Ordinance No. 14,399ORDINANCE NO. 14,399
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS,
APPROVING CHANGE ORDER NO. 9 TO THE BAYTOWN AREA WATER AUTHORITY 6
MGD SURFACE WATER TREATMENT PLANT PROJECT BETWEEN THE BAYTOWN AREA
WATER AUTHORITY AND PEPPER LAWSON WATERWORKS, LLC; AND PROVIDING FOR
THE EFFECTIVE DATE THEREOF.
****************************************************************************************************
WHEREAS, the Baytown Area Water Authority's enabling legislation requires that the City Council approve
certain agreements before Baytown Area Water Authority ("BAWA") enters into the same; and
WHEREAS, on May 20, 2020, the Board of Directors of BAWA approved Change Order No. 9 to the Baytown
Area Water Authority 6 MGD Surface Water Treatment Plant Project between the Baytown Area Water Authority and
Pepper Lawson Waterworks, LLC; and
WHEREAS, the City of Baytown desires to approve such change order; NOW THEREFORE,
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS:
Section 1: That the recitals set forth hereinabove are hereby found to be true and correct and are hereby
adopted.
Section 2: That the City Council of the City of Baytown, Texas, hereby approves Change Order No. 9 for
the Baytown Area Water Authority 6 MGD Surface Water Treatment Plant Project between the Baytown Area Water
Authority and Pepper Lawson Waterworks, LLC, which change order is attached hereto as Exhibit "A" and incorporated
herein for all intents and purposes.
Section 3: This ordinance shall take effect immediately from and after its passage by the City Council of
the City of Baytown.
INTRODUCED, READ and PASSED by the affirmative vote of the City Council of ity of Baytown this the
281h day of May, 2020.
NDON CAPETILLO, ayor
ATTEST:
LETICIA BRYSCH, Cit Jerk
APPROVED AS TO FORM:
KARE . HORNER, Interim City Attorney
e° 7„g, •!
°
of`�'S//
RAKaren\Files\City CouncihOrdinances\202OWay 28\ApprovingBAWAChangeOrderNo9.doc
BAYTOWN AREA WATER AUTHORITY
Change Order No. 9
6.0 MGD SURFACE WATER TREATMENT PLANT
PO: 1806021
Date: 15-May-20
Brief Description of Changes:
CO 9.1 Deduction for the deletion of brick masonry at seven structural steel columns at the Operations Building Chemical area which
were in conflict with column anchor plates (PCO#38).
CO 9.2 Deduction for the Operations Building Lobby Decorative Stone provided on one accent wall instead of 3 walls (PCO A61).
CO 9.3 Addition of epoxy floor coating in the Operations Building laboratory analyzer and eye wash area (PCO#62)-
CO 9.4 Additional work for the Operations Building administration area wall height adjustment (PCO #63).
CO 9.5 Additional work to remove a conflict between the millwork and SCADA operations desks, to modify the millwork and remove
cabinets in two locations, bracing the countertop, repair the wall and flooring. (PCO #64),
CO 9.6 No cost change to substitute tile for brick at the Operations Building administration area. (PCO #65).
CO 9.7 Additional work to provide a cabinet to at the Operations Building laboratory sink area. (PCO 66).
CO 9.8 Additional work to upsize the transformer from a 25KVA to a 37.5KVA unit to operate the High Service and Transfer Pumps
safely in cold weather (PCO #67).
CO 9.9 Additional work to re-route the Operations Building laboratory analyzer trough drain and sinks to the Sludge Pump Station.
(PCO; 57).
Add or Delete Items:
Item
Description
Unit
uanti
Unit Price
Total
9.1
Operations Bldg Column Masonry deletion (PCO 38)
1
LS
(4,025.00)
$ (4,025.00)
9.2
Operations Bldg Lobby Stone deduction (PCO 61)
1
LS
(7,014.50)
$ (7,014.50)
9.3
Epoxy Coating in Laboratory area (PCO 62)
1
LS
4,100.00
$ 4,100.00
9.4
Operations Bldg admin. wall height adjust. (PCO 63)
1
LS
3,815.00
$ 3,815.00
9.5
Millwork modifications at SCADA area (PCO 64)
1
LS
4,530.00
$ 4,530.00
9.6
Tile in lieu of brick at Operations Bldg admin (PCO 65)
1
LS
-
$ -
9,7
Operations Bldg laboratory sink area cabinet(PCO 66)
1
LS
1,500.00
$ 1,500.00
9.8
Transformer upsizing (PCO 67)
1
LS
21,880.08
$ 21,880.08
9.9
Reroute Operations Bldg laboratory drain and sinks to the
Sludge Pump Station(PCO 57)
I
LS
27,600.18
$ 27,600.18
Total
Contract Summary:
52,385.76
Original Revised
1
Ori inat Contract Price
$52,186,000.00
2
Owner Contingency
$0.00
Previous Change Orders
This Change Order
Remaining Contingency
3
1 Change Orders
Previous Change Orders
$ (3,423,196.97)
This change order
$ 52,385.76
4
Revised Contract Price
$52,186,000.00
$48,815,188.79
Original Contract Duration
1095
Previous Extensions
0
This Change Order
0
Revised Duration - Calendar Days
1095
��ud 5'y 5-15-20
Contractor: PLW Waterworks, LLC Date
Christopher F. Smith, Executive Vice President
_ 5-17-2020
Consultant: Jones I Carter, Inc. Dare
05/15/2020
Director of Public Works &'T; igineering Date
Frank O. Simoneaux Jr. P.E. /
City Manager Date
Richard L. Davis, ICMA-CM
P[W
waterworks
May 15, 2020
Mr. Andrea Brinkley
Assistant Director
Baytown Area Water Authority
The City of Baytown
2401 Market St.
Baytown, TX 77520
Re: CPR No. #038, #061, #062, #0639 #064, #065 & #066
BAWA 6 MGD Surface Water Treatment Plant
BAWA Job No. 1806021
Mrs. Brinkley,
PLW requests approval to combine the above referenced PCO's to complete requested modifications in
the Operations Building.
This change will result in a increase in the amount of $3,441.56 .
Please feel free to contact me at (713) 301-8637 with any questions or concerns.
Regards,
PLW Waterworks
Katy Drown
Project Manager
Page 1
Baytown Area Water Authority
BAWA 6 MGD Surface Water Treatment Plant
BAN A Job No. 1906021
Combined PCO's at Ops Building
Scope of Work
Combination of PCO N038 PCO N061, PCO N062 PCO N063 PCO #064 N065 & N066
CPR No.:, N065 & N066
Date: 05 I5/20
PLN Job No.: P3T
Non -Taxed
Labor
Material
Subcontract
Taxed Mat'1/E ui
Unit
Total
Unit Total
Unit Total
Unit
Total
Item
No.
Dmcn lion
Qtv
Unit
Con
Cost
Cost Cost
Cost Cost
Cost
Cost
1
PCO N038 - Credit for Deleting Brick Columns at Operations Building
I 1
Credit from Masonry Contractors (Addilrond materials will be IcA onsne for BAW
1
LS
$ -
S -
S - S -
f
(J 0 i 5 00) S (4 025 00)
S
2
PCO #061 -Operations Building Stone Credit
S pT r, 14 Si,,
Subtotal
21
Credit to delete (3) %ails of Stone Veewr duc to bcandcolumn cerdkcts
I
LS
S -
S -
S - f -
S (121r•140) S (12.76440)
f -
f
22
Add Stow Vaewr to South Wall
1
LS
t -
f -
S - f -
$
5 14990 S 5.74990
t
3
PCO #062 - Operations Building Epoxy Coating at Second Floor Trougb Drain
3 1
Add Epoxy Coating to Operations Building Second Floor Trough Dmm Eye Wash
I
LS
S -
$
S
J I[M.00 f J.Irni 10
S -
t
Area Needed for watcryrooling and pmper d�in slope to without towards lab
floating
J
PCO N063- Pony Wall Refight Adjustment
JI
Ad)ust Pon)Wullat Adnnlnn Arcato42'on Facaf Ponry Wall
I
LS
f -
S -
S - S -
S
391500 S 4.K19H1
f -
S -
5
PCO N064-Control Room Mill —It Modification,
f 453000
Subtotal
$ -
5 1
Remo%a lower cabinets and Ica, a countenop in place
2
EA
S
- S -
f - f -
f
765011 S 1 530 00
S
3
52
Farm & Flooring Repaus
2
EA
S
- S -
$ t
S
1 500(a1 f 1 000 (a)
6
PCO N065 - Pomv Wall Stone Remo-1 vs. Tile ./ Accent Tilr
61
Delete Stone at Pon) Wall and add Tile with Accent TiI
1
LS
f
- $ -
f 5 -
f
- 3 -
S
7
PCO N066 - Lab Cabinet Sinks Doors
71
Add Lower Cabrwl Doors
I
LS
S -
S -
S - 3 -
f
1,50000 S 1 100 00
S -
t -
Direct Con Subtotal
-
N05 50
Snail Tools n 5 0'.
-
- No
Equipment Burden n 50 0'.
Na
u a
da
n
Tax a a 25-.
da
ua
Na
Subtotal 2
-
-
2905 50
-
Oscnkad & Profit rn 15 0'.
41581
Subtotal
-
_
134133
-
Bonds & Insumsic a 3 0'.
A
10024
Subtotal J
144156
Total of all column,
1731 6
Other
Grand Total Cost 3,441.56
AM', ft��m
MASONRY COMPACTORS, I.I.0
NEWOW
18510 FLORENCE KNOLL OR, CYPRESS, IX 77429
Masonry Contractors, LLC proposes a credit of $4,025.00 for the deletion of decorative stone for 7 columns at
canopy area at BAWA project.
7 X $575 = ($4,025.00)
John Hill
Hamersveld Holdings, LLC
Houston Area Commercial Flooring
722 Talmalge Hall Dr.
Conroe, TX 77302
Submitted To: PLW Waterworks
Attention: Anonio lbarra
Cust Address: 5359 E. Grand Parkway S. Baytown, TX 77520
Contact: Anonio lbarra
Email; aibarra@plwus.com
Phone:
Mobile / EXT: (713) 412-1867
Proposal
Office: 832-401-1339
f
website:
Project: BAWA: Lobby Stone Pony Wall at
Millwork Desk
Date: 4/13/2020
lob Address:
Proposed -By, Mark van Hamersveld
Email: hamersveldholdingsAgmail.com
fdL 832 401 1339
Tag Description
IUnitj
Qty.
Unit Sell
Extension
SCOPE:
Stone for Entrance x Three Walls, North, East, & West
STN-1:
Emser, Veneer Stone, American Rockies, Calgary
sf
875.00
$ 11.25
$ 9,843.75
STN-OC:
Emser, Veneer Stone Corner, American Rockies, Calgary
if
85.00
Thinset-2:
Laticrete, 4-XLT White
bags
100.00
$ 18.59
$ 1,859.00
LABOR TOTAL
MATERIAL TOTAL
CRDIT
Sales tax not included unless noted above. TOTAL TAX
$ (12,764.40)
$
Total Credit With Tax 1 $ (12,764.40)
All work warranted one(1) year from installation.
Moisture tests will be billed at $115.0 for each required to cover manufactures warranty. Alternate 1
Epoxy Grout and Backer Boards Not included unless specifically stated above.
Additional Bags of Floor Prep Will be charged at $45.00 per bag.
Excluded no testing performed by outside Technician.
No furniture moving included unless specifically stated.
Job changes not conforming to last print date on proposal; incurring more materials or labor will require a change order.
Prices are based on clean Floors, broom swept and ready to receive Flooring.
Floor preparation, demo, mopping, vacuuming, waxing, and protection is not included unless specifically stated in proposal.
All prices are based on work completed during normal hours unless otherwise noted.
It is the responsibility of the General Contractor to make sure all slabs are cured to meet Floor Covering Standards.
Moisture Remediation, Asbestos Testing/removal, Final Clean, Wax / Polishing All not Included
Remobilization Fee of $500 if jobsite is not ready for install and installation crews arrive ready to work. Will be applied per each occurrence.
Waterproofing not included unless noted in above proposal
Terms Net 30
Accepted By Date
11W �94?
Hamersveld Holdings, LLC
Houston Area Commercial Flooring
Change Request 1
722 Talmalge Hall Dr.
Office:
832-401-1339
Conroe, TX 77302
fax.
website:
Submitted To: PLW Waterworks
Project:
BAWA: Entrance, South Wall
Attention: Antonio Ibarra
Stone
Cust Address: 5359 E. Grand Parkway S. Baytown, TX 77520
Date:
4/9/2020
Contact: Antonio Ibarra
job Address:
Email: aibarra@plwus.com
Phone:
Proposed By:
Mark van Hamersveld
Mobile / EXT: (713) 412-1867
Email:
hamersveldholdingsagmail.com
Cell:
832 4011339
Tag Description IUnitj
Qty.
I Unit Sell
I Extension
SCOPE:
Install new stone wall on south wall in lieu of west wall
Use existing stone from original contract
Balance needed for materials and labor to apply to this change order
STN-1:
Emser, Veneer Stone, American Rockies, Calgary
sf
218.00
$ 12.50
$ 2,72S.00
STN-OC:
Emser, Veneer Stone Corner, American Rockies, Calgary
If
61.00
$ 13.88
$ 846.68
Thinset-2:
Laticrete, 4-XLT White
bags
30.00
$ 20.66
$ 619.80
ADD:
Miter cuts for fur out wall angle
ea
1.00
$ 555.56
$ 555.56
ADD:
Scisor Lift
ea
1.00
$ 1,002.86
$ 1,002.86
LABOR TOTAL
MATERIAL TOTAL
SUBTOTAL
Sales tax not included unless noted above. TOTAL TAX
$ 1,002.86
$ 5,749.90
$ -
Total With Tax I $ 5,749.90
All work warranted one(1) year from installation.
Moisture tests will be billed at $115.0 for each required to cover manufactures warranty.
Epoxy Grout and Backer Boards Not included unless specifically stated above.
Additional Bags of Floor Prep Will be charged at $45.00 per bag.
Excluded no testing performed by outside Technician.
No furniture moving included unless specifically stated.
job changes not conforming to last print date on proposal; incurring more materials or labor will require a change order.
Prices are based on clean Floors, broom swept, and ready to receive flooring.
Floor preparation, demo, mopping, vacuuming, waxing, and protection is not included unless specifically stated in proposal.
All prices are based on work completed during normal hours unless otherwise noted.
It is the responsibility of the General Contractor to make sure all slabs are cured to meet Floor Covering Standards.
Moisture Remediation, Asbestos Testing/removal, Final Clean, Wax / Polishing All not Included
Remobilization Fee of $500 if jobsite is not ready for install and installation crews arrive ready to work. Will be applied per each occurrence.
Waterproofing not included unless noted in above proposal
Terms Net 30
Accepted By Date
I
April 2, 2420 01ANG : ORD111 t}uO'19161IAWA 20-021
PL W Waterworks
3701 Kirby Drive Ste 1133
1 kruston 1'X 77098
Attention, Katy DroWn
Office;
Ice:
Cell: 713-301-9637
1:-trtttil: kdrow�g�ilws�te}
Reference, 1:poxy Floor containment coating on second near.
Attention: Katy,
painting Professionals, Inc is pleased to submit our Lump Sum proposal for the above
referenced project. Our pricing includes supervision, labor, equipment, miscellaneous
materials and all tools necessary to complete the scope of work as outlined herein. Our
proposal, associated pricing and clarifications are based on information received from
scope and Email.
Should you have any questions or require any additional information, please do not
hesitate to call.
Best Regards,
Edward Ware
Painting, Professionals
Office: 713-401-0004
rl_ii_ :� -AlI-.[lM
We are pleased to submit our scope for the following project. If at any time during the duration of the project, an
unplanned scope of work is incurred or hold points or inspection delays occurring longer than 1 hour or plant outage
causing a delay, a change order will be submitted as per TIM rates.
Scoy-e of Work:
• Mobe up and set up equipment.
• Surface Prep concrete floor with diamond grinder for profile
• Hold for inspection. Document on Daily QC report.
• Apply caulking around edge of wall
• Apply Epoxy Coating Plasite 4500S to prepped areas ;-' 40 Mils DFT
• Hold fbr inspection. Document on Daily QC report.
Items included in pricing:
1. One mobilization and demobilization fee.
2. All labor.
3. Safety and training.
4. All equipment needed for preparation & application
Items to be supplied by customer:
1. Porte cans
2. Dumpster for disposal of waste
Crew Size: 3
• 3 Applicators
• 1 Supervisor
Work schedules will be coordinated with project management and are based on a forty -hour work week.
maintains a ten hour per day, 5-day work week. No additional overtime, holidays or nights are included in our
pricing for this project. Should additional overtime, weekend, holiday or night schedules be requested by the
client, additional charges will be accessed at overtime rates.
Painting Profmionals, Joe agrees to perform above work in a timely manner for a total price of
Secondary containment coating: $4,100.00
], larma of PnXment:
ice
JHN'GROUP
`0001-- 15344 Vantage Pkwy. E , Suite 150 1 Houston, TX 77032 11 Ph: 832.626.1060 1 Fax: 832.626.1057 1 Toll Free: 800.795.0696
PROPOSAL 69793-CO3
To: City of Baytown
Wastewater Treatment Plant
Baytown, TX
Bid Date: 5/5/2020
Date: 5/5/2020
Project: City of Baytown WTP
Location: Baytown, TX
Architect: Joiner
Addendum:0
We propose to furnish the following as manufactured by Phoenix Millwork using standard design,
materials, construction sizes and colors. Based on Change Order #3 request.
Specification Section: Change Order #3 Millwork
Material, freight and installation .........................
3 815.00
Pricing Includes:
1. Per request for change order #3 we will revise East side of pony wall to 42" and the 90 degree wall
will be revised to 30" per ADA requirements.
Qualifications:
1. Pricing good for 1 production run and 1 delivery with completion not later than June 30, 2020.
2. Due to the unsettled nature of "Steel Tariffs" and "Freight Regulations", any such surcharges are
not included in this proposal. Any steel or freight surcharges incurred will be passed along to the
customer.
3. We reserve our right to a schedule extension; change orders for additional costs (including but
not limited to material escalation; labor rate increases; acceleration costs; shipping costs; storage
costs; administration overhead; etc.) related to any occurrence of an event which is outside of our
reasonable control and which prevents us from performing our obligations (Examples but not
limited to: acts of God; strikes or other labor disturbances; delays in transportation; war; acts of
terrorism; epidemics (such as COVID-19); etc.).
Excludes
1. State Sales & Use Taxes. Purchaser by acceptance of this quotation agrees to furnish Tax
Exemption Certificates when requested on non-taxable materials, otherwise any applicable tax
will be added at time of invoicing.
2. Any Liquidated, Consequential and/or Actual Damages clauses.
3. Over time or after hours work.
4. Charges for vertical transportation, Mechanical utilities and connections, Electrical utilities and
connections, Bonds, Removal of existing equipment, Traps, Ducts, Fume hood fan/blowers,
Fume hood testing/balancing, Rubber/vinyl base, In -wall backing/blocking.
5. Note: Clean-up to be limited to removing all debris, dirt and rubbish accumulated as a result of
our installation to a dumpster provided by others, leaving the premises broom clean and orderly.
Solutions for industry, Education, and Healthcare Since 1924
CVO%h2iorouo.com
L _ mfoY�h2ioroun.corn
Serving all 50 states, Offices located:
Atlanta Austin I Baltimore I Chicago I Cedar Falls I Columba I Dallas I Denver I Des Moines I Kansas City I Houston I Madison I Mam, I Minneapolis I Salt Lake City Omaha I Seattle
Pagel of 3
H2I1GROUP
.' 15344 Vantage Pkvvy. E , Suite 150 1 Houston, TX 77032 II Ph: 832.626.1060 1 Far: 832.626.1057 1 Toll Free: 800.795.0696
SEE PAGE 3 for Terms & Conditions
This proposal is based upon usage of the AGC/ASA/ASC "Standard Form Construction Subcontract',
1996 Edition or a subcontract form otherwise acceptable to 1-121 Group, Inc.
TERMS: Net 30 Days
ACCEPTED: Company
Name
Date
RESPECTFULLY,
H21 Group, Inc.
By D� s4
Brett Starr
Project Manager
281.979.8806
Note: This quotation is offered for acceptance within 30 days and is subject to revision beyond that time.
Solutions for Industry, Education, and Healthcare Since 1924 _
COOP::
%WLW-� Serving all 50 states, Offices located:
Atlanta I Austin I Baltimore I Chicago I Cedar Falls I Columbia I Dallas I Denver I Des Moines I Kansas City I Houston I Madison i Miam I Minneapolis I Salt Lake City Omaha I Seattle
Page 2 of 3
4000%1**w
!H2IGROUP
lsi� 15344 Vantage Pkwy. E , Suite 150 1 Houston, TX 77032 11 Ph: 832.626.1060 1 Fax: 832.626.1057 1 Toll Free: 800.795.0696
PROPOSAL 69793-CO4
To: City of Baytown Date: 5/12/2020
Wastewater Treatment Plant Project: City of Baytown WTP
Baytown, TX Location: Baytown, TX
Architect: Joiner
Bid Date: 5/12/2020 Addendum: 0
We propose to furnish the following as manufactured by Phoenix Millwork using standard design,
materials, construction sizes and colors. Based on Change Order #4 request
Specification Section: Change Order #4 Millwork
Material, freight, and installation................................................................................... $1,530.00
Pricing Includes
1. Per request for change order #4 we will remove base cabinet at 209 Control Room, Cut down
countertop to next most cabinet, finish side of exposed next cabinet, re -laminate countertop cut.
Qualifications:
1. Pricing good for 1 production run and 1 delivery with completion not later than June 30, 2020.
2. Due to the unsettled nature of "Steel Tariffs" and "Freight Regulations", any such surcharges are
not included in this proposal. Any steel or freight surcharges incurred will be passed along to the
customer.
3. We reserve our right to a schedule extension; change orders for additional costs (including but
not limited to material escalation; labor rate increases; acceleration costs; shipping costs; storage
costs; administration overhead; etc.) related to any occurrence of an event which is outside of our
reasonable control and which prevents us from performing our obligations (Examples but not
limited to: acts of God; strikes or other labor disturbances; delays in transportation; war; acts of
terrorism; epidemics (such as COVID-19); etc.).
Excludes:
1. State Sales & Use Taxes. Purchaser by acceptance of this quotation agrees to furnish Tax
Exemption Certificates when requested on non-taxable materials, otherwise any applicable tax
will be added at time of invoicing.
2. Any Liquidated, Consequential and/or Actual Damages clauses.
3. Over time or after hours work.
4. Charges for vertical transportation, Mechanical utilities and connections, Electrical utilities and
connections, Bonds, Removal of existing equipment, Traps, Ducts, Fume hood fan/blowers,
Fume hood testing/balancing, Rubber/vinyl base, In -wall backing/blocking.
5. Note: Clean-up to be limited to removing all debris, dirt and rubbish accumulated as a result of
our installation to a dumpster provided by others, leaving the premises broom clean and orderly.
�..0"AS
1i ESON
��./r
,r
s k
Solutions for Industry, Education, and Healthcare Since 1924
h&hZig o.com
�nfa h i rim
ith2igroup
Serving all 50 states, Offices located:
Atlanta Austin I Baltimore I
Chicago I Cedar Falls I Columbia I Dallas I Derive, I Des Moines I Kansas City I Houston I Madison I Mom I Minneapolis I Salt Lake City I Omaha I Seattle
Page 1 of 3
lrol'"Oorals. tnc.
May 14, 2020
Painting Professionals, Inc. is proposing to patch, rub and paint two location in control room where proposed
control room cabinets are to be removed. PPI proposes to provide all labor, material and equipment to bring wall
back to finish.
2 Locations - $1,000 each
Total Proposal - $2,000.00
Please feel free to contact me with any questions.
Ed Ware
(307) 431-0087
Proposal
Hamersveld Holdings, LLC
Houston Area Commercial Flooring
722 Talmalge Hall Dr. O ce• 832-401-1339
Conroe, TX 77302 Im.
e ite:
Submitted To: PLW Waterworks oje • BAWA: Tile Repair in Control
Attention: Anonio Ibarra Room under Cabinets
Cust Address: 5359 E. Grand Parkway S. Baytown, TX 77520 Date: 5/14/2020
Contact: Anonio Ibarra lob Address:
Email: aibarra@plwus.com
Phone: Proposed Bv: Mark van Hamersveld
Mobile / EXT: (713) 412-1867 mil: hamersveldholdinos(ftmail.com
fe • 832 4011339
Tag Description
Unit
Qty.
Unit Sell
Extension
SCOPE:
Add the under removed cabinets in control room
EA
2
$500.00
$1,000.00
LABOR TOTAL
MATERIAL TOTAL
SUBTOTAL
Sales tax not included unless noted above. TOTAL TAX
$ 1,000.00
$ -
Total With Tax I $ 1,000.00
All work warranted one(1) year from installation.
Moisture tests will be billed at $115.0 for each required to cover manufactures warranty. Alternate 1
Epoxy Grout and Backer Boards Not included unless specifically stated above.
Additional Bags of Floor Prep Will be charged at $45.00 per bag.
Excluded no testing performed by outside Technician.
No furniture moving included unless specifically stated.
job changes not conforming to last print date on proposal; incurring more materials or labor will require a change order.
Prices are based on clean Floors, broom swept, and ready to receive Flooring.
Floor preparation, demo, mopping, vacuuming, waxing, and protection is not included unless specifically stated in proposal.
All prices are based on work completed during normal hours unless otherwise noted.
It is the responsibility of the General Contractor to make sure all slabs are cured to meet Floor Covering Standards.
Moisture Remediation, Asbestos Testing/removal, Final Clean, Wax / Polishing All not Included
Remobilization Fee of $500 if jobsite is not ready for install and installation crews arrive ready to work. Will be applied per each occurrence.
Waterproofing not included unless noted in above proposal
Terms Net 30
Accepted
r WIGROUP
N� 15344 Vantage Pkwy. E , Suite 150 1 Houston, TX 77032 II Ph: 832.626.1060 1 Far: 832.626.1057 1 Toll Free: 800.795.0696
SEE PAGE 3 for Terms & Conditions
This proposal is based upon usage of the AGC/ASA/ASC "Standard Form Construction Subcontract',
1996 Edition or a subcontract form otherwise acceptable to H21 Group, Inc.
TERMS: Net 30 Days
ACCEPTED: Company
Name
Date
RESPECTFULLY,
H21 Group, Inc.
By FW& Sty
Brett Starr
Project Manager
281.979.8806
Note: This quotation is offered for acceptance within 30 days and is subject to revision beyond that time.
Solutions for Industry, Education, and Healthcare Since 1924
Q�..70i'� h2iarouo.com rA
�..r
info(dh2,arouo.com r -s--••
Serving all 50 states, Offices located:
Atlanta I Austin I Baltimore, Chicago I Cedar Falls I Columbia I Dallas I Denver I Des Moines I Kansas City I Houston I Madison I M•am I Minneapolis I Salt Lake City Omaha I Seattle
Page 2 of 3
PCO #65 - Proposed Change (zero cost)
rWIIGROUP
t® 15344 Vantage Pkvvy. E , Suite 150 1 Houston, TX 77032 II Ph 832.626.1060 1 Fax: 832.626.1057 1 Toll Free: 800.795.0696
PROPOSAL 69793-CO4
To: City of Baytown Date:
5/12/2020
Wastewater Treatment Plant Project:
City of Baytown WTP
Baytown, TX Location:
Baytown, TX
Architect:
Joiner
Bid Date: 5/12/2020 Addendum:
0
We propose to furnish the following as manufactured by Phoenix Millwork using standard design,
materials, construction sizes and colors. Based on Change Order #5 request.
Specification Section: Change Order #5 Millwork
Material, freight, and installation....................................................................................... $1,500.00
Pricing Includes:
1. Per request for change order #5 we will build a lower cabinet for sink in the Lab area. Price includes
door & hardware.
Qualifications:
1. Pricing good for 1 production run and 1 delivery with completion not later than June 30, 2020.
2. Due to the unsettled nature of "Steel Tariffs" and "Freight Regulations", any such surcharges are
not included in this proposal. Any steel or freight surcharges incurred will be passed along to the
customer.
3. We reserve our right to a schedule extension; change orders for additional costs (including but
not limited to material escalation; labor rate increases; acceleration costs; shipping costs; storage
costs; administration overhead; etc.) related to any occurrence of an event which is outside of our
reasonable control and which prevents us from performing our obligations (Examples but not
limited to: acts of God; strikes or other labor disturbances; delays in transportation; war; acts of
terrorism; epidemics (such as COVID-19); etc.).
Excludes:
1. State Sales & Use Taxes. Purchaser by acceptance of this quotation agrees to furnish Tax
Exemption Certificates when requested on non-taxable materials, otherwise any applicable tax
will be added at time of invoicing.
2. Any Liquidated, Consequential and/or Actual Damages clauses.
3. Over time or after hours work.
4. Charges for vertical transportation, Mechanical utilities and connections, Electrical utilities and
connections, Bonds, Removal of existing equipment, Traps, Ducts, Fume hood fan/blowers,
Fume hood testing/balancing, Rubber/vinyl base, In -wall backing/blocking.
5. Note: Clean-up to be limited to removing all debris, dirt and rubbish accumulated as a result of
our installation to a dumpster provided by others, leaving the premises broom clean and orderly.
�.fft"�.� Solutions for Industry, Education, and Healthcare Since 1924
ZESOPI h2icrouo.com
1.
n�o.[glh2 groug.[5m
$W�W'
Serving all 50 states, Offices located:
Atlanta I Austin I Baltimore I Chicago I Cedar Falls I Columbia I Dallas I Denver I Des Moines I Kansas City I Houston I Madison i Miami I Minneapolis I Salt Lake City Omaha I Seattle
Page 1 of 3
IH2IGROUP
N� 15344 Vantage Pkwy E , Suite 150 1 Houston, TX 77032 II Ph: 832.626.1060 1 Far: 832.626.1057 1 To0 Free: 800.795.0696
SEE PAGE 3 for Terms & Conditions
This proposal is based upon usage of the AGC/ASA/ASC "Standard Form Construction Subcontract',
1996 Edition or a subcontract form otherwise acceptable to H21 Group, Inc.
TERMS: Net 30 Days
ACCEPTED: Company
Name
Date
RESPECTFULLY,
H21 Group, Inc.
By F SM=
Brett Starr
Project Manager
281.979.8806
Note: This quotation is offered for acceptance within 30 days and is subject to revision beyond that time.
ItOnplt�
Solutions for Industry, Education, and Healthcare Since 1924
h2g gua.com
EMP
tnfa{��vrou�mm
#h2igroup
6/�1��
Serving all 50 states, Offices located:
Atlanta I Austin I Baltimore I
Chicago I Cedar Falls I Columbia I Dallas I Denver I Des Moines I Kansas City I Houston I Madison I Miami I Minneapolis I Salt Lake City Omaha I Seattle
Page 2 of 3
PLW
waterworks
May 14, 2020
Mr. Andrea Brinkley
Assistant Director
Baytown Area Water Authority
The City of Baytown
2401 Market St.
Baytown, TX 77520
Re: CPR No. 67
BAWA 6 MGD Surface Water Treatment Plant
BAWA Job No. 1806021
Mrs. Brinkley,
PLW proposes to upgrade the transformer to provide required amps to be able to utilze the Heat Trace
Panel. Current designed transformer does not have required amperage load to power the Heat Trace
Panel.
This change will result in a increase in the amount of $21,880.08
Please feel free to contact me at (713) 301-8637 with any questions or concerns.
Regards,
PLW Waterworks
Katy Drown
Project Manager
Page 1
Baytown Area Water Authority
BAW A 6 MGD Surface Water Treatment Plant
BAWA Job No. 1806021
Heat Trace Panel Transformer Upgrade
Scope of We
l p;. Lade transformer r: that Heat Trace Panel can be utilized in cold weather et eats
CPR No.: 67
Date: 05114120
PLW Job No.: P3T
Non -Taxed
Labor
Material
Subcontract
Taxed Mat'UE ui
Unit Total
Unit Total
Unit Total
Unit Total
11em
No.
D—ri lion
Qty
Unit
Coo Cost
Cost Cost
Cost Coat
Cost Cost
1
Transformer Modifications
. t
• pgmdc Tmnsfonncr and Conduc
1
Ls
S - S -
$ - S - SI84- S 181`200 S
Duccl Cost Subtotal
-
- 18 472 GO -
SnullTools n' 50°.
-
Na - a/a da
Egmpmwu Burdcn 7 50 0%
r. a
n a Na Na
Tac a 825%
'La
ua da
Subioul 2
- - IS 472 00 -
Oscdead do Pmftt rt 15 0°.
2 770 80
Sublot.11
- - 2124290 -
Bonds k Insumnct d i M.
61728
Sublowl 4
2188008
Tout o all column
21 880 O8
Oiler
Grand Total Cost 21,880.08
PFEIFFER & SON, LTD.
ECectricaCContractors
PHONE - (281) 471-4222 * FAX - (281) 471-6856
116 N. 16TH ST. * P.O. BOX 1116
LA PORTE, TEXAS 77572
CHANGE ORDER
BID DATE: May 14, 2020
TO: Pepper -Lawson Waterworks
PROJECT: BA WA SURFACE WATER PLANT 23-XMR-001 TRANSFORMER MODIFICATIONS
We are pleased to offer for your consideration our lump sum quotation for the completion of the above
referenced work, according to our interpretation of the plans, specifications, correspondence and
conversations with the owner and design engineers. We propose to furnish all material, labor, equipment,
and supervision in a safe and skillful manner for a complete and functioning system as discussed and
detailed below for $18,472.00.
To avoid confusion, we offer the following clarifications:
1. Price includes direct replacement of the existing 25 kVA 23-XMR-001 transformer with a 37.5 kVA
transformer, adjustment of primary breaker trip settings and upsizing of primary and secondary
conductors to accommodate higher current.
2. All work to be done per applicable specifications in neat and workmanlike manner meeting or
exceeding NEC standards.
3. Temporary electrical power for systems downstream of existing transformer is NOT included nor
thought to be necessary.
4. Proposed 37.5 kVA transformer will have approximately the same footprint as existing 23-XMR-001.
Existing housekeeping pad is thought to be sufficient to support and ensure proper ventilation around
transformer.
5. Bond is included.
6. We will provide insurance coverage in accordance with the specifications. Additional coverage
specifically required by the contractor may necessitate additional premium charges.
We appreciate this opportunity to quote on this project. If you have any questions or need additional
clarifications, please call me at (281) 471-4222.
Sincerely,
PFEIFFER & SON, LTD.
Mark Antley
Estimator
REGULATED BY THE TEXAS DEPARTMENT OF LICENSING AND REGULATION
CONTRACTOR'S LICENSE SIS259
P.O. BOX 12157, AUSTIN, TEXAS, 75711
(S00) 803_92091W R (512) 463.65" 1 W W.TDLTEXAS.GOV
ADOPTED ADMINISTARTIVE RULES 73 51 (C) ELECTRICAL CONTRACTOR S RESPONSIBILITIES
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
PFEIFFER&SON, LTD.
Electrical & Telecommunication Contractors
PFEIFFER AND SON JOB # 4200119 CHANGE ORDER REQUEST
Date: 5/14/2020
Project: BAWA 6MGD SWTP
Description: Increase existing 25 KVA transformer to 37-
1 /2 KVA
General Labor
Supervisory Labor
Subtotal items 1 and 2
Labor Burden 55% x Item 3
Cost of Materials
Equipment
Cost of Transportation
Subcontractor
Subtotal items 3,4,5,6 and 7
Cost of Insurance 4% x item 8
Cost of Bonds (7.4.2.2.4)
Subtotal lines 8,9 and 10
Overhead 10%
Profit 5%
Not Used
Total change order amount items, items 11,12,13 and 14
Page 1
49.00 hours x $
6.00 hours x $
29.9 1,465.10
55.0 330.00
1,795.10
987.31
11,783.00
346.72
0.00
0.00
14,912.13
596.49
554.00
16,062.62
1,606.26
803.13
n nn
$ 18,472.01
JONES CARTER RFP NO.: 009
REQUEST FOR PROPOSAL (RFP)
1. PROJECT NAME: 6 MGD Surface Water Treatment Plant
2. AC PROJECT NO.: 09986-0002-00
3. CONTRACTOR: Pepper Lawson Waterworks
4. SUBMITTED TO: Katy Drown
S. SUBJECT: Baytown Process Analyzer Drain Routing
6. REFERENCE: Proposed Change Order No. 057
7. REF. DWG. NO.: N/A
S. REF. SPEC. NO.:
9. DESCRIPTION OF WORK: (The Contractor is requested to furnish a price proposal for the below described work. Please complete, sign, date, and
return a proposal at your earliest convenience. Please attach a detailed cost breakdown to your proposal.
The following RFP is per Owner request and direction from on -site meeting on Thursday, May 14, 2020.
1. Remove analyzer trough drain from the Operations Building Sanitary Sewer system and route to the interior west wall of
the structure, down the wall, and exit the building approximately 12" above the finished floor elevation
2. Route drain line outside the building to 18" to 24" below the sidewalk adjacent to the building
3. Route the 6" drain line to the 4" drain line located at the northeast corner of the pulsed bed clarifier per Engineer
Drawings.
4. Tie in 6" gravity line into the existing 4" drain line at the northeast corner of the pulsed bed clarifier.
S. Reroute the sink drains located in the laboratory to tie into the new analyzer drain line inside the building.
11. Requestor's Name & Signature: Larry Weppler
Date: 5/15/20
The Contractor acknowledges that this RFP is to be used to request pricing information only, and does NOT constitute a contract modification. The Contractor
is NOT AUTHORIZED/DIRECTED to perform this work UNTIL/PRIOR TO written notification that a contract modification is approved.
I:wp\docs\const\forms\rfi or rfp\rfpform doc
REV 9.14 ii
Ptw
waterworks
May 15, 2020
Mr. Andrea Brinkley
Assistant Director
Baytown Area Water Authority
The City of Baytown
2401 Market St.
Baytown, TX 77520
Re: CPR No. 57
BAWA 6 MGD Surface Water Treatment Plant
BAWA Job No. 1806021
Mrs. Brinkley,
Per the Engineer's request, PLW proposes to modify Operations Building plumbing confirgration per
the attached drawings and quote. The plumbing modifications will be completed on a time and
material basis, not to exceed $12,000. Any resulting savings will be applied to a future change request.
This change will result in a increase in the amount of $27,600.18
Please feel free to contact me at (713) 301-8637 with any questions or concerns.
Regards,
PLW//Waterworks
l 10—
Katy Drown
Project Manager
Page 1
Baytown Ana Water Authority
BAWA 6 MGD Surface Water Treatment Plant
BAW A Job No. 1806021
Anaylzer Trough from Ops Building to Treatment Train
CPR No.: 57
Date: 0515;20
PLW Job No.: P3T
Scope of Work
Modify Analyzer Trough Drain Eye Wash Station and Laboralon Sink Collection into single dram line Analyzer Dram combination to go out rest side of operations building and tie into eyenash dram
closest to manhole 5 to dram to the sludge lagoon
Non -Tried
Labor
Material
Subcontract
Tried Mat'IIE ui
Item
Unit
Total
Unit Total
Unit
Total
Unit
Total
No.
D"Cri lion
Qtv
Unit
Cost
Cost
Cost Cost
Cost
Coil
Coat
Cost
I
PLW Coordination Efforts
l l
Pmjmt Martiger
0
HR
f 9800 S
-
S - S -
S - S
-
f - S
-
12
Project Engucecr
0
HR
f 7600 S
-
S - S -
f - S
-
S - S
-
I 1
Superintendent
IS
HR
f 12100 S
1.at5 M
S - f -
$ - S
-
S
2
100' of J" diameter whJO pipe and pipe inmlatioc
21
Foreman
40
HRS
S 6500 S
2,600 iw
$ - $ -
f - f
-
f - S
22
100 of 1' diameter seh40 pipe mod pipe insulation
100
FT
f 4500 S
4,50000
S - f
f - $
S S
23
Muu F.—.1os
3
DAY
$ - $
-
f - f
S f
f 31000 f
1 050 00
24
Dclncn Pickup
2
EA
S - S
-
f - s -
f - f
-
f 21000 $
5tian0
25
Opcmtor
20
HRS
S 5000
26
Final Gmdc Ckamrp
I
LS
S 25000 f
25000
$ - f -
S - S
-
f - S
-
3
JM Reed lie -Route of Sinks in Lab Arta
I
LS
S - S
S - S
S12.000 00 $
12.000 GO
S
Duccl Cost Subtotal
9 16500
-
12 Ora) on
1 550 00
Small Tools a 5 0%
45825
-
Na
of.
Equipment Burdcn a 500°.
nla
na
W.
Na
T.0825°.
Na
UL
n/a
12788
Subtotal 2
9.62125
-
1200000
167789
01 erhead & Protit ? 15 Os.
144149
1.90000
25168
Subtotal 1
11.066 71
-
11.80000
1 92956
Bonds & Insumsice d 3 0••.
112 60
41400
5789
Subtotal 4
11 39874
14 214 ti0
198744
Tow] of all co umu:
27.600 18
Other
Grand Total Cost 27,600.18
Payr 1
1. M Reed Plumbing Co. LLC
A Division of Derryberry's, L.P. 2203 W. Cedar Bayou Lynchburg
Baytown, TX 77521
(713) 943-1483 Fax (281) 837-6803
To: Albarra
Our price to rework the 5 SK sinks to tie into the 6" line is a not to exceed $12,000.00.
Thanks
Mike Broz
Project Manager
Regulated by the Texas Department of Licensing and Registration, PO Box 12157, Austin, TX 78711, 1-800-803-9202
TACL A024531E
Regulated by the State Board of Plumbing Examiners, PO Box 4200, Austin, TX 78765, 512-458-2145
M-10717
Regulated by the Texas Department of Insurance, P.O. Box 149104, Austin, TX 78714
SCR-U-1768030
RME-U-1795129
�. Ri oOu
........... 1
t WA7 WE WWOUAL p tIP.1.PlE PPEB ENiR! TMM WALL
ELECiRK4
itiSiRYY[N1
lOS'
l N
QWAR[NWY ��
PLLAMM
Pt.U.EBINIIE AL NOTES 0.;�.s,a.Y.,4.Y�
mml1 ■
�l HEMAM m
IIII IxStRUUENI
__-
41$E_R 1 11 1
I I>0 II�� 1. •a. 4��. It .:�
a
�II�.niniliv, 47 ~ - . QW.IR104. -. n '.
aGs• '�,tr„p�i5 s,d... �"�,�a>e `� ovL,asWra� �,,..NR.,y
0 0
i
L.............
ELC4iR1[4L
1 �63 1�1
Loj
PLIIMBMO KEY® NOTES:
o�
./ . w..R rN.x ssw.+n-o�enR,n.,r i°9 'W ��°"•�"-�'ap1w" 4Dn'ursrin mu ie'ua+s.w.a urav OPERA STF [IUILOING
15T FLOOR
w n nw I/ -I' •'^•l— " rt .R..s e O - .m L . m. PLOMBING PLW
s.a �1 1.. u ..• ems. e.n J�i0N ES
PI EIAABMO L7El/6aAL ND7ES q m� m vc� w. lu * DBR
Yam— a g BAFFLE PPES @I1FIY hNU WALL •�s w..a.. r m a a.a sn. ®'iea w..w...rn mu a • w a 20-P-11
. .� i u: • �ir�. � fie' -''' ;'rt e
��SSff r
��
1• j Lila • Y �' n� _ ' �... ..