-6856
116 N. 16TH ST. * P.O. BOX 1116
LA PORTE, TEXAS 77572
j onathan@ pfei fferandson. corn
CHANGE ORDER
BID DATE: JUNE 5, 2020
TO: PLW WATERWORKS
ATTN: MRS. KATY DROWN
PROJECT: BAWA 6 MGD SURFACE WATER TREATMENT PLANT
We request, as discussed, the below listed change order for the BAWA 6 MGD SWTP project. Please see
the price below for your consideration and reference the below list of exclusions and clarifications as well
as the attached documents. We propose to furnish all material, labor, equipment, and supervision in a safe
and skillful manner for a complete and functioning system.
RELOCATION OF CHLORINE DIOXIDE ANALYZER 20-AE/AIT-005 $5063.18
To avoid confusion, we offer the following clarifications:
1. Above pricing is in response to RFP 11 and specifically pertains to items 1 D, 1 E, 1 F, 1 G AND 1 H. No
pricing is provided for any other items and all work required for the completion of other tasks included
in RFP 11 are excluded.
2. Above price includes the relocation of the 20-AE/AIT-005 from the lab room to the disinfection basin.
The instrument is to be installed in one of the sample pump enclosure and the transmitter will be
installed directly on the back panel of a new sunshield supported by a HDG `C'-channel stand. The
transmitter, sunshield and stand will be installed between the level transducer display and the sample
pump PLC enclosure 7-TC-001. See attached photo for clarification.
3. Transmitter is to be powered by same 120V circuit as nearest sample pump.
4. All work will be completed per the specifications and NEC requirements
5. See additional detail, exclusions and clarifications included in system integrator subcontractor's
proposal attached.
6. Bond is included.
We appreciate this opportunity to quote on this project. If you have any questions or need additional
clarifications, please call me at (281) 471-4222.
Sincerely,
PFEIFFER & SON, LTD.
Jonathan Pfeiffer
REGULATED BYTHE IE TEXAS DEPARTMENT OF LICENSING AND REGULATION
CONTRACTOR'S LICENSE N 18259
P O BOX 12157 • AUSTIN TX 78711
(RIND X 3.92()9 • (512) 463.65" • — I.—.— tx
DMIu+koml�lumts
ADOPTED ADMINISTRATIVE RULES. 7351 (0ELEITRICAL CONTRACTORS RESPONSIBILITIES
Rk1:11.ifkO Rl TI¢nX. UEPARTILL:W OF I.ICkNSINO A.W REO1i MIN
CONI ll"R $I[t M•It_5�
P U. BO\ 1515) • AL'S fIN T\.111
(eool w49.ro9 • I51_I ...m n.m wmy—
VS(5PIID.VSALLNI'iRITI\t RILES 7—(.iF.LLCIWCLL COW—mRLSPONSIMMLS
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
PFEIFFER&SON, LTD.
Electrical & Telecommunication Contractors
PFEIFFER AND SON JOB # 4200119 CHANGE ORDER REQUEST
Date: 6/5/2020
Project: BAWA 6MGD SWTP
Description: Re -location of 20-AE/AIT-005 Chlorine
Dioxide analayzer from operations building
lab to dinsefection basin
General Labor
Supervisory Labor
Subtotal items 1 and 2
Labor Burden 55% x Item 3
Cost of Materials
Equipment
Cost of Transportation
Subcontractor
Subtotal items 3,4,5,E and 7
Cost of Insurance 4% x item 8
Cost of Bonds (7.4.2.2.4)
Subtotal lines 8,9 and 10
Overhead 10%
Profit 5%
Not Used
Total change order amount items, items 11,12,13 and 14
Page 1
11.00 hours x $
1.00 hours x $
29.9 328.90
55.0 55.00
383.90
211.15
522.45
71.50
0.00
2,928.00
4,117.00
164.68
121.08
4,402.76
440.28
220.14
n nn
$ 5,063.18
P-RIME
ONMOLS
12144 DAIRY ASHFORD, BLDG 3 • SUGAR LAND, TX 77478
PHONE 713-244-9747 0 FAx 713-244-9717
June 4, 2020
To: Pfeiffer & Sons
116N16thSt
La Porte, TX 77571
Attn: Jonathan Pfeiffer
Mark Antley
Ref: BAWA 6 MGD Surface Water Treatment Plant Project
Work Authorization No. 265
Prime Controls Change Order No.: PCO-007
PRIME CONTROLS PROPOSAL
Prime Controls is pleased to offer this proposed change order (PCO) to relocate the Chlorine Dioxide Analyzer as
per RFP-11 with the referenced Baytown Area Water Authority 6 MGD Surface Water Treatment Plant project as
described hereafter.
Our Scope of Work shall include applicable products and services specified to be provided in the following bid
specifications:
The offering is complete with the exception of those items specifically excluded within the "Exclusions" section of
this proposal.
Equipment and Materials to be provided by Prime Controls include the following major items:
ITEM
EQUIPMENT
1.
One (1) Aluminum Sunshield
2.
Lot polytubing, isolation valves, etc.
3.
Lot wire tags, tie wraps, etc.
Services to be provided by Prime Controls include the following major items:
ITEM
I SERVICES
1.
Removal of the installed Chlorine Dioxide Transmitter and Analyzer from the Lab Room.
2.
Cleanup and wiring modifications to the existing lab analyzer board
3.
Relocation of the Chlorine Dioxide Transmitter and Analyzer to the new sunshield
4.
PLC programming modifications to remove the PLC logic for monitoring of the Chlorine Dioxide from
20-PLC-001 and moving the logic to 7-TC-001.
Page 1 of 2
PRIME
PROPOSAL CLARIFICATIONS
ITEM
CLARIFICATION
1.
Prior to commencement of work, Prime Controls requests an executed copy of this change order
request. We expect this change will be accepted in a timely manner. Prime Controls is not liable for
schedule delays associated with this change in the scope of work.
2.
Pricing shall be valid for 30 days only from proposal date.
3.
Acceptance of an order shall be subject to the attached General Terms & Conditions. These General
Terms and Conditions are superseded by current Master Service Agreements (MSAs), Contracts,
Subcontracts and/or Blanket Purchase Orders that authorize this work.
EXCLUSION
ITEM EXCLUSION
1. Conduit and wiring additions
PROPOSED CHANGE ORDER PRICING
ITEM DESCRIPTION PRICING
1 Chlorine Dioxide Relocation $2,928.00
Proposal Approval
Approved by (print):
Signature:
Date:
We sincerely appreciate this opportunity and look forward to being of service for this work.
Thanks again and please feel free to call if there are any questions.
Sincerely,
Prime Controls, LP
Michael Nivong
Project Manager
713-244-9747
m.nivong@prime-controls.com
Prime Controls Proposal Page 2 of 2
PRIME
1725 Lakepointe Drive, Lewisville TX 75057
(972) 221-4849 Phone
(972) 420-4842 Fax
Change Request Proposal
Itemized Breakdown
Date Submitted: ............................................................................... 6/4/2020
Project Name: ...............................................................................
BAWA 6 MGD SWTP Project
Contract or Subcontract Number: ........................................................ Work Authorization No. 265
PC Change Request Proposal Number: ................................................ PCO-007
Source of Change
Per Electrical Subcontractor Request
Material
CITY Unit Price Ext Price
Sunshield
1
$ 450.00
$ 450.00
Isolation Valves
2
$ 10.00
$ 20.00
$ -
$
Freight
$ 9.40
Tax Rate
Subtotal Material Cost:
$ -
$ 479.40
I ahnr IP2fac inrhirlp Pavrnll Tavae P. InQiirnnrp rnatcl
(]TV Mrcl Fvt Prica
Project Manager
2
$ 191.98
Automation Specialist II
16
$ 1,146.91
Technician 1
16
$ 727.04
Subtotal Labor:
$ 2,065.93
Travel Expenses (CITY Unit Price Ext Price
Subtotal Travel Cost: $ -
Subcontractor Charges Unit Price Ext Price
Subtotal Subcontractor Cost: $ -
Direct Jobsite Costs OTY Unit Price Ext Price
Subtotal Jobsite Cost: $ -
Equipment CITY Unit Price Ext Price
Subtotal Equipment Cost: $ -
Cost Recap
Subtotal Direct Costs
$ 2,545.33
Overhead & Profit Charge ( 15%)
$ 381.80
Subtotal:
$ 2,927.13
Total COR Amount:
$ 2,928.00
Page 1 of 1
PCO-007 Chlorine Dioxide Relocation
FUII GO CR LTE
6/3/2020
Houston, Tx 77064
To: PEPPER LAWSON WATERWORKS
1725 HUGHES LANDING BLVD.
THE WOODLANDS, TX 77380
Phone: 281-907-8600
Proposal
P.O. No.
Proposal No. 75904
Job Location: ELEVATED DECK / SLAB
5495 E. GRAND PKWY
BYTOWN, TX 77523
Terms Due Upon Receipt
Qty
Total
********** CONCRETE CORE DRILLING SERVICES ********* CORE DRILLING IN WALL OF
1,510.00T
SANITATION / WATER TREATMENT TANK
* BELKNAP IS TO PROVIDE ALL LABOR AND EQUIPMENT TO PERFORM THE FOLLOWING
SCOPE OF WORK:
- CORE DRILL 8 (EIGHT) 3" DIAMETER HOLES - 15" DEEP - ELEVATED DECK.
- PERFORM WATER CONTROL.
- HAUL OFF OF DEBRIS
**ALL JOBS MUST BE LAID OUT UPON ARRIVAL - STAND BY TIME CHARGES $75.00 PER
HOUR.**
** CUSTOMER HAS INFORMED ME THAT WORK IS TO BE PERFORMED ON ELEVATED DECK.**
********** AFTERHOURS OPTION ********** $450.00 PER MOBILIZATION
O.00T
ANY SAW CUTTING / CORE DRILLING WORK PERFORMED AFTER HOURS WILL INCUR AN
ADDITIONAL FEE OF $450.00 PER MOBILIZATION.- BASED ON 2 MAN WORK CREW.
Sales Tax (8.25%)
Submitted by Belknap Concrete Cutting & Drilling, Inc. per DALE SNEAD
Phone # Acceptance of Proposal/Date
(281)955-6812
Page 1
Houston, Tx 77064
6/3/2020
To: PEPPER LAWSON WATERWORKS
1725 HUGHES LANDING BLVD.
THE WOODLANDS, TX 77380
Phone: 281-907-8600
Proposal
P.O. No.
Proposal No. 75904
Job Location: ELEVATED DECK / SLAB
5495 E. GRAND PKWY
BYTOWN, TX 77523
Terms Due Upon Receipt
Qty
Total
BID IS BASED ON CONCRETE SAW CUT/DRILLED NO MORE THAN THICKNESS LISTED
O.00T
ABOVE. DEEPER SAW CUTTING/DRILLING CAN BE PERFORMED AT ADDITIONAL COST.
BID EXCLUDES GPR SCANNING OF CONCRETE / X-RAY SERVICES PRIOR TO CUTTING OR
DRILLING.
" BID EXCLUDES THE MOVING, COVERING AND/OR PROTECTION OF ANY AND ALL
MERCHANDISE, ITEMS AND/OR FINISHED SURFACES.
ALL LAYOUT, DESIGN OR STRUCTURAL ISSUES ARE THE RESPONSIBILITY OF THE HIRING
CONTRACTOR.
" IF TAX NOT APPLICABLE, PLEASE PROVIDE TAX CERTIFICATE TO BELKNAP.
Sales Tax (8.25%
Submitted by Belknap Concrete Cutting & Drilling, Inc. per DALE SNEAD
Phone # Acceptance of Proposal/Date
(281) 955-6812 Page 2
AAN 1 � �
FULL I q_ GR E
6/3/2020
Houston, Tx 77064
To: PEPPER LAWSON WATERWORKS
1725 HUGHES LANDING BLVD.
THE WOODLANDS, TX 77380
Phone: 281-907-8600
Proposal
P.O. No.
Proposal No. 75904
Job Location: ELEVATED DECK / SLAB
5495 E. GRAND PKWY
BYTOWN, TX 77523
Terms Due Upon Receipt
Qty Total
EXCLUSIONS - ITEMS NOT LISTED ABOVE, REPAIRS TO UNMARKED UTILITIES, OVER OR O.00T
AFTER-HOURS LABOR, ANY CADD PRODUCTION DRAWINGS OR RECORD DRAWINGS
UNLESS SPECIFICALLY INCLUDED, ANY WORK NOT SHOWN ON THE BID DRAWINGS
UNLESS SPECIFICALLY INCLUDED ABOVE
THIS PROPOSAL CONTAINS BELKNAP CONCRETE CUTTING & DRILLING'S STANDARD
INSURANCE AS FOLLOWS: $2M GL AGGREGATE / $500K AUTO / $1 M WC / $4M UMBRELLA/
NO E&O
THIS PROPOSAL DOES NOT INCLUDE ANY GC -REQUIRED INSURANCE OTHER THAN THE
STANDARD GENERAL LIABILITY, AUTOMOBILE, AND WORKERS' COMPENSATION. ALL
BONDING AND/OR SPECIAL INSURANCE REQUIREMENTS ARE SUPPLIED AT ADDITIONAL
COST IF REQUIRED FROM GENERAL CONTRACTOR AFTER THE BID DATE.
PRICE MAY INCLUDE SALES TAX UNLESS A RESALE / EXEMPTION CERTIFICATE IS
PROVIDED.
THIS QUOTE IS GOOD FOR 30 DAYS.
NOTE: IF WE ARE AWARDED THIS PROJECT, A COPY OF OUR PROPOSAL IN ITS ENTIRETY
SHALL BECOME PART OF THE CONTRACT.
ALL CUTS MUST BE MARKED BY OTHERS PRIOR TO BELKNAP ARRIVAL - STANDBY TIME O.00T
CHARGES $75.00/HR PER WORKER.
Sales Tax (8.25%)
$124.58
Total
$1,634.58
Any alteration or deviation from above specifications involving extra cost will be executed only upon written order, and will become
an extra charge over and above the estimate. Owner is responsible for fire, tornado, and other necessary insurance on above
work. Title to material and/or equipment shall remain with the seller until total purchase price is paid. In default of payment, buyer
waives all claims for damages against seller for injury that may arise from removal of said goods. If collection is necessary, buyer
agrees to pay reasonable interest, all collection costs, including Attorney's fees until paid at 1 1/2% (18% per annum) service
charge will be added to your statement if not paid in accordance with the above conditions.
Submitted by Belknap Concrete Cutting & Drilling, Inc. per
Phone # Acceptance of Proposal/Date
DALE SNEAD
(281) 955-6812
Page 3
P[W
waterworks
August 1, 2019
Baytown Area Water Authority
The City of Baytown
2401 Market St.
Attn: Ajay Shakyaver
Re: CPR No. 19 REV 2
BAWA 6 MGD Surface Water Treatment Plant
Houston, TX 77056
Mr. Shakyaver,
In order to improve the structural resistance and meet the wind loading requirements for the Operations
Building north and south wall, additional reinforcemement will need to be added the structure. PLW is
proposing this Change Order Request in accordance with the Engineer's recommendations.
The operation building CMU and steel beam modifications involve the changes of the CMU reinforement,
the size of the CMU blocks and the building steel beams around the building and minor modifications to the
slab. Please refer to the attached Plan Sheet 20-A-2.1 for modification details. Partial cost of the modifications
will be compensated by AECOM. Therefore, the work associated with the structure change will result in a cost
increase of $30,151.95.
Please find the attached PLW cost summary and associated reference material for your review and
acceptance. Please note, should any additional costs be incurred as a result of this Work due to clarifications,
changes or unknown scope, PLW will seek reimbursement. Clarifications and exclusions are listed on
subcontractor's proposal.
If you have any questions or need additional information, please do not hesitate to call me
at 713-301-8637, or kdrown@plwus.com.
Regards,
PLW Waterworks
741��Q-
Katy Drown
Project Manager
Page 1
P1W
waterworks
AECOM
5444 Westheimer Rd. #1400
Houston, TX 77056
Operation Building CMU and Steel Beam Modifications
Scope of Work
Operation Building CMU and Metal Structure Modifications per the Entgneet's Recommendation
Imoice# 1
Date: 08/07/19
PLW Job No.: P3T
Item
Labor
Non -Taxed
Material
Subcontract
Taxed Mat'l/E ui
Unit Total
Unit Total
Unit Total
Unit Total
No.
Description
QtV
Unit
Cost
Cost
Cost Cost
Cost
Cost
Cost
Cost
Operation Building CMU and Metal Beam Change
I
PLW Coordination
Project Manager
0
HRS
S 12189
S
S S
$
S
S
s
Project Engineer
0
HRS
S 9452
S
s s
s
S
s
$
Project Superintendent
0
HRS
S 15049
$
S s
S
S
s
S
2
Modfications to Slab and Additional Reinforcement
Foreman
0
HRS
S 5783
S
s S
s
s
s
s
Field Engineer (Surveying/Layout)
0
HRS
S 62 19
$
s s
s
s
$
$
Formwork Concrete Ftnshing Curing
0
LS
S 3532
$
S 15487 S
s
S 19233
S
3
CMU Reinforcement Modifications (Fabco)
Supply Only
0
LS
S -
s
s - s
$ 3,28555
S
s -
s
4
CMU and Steel Beam Modifications (Armstrong)
Modfication to design and install CMU
0
LS
S -
s
$ 3
S 32,568 14
S
$ -
s
5
Additional Dowel Reinforcement at Operation Building CMU
Additional dowel reinforcement #7 bars
0
LS
S 2,76020
S
6
251. of Owner Change Order
I
LS
$ 10,050 65
S 10 050 65
Total Invoice Due Amount S 10,050.65
Invoice Due
Upon Receipt
Payment Method: FedEx Check to Jobsite Address: 5459 E Grand Parkway South, Baytown, TX 77523
1725 Hughes Landing Blvd., Suite 1200
The Woodlands, TX 77380
(281) 907-8600 - Fax: (713) 521-0386
Equal Opportunity Employer
Baytown Area Water Authority
BA\I A 6 MGD Surface Water Treatment Plant
BAWA Job No. 1806021
Operation Building CMU and Steel Beam Modifications
Scope of NL ork
Operation Budding CMU and Metal Structure Modifications per the Emgneer's Recommendation
CPR No.: 19 Rev 3
Date: 08/07/19
PLW Job No.: P3T
Non -Taxed
Labor
Material
Subcontract
Taxed 111at'I/E ui
Unit
Total
Unit Total
Unit
Total
Unit Total
Item
No.
Description
QIY
Linn
Cost
Cost
Cost Cost
Cost
Cost
Cost Cost
Operation Building CMU and Metal Beam Change
I
PLW Coordination - Invoiced to AECOM
Project Manager
0
14RS
$ 9800
S
-
$ - S -
$ -
$ -
$ - $ -
Project Engineer
0
HRS
S 7600
S
-
$ - $ -
$ -
$ -
S - S -
Project Superintendent
0
HRS
$ 12100
$
-
S - S -
$ -
$ -
$ - $ -
2
Modfications to Slab and Additional Reinforcement
Foreman
8
HRS
S 4650
$
37200
$ - $ -
S -
$ -
S - $ -
Field Engineer (Surveying/Layout)
4
HRS
S 5000
S
20000
$ - $ -
$ -
$ -
$ - $ -
Fx,rmwork Concrete: Finshtng : Curing
I
LS
$ 2840
S
22700
$ 13075 $ 39225
$ -
$ 15000 $ 15000
3
CMU Reinforcement Modifications (Fabco)
Supply Only
1
LS
$ -
$
-
S - $ -
S 2,773 79
S 2.773 79
$ - $ -
4
CMU and Steel Beam Modifications (Armstrong
Moditcatton to design and install CMU
1
LS
$ -
$
-
S - S -
$ 27.495 26
$ 27.495 26
S
5
Additional Dowel Reinforcement at Operation Buildinp
CMt
Additional dowel reinforcement #7 bars
I
LS
S 2 330 27
$ 2 330 27
Direct Cost Subtotal
79900
3ST25
32,599 32
15000
Small Tools @ 0 oa o
-
-
-
- -
Equtpment Burden @ 0 Oo a
-
-
-
Tax u. 0 00 o
Subtotal 2
799 00
39225
32 59932
15000
Overhead & Profit A, 15 00 a
11985
5884
4,88990
2250
Subtotal 3
91885
45109
37,489 22
17250
Bonds & Insurance l 3.0%
2757
13 53
1.12468
5 18
Subtotal 4
94642
46462
3861389
17768
Total of all columns
40,202 61
Other
Adjusted City's Portion at 75 % of the total cost 30,151.95
Note. The remainder of the Change Order Request will be paid by AECOM 10,050.65
Page 2
-Tor I
Beam at 12�1 above
FF
NI
Cp
W8x1 8. Bottom of
Beam
at 12' above
i
ory
---L� f
11-1
FF
(TYP)
(2)) W8x18. (1) at 12'-0"
O.c
22'
(1� (1 aT�2x2 -0" above FF
nr
EIECIRiCK
Revisesize
from 8" to 12" with
ti
12"X24- Door Jamb
with #7 ach face
@ 8" each face
(2) W8x18. (1) at IT-6",
(.) at 22 above FF
Additional V48X18
x
1(2) —VV8x1
8.
12'7-10
;57
rem
(1) at .011.
" !F
at above FF
I
r
x 18. Bottom of
ID
(I>
3> Option 2.
k Beam
at 12'above
Steel Beam around Building with #5
L
FF
(TYP)
with
24'o.c as indicated on drawings.
—D
7
5 WD --E IEI
M I uu m xc.
<D
T V All
OPERATIONS BUILDING
!f=1 7y MW 11
® W I
Ist FLOOR PLAN
I st FLOOR PLAN
OD— -11 1-111*1
(D
M,
s' Floor F.F.
(3o6on: 33.0
(3))
2nd Floor FF
Ele-ti— 4i633
<1D
vy
-o-A-
ra.. IC- IMAr 1.
JOB ESTIMATE
ilARMSTRONG
ROLES
DATE OF QUOTE
1 102 Callahan
03/27/2019
Conroe, TX 77301
PAGE 1 of 1
Project: Baytown Water Authority: CMU STEEL OPTIONS
REVISION
CLIENT
DESCRIPTION
AMOUNT
ATTN: Dennis
PLW
1725 Hughes Landing
Suite 1200
The Woodlands, TX
(281) 907-8600
TOTAL BID
OPTION 1
12" MASONRY JAMB AND HEADER GRID 1 FROM A.2 TO C.
12" MASONRY NORTH WALL GRID 10 A.8 TO C.
GROUT INCREASE
CITY
j
216 SF
$ 972.00
662 SF
$ 2,979.00
50 CY
$ 5,350.00
3 STEEL FLAT W8 x 18 BEAMS AND 1 COLUMN {DESIGN, FAB.INSTALL)
72 LF
$ 5,102.00
1/2" DIA TENSION ROD TO BEAM ABOVE. CENTERED.
3
$ 185.00
1/2" DIA BOLTS W/ 4.5" EMBED ABOUT 5.5" PER BEAM
12
$ 600.00
OPTION 2
12" MASONRY JAMB AND HEADER GRID 1 FROM A.2 TO C.
12" MASONRY NORTH WALL GRID 10 A.8 TO C.
$ 15,188.00
216 SF
$ 972.00
662 SF
$ 2,979.00
GROUT INCREASE
7.4 CY
$ 791.80
3 STEEL FLAT W8 x 18 BEAMS AND 1 COLUMN (DESIGN, FAB, INSTALL)
585 LF
$ 13,325.00
1/2" DIA TENSION ROD TO BEAM ABOVE. CENTERED.
27
$ 1,350.00
1/2" DIA BOLTS W/ 4.5" EMBED ABOUT 5.5" PER BEAM
131
$ 8,077.46
$ 27,495.26
FA B C CL
13835 Beaumont Highway
Houston, TX 77049
Tel:713.633.6500 Fax:713.633.6541
Customer
Pepper Lawson Waterworks, LLC
3701 Kirby Drive, Suite 1133
Houston77098,TX
866.536.7992
Change Order Request
Change Order Number Date
0004 03/01/19
Page 1 of 1
Project
BAWA 6 MGD SURFACE WATER TREATMENT PLANT
Baytown77523,TX
Receipt of materials, or services rendered, constitutes acceptance of this change order. Buyer shall be bound to seller's typical terms and
conditions, for materials and services covered within this change order, as previously outlined in its original proposal.
Cust Job#: Cust PO#:
CMU CO Breakdown @ Ops Building
Description
Qty U Of M
Unit Price
Extended
v Option 1
Subtotal:
19,440.77
Rebar Weight
32323 Lbs
0.4750
15,353.43
Administrative
1 Hours
60.0000
60.00
Detailing
20 Hours
85.0000
1,700.00
Delivery
2 Each
280.0000
560.00
Overhead & Profit
1 10%
1,767.3400
1,767.34
EJ Option 2
Subtotal:
2,773.79
Rebar Weight
3035 Lbs
0.4750
1,441.63
Administrative
1 Hours
60.0000
60.00
Detailing
12 Hours
85.0000
1,020.00
Overhead & Profit
1 10%
252.1600
252.16
Change Order Total: 22,214.56
BAWA 1705932 - CO BREAKDOWN (3/19/19)
ORIGINAL
BAR :,
BENDING DIMENSIONS
OPTION 1 (REV-1)
THEO TING
BENDING MANSIONS
Total for size 1: 38433
Total for size 5: 6598
OPTION 2
THEO BAR:,BENDING
DIMENSIONS
Ida L' k
Or jj\v,
0 -�,;
0
TA
F A 0 C�0
13835 Beaumont Highway
Houston, TX 77049
Tel:713.633.6500 Fax:713.633.6541
Customer
Pepper Lawson Waterworks, LLC
3701 Kirby Drive, Suite 1133
Houston77098,TX
866.536.7992
Change Order Request
Change Order Number Date
0005 04/11/19
Page 1 of 1
Project
>BAWA 6 MGD SURFACE WATER TREATMENT PLANT
Baytown77523,TX
Receipt of materials, or services rendered, constitutes acceptance of this change order. Buyer shall be bound to seller's typical terms and
conditions, for materials and services covered within this change order, as previously outlined in its original proposal.
Cust Job#:
OB Chem Building #7 40'
Cust PO#:
Description
Qty U Of M
Unit Price
Extended
S Add
Subtotal:
2,330.27
Rebar Weight
2453 Lbs
0.4750
1,165.18
Install Rebar
2453 Lbs
0.2500
613.25
Administrative
1 Hours
60.0000
60.00
Delivery 1 Each 280.0000 280.00
Overhead & Profit 1 10% 211.8400 211.84
Change Order Total: 2,330.27