Ordinance No. 12,260C)ROFNA,NCE O. 12,26(:a
AN C)RD1N.,kNCE C)F "R-]IF CITY (.7C)UNCIE. OF TFIIZ CIVY OF RAYTOWN, WAXAS,
AUTY10RIZINCi CI LAN(31, ()RD R, N(_:)� 2 WFITI T,&-C CONS'l-RU)C71-10N. L_FD_ FOP,
'I'] IF' RACCC� UN ROA L-) i_it� I, s,rivmw imi uA DILYFAl ION AN L> I Z, -INC1 I FC)RCE�,
N V I A IN PR'03 E_C'F; AUTI MR ]ZINCir PAYM F'N'F BY T[ IF, CYYY OF 13AYT()1V%1N, IN AN
ANIC")LIN'l- T,;C)'[- 1-C) 'I'WC') 11UNDIT•D SLX'FN"-NJNF-, "I'l IC-)USAND
SIMMICIMEN AND 24/100 DOLLARS (S269IM7,24); ANL> PRC )VIDINCi THE'
1_,FFI_;CT1VF E)A'I'U' T[
I , rr cwtoAurnin It%, 'I um C.:` 1' c7C)UNC711. QF THE crin (OF BAY FOWN, 'FEWCAS:
Section 1: That th(, City CU)uncil does hereby' M-11horizsc Cluinge Orcler No 2 %vith "FLSLC
Con-artiction, IAd., Corthe Risectson Road Lilt RehabUitation mid 12AnchF`()rce N-lain 11rqjCCi_ A cc)p�
Wsakl changto order is attached. hercuo, nnwkcd Exhibit -A and niade a part livreofW all intents and
IMArIloses.
Sl.,i,:Iioll 2: 'I-hat ois, city cou"wi or the t3i", of Buylown hereby au"horlzus the paynwiu in mi
'111jokillt -1, -mousApaj SL -.VI N'F1-r',U',N AND 24/100
1)(It to eXCee(,l ,if' 'r FWC> Ift-fNI'AMIA SIXI 041pw
DOLL/A R'S (5,269 01 V24) to W&C' C'emstruction, IAN, Par Change Ch-dur No. 2 for- the Ulaccoon Rcmd Lilt
Matkmi RohnWhallon and 12-inch Force Maiut llr( ject.
Section 3:, -1-his vordin.111cc. tiJiall Ink efi-L ct jyj"I al"I afQj it-s pa,,�szqge by the C,ity
C"cnincil or the Cjv�,,, oV Ba!,,to%,vn_
IC' 'TRC)DUCLED, READ 1"id IN%SSED by the afl-irinative %10tC OCOIC Cill�
Baylo"ni this the 23`1 day ca :l` Nd my, 2013. 1/ /
A P] " I � C) V I _ D, A S 'T'k 3 1 "C ") R , M:
jNACIQ RAMIREPQ ruz, Cali 61" lonle;
ON M SOMMU
COLIXICH ti_)f OIC City Or
NCAR,L,C)S, N/lay -w
c
H A KamnUQ%W&1O C"snWEQhdQanmsUOF3%N1a.y 23N(_'hang,0rdcrN1o2 I I L tf Is lasimik cis abditation doc
10 21
Brief Description of Changes*
Raccoon Drive Lift Station Rehabilitation &
12" Force Main Project
5,11 612013
This change order is created to authorize T&C Construction, LTD. To perform the following work that is
outside of the current contract: 1) open cut trench irl HeLl of directional boring dUe to obstructions encountered
in the path of the force main; 2) removal and disposal of upl to 300 Cubic yards tons of unacceptable soil
material,
Add or Delete Items:
Item
I De�scri Lion
Unit Price
- Total
I
Open cut trench work in fle:u of directional bodrg
due to
obstructions encountered
in the
aath of the main
16 Class 160 Force Main by open out or
auger const,, includang pvnit, Repair
LF
-500
$199,010
-$0501 p0
Traffic Control -
LS
1 1
$14,000.00
$14,00U0
Pavement removal
400
$17. 60
$7,0140 00
Jconcrete pavement
SY
400
$96,80
$38,72U0
Concrete curb
LF
50 "1 0
$1120
$6,6001,00
Cement stabilized sand backfill
TON
-160,
531.901
S5,104,00
Select fill
CY
450
$25,30
$11,385,00
161" Class 160 Force Main by open cut const,
LF
500
$63,80
S31,900 00
Water service fine adjustment
EA
2
S1,210,00
-$2.,4201,00
Sanitary sewer service line adjustment
EA
2
$550,00
S1,100.00
Rernovat and disposal of upto 300, cubic yards
on unacceptaNe
s matedE�
removal and disposal of unacceptable sad
CA J!
1
24
,24814
Total
5 259,017,24
Contract Summary:
Original Contract Price
Previous Change Orders
This Change Order
Revised Contract Price
Criginal Contract Duration - Calendar22L---�
g
Previous T me Extensions
This Change Order
Revised Contract Duration - Calendar Days
T&C Construction, LTD, Da 01
Mrector of Finance mate
H RIClaunch & Miller fate
5 2,565,8101,00
$ 220,,380,00
S 3,05:5,
Director of Engineering Dale
City Mana(
ger Date
BAYTOWN
Brief Description of Changes:
CITY OF BAYTOWN
Change Order No. 2
Raccoon Drive Lift Station Rehabilitation &
12" Force Main Project
5/16/2013
This change order is created to authorize T&C Construction, LTD. To perform the following work that is
outside of the current contract: 1) open cut trench in lieu of directional boring due to obstructions encountered
in the path of the force main; 2) removal and disposal of up to 300 cubic yards tons of unacceptable soil
material.
Add or Delete Items:
Item
Description
Unit Quantity I Unit Price
Total
1
Open cut trench work in lieu of directional boring due to obstructions encountered in the path of the main
16" Class 160 Force Main by open cut or
auger const., including pvmt. Repair
LF
-500
$199.00
-$99,500.00
Traffic Control
LS
1
$14,000.00
$14,000.00
Pavement removal
SY
400
$17.60
$7,040.00
Concrete pavement
SY
400
$96.80
$38,720.00
Concrete curb
LF
500
$13.20
$6,600.00
Cement stabilized sand backfill
TON
160
$31.90
$5,104.00
Select fill
CY
450
$25.30
$11,385.00
16" Class 160 Force Main by open cut const.
LF
500
$63.80
$31,900.00
Water service line adjustment
EA
2
$1,210.00
$2,420.00
Sanitary sewer service line adjustment
EA
2
$550.00
$1,100.00
2
Removal and disposal of up to 300 cubic yards on unacceptable soil material
removal and disposal of unacceptable soil CA 1 $250,248.24 $250,248.24
Total
$ 269,017.24
Contract Summary:
Original Contract Price
$ 2,565,810.00
Previous Change Orders
$ 220,380.00
This Change Order
$ 269,017.24
evised Contract Price
$ 3,055,207.24
Original Contract Duration - Calendar Days
240
Previous Time Extensions
45
This Change Order
60
evised Contract Duration - Calendar Days
T&C Construction, LTD
it
Director of Finance
Raidoll-66
RIClaunch & Miller
Da e
5 LL(i�
Date
5/161) 3
Date
'rector f Engineering Date
MIt)-1 r3
345
City Manager
sa(7-0
Date