Loading...
Ordinance No. 14,407ORDINANCE NO. 14,407 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AUTHORIZING CHANGE ORDER NO. 2 WITH COMEX CORPORATION FOR THE FIRE TRAINING FACILITY PHASE 3 PROJECT; AUTHORIZING PAYMENT BY THE CITY OF BAYTOWN IN THE AMOUNT OF ONE HUNDRED SEVENTY-THREE THOUSAND FOUR HUNDRED EIGHTY AND 03/100 DOLLARS ($173,480.03); AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. ****************************************************************************** BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 2 with Comex Corporation for the Fire Training Facility Phase 3 Project. A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. Section 2: That subject to funding from the Baytown Municipal Development District, the City Council of the City of Baytown authorizes payment to Comex Corporation, in an amount not to exceed ONE HUNDRED SEVENTY-THREE THOUSAND FOUR HUNDRED EIGHTY AND 03/100 DOLLARS ($173,480.03) in accordance with the change order authorized in Section 1 hereinabove. Section 3: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 1 I'h day of June, 2020. B NDON CAPETILLO, Mayor ATT T: &A�7� - LE ICIA BRYSCH, City Jerk APPROVED AS TO FORM: Kt� KAREN L. HORNER, Interim City Attorney RAKaren\Fi1es\CityCounci1l0rdinances\2020Vune I I iChangeOrderNo2forFireTrainingFacilityPhase3 Project.doc Exhibit "A" s BAYTOWN CITY OF BAYTOWN Baytown Fire Training Facility Phase 3 Change Order No. 2 PO: 1906779 Date: June 11, 2020 Synopsis: The elevated training structure construction had items that need to be addressed which include the following: four (4) stairs to the props, an elevated grate walkway, 186 linear feet of handrails; a check valve at the fire riser to the indoor classroom building, a water training reservoir, pumps, extension of the onsite waterline; conduit for emergency shut down from the liquified petroleum (LP) gas tank to the control room, and a concret pad to serve electrical panels at the pre-engineered metal storage building. Also included are deductions: eliminating the landscaping & irrigation system; one indoor fan; one outdoor fan and substitution of rubber baseboard in lieu of wood baseboard. Brief Description of Changes: Item 2.1: The first item of work is for an increase of $105,762.72 for adding four (4) stairs, elevated grate walkway, and 186 linear feet of handrails to reach and traverse the elevated section of the fire training structure. These additional items will provide a realistic training experience for firefighters and allow an approach to fighting fires from different angles. Item 2.2: The second item of work is for an increase in the amount of $1,313.76 for adding a check valve at the fire riser per Fire and Building Code. This item was not included in Change Order No. 1. Item 2.3: The third item of work is for an increase in the amount of $156,477.55 for adding a water training reservoir, a different pump system, and extension of the onsite waterline. The fire training exercises are expected require a large demand of continuous water for short amounts of time. The pond will function to ensure constant service of training water, and no drop in water pressure or adverse effect on the City's water system. The pond will function to capture and recycled water used to fight training fires. Recycling of water will reduce the amount of water used during training exercises which will save money the City money. The pond will also function to provide a training opportunity on drafting from an open body of water. Item 2.4: The fourth item of work is for an increase of $924.00 for adding 420 linear feet of conduit for an emergency shut down from the liquid petroleum tank to the control tower. Item 2.5: The fifth item of work is for an increase of $1,008.00 for adding a concrete pad for the electrical equipment located outside of the pre-engineered metal storage building. Item 2.6: The sixth item of work is for a deduction in the amount of $92,006.00 for eliminating the landscaping and irrigation, one indoor fan, one outdoor fan, and substituting rubber baseboard in lieu of wood baseboard. (Change Order No. 2 continues on next page) updated: 6/3/2020 tern Uescniption unit Quantity lusil Pric Total 2.1 Adding 4 stairs, elevated grate walkway, and handrails to fire training structure. LS 1 $ 105,762.72 $ 105,762.72 2.2 Adding a check valve at the fire riser per Fire and Building Code. LS 1 $ 1,313.76 $ 1,313.76 Added a water training reservoir, pumps, and extension of waterline. LS 1 $ 156,477.55 $ 156,477.55 F2.4 Conduit for emergency shut down of liquid troleum tank to control tower. LS 1 $ 924.00 $ 924.00 2.5 Concrete Pad for electrical equipment outside of pre-engineered metal storage building. LS 1 $ 1,008.00 $ 1,008.00 2.6 Eliminaton of landscaping & irrigation system, one indoor fan, one outdoor fan, substitution of rubber baseboard in lieu of wood baseboard. LS 1 $ (92,006.00} $ (92,006.00) Total 173,480.03 ContractVn nal 1�eyised 1 Original Contract Price $7,438,000.00 $ 7,438,000.00 2 Owner Contingency Previous Change Orders This Change Order Remaining Contingency 3 Change Orders Previous Change Orders $ 13,559.:0 This change order $ 173,480.03 4 Revised Contract Price $7,438,000 00 $7,625,039.52 Original Contract Duration 450 NTP Date 7/15/19 Previous Extensions 70 Original Complete Date 10/7/20 This Change Order 0 Revised Duration - Calendar Days 520 Revised Duration Date 12/16/20 Co actor - bate: (;A3 Ae ilo Co tant o6ro412o2o pw" WUc,c" 0610312020 _7AL_�__,� ' 06/04/2020 Director: Frank O. Simoniaux, Jr., P.E. Date City Manager Date updated: 6/3/2020 Documentation for Item 2.1 Comex Corporation Page 1 of 1 9841 Spencer Highway LaPorte, TX 77571 (281) 479-2322 Change Order 05/27/2020 Project: Baytown Fire Training To: Contract : 1061 Change Order: 17 Owner/GC CP: Reference: RF150 Section: RE: RF150 Stairs Requested By: Respond By: Scope of Work: Provide and Install Stairs per RFI 50. See attached Sub proposals for stairs, elevated grate walkway, and handrails. Add 50 Days To contract once approved submittals are returned. Steel Fabricator $ 59,531.00 Steel Erector $ 33,500.00 Concrete Slab $ 1,400.00 Insurance & Bond $ 1,888.62 OH&P $ 9,443.10 Total $ 105,762.72 Total Proposed Amount: $105,762.72 The Contract time Will be extended by: 50 days Please indicate your approval by returning a change order for the work specified. Distribution: Sincerely, Rickey Trant RULDtNG CORP. MINFINUMN Job A 8607 Change Order Form Ctlullubf hitnlmition Company Come: Corporation Project Name Saytowrt City Fire Training Project Manager Rickey pant Pricing Event Added. stairs on RA / RF160 Address 9841 Spencer Hip" Project City, State Baytown, TX City, State ZIP LaPore, TX 77671 Change Order# 0607.04R2 Phone 291-479-2322 Change Order Amount S69,631 Email rickavMcomexcomcorrn stwei Cost to furnish Stair A4- 24 Treads (bar grating), 72 LF of 1.5" dia. Pipe Hand+ail, 69 LF of 2-Une Guardrail. 1 landing (bar grating)- $18,268.00 Stair W 18 Treads (bar grating), 46 LF of 1.5' dia. Pipe Handrail, 44 LF of 241ne Guardra I 1 landing (bar grating} $11,395.00 Stair A8- 13 Treads (bar grating), 34 LF of 1.5" dia. Pipe Handrail 30 LF of 2-fine Guardrail- $7,824.00 Stair 97- 13 Treads (bar grating), 34 LF of 1.5" dia Pipe Handrail, 30 LF of 2-fine Guardnal- ALTERNATE- $7,824.00 Furnish Galvanized STD 3- line ralliing at Platform per RFI 50. $5.606.00 Furnish grating at platform floor per RFI 50- $8,014.00 Net fticlilm Install, Stair 1, Stair 2 and Stair 3 This is Contractor's official notiPlcaton that the scope of work added to this project by this change will impact the existing production schedule. MSD Building Corp requests (56) additional working days to accomplish this scope of work. cemmmpmpom See attached cost breakdown for added 8 removed material Submitted by: Sandra Gonzalez Date: 06/01120 Cmmar e IASO SUMNO CORD no It as o tm it right Do It rww 120 rl Main Snot Pma&rra. Tx 77608 71id774= 71�.�n•losro Submitted by (authorized representative) MSD Date Cost Breakdown - Added Scope BUILDING CORP.. U9101 MatBn81S Bad Cosa 8607-04R2 Baytown City Flre Training Descripl9on fOTY Price Unit Total W SHAPE S0.55 Ibs $0.00 Drop $0.55 Ibs $0.00 C SHAPE Drop 8,500.00 $0.55 $0 55 Ibs Ibs $3,575.00 $0.00 PLATE _ 3,000.00 $0 60 Ibs $1,800.00 ANGLE 1,965.00 $0.55 Ibs $1,080.75 Drop TUBE $0.55 $0.78 Ibs Ibs $0.00 $0.00 Drop $0.78 Ibs $0.00 11.465.00 Ibs Grating at Stair 1.00 $11.512.00 LS $11.512.00 Galvanizing for Stair 11,465.00 S0,40 Ibs $4.586.00 Galvanized STD 3-line Rails per RFI 50 1.00 2.875.00 LS $2,875.00 Platform grating per RFI 50 1.00 S6,240.00 LS $6,240.00 Fabrication 303.00 $50.00 His S15,150.00 Detailing 8 Engineering 146.00 $50 00 Hrs $7,300.00 Subtotal $54,118.75 Overhead 8 Profit 10.00% $5,411.88 Tax $0.00 Bond Fee $0.00 Grand Total $59,531 Page 2of3 METRO ERECTORS, L.L.C. Page lof 2 P.O. Box 7433, Pasadena, Tx 77SO8 Structural Steel Erection Precast Phone: 281-487-0100 Fax: 281487-3690 Crane Rental and Rigg ng Baytown Fire Training - Stairs, Handrails, and Grating May 29th 2020 Drawings Reviewed for Proposal: 'Architectural/Structural Drawings Only —ERECTION OF STRUCTURAL STEEL- 810 ITEMS: Labor, supervision, Insurance, and hoisting for erection of all structural stee , joists and bridging based on Structural Drawings only and qualified per the A.I.S.C. Code of Standard Practice. GENERAL CONTRACTOR SHALL PROVIDE: 1. Shims, elevations, and all Column tines. 2. Continuous f,ow of work including delivery of steel, joists. and deck per Metro Erectors agreed sh pp ng dates 3. Access and regress for safe operation of crane through the bul ding and site. 4. Access to existing steel for new framing - exposed and cleared S. Traffic control and barricades where needed. 6. Safety cables at floors and roof per OSHA requirements. 7. Floor and roof penetration coverings per OSHA requirements 8. Any demolition required for erection purposes, 9. Any shoring requ red. 10 Field testing fees or retest fees. 11 Engineering for plumbness of building and sign -off for ac^.epta,ce 12. Ancho(bolt Acceptance per OSHA requirements. 13. Fire Protection. STANDARD EXCLUSIONS: (These are based on the Area Practice as deUried by Greater Houstor Steel Association) 1. Bonds. 2. Permits. 3. Grout. 4 Gauge material or any steel welding or attaching to gauge mater al. S. Stair rails mounted to drywall. CMU, or concrete walls. Any not welded to steel. 6. Embedded items (Including hand rails or guardrails.) 7. Loose lintels. S. Touch-up paint or galvanized touch-up. 9. Masonry anchors, ties, or CMU anchors (steel attaching to structure to anchor CMU wads I 10. Mats for crane -(General Contractor wilprovide stable conditions for crane operations and material storage. 11 General Contractor will coordinate omission of slab to allow crane on building pad 12. Any demolition. 13. Curbs for roof openings. 14. Additional move -ins for crew and crane (pricing avallab•e for return charges) IS. Mechanical hangers with joists reinforcement of either new or ex st ng structure 16. Shoring of either new or existing structure. Page 2: METRO ERECTORS, L.L.0 STANDARD EXCLUSIONS (Continued) 17 Work In existing building 18 Inspection fees. 19 Protection of existing building (Includes fire protection) 20 finished roof deck or deck attaching to light gauge 21. Uquidated damages 22 Civil and MEP Drawings 23 Exclude lollet Partitions ADDITIONAL EXCLUSIONS: 24 Touch up paint Add to Erect Additional Stairs Crane $9,000 Stair p4 $6,000 Stair q5 $4,000 Stair 06 $4,000 Stair 07 $4,000 Add to Erect Handrai s and Grating $6,500 Total Add for Stairs, Handrails, and Grating $33,500 Clay R. Parmer Accepted By: (5COMMERCIAL CONCRETE SUBCONTRACTORS �J� L� 13326 Ralph Culver Rd, Suite 110, Houston, TX 77086 01IIce:281-784-M70—Fax:281-791-0117 wivw.botetlobuitilets.com Pilaster Alterations May 1.2020 Company: Comex Contractors Projecr. Baytown Fire Training Facility Location: 7022 Bay Way Drive. Baytown, TX 77520 Description. Botello Builders Corporation to Pro -vide: Thickened Paving Thicken Paving to 12" Surrounding Stan Columns Excluded Items: • Any Type or Brand of Joint Sealant (Mist be Done by tltfieis3 • Colored, Stamped Textured or Any Type of Decorative Concrete (May be included as a-Cliange Qrder) • Removal or Placement of any type of subgrade r';: awtenals such as select fill, aggregate base. or bank sand from/into property ■ Permits, Engineering, Testing, and or inspections (Must be Obtained by 4C / %Men If Heeded) • Surveying (OC Must Provide Surveyor to Mark Building Co= Dnnr to StartimTbr•.i•r,on Form World All footage quantities provided on 11us proposal are approximate to eesct dimensions Agy other work or material that m►aht arise and that is not mentioned on this proposal wdl be added to the total bid amount -- - _L__-_ _J__ Thickened Paving--------..--- ____,.�_.... — Total S 1,400. er S . Ft. Rate: S Wit Grand Total: $ 1. NA-0 ' Prices on this proposal are valid for 30 days. i erms and Conditions 1 Scope of Work Subcontractor agrees to furnish all labor, services materials, installation, supplies iiintrauceequtptnem tools and other facilities required for the prompt and efficient execution of the work described herein in a professional and workmanlike manner. 2 Quote Amount. General Contractor agrees to pay Subcontractor for the strict perforniance of his work, the sum as indicated above subject to additions and deductions for changes in the scope of work as may be subsequently agreed upon Signed By: Eleazar G. Botello Botello Builders Corporation President Date: Accepted By General Contractor Title: Date: Baytown Fire Training Facility 7022 Bayway Drive, Baytown, Texas RFI 0050 - Prop Stairs Status: Sent To Reviewer Due Date: Feb 07, 2020 Question Kailum Flores (Comex Corp) on Feb 4, 2020 at 3:21 PM UTC S2.42 I only show one foundation for a stair, we have this foundation poured and ready per the cad design and drawings. In looking at the framing plan on S2.52 I do not see any stairs on this drawing, in fact I do not see any stairs period... I do however see a ladder with a cage on the new tank on the isometric view on S2.60. As of right now MSD did not pickup any stairs because the design drawings do not currently show them. Please advise on final stair and foundation additions. ® 520020409270.pdf(See page2) O 520020409280.pdf(See page 3) No additional piers are required for stair support unless currently shown on the structural plan. Provide a thickened slab below the stringer and post support similar to detail 5/S3.02. The thickened slab should be monolithic with the paving. Stairs are indicated in the specifications and on the structural drawings to be designed by fabricator. All of the locations where the stairs hit the slab are indicated on civil sheets C1.02, C1.03, C1.05, C3.01, C4.01. Final stair locations are as indicated in the prop stair update issued 12-16-2019.... (and later updated by MSD for stair #6 and #7). Center thickened slab on stair landing and extend 12" on either side of stair. Prepared by Kailum Flores 1 Created with PlanGrid History Question drafted and sent to manager • Question added: Kailum Flores (Comex Corp) on Feb 4, 2020 at 3:28 PM UTC S2.42 I only show one foundation for a stair, we have this foundation poured and ready per the cad design and drawings. In looking at the framing plan on S2.52 I do not see any stairs on this drawing, in fact I do not see any stairs period... I do however see a ladder with a cage on the new tank on the isometric view on S2.60. As of right now MSD did not pickup any stairs because the design drawings do not currently show them. Please advise on final stair and foundation additions. • Title added: Prop Stairs • Submitter added: Kailum Flores (Comex Corp) • Manager added: Rickey Trant (Comex Corp.) Prepared by Kailum Flores 4 Created with PlanGrid S8.07 I -- W1 _. ....._ sk TYPICAL HANDRAIL REF. 2/S4.05 t2 STEEL GRATING REF. LAN OTE 2 N 35 S6.07 m, � J.1 m, N � rl REF.2/S4.05 - — G N ryt N + +� W 12a45 l Sfi C7 PARTIAL INDUSTRIAL PROP PLAN AREA 7 - ALT. #3 1 /6" = V-0" REFER TO SHEET 2/S2.52 FOR PLAN NOTES 27, N W+ 5 TOVANIHART ot> crombie 1� r t1r, I I U)LLI a: Z x Oa, W r U) co R qov Documentation for Item 2.2 Comex Corporation Page 1 of 1 9841 Spencer Highway LaPorte, TX 77571 (281) 479-2322 Change Order 05/19/2020 Project: Baytown Fire Training To: Contract : 1061 Change Order: 18 Owner/GC CP: Reference: RFI 63 Section: RE: RFI 63 Requested By: Respond By: Scope of Work: Add Check Valve at Fire Riser Per RFI 63 and sub back up attached. Battle Ground Fire $ 1,173.00 Insurance and Bond $ 23.46 OH&P $ 117.30 Total $ 1,313.76 Total Proposed Amount: The Contract time Will be extended by: 0 days $1,313.76 Please indicate your approval by returning a change order for the work specified. Distribution: Sincerely, t xs f Z• Ricke Trant BATTLEGROUND FIRE PROTECTION 5041 Spencer Hwy., #407 Pasadena, TX 77505 Phone: 713.473-0008 SCR-0-2142876 Change Order Proposal Project Name: Baytown Fire Training Facility Address: 7022 Bayway Drive City. Sate Zip Baytown TX 77520 Date. May 19, 2020 Ticket 11 or RFI Ref # See attached Contractor/Owner Comex Corporation Address 9841 Spencer Hwy City, State, Zip La Porte Tx 77571 Attn Rickey Trent Phone: 713-829-2187 Date of Field Order: tmair MWA Scope of Work Install check valve in riser spigot per AHJ Materiel B Fees 1X 10-6 Pipe 0 units Q $ 1.39 $ - 1X1/2° Reducers 0 units $ 2.50 $ - 165 degree sprinkler 0 units $ 21.00 $ - 40 Grooved Check Valve 1 units $ 380.00 $ 380.00 Labor Field Labor Straight Time 8 hrs 42.00 $ 336.00 Field Labor Overtime 15 0 hrs $ 53.00 $ - Design Straight Time 2 hrs a $ 36.40 $ 72.80 Supervision 0.4 hrs Q $ 42.30 $ 16.92 Labor Burden 40% $ 170.29 Project Management (dt 5% $ 29.80 Other Equipment 0 units 0 $ - $ - Subcontract/B out Items 0 units a $ - $ Subsistance 0 units 0 $ 65.00 $ - Truck & Consumables Charge 1 hrs $ 10.00 $ 10.00 Permit 0 units $ 327.50 $ - Fre ht & Shl2ping 0 units $ 225.00 $ - Bond 0 units $ - $ - SubTotal Overhead Profit Total 10% 5% $ $ $ S $ 1,015.81 101.58 1,11739 5587 1,173.26 Adjusted Pri6o Flow,Amotint 0r Please let me know it you have anv questions or require anv additional Information. Respectfully, Battleground Fire Protection Documentation for Item 2.3 Comex Corporation Page 1 of 2 9841 Spencer Highway LaPorte, TX 77571 (281) 479-2322 Change Order 05/06/2020 Project: Baytown Fire Training To: Contract : 1061 Change Order: 15 Owner/GC CP: Reference: CPR 03 Section: RE: CPR03 Requested Respond Scope of Work: See attached sub proposal back up per CPR03 for the retention pond to recycle water to fight prop fires. Electrical $ 14,348.99 Mechanical /Plumbing $ 109,363.11 Concrete $ 1,900.00 Dirt /Clay Liner $ 14,100.00 Bond and Ins. $ 2,794.24 OH&P $ 13,971.21 Total $ 156,477.55 Total Proposed Amount-. $156,477.55 The Contract time Will be extended by: 0 days Please indicate your approval by returning a change order for the work specified. Distribution: Sincerely, Rickey Trant CMA 7odentia! commereut Irufustrrat LC47, E(a Co", Inc.Ui Ti['L 18185 =5 Pins C Fourth - *aurwnt, ?errs 77701 April 28, 2020 Comex Corporation 9841 Spencer Hwy LaPorte, TX 77571 RE: Baytown Fire CPR 03 We are submitting pricing for the CPR03 of the Baytown Fire Training Academy project as per plans and specs The price Includes labor miscellaneous material, and excavation. The price excludes overtime and sales tax tabor - $ 7,670 00 Material $ 3,049.53 Excavation $ 4,725.00 10% Mark up & overhead - $ 1,544-45 Total $16,988-99 Fire suppression credit (bid drawlnes) labor - $1,449 50 Material $ 951.40 10% mark up and overhead - $ 240.99 Total Credit —$ 2,640.00 Total CPR 03 - $14,348.99 The price is based on regular working hours of Monday through f riday from 7:00am to 3 30pm +f you have any questions or comments, please contact the office. Sincerely, Gulf Coast Electric Co., Inc. �.� /'TM Kevin J Picard Vice President Kjp/Jmh Cc.files IGWT 409 833-2828 - Fax W9 833-4M • xvwwSuOrwa. tefectrrc.com CP9U Job ID: UNTITLED u 7 fZ3c r r• �C 3 Project: Untitled Summary Item Number Report Vendor. TARGET Labor Level: LABOR 3 4f2812020 4:16:18PM Kan De5Cr1P0or1 314e am E" t M Urt UnBs MMR= t LAWUnft L*Wr Rnu0. QO Units OWM Pe 0 1002 GRG _ IN M 20 FT 1.0885 2t.769 0.0900 1800 1003 GRC I M _ 2 FT Ism 7J70 0.1050 M210 1061 PVC SCH 40 . ---. WA M 20 FT 0.2D5 4 530_ Dam I.M0 1062 PVC SCH t0 _ _ _ 1 M 471 El_ 0.1196 ,59.589 �_ 0.0790 37,30 ,tw PVC SCH 40 ] M 30 FT - -1,5334 46,15I DAM 4%0 VC 2002 PSCH 4020•DEG ELBOW 31n M 2 EA 0.7000 '0600� 033M 0680 2007 PVC SCH 40604)EG ELBOW 1 M - _ ] EA _ O4866 1.44D 0.3600 1140 3225 PVC COUPUNG 314 M 4 Ell 00360 0,392 02400 0960 3229 PVC COUPLING 1 M 6 EA 0.1509 0905 0.2700 1420 7035 THHtLRNVTN CU(STRI 12 M 90 FT 10.457 0.0090 0110 7038 TNHNrrHVJN CU(STR) 10 M 480 FT _0-1184 01816 97175 00112 5.376 N49 TNHMRHNM CU(STR) A. M 1910 FT 05205 I537Il03 00310 40110 7048 THHNfrHWN CU(STR) 250 M 120 FT 4.5666 550.880 00480 5760 -I 14 OUPLEX GFC1 RECEPTACLE -14538 20A M I FA 12.9393 12979 0.5200 0520 1G WP GFC1 PLATE 4N USE VERT M 1 FA 183197 18.320 03000 0-300 15007 4-SO 3(4- KO NO BUT 1.1?D 216Ct M I EA 14469 1.447 0.4000 0,400 _ _ _ 1W65 1G VSO PUISTER4tMO. SIMSE 4S-Cl M I EA 0e534 0.653 025W 0.250 I8463 BOLT ON BREAKERS _ _ 259 M I EA 141.9352 141935 11200 1 120 20294 NEAIht UGHT 6 RAT CONTACTTIR _- __. 30 MP M 1 EA 00000 0.000 3.0000 3000 0V2R W04 NFMOM0NItT SAFETTS 013 . . M 1 FA 1281000 126100 3.0000 -- 7.000 IIIK 22205 NFOBOLA Na RT 9AFETIG§W _ —~_ _ — M3 M t EA _ Y2e.5000 226.590 4,5000 { 500 39119 aACKHOE TRENCIONG _ ITx38'OEEP _ M 500 FT 0AM 0.000 CUM 39144 OACKHOEBACKFKLMENCH _ IT a76`pEEP Y_ _..FT -.._--0.0000 _ 0.OW MOM 496 00 51054 40A1125VISPST TOs.SV 7100 M 1 EA .. _ 67.0687 67.089 _ 3.0000 7.000 Phne TOMW 53.040M 180.9T T0.00 .b0 T t w 83.04933 1e01T $0.00 (,4T3' — P -- 7,` /4t 4-0 s u -- �AcaV4+,Or, —�7,Suj 4!S" Pirona Softi° Page I of 1 Job ID: UNTITLED .S y ps�5� Project UnMJed w TARGET ft— Summary Item Number Report Labor Level: LABOR 3 r a= Qeaecr, um mdwhM . Q ..... -- M 00 Fr to M NO Ff 200q M i FA FUM Two: SWIAe Job raUW so" W3112020 11:32:67AM 1 lAto t7 70 Woo um ph — Page t of t D E R R Y B E R R Y' S `WA FMAMM M Ut MECHANICAL May 8, 2020 Job # Baytown Fire Training Facility 4827 Revised CPR M3 CPR/RPP # F CPR 03 Proposal # Quantity Description Unit Total Unit cost total Unit total Labor labor Material Material Equipment Equipment WinSupply material quote 0.00 ; 1084.15 i ore Main ma en quo e 0 $ 13. 51.24 I ore main material quote 0.00 ; 13,572.04 $ i booster pump & of OJ]0 $113,890.00 $ 5 nk 0.00 155 $ 755. $ 36 socrete OJb 678 $ 244D8 $ I c mateno 0.00 $ 50000 $ 1 Qredii original pump OJp 0.001— — $ 83,055.00 $ I credif mat for pump tie in $ 400.00) 1 Ilabor 1 550.00 $ $ Smen I Oly day i t days 0.00 $ I I excavator loader 0.00 $ ^ — 600 500 $ 3,600.00 0.00 $ 3.000.00 I fue 0.00 $ 150 $ 900.00 I tax on eqLipment 0.00i $ 544.50 0.00• $ $ 0.00 $ 0.00 $ $ 0.00 $ 00.00 0000 $ $ $ 0.00 $ o.00 $ $ o.00 0.001 $ $ $ — $ 0.00 $ DA) $ _ $ $ 0.00 0.00 $ o.00 $ $ 0.00 onrc, or Out revised price for CPR tl3 will be y109,363.11 h� material quotes are atlaChed- it you have any questlons feel tree to give me a call. Total Man Hours Labor Rate Ea—bn 3500 $ 19,250.00 L29E ToralMotedal $ 64,041.51 Total Equipment 8.044.50 Contractor Total Cost f 99,421.01 contractor OH&P T 10% $ 109,363.11 Subcontractor Shee Me of Sub, Sub. Controls Sub. $ $ Tlechicd Sub. Water heatment Sub. Sub Contractor Total Cost Su lton� rT'ac7or W/ OHS 5� $ $ Subtotal109 363.11 -Pro;xxal Tax- Borx1 S Mike &oz •Project Manager Permt 0.00% $ To tat & $ t09,363.!1 Page i Xuf L ..* 4 Of HOUSTON RAWM 4 tfPOw=4 PO Sm 41109 jwm9 10N, = 77241-2203 VMM P (346) 219-2219 748 a -1641 Fbwo (281) 837-1129 PCX (061) 637-6803 000609 lAwr 30 BayGOvnty'�ra Tt�e%is{q 80ct21ty MW 70' 1 car swme i ■ 1.0 21 10 a 21 GMV 0=40 ply1 2.0 9.0 21 6121' GALV I&C 4C640 or= $6.6700 ML 1400.07 S 201 1B06 QLV 2y AS,= VW 302WT TAP 26 CAR 192L�500618A 336.0 9b2.80 4.0 1 2016 OALV C@!C V= C1R wtffl a MIT on p/116 19 196.71 4.0 Silo.150♦ l2500 8t731/J1g8 3tgp pg� 32 160.23 5l 27.20 Tar f1J3�p�p�.•J_ � i=ht 3 aa�.z w Bid Proposal for BB Baytown Fire Training DuMBERM LP Curs & main Bid Dam: 04/24/2020 4053 Hamesbead Rd 0xv s RftIn 1310815 Haug^ nc 77028 Pitm :713-672-1472 ftc n3-672-8111 SW an Doutd= Uftb Price b*pdm "m Bid IF.13108]S Bid Proposal fbr Be Baytown Fire Training mw or 1ptlen Unite Pft utpda emneh Twmr.UwLmonmwm MYOMlER FOR MAMU60.iMHBBqq�,, PRIES 4�1 M ARE VALID iFAOOL M aY pFyM AM 1UDOUt.1s ARE ROAASM SY WF1FgN TFURtY (may CALEFfpAR D1O5 FiIOM TNf OIME DP TFiB 4UaDQtG/L Cpil! 6 MAtN tP NOT U Bt O RtBFRTO PARR! uPOM TNIRtt► �C} p1tB OA1r5' MORM 70 ADOREM IMat7DIAs� Bl/f commumaimunik MOR LibttiF'd TO; o aNErrr �D� AMY FOR MW MAmA Oit11tHL1►ryytl n WMMUPRtMIN A9MDIOR RI�11ER^x of aELtfJt'i TFRM4S AND DtitOl >il>aFlAa! FElS.7 POM"L Et CONE WQW UPON SAIF, AS @kjM �D FROM Y MH TOTIK% YYMIOtt CAN OF FOUND 04 o2o-S:19PM ACDWmmmWMy Page 3 of 3 Bid Proposal for Baytown Fire Change Order Dau"ll 7WS LP SW tMta: IV30/2019 02:00 pm. t"a a Mann Cam & Ntaln 1148246 405.3 Homestead Rd M13UMn, 7X 77= Phone. 713.672-1472 qoe 713.672.81U sear euy casalOwl UnRs vftat Prtcr os/o7/2020.10:26 AM Actual Mo ruy vvv Page 2 of 2 E To: PIUMbft Contnetms ATT14: Ea bnao iq caparmwN EMMATING 7401 RaMmd Line Houston, Texas 7M 1-a66.9"22 723-69ez13 Fax ouawan ft-613:18 Job. "Yomm phs= a Engl me : DEW Ownsuit * Grow, tno iaeonrmQummyaoronme�,mtipeq�p1ij &1� map NedtrrlgfNop�oaabn err+ esmaeaAarsapar►a�thrpvtorsorasadVrctmhostarwaawtmaz*"me #groom anta.,�ertasaaAdr�aoteee. �a�hac+�wr�aarHamena+�s.+arwagmrermarawrwna ;ae�koaYastedotaaotbdaseQ storepeNn�bamNcraoaeaaAt�f6�.ep�niper�7pelera �►s'�rme�oranrs mr s�eetmeoetptanos6rtlsr�mponPandma � roe.onra,ermr r�seflesaoaiarQypjz M�ele+ooroal ,mgr+vtmea anstum tlae, aktpottos rmmbdn cnaewdittrm ao,epuayas ea0etA7ueattporl rams at ��amsnaraa�e�amaamw�o>�y�a,�mreaamre� oaanaarfauy A%waraw twerr4ftuld Opp tsmydwwo0aiema NOTE IlOSPMlunOAf$PW WASUB=rTV EV rlJ MAPMVAL. BOOSTER S V 31 1 Bd G T«hrbo'Ww *-MT Os*dPWX 80ostar Sytt M Sta9an Meld V4MMM92 M 2S MP, 4WVr^ B600RPM, B` Standess Steel NUderj, NEMA 4X ENCLO: WRE5 PUMP MODEL 46SV32GM4C60N,1000GPM,105p$L L25R5/2S/IS V ti{150 GPM EA I 1 Sh UP/TraWnp Pef DW N System u Not heady 6tn fen May Apply Taft OWA.I HYORaPN1UMATIC TANK 1 XMN WOOD MODEL JOPX2M4 (2640 GALLONSL v TWAL KMRO-0NEU.&ATIC TANK W/ REPLACEABLE NEAW DTV BUTYL RUBBER &ADOElL 49UPPED {POSE FOR FIELD INSTAUITTON BVCONMACTOR) Taos WA,9-I Tab' W B.00MA SYSTEM A HVOR"PKUfAAnc TANK NOTES A -EX ERT 0ft I. G0 Mft Sr*xrL4jt TO qEPLtL vww 6r0TNW 2. WVDR04kEumATletAWK IS$Wp"D LWE pOR pELOINSTAUATNIN. 5, LEAD THE 10-11 WWS S113AD.00 tt a! EMMATiNG MW 7401 Rellhead Lane Houston, Texas r/m 14WP6-333-3422 713699.8213 Fmt '�r�e9a�� bids-houstont�ontzopycom 19 TO: piumbws Y11halesaleTt lob. erreawn Pun 3 AM: F.etin wKg DeP V"fft ErsIneer. OFw C-dul ft Group, hm Plumbing Proposal (1 pw tow# We ovo=d to RWi pa go of Axb"C**BaatlbrftjbbR4Wtoopp"*dReaanfmoa�ats��d�8abr:� chew��mp a+omeaon�ks►eeaveeaMebi,tre�rn�IImA.wa:n Resteemm.,rrno awnar�aem�eae �oearmeaberaaandat�rbe„t�ra roeax�p,9ne�+n�aotwtierea�hra+ac�mre�mencwaao�rerwea 9rerdanenarbta4dea Snmo4rAbeiu&dar�mno�d«wdov�weeav Allomaordororduson _&otaa=pM=bror andmeb rMq>a7nee4aamenaral raaroMncrGfgO bey-40W&raeoac AB4uatotbwowsLlaaMLb6eNaftLbse2eftebmrnaodaar�tlpm&,GgMWon+r "OmOWL "'00e�lpd& Tereeyoa tbIItmefM4+I ntudAhOMlmten] ardesa wush notbrd"f0• FrewErmuCMM6 v P(aaw note blata�pa[rt B regaNe+?ap aARems city Oraucdp�bn ! T _ _ _ _ _ . _� _ . Totef iWd Pylpe NOTE NOOmNcomxwNSO8vEoh7CArompnowofO,StJB/$ m E WAMAWROVAL. * HYDROPNEMAunc TANK NOT i PROPOSED N t300STfR SYSTEAq 1 B&G Ted—fc— "TO)AW0 +c 800ste' 50tM Station Model V4VKG7N21F1GCK, BD l HP, 57SV/3PN MOORPM, MOCGIK 135M, i25req SnS Sp[W. 1 I StarUWTr&nrng Per 00V If SVstam 6 Not Brady Eeira Fees May Apply j Taar Owm Totes It) B00STER SYSTEM $i$,055.00 COMMERCIAL CONCRETE SUBCONTRACTORS L�l! 13326 Ralph Culver Rd, Suite 110, Houston, TX 77086 6 b S Office: 281-784-3070 — Fax: 281-791-0117 n . ; www.boteUobaildeis.com PRICE REQUEST PR03 March 30.2020 To: Kaitum Flora Company Comex Contractors Project Baytown Fire Training Facility Location 7022 Bay Way Drive, Baytown. TX 77320 Descnpiion Boteno Builders Corporatton to Provide: Price Rearrest PR03 Tank Slab . 7x7'x IT Tank Slab wJ #4s r@12" O.C. Pump Slab . 4xB'xl2" Pump Slab w/ 943 Qa 12" O,C. Free Standitrg Pump Base 5x1oxl2' Base w 64 ®12" O.C. (Specifications Assumed) Excluded Items: • Removal of Top Strip at Rcd%%mod Expansion Joints (Must be Done by Others) • Any Type or Brand ofJoint Sealant (Must be Done by Otbets) • Furnishing and Installing O-Seal for Expansion Johns (May be Included as a change Order) • Colored. Stamped. Textured, or Any Type or Decorative Concrete (May be included as a Charrlge Order) • Removal or Placement of any type of subgrade fill matertals such as select fill, aggregate base, or bank sand fromhato property • Din Spoils Ham: Off(Usually dirt spoils am uW by don coattactor to spread on sera) • Demolition and/or ftsung Concrete Saw Cutting (Ma be Included as a Change Order if Needtxy • Pemtim Engineeaag, Testing, and/or inspections (Must be Obtained by QC / Owner if Needcd ) • Surveying (OC Mint Rmide Surveyor to Mad(Building Comers Prior to Start on. Foundation Fo>m World > Subcontractor not to be liable for anatoldabie surface cracks that might appear on concrete stabs et to after fbnowing an engineered specifications provided. > All footage quantities provided on tilts proposal ate approximate to exact dimensions > 6M other work or matenal that might arise and that is not mentioned on dus pmRRxd will be added to the total bid amaumt as a ctiroBS order > Warr my to be limided for all pMposet Concrete will be One ( I) Year from date of Substantial Comgiet_ n. dye ded wwaiaties mew be mavided for am additional fee To lbs. Tank Slab ---.. Total S 700.00 Pump Slab---._ .__----.--__ __ _� _�. _______�______.r�_ Total S 500. Pump Base—__....___��.___�— Y.__ --- _ _-�____--_---------_-_--- — Total S 700.00 iamvi V hom rft* O c nil up - PO Box 905 Pinehurst, TX 77362 Office! 281-777-0147 Change Order Request Form Between Contractor and Subcontractor Change Order #: R6 P•oject. Baytown Fire Tra ning Date: 3/26/20 7022 Bayway Dr Baytown, TX 77520 Subcontractor. RSW Construction LLC Request for contract change as follows Change order for the completion of extra work to be performed on the above referenced job site, under the supervision of the;ob s to Superintendent, with the approval of project manager of Comex Corporation Excavation and placement of fill on site to create fire water pond with clay liner $14,100 All material to remain onsite Excavation $10,100 Clay Liner $4,000 Not Valid unYl signed by contractor and subcontractor The original contract sum 5362,000 Net Change by previously authorized change orders $175,575 The contract sum prior to this change order 5537,575 The contract sum will be Increased by this change order $14,100 The new contract sum including this change order $551,675 The contras* time will remain unchanged Comex Corporation 9841 Spencer Hwy La Porte, TX 77571 Name Signature/Title Date RSW Construction LLC PO Box 90S Pinehurst, TX 77362 Amanda Rickett Name VP Signature/Title T . _ __3126120_ _. Date Documentation for Item 2.4 Comex Corporation Page 1 of 1 9841 Spencer Highway LaPorte, TX 77571 (281) 479-2322 Change Order 05/27/2020 Project: Baytown Fire Training To: Contract : 1061 Change Order: 22 Owner/GC CP: Reference: Kirilia Section: RE: 3/4 Conduit Emergency stop Requested Respond Scope of Work: Installation of 420' of 3/4 conduit for a LP emergency Shut down from LP tank to Control tower per Kirilia suggestions at 5/20 meeting. 420'x $2 per ft = $ 840.00 OH&P $ 84.00 Total $ 924.00 Total Proposed Amount: $924.00 The Contract time Will be extended by: 0 days Please indicate your approval by returning a change order for the work specified. Distribution: Sincerely, Rickey Trant Documentation for Item 2.5 Comex Corporation Page 1 of 1 9841 Spencer Highway LaPorte, TX 77571 (281) 479-2322 Change Order 05/20/2020 Project: Baytown Fire Training To: Contract : 1061 Change Order: 20 Owner/GC CP: Reference: RF152 Section: RE: RF152 Electrical Pad Requested By: Respond By: Scope of Work: Provide Electrical Pad per RF152 response Concrete $ 900.00 Ins. & Bond $ 18.00 OH&P $ 90.00 Total $ 1,008.00 Total Proposed Amount: $1,008.00 The Contract time Will be extended by: 0 days Please indicate your approval by returning a change order for the work specified. Distribution: Sincerely, Rickey Trant CS&OO COMMERCIAL CONCRETE SUBCONTRACTORS 13326 Ralph Culver Rd, Suite 110, Houston, TX 77086 BUILDIr"Im.r $ Office: 281-784-3070 — Fax: 291-791-0117 www.botellobuilders.com May 20, 2020 Company: Comex Contractors Project: Baytown Fire Training Facility Location: 7022 Bay Way Drive, Baytown, TX 77520 Description. Botello Builders Corporation to Provide: Mechanical Pad - 5' X 18' Mechanical Pad 5" Thick with #4 Rebar @ 18" - Rebar Placement, Concrete Pouring and Finishing Excluded Items: • And Type or Brand of Joint Sealant (Must be Done by Others) • Colored, Stamped, Textured, or Any Type of Decorative Concrete (May be Included as a Change Order) ■ Removal or Placement of any type of subgrade fill materials such as select fill, aggregate base, or bank sand from/into property • Permits, Engineerng, I esting, and/or Inspections (Must be Obtained by GC / Ow,ner if Neededl • Surveying (GC Must Provide Surveyor to Marl. Building Corners Prior to Starting Foundation Form Work) ➢ Subcontractor not to be liable for unavoidable surface cracks that might appear on concrete slabs even after followin all engineered specifications provided. ➢ All footage quantities provided on this proposal are approximate to exact dimensions. ➢ Any other work or material that might arise and that is not mentioned on this proposal will be added to the total bid amount as a change order. ➢ Warranty to be provided for all_pronosed Concrete will be One (1) Year from date of Substantial Completion Extended warranties may be provided for an additional fee. Mechanical Pad * Prices on this proposal are valid for 30 days. Terms and Conditions: Total 9$ 00.00 er S . Ft. Rate: n/a Grand Total: $ 900.0 1. Scope of Work. Subcontractor agrees to furnish all labor, services, materials, installation, supplies, insurance, equipment, tools and other facilities required for the prompt and efficient execution of the work described herein in a professional and workmanlike manner. 2. Quote Amount. General Contractor agrees to pay Subcontractor for the strict performance of his work, the sum as indicated above subject to additions and deductions for changes in the scope of work as may be subsequently agreed upon. This work will be started within three days after confirmation has been received that you agree with what has been presented to you in this proposal. The parties hereto have executed this Agreement for themselves, their heirs, executors, successors, administrators, and assignees on the day and year written below. in foreDbmel lobui lder.s.cotn Baytown Fire Training Facility 7022 Bayway Drive, Baytown, Texas RN 0052 - Pre Engineered Building Electrical? Status: Sent To Reviewer Due Date: Feb 10, 2020 Question Rickey Trant (Comex Corp.j on Feb 7, 2020 at 1 12 PM CST We need more details on how we are to enter the pre engineered building with our conduits? We also need a lighting and outlet layout for inside the building. ,o', MEP 101 (See page 1) see sketch on next page. install equipment outside per or-i-gin-al pans. John. Blacker 05M/2.020 , MEP 101 Rickey Trant (Comex Corp.) on Feb 7, 2020 at 1r12 PM CST rum �Pw,uYm�oa.,• row+u,na•Yu n••a,"r•.Ysa.run•swssa OO .u.ocumwnrn.�wmAt O wma.a9�.•aneounmrcna ..emn.�rmreYn AYw.I• iunv wiwmmu�,suo.s Q- r.:n, �w�.vr� uuma.n ac•annYmF.wo 9uirr9*xrm mn.cmnralrmawormucem wrvrrYaw.ramaar•Yu s •n <.nmsumunn•.mv�m uncr w•un nlmn! +c.a m wo•arau•n.am.c.rwa•uu � ,iwaaf"ww••mmwa�oi u•moanun:asuwonFr rc,wno•.�mnYa 1•ntww wn.cnu•ranwm"'� """"_ TOVANI HART ,� ••VI.1Y•O.O wOY•0•YMiNNeR (4YnH•.sY6YF ��� !0!A :IYYPIA WA 9IS01 niW •I1{fi � mrtYa par Mpyppt. F 1p9140:Bw �� � R •llt•CiYt'.s NFYn GYMilC41M1A1 obercrombie AaoeYm ro,eunonna.amw �n• ^ . ra.an® w.mYn,v nwn.� I �'-x. 1---0 m.wYrYulYYiu! .uwe o.um ��w• `"' r Z = Prepared by Rickey Trant 1 Created with PlanGrid History Question drafted and sent to reviewer • Question added: Rickey Trant (Comex Corp.) on Feb 7, 2020 at 1:12 PM CST We need more details on how we are to enter the pre engineered building with our conduits? We also need a lighting and outlet layout for inside the building. • Title added: Pre Engineered Building Electrical? • submitter added: Rickey Trant (Comex Corp.) • Manager added: Rickey Trant (Comex Corp.) • References added: Loj MEP 101 provide 5' x 18' concrete pad. Prepared by Rickey Trant 2 Created with PlanGrid Documentation for Item 2.6 Comex Corporation Page 1 of 1 9841 Spencer Highway LaPorte, TX 77571 (281) 479-2322 Change Order 05/29/2020 Project: Baytown Fire Training To: Contract : 1061 Change Order: 21 Owner/GC CP: Reference: VEList Section: RE: VE Credits Requested By: Respond By: Scope of Work: VE Credits based on Meeting Discussions and site visits. See attached VE list Landscaping and irrigation ($ 80,000.00) 1-8' Classroom Fan ($ 6,190.00) 1-7' Outdoor Classroom Fan ($ 2,016.00) Wood Basse to Rubber Base ($ 3,800.00) Total ($ 92,006.00) Total Proposed Amount: ($92,006.00) The Contract time Will be extended by: 0 days Please indicate your approval by returning a change order for the work specified. Distribution: Sincerely, Rickey rant Baytown Fire Training VE CO 21 Description uanit Unit Price VE Amount Accented Credits Accented Landscaping and Irrigation 1 $ 80,000.00 $ (80,000.00) Based On City taking over remaining $ 80,000.00 05/20/2020 1- 8' Classroom Fans 1 $ 6,190.00 $ (6,190.00) 1 fan Delted Accepted $ 6,190.00 05/20/2020 1- 7' Outdoor Classroom Fan 1 $ 2,016.00 $ (2,016.00) Accepted $ 2,016.00 05/20/2020 Wood Base to Rubber Base 1 $3,800 $ (3,800.00) Accepted $ 3,800.00 05/13/2020