Ordinance No. 14,407ORDINANCE NO. 14,407
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN,
TEXAS, AUTHORIZING CHANGE ORDER NO. 2 WITH COMEX
CORPORATION FOR THE FIRE TRAINING FACILITY PHASE 3 PROJECT;
AUTHORIZING PAYMENT BY THE CITY OF BAYTOWN IN THE AMOUNT
OF ONE HUNDRED SEVENTY-THREE THOUSAND FOUR HUNDRED
EIGHTY AND 03/100 DOLLARS ($173,480.03); AND PROVIDING FOR THE
EFFECTIVE DATE THEREOF.
******************************************************************************
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS:
Section 1: That the City Council does hereby authorize Change Order No. 2 with Comex
Corporation for the Fire Training Facility Phase 3 Project. A copy of said change order is attached
hereto, marked Exhibit "A" and made a part hereof for all intents and purposes.
Section 2: That subject to funding from the Baytown Municipal Development District,
the City Council of the City of Baytown authorizes payment to Comex Corporation, in an amount not
to exceed ONE HUNDRED SEVENTY-THREE THOUSAND FOUR HUNDRED EIGHTY AND
03/100 DOLLARS ($173,480.03) in accordance with the change order authorized in Section 1
hereinabove.
Section 3: This ordinance shall take effect immediately from and after its passage by the
City Council of the City of Baytown.
INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City
of Baytown this the 1 I'h day of June, 2020.
B NDON CAPETILLO, Mayor
ATT T:
&A�7� -
LE ICIA BRYSCH, City Jerk
APPROVED AS TO FORM:
Kt�
KAREN L. HORNER, Interim City Attorney
RAKaren\Fi1es\CityCounci1l0rdinances\2020Vune I I iChangeOrderNo2forFireTrainingFacilityPhase3 Project.doc
Exhibit "A"
s
BAYTOWN
CITY OF BAYTOWN
Baytown Fire Training Facility Phase 3
Change Order No. 2
PO: 1906779
Date: June 11, 2020
Synopsis: The elevated training structure construction had items that need to be addressed which include the
following: four (4) stairs to the props, an elevated grate walkway, 186 linear feet of handrails; a check valve at the fire
riser to the indoor classroom building, a water training reservoir, pumps, extension of the onsite waterline; conduit for
emergency shut down from the liquified petroleum (LP) gas tank to the control room, and a concret pad to serve
electrical panels at the pre-engineered metal storage building. Also included are deductions: eliminating the
landscaping & irrigation system; one indoor fan; one outdoor fan and substitution of rubber baseboard in lieu of wood
baseboard.
Brief Description of Changes:
Item 2.1: The first item of work is for an increase of $105,762.72 for adding four (4) stairs, elevated grate walkway, and
186 linear feet of handrails to reach and traverse the elevated section of the fire training structure. These additional
items will provide a realistic training experience for firefighters and allow an approach to fighting fires from different
angles.
Item 2.2: The second item of work is for an increase in the amount of $1,313.76 for adding a check valve at the fire riser
per Fire and Building Code. This item was not included in Change Order No. 1.
Item 2.3: The third item of work is for an increase in the amount of $156,477.55 for adding a water training reservoir, a
different pump system, and extension of the onsite waterline. The fire training exercises are expected require a large
demand of continuous water for short amounts of time. The pond will function to ensure constant service of training
water, and no drop in water pressure or adverse effect on the City's water system. The pond will function to capture
and recycled water used to fight training fires. Recycling of water will reduce the amount of water used during
training exercises which will save money the City money. The pond will also function to provide a training
opportunity on drafting from an open body of water.
Item 2.4: The fourth item of work is for an increase of $924.00 for adding 420 linear feet of conduit for an emergency
shut down from the liquid petroleum tank to the control tower.
Item 2.5: The fifth item of work is for an increase of $1,008.00 for adding a concrete pad for the electrical equipment
located outside of the pre-engineered metal storage building.
Item 2.6: The sixth item of work is for a deduction in the amount of $92,006.00 for eliminating the landscaping and
irrigation, one indoor fan, one outdoor fan, and substituting rubber baseboard in lieu of wood baseboard.
(Change Order No. 2 continues on next page)
updated: 6/3/2020
tern
Uescniption
unit
Quantity
lusil Pric
Total
2.1
Adding 4 stairs, elevated grate walkway, and
handrails to fire training structure.
LS
1
$ 105,762.72
$ 105,762.72
2.2
Adding a check valve at the fire riser per Fire
and Building Code.
LS
1
$ 1,313.76
$ 1,313.76
Added a water training reservoir, pumps, and
extension of waterline.
LS
1
$ 156,477.55
$ 156,477.55
F2.4
Conduit for emergency shut down of liquid
troleum tank to control tower.
LS
1
$ 924.00
$ 924.00
2.5
Concrete Pad for electrical equipment outside
of pre-engineered metal storage building.
LS
1
$ 1,008.00
$ 1,008.00
2.6
Eliminaton of landscaping & irrigation
system, one indoor fan, one outdoor fan,
substitution of rubber baseboard in lieu of
wood baseboard.
LS
1
$ (92,006.00}
$ (92,006.00)
Total
173,480.03
ContractVn
nal 1�eyised
1
Original Contract Price
$7,438,000.00
$ 7,438,000.00
2
Owner Contingency
Previous Change Orders
This Change Order
Remaining Contingency
3
Change Orders
Previous Change Orders
$ 13,559.:0
This change order
$ 173,480.03
4
Revised Contract Price
$7,438,000 00
$7,625,039.52
Original Contract Duration
450
NTP Date
7/15/19
Previous Extensions
70
Original Complete Date
10/7/20
This Change Order
0
Revised Duration - Calendar Days
520
Revised Duration Date
12/16/20
Co actor - bate:
(;A3 Ae ilo
Co tant
o6ro412o2o
pw" WUc,c" 0610312020
_7AL_�__,� ' 06/04/2020
Director: Frank O. Simoniaux, Jr., P.E. Date
City Manager
Date
updated: 6/3/2020
Documentation for Item 2.1
Comex Corporation Page 1 of 1
9841 Spencer Highway
LaPorte, TX 77571
(281) 479-2322
Change Order
05/27/2020
Project: Baytown Fire Training
To: Contract : 1061
Change Order: 17
Owner/GC CP:
Reference: RF150
Section:
RE: RF150 Stairs
Requested By:
Respond By:
Scope of Work:
Provide and Install Stairs per RFI 50. See attached Sub proposals for stairs, elevated grate
walkway, and handrails. Add 50 Days To contract once approved submittals are returned.
Steel Fabricator $ 59,531.00
Steel Erector $ 33,500.00
Concrete Slab $ 1,400.00
Insurance & Bond $ 1,888.62
OH&P $ 9,443.10
Total $ 105,762.72
Total Proposed Amount: $105,762.72
The Contract time Will be extended by: 50 days
Please indicate your approval by returning a change order for the work specified.
Distribution: Sincerely,
Rickey Trant
RULDtNG CORP.
MINFINUMN
Job A 8607
Change Order Form
Ctlullubf hitnlmition
Company Come: Corporation
Project Name Saytowrt City Fire Training Project Manager Rickey pant
Pricing Event Added. stairs on RA / RF160 Address 9841 Spencer Hip"
Project City, State Baytown, TX City, State ZIP LaPore, TX 77671
Change Order# 0607.04R2 Phone 291-479-2322
Change Order Amount S69,631 Email rickavMcomexcomcorrn
stwei
Cost to furnish
Stair A4- 24 Treads (bar grating), 72 LF of 1.5" dia. Pipe Hand+ail, 69 LF of 2-Une Guardrail. 1 landing (bar grating)-
$18,268.00
Stair W 18 Treads (bar grating), 46 LF of 1.5' dia. Pipe Handrail, 44 LF of 241ne Guardra I 1 landing (bar grating}
$11,395.00
Stair A8- 13 Treads (bar grating), 34 LF of 1.5" dia. Pipe Handrail 30 LF of 2-fine Guardrail- $7,824.00
Stair 97- 13 Treads (bar grating), 34 LF of 1.5" dia Pipe Handrail, 30 LF of 2-fine Guardnal- ALTERNATE- $7,824.00
Furnish Galvanized STD 3- line ralliing at Platform per RFI 50. $5.606.00
Furnish grating at platform floor per RFI 50- $8,014.00
Net fticlilm
Install, Stair 1, Stair 2 and Stair 3
This is Contractor's official notiPlcaton that the scope of work added to this project by this change will impact the existing
production schedule. MSD Building Corp requests (56) additional working days to accomplish this scope of work.
cemmmpmpom
See attached cost breakdown for added 8 removed material
Submitted by: Sandra Gonzalez Date: 06/01120
Cmmar e
IASO SUMNO CORD
no It as o tm it right Do It rww
120 rl Main Snot
Pma&rra. Tx 77608
71id774=
71�.�n•losro
Submitted by (authorized representative)
MSD
Date
Cost Breakdown - Added Scope
BUILDING CORP..
U9101 MatBn81S Bad Cosa 8607-04R2 Baytown City Flre Training
Descripl9on fOTY Price Unit Total
W SHAPE S0.55 Ibs $0.00
Drop
$0.55
Ibs
$0.00
C SHAPE
Drop
8,500.00 $0.55
$0 55
Ibs
Ibs
$3,575.00
$0.00
PLATE
_
3,000.00 $0 60
Ibs
$1,800.00
ANGLE
1,965.00 $0.55
Ibs
$1,080.75
Drop
TUBE
$0.55
$0.78
Ibs
Ibs
$0.00
$0.00
Drop
$0.78
Ibs
$0.00
11.465.00 Ibs
Grating at Stair
1.00
$11.512.00
LS
$11.512.00
Galvanizing for Stair
11,465.00
S0,40
Ibs
$4.586.00
Galvanized STD 3-line Rails per RFI 50
1.00
2.875.00
LS
$2,875.00
Platform grating per RFI 50
1.00
S6,240.00
LS
$6,240.00
Fabrication
303.00
$50.00
His
S15,150.00
Detailing 8 Engineering
146.00
$50 00
Hrs
$7,300.00
Subtotal $54,118.75
Overhead 8 Profit 10.00% $5,411.88
Tax $0.00
Bond Fee $0.00
Grand Total $59,531
Page 2of3
METRO ERECTORS, L.L.C. Page lof 2
P.O. Box 7433, Pasadena, Tx 77SO8 Structural Steel Erection Precast
Phone: 281-487-0100 Fax: 281487-3690 Crane Rental and Rigg ng
Baytown Fire Training - Stairs, Handrails, and Grating May 29th 2020
Drawings Reviewed for Proposal: 'Architectural/Structural Drawings Only
—ERECTION OF STRUCTURAL STEEL-
810 ITEMS: Labor, supervision, Insurance, and hoisting for erection of all structural stee , joists and
bridging based on Structural Drawings only and qualified per the A.I.S.C. Code of Standard Practice.
GENERAL CONTRACTOR SHALL PROVIDE:
1. Shims, elevations, and all Column tines.
2. Continuous f,ow of work including delivery of steel, joists. and deck per Metro Erectors
agreed sh pp ng dates
3. Access and regress for safe operation of crane through the bul ding and site.
4. Access to existing steel for new framing - exposed and cleared
S. Traffic control and barricades where needed.
6. Safety cables at floors and roof per OSHA requirements.
7. Floor and roof penetration coverings per OSHA requirements
8. Any demolition required for erection purposes,
9. Any shoring requ red.
10 Field testing fees or retest fees.
11 Engineering for plumbness of building and sign -off for ac^.epta,ce
12. Ancho(bolt Acceptance per OSHA requirements.
13. Fire Protection.
STANDARD EXCLUSIONS: (These are based on the Area Practice as deUried by Greater Houstor
Steel Association)
1. Bonds.
2. Permits.
3. Grout.
4 Gauge material or any steel welding or attaching to gauge mater al.
S. Stair rails mounted to drywall. CMU, or concrete walls. Any not welded to steel.
6. Embedded items (Including hand rails or guardrails.)
7. Loose lintels.
S. Touch-up paint or galvanized touch-up.
9. Masonry anchors, ties, or CMU anchors (steel attaching to structure to anchor CMU wads I
10. Mats for crane -(General Contractor wilprovide stable conditions for crane operations
and material storage.
11 General Contractor will coordinate omission of slab to allow crane on building pad
12. Any demolition.
13. Curbs for roof openings.
14. Additional move -ins for crew and crane (pricing avallab•e for return charges)
IS. Mechanical hangers with joists reinforcement of either new or ex st ng structure
16. Shoring of either new or existing structure.
Page 2:
METRO ERECTORS, L.L.0
STANDARD EXCLUSIONS (Continued)
17 Work In existing building
18 Inspection fees.
19 Protection of existing building (Includes fire protection)
20 finished roof deck or deck attaching to light gauge
21. Uquidated damages
22 Civil and MEP Drawings
23 Exclude lollet Partitions
ADDITIONAL EXCLUSIONS:
24 Touch up paint
Add to Erect Additional Stairs
Crane
$9,000
Stair p4
$6,000
Stair q5
$4,000
Stair 06
$4,000
Stair 07
$4,000
Add to Erect Handrai s and Grating $6,500
Total Add for Stairs, Handrails, and Grating $33,500
Clay R. Parmer Accepted By:
(5COMMERCIAL CONCRETE SUBCONTRACTORS
�J� L� 13326 Ralph Culver Rd, Suite 110, Houston, TX 77086
01IIce:281-784-M70—Fax:281-791-0117
wivw.botetlobuitilets.com
Pilaster Alterations
May 1.2020
Company: Comex Contractors
Projecr. Baytown Fire Training Facility
Location: 7022 Bay Way Drive. Baytown, TX 77520
Description. Botello Builders Corporation to Pro -vide:
Thickened Paving
Thicken Paving to 12" Surrounding Stan Columns
Excluded Items:
• Any Type or Brand of Joint Sealant (Mist be Done by tltfieis3
• Colored, Stamped Textured or Any Type of Decorative Concrete (May be included as a-Cliange Qrder)
• Removal or Placement of any type of subgrade r';: awtenals such as select fill, aggregate base. or bank sand
from/into property
■ Permits, Engineering, Testing, and or inspections (Must be Obtained by 4C / %Men If Heeded)
• Surveying (OC Must Provide Surveyor to Mark Building Co= Dnnr to StartimTbr•.i•r,on Form World
All footage quantities provided on 11us proposal are approximate to eesct dimensions
Agy other work or material that m►aht arise and that is not mentioned on this proposal wdl be added to the total bid amount
-- - _L__-_ _J__
Thickened Paving--------..--- ____,.�_.... — Total S 1,400.
er S . Ft. Rate: S Wit Grand Total: $ 1. NA-0
' Prices on this proposal are valid for 30 days.
i erms and Conditions
1 Scope of Work Subcontractor agrees to furnish all labor, services materials, installation, supplies iiintrauceequtptnem
tools and other facilities required for the prompt and efficient execution of the work described herein in a professional and
workmanlike manner.
2 Quote Amount. General Contractor agrees to pay Subcontractor for the strict perforniance of his work, the sum as indicated
above subject to additions and deductions for changes in the scope of work as may be subsequently agreed upon
Signed By:
Eleazar G. Botello
Botello Builders Corporation
President
Date:
Accepted By
General Contractor
Title:
Date:
Baytown Fire Training Facility
7022 Bayway Drive, Baytown, Texas
RFI 0050 - Prop Stairs
Status: Sent To Reviewer
Due Date: Feb 07, 2020
Question
Kailum Flores (Comex Corp) on Feb 4, 2020 at 3:21 PM UTC
S2.42 I only show one foundation for a stair, we have this foundation poured and ready per the cad design and
drawings.
In looking at the framing plan on S2.52 I do not see any stairs on this drawing, in fact I do not see any stairs
period... I do however see a ladder with a cage on the new tank on the isometric view on S2.60.
As of right now MSD did not pickup any stairs because the design drawings do not currently show them.
Please advise on final stair and foundation additions.
® 520020409270.pdf(See page2)
O 520020409280.pdf(See page 3)
No additional piers are required for stair support unless currently shown on the structural plan.
Provide a thickened slab below the stringer and post support similar to detail 5/S3.02. The thickened
slab should be monolithic with the paving.
Stairs are indicated in the specifications and on the structural drawings to be designed by fabricator.
All of the locations where the stairs hit the slab are indicated on civil sheets C1.02, C1.03, C1.05,
C3.01, C4.01. Final stair locations are as indicated in the prop stair update issued 12-16-2019....
(and later updated by MSD for stair #6 and #7).
Center thickened slab on stair landing and extend 12" on either side of stair.
Prepared by Kailum Flores 1 Created with PlanGrid
History
Question drafted and sent to manager
• Question added:
Kailum Flores (Comex Corp) on Feb 4, 2020 at 3:28 PM UTC
S2.42 I only show one foundation for a stair, we have this foundation poured and ready per the cad design and
drawings.
In looking at the framing plan on S2.52 I do not see any stairs on this drawing, in fact I do not see any stairs
period... I do however see a ladder with a cage on the new tank on the isometric view on S2.60.
As of right now MSD did not pickup any stairs because the design drawings do not currently show them.
Please advise on final stair and foundation additions.
• Title added: Prop Stairs
• Submitter added: Kailum Flores (Comex Corp)
• Manager added: Rickey Trant (Comex Corp.)
Prepared by Kailum Flores 4 Created with PlanGrid
S8.07
I --
W1
_. ....._ sk
TYPICAL HANDRAIL
REF. 2/S4.05
t2
STEEL GRATING
REF. LAN OTE 2
N
35 S6.07 m,
� J.1
m,
N �
rl REF.2/S4.05
- — G
N ryt N
+ +�
W 12a45
l
Sfi C7
PARTIAL INDUSTRIAL PROP PLAN
AREA 7 - ALT. #3
1 /6" = V-0"
REFER TO SHEET 2/S2.52 FOR PLAN NOTES
27,
N
W+
5
TOVANIHART
ot> crombie
1� r
t1r, I I
U)LLI
a:
Z
x Oa,
W
r U) co R
qov
Documentation for Item 2.2
Comex Corporation Page 1 of 1
9841 Spencer Highway
LaPorte, TX 77571
(281) 479-2322
Change Order
05/19/2020
Project: Baytown Fire Training
To: Contract : 1061
Change Order: 18
Owner/GC CP:
Reference: RFI 63
Section:
RE: RFI 63
Requested By:
Respond By:
Scope of Work:
Add Check Valve at Fire Riser Per RFI 63 and sub back up attached.
Battle Ground Fire $ 1,173.00
Insurance and Bond $ 23.46
OH&P $ 117.30
Total
$ 1,313.76
Total Proposed Amount:
The Contract time Will be extended by: 0 days
$1,313.76
Please indicate your approval by returning a change order for the work specified.
Distribution: Sincerely,
t xs f Z•
Ricke Trant
BATTLEGROUND FIRE PROTECTION
5041 Spencer Hwy., #407
Pasadena, TX 77505
Phone: 713.473-0008
SCR-0-2142876
Change Order Proposal
Project Name: Baytown Fire Training Facility
Address: 7022 Bayway Drive
City. Sate Zip Baytown TX 77520
Date. May 19, 2020
Ticket 11 or RFI Ref # See attached
Contractor/Owner Comex Corporation
Address 9841 Spencer Hwy
City, State, Zip La Porte Tx 77571
Attn Rickey Trent
Phone: 713-829-2187
Date of Field Order:
tmair MWA
Scope of Work
Install check valve in riser spigot per AHJ
Materiel B Fees
1X 10-6 Pipe
0 units Q
$ 1.39
$
-
1X1/2° Reducers
0 units
$ 2.50
$
-
165 degree sprinkler
0 units
$ 21.00
$
-
40 Grooved Check Valve
1 units
$ 380.00
$
380.00
Labor
Field Labor Straight Time
8 hrs
42.00
$
336.00
Field Labor Overtime 15
0 hrs
$ 53.00
$
-
Design Straight Time
2 hrs a
$ 36.40
$
72.80
Supervision
0.4 hrs Q
$ 42.30
$
16.92
Labor Burden
40%
$
170.29
Project Management
(dt
5%
$
29.80
Other
Equipment
0 units 0
$ -
$
-
Subcontract/B out Items
0 units a
$ -
$
Subsistance
0 units 0
$ 65.00
$
-
Truck & Consumables Charge
1 hrs
$ 10.00
$
10.00
Permit
0 units
$ 327.50
$
-
Fre ht & Shl2ping
0 units
$ 225.00
$
-
Bond
0 units
$ -
$
-
SubTotal
Overhead
Profit
Total
10%
5%
$
$
$
S
$
1,015.81
101.58
1,11739
5587
1,173.26
Adjusted Pri6o
Flow,Amotint
0r
Please let me know it you have anv questions or require anv additional Information.
Respectfully,
Battleground Fire Protection
Documentation for Item 2.3
Comex Corporation Page 1 of 2
9841 Spencer Highway
LaPorte, TX 77571
(281) 479-2322
Change Order
05/06/2020
Project: Baytown Fire Training
To: Contract : 1061
Change Order: 15
Owner/GC CP:
Reference: CPR 03
Section:
RE: CPR03
Requested
Respond
Scope of Work:
See attached sub proposal back up per CPR03 for the retention pond to recycle water to fight prop
fires.
Electrical
$
14,348.99
Mechanical /Plumbing
$ 109,363.11
Concrete
$
1,900.00
Dirt /Clay Liner
$
14,100.00
Bond and Ins.
$
2,794.24
OH&P
$
13,971.21
Total $ 156,477.55
Total Proposed Amount-.
$156,477.55
The Contract time Will be extended by: 0 days
Please indicate your approval by returning a change order for the work specified.
Distribution: Sincerely,
Rickey Trant
CMA
7odentia!
commereut
Irufustrrat
LC47, E(a Co", Inc.Ui
Ti['L 18185
=5 Pins C Fourth - *aurwnt, ?errs 77701
April 28, 2020
Comex Corporation
9841 Spencer Hwy
LaPorte, TX 77571
RE: Baytown Fire CPR 03
We are submitting pricing for the CPR03 of the Baytown Fire Training Academy project as per plans and
specs The price Includes labor miscellaneous material, and excavation. The price excludes overtime and
sales tax
tabor - $ 7,670 00
Material $ 3,049.53
Excavation $ 4,725.00
10% Mark up & overhead - $ 1,544-45
Total $16,988-99
Fire suppression credit (bid drawlnes)
labor - $1,449 50
Material $ 951.40
10% mark up and overhead - $ 240.99
Total Credit —$ 2,640.00
Total CPR 03 - $14,348.99
The price is based on regular working hours of Monday through f riday from 7:00am to 3 30pm +f you
have any questions or comments, please contact the office.
Sincerely,
Gulf Coast Electric Co., Inc.
�.� /'TM
Kevin J Picard
Vice President
Kjp/Jmh
Cc.files
IGWT
409 833-2828 - Fax W9 833-4M • xvwwSuOrwa. tefectrrc.com
CP9U
Job ID: UNTITLED u 7 fZ3c r r• �C 3
Project: Untitled
Summary Item Number Report
Vendor. TARGET Labor Level: LABOR 3 4f2812020 4:16:18PM
Kan De5Cr1P0or1
314e
am
E"
t M
Urt UnBs
MMR= t LAWUnft L*Wr Rnu0. QO Units OWM Pe 0
1002 GRG _
IN
M
20
FT
1.0885
2t.769
0.0900
1800
1003 GRC
I
M
_
2
FT
Ism
7J70
0.1050
M210
1061 PVC SCH 40 . ---.
WA
M
20
FT
0.2D5
4 530_
Dam
I.M0
1062 PVC SCH t0 _ _ _
1
M
471
El_
0.1196
,59.589
�_ 0.0790
37,30
,tw PVC SCH 40
]
M
30
FT
-
-1,5334
46,15I
DAM
4%0
VC 2002 PSCH 4020•DEG ELBOW
31n
M
2
EA
0.7000
'0600�
033M
0680
2007 PVC SCH 40604)EG ELBOW
1
M
- _ ]
EA
_
O4866
1.44D
0.3600
1140
3225 PVC COUPUNG
314
M
4
Ell
00360
0,392
02400
0960
3229 PVC COUPLING
1
M
6
EA
0.1509
0905
0.2700
1420
7035 THHtLRNVTN CU(STRI
12
M
90
FT
10.457
0.0090
0110
7038 TNHNrrHVJN CU(STR)
10
M
480
FT
_0-1184
01816
97175
00112
5.376
N49 TNHMRHNM CU(STR)
A.
M
1910
FT
05205
I537Il03
00310
40110
7048 THHNfrHWN CU(STR)
250
M
120
FT
4.5666
550.880
00480
5760
-I 14 OUPLEX GFC1 RECEPTACLE
-14538
20A
M
I
FA
12.9393
12979
0.5200
0520
1G WP GFC1 PLATE 4N USE
VERT
M
1
FA
183197
18.320
03000
0-300
15007 4-SO 3(4- KO NO BUT
1.1?D 216Ct
M
I
EA
14469
1.447
0.4000
0,400
_ _ _
1W65 1G VSO PUISTER4tMO.
SIMSE 4S-Cl
M
I
EA
0e534
0.653
025W
0.250
I8463 BOLT ON BREAKERS
_ _ 259
M
I
EA
141.9352
141935
11200
1 120
20294 NEAIht UGHT 6 RAT CONTACTTIR _-
__. 30 MP
M
1
EA
00000
0.000
3.0000
3000
0V2R W04 NFMOM0NItT SAFETTS
013 .
. M
1
FA
1281000
126100
3.0000
--
7.000
IIIK
22205 NFOBOLA Na RT 9AFETIG§W _
—~_
_ — M3
M
t
EA
_
Y2e.5000
226.590
4,5000
{ 500
39119 aACKHOE TRENCIONG _
ITx38'OEEP
_
M
500
FT
0AM
0.000
CUM
39144 OACKHOEBACKFKLMENCH _
IT a76`pEEP
Y_
_..FT
-.._--0.0000
_
0.OW
MOM
496 00
51054 40A1125VISPST TOs.SV
7100
M
1
EA
.. _
67.0687
67.089
_
3.0000
7.000
Phne TOMW 53.040M 180.9T T0.00
.b0 T t w 83.04933 1e01T $0.00
(,4T3' — P -- 7,` /4t 4-0 s u --
�AcaV4+,Or, —�7,Suj
4!S"
Pirona
Softi° Page I of 1
Job ID: UNTITLED .S y ps�5�
Project UnMJed w
TARGET
ft—
Summary Item Number Report
Labor Level: LABOR 3
r a= Qeaecr, um mdwhM
. Q ..... -- M 00 Fr
to M NO Ff
200q M i FA
FUM Two: SWIAe
Job raUW so"
W3112020 11:32:67AM
1 lAto
t7 70 Woo
um
ph —
Page t of t
D E R R Y B E R R Y' S `WA FMAMM M Ut
MECHANICAL
May 8, 2020
Job #
Baytown Fire Training Facility
4827
Revised CPR M3
CPR/RPP #
F CPR 03
Proposal #
Quantity Description Unit Total Unit cost total Unit total
Labor labor Material Material Equipment Equipment
WinSupply material quote
0.00
; 1084.15
i
ore Main ma en quo e
0
$ 13. 51.24
I
ore main material quote
0.00
; 13,572.04
$
i
booster pump & of
OJ]0
$113,890.00
$
5
nk
0.00
155
$ 755.
$
36
socrete
OJb
678
$ 244D8
$
I
c mateno
0.00
$ 50000
$
1
Qredii original pump
OJp
0.001—
—
$ 83,055.00
$
I
credif mat for pump tie in
$ 400.00)
1
Ilabor
1 550.00
$
$
Smen I Oly day i t days
0.00
$
I
I
excavator
loader
0.00
$
^ —
600
500
$ 3,600.00
0.00
$ 3.000.00
I
fue
0.00
$
150
$ 900.00
I
tax on eqLipment
0.00i
$ 544.50
0.00•
$
$
0.00
$
0.00
$
$
0.00
$
00.00
0000
$
$
$
0.00
$
o.00
$
$
o.00
0.001
$
$
$
—
$
0.00
$
DA)
$
_
$
$
0.00
0.00
$
o.00
$
$
0.00
onrc, or
Out revised price for CPR tl3 will be y109,363.11 h�
material quotes are atlaChed- it you have any
questlons feel tree to give me a call.
Total Man Hours
Labor Rate
Ea—bn
3500
$ 19,250.00
L29E
ToralMotedal
$ 64,041.51
Total Equipment
8.044.50
Contractor Total Cost
f 99,421.01
contractor OH&P T 10%
$ 109,363.11
Subcontractor
Shee Me of Sub,
Sub.
Controls Sub.
$
$
Tlechicd Sub.
Water heatment Sub.
Sub Contractor Total Cost
Su lton� rT'ac7or W/ OHS 5�
$
$
Subtotal109
363.11
-Pro;xxal
Tax-
Borx1
S
Mike &oz •Project Manager
Permt
0.00%
$
To tat &
$ t09,363.!1
Page i
Xuf
L ..* 4
Of HOUSTON
RAWM 4 tfPOw=4
PO Sm 41109
jwm9 10N, = 77241-2203
VMM
P (346) 219-2219 748
a
-1641
Fbwo (281) 837-1129
PCX (061) 637-6803
000609 lAwr 30
BayGOvnty'�ra Tt�e%is{q 80ct21ty
MW 70' 1 car swme i ■
1.0 21 10 a 21 GMV 0=40 ply1
2.0
9.0
21 6121' GALV I&C 4C640 or=
$6.6700 ML
1400.07
S 201 1B06 QLV 2y AS,= VW
302WT TAP 26 CAR
192L�500618A
336.0
9b2.80
4.0
1 2016 OALV C@!C V= C1R
wtffl a MIT on
p/116
19
196.71
4.0
Silo.150♦ l2500
8t731/J1g8 3tgp pg�
32
160.23
5l
27.20
Tar f1J3�p�p�.•J_
�
i=ht
3 aa�.z
w
Bid Proposal for BB Baytown Fire Training
DuMBERM LP Curs & main
Bid Dam: 04/24/2020 4053 Hamesbead Rd
0xv s RftIn 1310815 Haug^ nc 77028
Pitm :713-672-1472
ftc n3-672-8111
SW an Doutd= Uftb Price b*pdm
"m
Bid IF.13108]S Bid Proposal fbr Be Baytown Fire Training
mw or 1ptlen Unite Pft utpda
emneh Twmr.UwLmonmwm
MYOMlER FOR MAMU60.iMHBBqq�,, PRIES 4�1 M ARE VALID iFAOOL M aY pFyM AM 1UDOUt.1s ARE ROAASM SY
WF1FgN TFURtY (may CALEFfpAR D1O5 FiIOM TNf OIME DP TFiB 4UaDQtG/L Cpil! 6 MAtN tP
NOT U Bt O RtBFRTO PARR! uPOM TNIRtt► �C} p1tB OA1r5' MORM 70 ADOREM IMat7DIAs� Bl/f
commumaimunik MOR LibttiF'd TO; o aNErrr �D� AMY FOR MW MAmA Oit11tHL1►ryytl
n WMMUPRtMIN A9MDIOR
RI�11ER^x of aELtfJt'i TFRM4S AND DtitOl >il>aFlAa! FElS.7 POM"L Et CONE WQW UPON
SAIF, AS @kjM �D FROM Y MH TOTIK% YYMIOtt CAN OF FOUND
04 o2o-S:19PM ACDWmmmWMy
Page 3 of 3
Bid Proposal for Baytown Fire Change Order
Dau"ll 7WS LP
SW tMta: IV30/2019 02:00 pm. t"a a Mann
Cam & Ntaln 1148246 405.3 Homestead Rd
M13UMn, 7X 77=
Phone. 713.672-1472
qoe 713.672.81U
sear euy casalOwl UnRs vftat Prtcr
os/o7/2020.10:26 AM Actual Mo ruy vvv
Page 2 of 2
E
To: PIUMbft Contnetms
ATT14: Ea bnao iq caparmwN
EMMATING
7401 RaMmd Line
Houston, Texas 7M
1-a66.9"22
723-69ez13 Fax
ouawan ft-613:18
Job. "Yomm phs= a
Engl me : DEW Ownsuit * Grow, tno
iaeonrmQummyaoronme�,mtipeq�p1ij &1� map
NedtrrlgfNop�oaabn err+ esmaeaAarsapar►a�thrpvtorsorasadVrctmhostarwaawtmaz*"me #groom
anta.,�ertasaaAdr�aoteee. �a�hac+�wr�aarHamena+�s.+arwagmrermarawrwna
;ae�koaYastedotaaotbdaseQ storepeNn�bamNcraoaeaaAt�f6�.ep�niper�7pelera
�►s'�rme�oranrs mr s�eetmeoetptanos6rtlsr�mponPandma � roe.onra,ermr r�seflesaoaiarQypjz
M�ele+ooroal
,mgr+vtmea anstum tlae, aktpottos rmmbdn cnaewdittrm ao,epuayas ea0etA7ueattporl rams at
��amsnaraa�e�amaamw�o>�y�a,�mreaamre� oaanaarfauy
A%waraw twerr4ftuld Opp tsmydwwo0aiema
NOTE IlOSPMlunOAf$PW WASUB=rTV EV rlJ MAPMVAL.
BOOSTER S V 31
1 Bd G T«hrbo'Ww *-MT Os*dPWX 80ostar Sytt M Sta9an Meld V4MMM92 M
2S MP, 4WVr^ B600RPM, B` Standess Steel NUderj, NEMA 4X ENCLO: WRE5
PUMP MODEL 46SV32GM4C60N,1000GPM,105p$L L25R5/2S/IS V ti{150 GPM EA I
1 Sh UP/TraWnp Pef DW N System u Not heady 6tn fen May Apply
Taft OWA.I
HYORaPN1UMATIC TANK
1 XMN WOOD MODEL JOPX2M4 (2640 GALLONSL v TWAL KMRO-0NEU.&ATIC
TANK W/ REPLACEABLE NEAW DTV BUTYL RUBBER &ADOElL 49UPPED {POSE FOR
FIELD INSTAUITTON BVCONMACTOR)
Taos WA,9-I
Tab' W B.00MA SYSTEM A HVOR"PKUfAAnc TANK
NOTES A -EX ERT 0ft
I. G0 Mft Sr*xrL4jt TO qEPLtL vww 6r0TNW
2. WVDR04kEumATletAWK IS$Wp"D LWE pOR pELOINSTAUATNIN.
5, LEAD THE 10-11 WWS
S113AD.00
tt a!
EMMATiNG MW
7401 Rellhead Lane
Houston, Texas r/m
14WP6-333-3422
713699.8213 Fmt
'�r�e9a��
bids-houstont�ontzopycom
19
TO: piumbws Y11halesaleTt lob. erreawn Pun 3
AM: F.etin wKg DeP V"fft ErsIneer. OFw C-dul ft Group, hm
Plumbing Proposal (1 pw tow#
We ovo=d to RWi pa go of Axb"C**BaatlbrftjbbR4Wtoopp"*dReaanfmoa�ats��d�8abr:�
chew��mp a+omeaon�ks►eeaveeaMebi,tre�rn�IImA.wa:n Resteemm.,rrno awnar�aem�eae �oearmeaberaaandat�rbe„t�ra roeax�p,9ne�+n�aotwtierea�hra+ac�mre�mencwaao�rerwea 9rerdanenarbta4dea Snmo4rAbeiu&dar�mno�d«wdov�weeav
Allomaordororduson _&otaa=pM=bror andmeb rMq>a7nee4aamenaral raaroMncrGfgO bey-40W&raeoac
AB4uatotbwowsLlaaMLb6eNaftLbse2eftebmrnaodaar�tlpm&,GgMWon+r "OmOWL
"'00e�lpd& Tereeyoa
tbIItmefM4+I ntudAhOMlmten] ardesa wush notbrd"f0• FrewErmuCMM6 v
P(aaw note blata�pa[rt B regaNe+?ap aARems
city Oraucdp�bn ! T _ _ _ _ _ . _� _ . Totef iWd Pylpe
NOTE NOOmNcomxwNSO8vEoh7CArompnowofO,StJB/$ m
E WAMAWROVAL. * HYDROPNEMAunc TANK NOT
i PROPOSED N
t300STfR SYSTEAq
1 B&G Ted—fc— "TO)AW0 +c 800ste' 50tM Station Model V4VKG7N21F1GCK, BD
l HP, 57SV/3PN MOORPM, MOCGIK 135M, i25req SnS Sp[W.
1 I StarUWTr&nrng Per 00V If SVstam 6 Not Brady Eeira Fees May Apply
j Taar Owm
Totes It) B00STER SYSTEM $i$,055.00
COMMERCIAL CONCRETE SUBCONTRACTORS
L�l! 13326 Ralph Culver Rd, Suite 110, Houston, TX 77086
6 b S Office: 281-784-3070 — Fax: 281-791-0117
n . ; www.boteUobaildeis.com
PRICE REQUEST PR03
March 30.2020
To:
Kaitum Flora
Company
Comex Contractors
Project
Baytown Fire Training Facility
Location
7022 Bay Way Drive, Baytown. TX 77320
Descnpiion
Boteno Builders Corporatton to Provide:
Price Rearrest PR03
Tank Slab
. 7x7'x IT Tank Slab wJ #4s r@12" O.C.
Pump Slab
. 4xB'xl2" Pump Slab w/ 943 Qa 12" O,C.
Free Standitrg Pump Base
5x1oxl2' Base w 64 ®12" O.C. (Specifications Assumed)
Excluded Items:
• Removal of Top Strip at Rcd%%mod Expansion Joints (Must be Done by Others)
• Any Type or Brand ofJoint Sealant (Must be Done by Otbets)
• Furnishing and Installing O-Seal for Expansion Johns (May be Included as a change Order)
• Colored. Stamped. Textured, or Any Type or Decorative Concrete (May be included as a Charrlge Order)
• Removal or Placement of any type of subgrade fill matertals such as select fill, aggregate base, or bank sand
fromhato property
• Din Spoils Ham: Off(Usually dirt spoils am uW by don coattactor to spread on sera)
• Demolition and/or ftsung Concrete Saw Cutting (Ma be Included as a Change Order if Needtxy
• Pemtim Engineeaag, Testing, and/or inspections (Must be Obtained by QC / Owner if Needcd )
• Surveying (OC Mint Rmide Surveyor to Mad(Building Comers Prior to Start on. Foundation Fo>m World
> Subcontractor not to be liable for anatoldabie surface cracks that might appear on concrete stabs et to after fbnowing an
engineered specifications provided.
> All footage quantities provided on tilts proposal ate approximate to exact dimensions
> 6M other work or matenal that might arise and that is not mentioned on dus pmRRxd will be added to the total bid amaumt as a ctiroBS
order
> Warr my to be limided for all pMposet Concrete will be One ( I) Year from date of Substantial Comgiet_ n. dye ded wwaiaties mew be
mavided for am additional fee
To lbs.
Tank Slab ---.. Total S 700.00
Pump Slab---._ .__----.--__ __ _� _�. _______�______.r�_ Total S 500.
Pump Base—__....___��.___�— Y.__ --- _ _-�____--_---------_-_--- — Total S 700.00
iamvi V hom rft* O c nil up -
PO Box 905 Pinehurst, TX 77362 Office! 281-777-0147
Change Order Request Form
Between Contractor and Subcontractor Change Order #: R6
P•oject. Baytown Fire Tra ning Date: 3/26/20
7022 Bayway Dr
Baytown, TX 77520
Subcontractor. RSW Construction LLC
Request for contract change as follows Change order for the completion of extra work to be performed on the
above referenced job site, under the supervision of the;ob s to Superintendent, with the approval of project
manager of Comex Corporation
Excavation and placement of fill on site to create fire water pond with clay liner $14,100
All material to remain onsite
Excavation $10,100
Clay Liner $4,000
Not Valid unYl signed by contractor and subcontractor
The original contract sum 5362,000
Net Change by previously authorized change orders $175,575
The contract sum prior to this change order 5537,575
The contract sum will be Increased by this change order $14,100
The new contract sum including this change order $551,675
The contras* time will remain unchanged
Comex Corporation
9841 Spencer Hwy
La Porte, TX 77571
Name
Signature/Title
Date
RSW Construction LLC
PO Box 90S
Pinehurst, TX 77362
Amanda Rickett
Name
VP
Signature/Title T
. _ __3126120_ _.
Date
Documentation for Item 2.4
Comex Corporation Page 1 of 1
9841 Spencer Highway
LaPorte, TX 77571
(281) 479-2322
Change Order
05/27/2020
Project: Baytown Fire Training
To: Contract : 1061
Change Order: 22
Owner/GC CP:
Reference: Kirilia
Section:
RE: 3/4 Conduit Emergency stop
Requested
Respond
Scope of Work:
Installation of 420' of 3/4 conduit for a LP emergency Shut down from LP tank to Control tower per
Kirilia suggestions at 5/20 meeting.
420'x $2 per ft = $ 840.00
OH&P $ 84.00
Total $ 924.00
Total Proposed Amount:
$924.00
The Contract time Will be extended by: 0 days
Please indicate your approval by returning a change order for the work specified.
Distribution:
Sincerely,
Rickey Trant
Documentation for Item 2.5
Comex Corporation Page 1 of 1
9841 Spencer Highway
LaPorte, TX 77571
(281) 479-2322
Change Order
05/20/2020
Project: Baytown Fire Training
To: Contract : 1061
Change Order: 20
Owner/GC CP:
Reference: RF152
Section:
RE: RF152 Electrical Pad
Requested By:
Respond By:
Scope of Work:
Provide Electrical Pad per RF152 response
Concrete $ 900.00
Ins. & Bond $ 18.00
OH&P $ 90.00
Total $ 1,008.00
Total Proposed Amount: $1,008.00
The Contract time Will be extended by: 0 days
Please indicate your approval by returning a change order for the work specified.
Distribution: Sincerely,
Rickey Trant
CS&OO
COMMERCIAL CONCRETE SUBCONTRACTORS
13326 Ralph Culver Rd, Suite 110, Houston, TX 77086
BUILDIr"Im.r $ Office: 281-784-3070 — Fax: 291-791-0117
www.botellobuilders.com
May 20, 2020
Company: Comex Contractors
Project: Baytown Fire Training Facility
Location: 7022 Bay Way Drive, Baytown, TX 77520
Description. Botello Builders Corporation to Provide:
Mechanical Pad
- 5' X 18' Mechanical Pad 5" Thick with #4 Rebar @ 18"
- Rebar Placement, Concrete Pouring and Finishing
Excluded Items:
• And Type or Brand of Joint Sealant (Must be Done by Others)
• Colored, Stamped, Textured, or Any Type of Decorative Concrete (May be Included as a Change Order)
■ Removal or Placement of any type of subgrade fill materials such as select fill, aggregate base, or bank sand
from/into property
• Permits, Engineerng, I esting, and/or Inspections (Must be Obtained by GC / Ow,ner if Neededl
• Surveying (GC Must Provide Surveyor to Marl. Building Corners Prior to Starting Foundation Form Work)
➢ Subcontractor not to be liable for unavoidable surface cracks that might appear on concrete slabs even after followin
all engineered specifications provided.
➢ All footage quantities provided on this proposal are approximate to exact dimensions.
➢ Any other work or material that might arise and that is not mentioned on this proposal will be added to the total bid amount
as a change order.
➢ Warranty to be provided for all_pronosed Concrete will be One (1) Year from date of Substantial Completion Extended
warranties may be provided for an additional fee.
Mechanical Pad
* Prices on this proposal are valid for 30 days.
Terms and Conditions:
Total 9$ 00.00
er S . Ft. Rate: n/a Grand Total: $ 900.0
1. Scope of Work. Subcontractor agrees to furnish all labor, services, materials, installation, supplies, insurance, equipment,
tools and other facilities required for the prompt and efficient execution of the work described herein in a professional and
workmanlike manner.
2. Quote Amount. General Contractor agrees to pay Subcontractor for the strict performance of his work, the sum as indicated
above subject to additions and deductions for changes in the scope of work as may be subsequently agreed upon.
This work will be started within three days after confirmation has been received that you agree with what has been presented to you in
this proposal.
The parties hereto have executed this Agreement for themselves, their heirs, executors, successors, administrators, and assignees on
the day and year written below.
in foreDbmel lobui lder.s.cotn
Baytown Fire Training Facility
7022 Bayway Drive, Baytown, Texas
RN 0052 - Pre Engineered Building
Electrical?
Status: Sent To Reviewer
Due Date: Feb 10, 2020
Question Rickey Trant (Comex Corp.j on Feb 7, 2020 at 1 12 PM CST
We need more details on how we are to enter the pre engineered building with our conduits? We also need a
lighting and outlet layout for inside the building.
,o', MEP 101 (See page 1)
see sketch on next page. install equipment outside per or-i-gin-al pans.
John. Blacker 05M/2.020 ,
MEP 101 Rickey Trant (Comex Corp.) on Feb 7, 2020 at 1r12 PM CST
rum �Pw,uYm�oa.,• row+u,na•Yu
n••a,"r•.Ysa.run•swssa OO .u.ocumwnrn.�wmAt O wma.a9�.•aneounmrcna
..emn.�rmreYn AYw.I• iunv wiwmmu�,suo.s Q- r.:n, �w�.vr� uuma.n
ac•annYmF.wo 9uirr9*xrm mn.cmnralrmawormucem wrvrrYaw.ramaar•Yu
s •n <.nmsumunn•.mv�m uncr w•un
nlmn! +c.a
m wo•arau•n.am.c.rwa•uu � ,iwaaf"ww••mmwa�oi
u•moanun:asuwonFr rc,wno•.�mnYa 1•ntww
wn.cnu•ranwm"'� """"_ TOVANI HART
,� ••VI.1Y•O.O wOY•0•YMiNNeR (4YnH•.sY6YF ��� !0!A :IYYPIA WA 9IS01
niW •I1{fi � mrtYa par Mpyppt. F 1p9140:Bw
�� � R •llt•CiYt'.s NFYn
GYMilC41M1A1
obercrombie
AaoeYm ro,eunonna.amw �n• ^ .
ra.an® w.mYn,v nwn.� I �'-x. 1---0
m.wYrYulYYiu!
.uwe o.um ��w•
`"'
r
Z =
Prepared by Rickey Trant 1 Created with PlanGrid
History
Question drafted and sent to reviewer
• Question added:
Rickey Trant (Comex Corp.) on Feb 7, 2020 at 1:12 PM CST
We need more details on how we are to enter the pre engineered building with our conduits? We also need a
lighting and outlet layout for inside the building.
• Title added: Pre Engineered Building Electrical?
• submitter added: Rickey Trant (Comex Corp.)
• Manager added: Rickey Trant (Comex Corp.)
• References added:
Loj MEP 101
provide 5' x 18' concrete pad.
Prepared by Rickey Trant 2 Created with PlanGrid
Documentation for Item 2.6
Comex Corporation Page 1 of 1
9841 Spencer Highway
LaPorte, TX 77571
(281) 479-2322
Change Order
05/29/2020
Project: Baytown Fire Training
To: Contract : 1061
Change Order: 21
Owner/GC CP:
Reference: VEList
Section:
RE: VE Credits
Requested By:
Respond By:
Scope of Work:
VE Credits based on Meeting Discussions and site visits. See attached VE list
Landscaping and irrigation ($ 80,000.00)
1-8' Classroom Fan ($ 6,190.00)
1-7' Outdoor Classroom Fan ($ 2,016.00)
Wood Basse to Rubber Base ($ 3,800.00)
Total ($ 92,006.00)
Total Proposed Amount: ($92,006.00)
The Contract time Will be extended by: 0 days
Please indicate your approval by returning a change order for the work specified.
Distribution:
Sincerely,
Rickey rant
Baytown Fire Training VE CO 21
Description
uanit
Unit Price
VE Amount
Accented Credits
Accented
Landscaping and Irrigation
1
$ 80,000.00
$ (80,000.00)
Based On City taking over remaining
$ 80,000.00
05/20/2020
1- 8' Classroom Fans
1
$ 6,190.00
$ (6,190.00)
1 fan Delted Accepted
$ 6,190.00
05/20/2020
1- 7' Outdoor Classroom Fan
1
$ 2,016.00
$ (2,016.00)
Accepted
$ 2,016.00
05/20/2020
Wood Base to Rubber Base
1
$3,800
$ (3,800.00)
Accepted
$ 3,800.00
05/13/2020