Loading...
Ordinance No. 11,774ORDINANCE NO. 11,774 AN ORDINANCI", OFTI-IF" CITY COUNCIL OF CITY Ol"BAYTOWN, TEXAS, AuTfiORIZING CHANGE ORDf."R NO. I WITH MONTGOMFRY BUILDING SERVICES, L-LC, FOR THE CITY HALL SOLY"I'll RE'NOVATION PROJECT; AUTHORIZING PAYMENT 13Y THE, CITY OFBAYTOWN,THE StJM, OF ONE I'l UN DRED 'ri iiwry-i"OU R THOU SAND THREE HUNDRED SEVENTY-NINE, AND NO/100 DOLLARS ($134,379,00); AND PROVIDING I"'OR, THE EFFECTIVE' DATETHERF-10F, * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * 4, * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * 131"' ITORDAINE[) BYTf-IF'CI'J`Y COUNCIL 01" THE, CITY OF BAYTOWN,Tl1`XAS: Section 1: That the City Council does hereby authorize Change Order No, I with Montgomery Building Services, I. for the City Hall South Renovation Project, A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. Section 2: That the City Council ofthe City of Baytown hereby authorizes the payment of ONE I-IUNDRED'ri-IllZ TY-f'OtJR'I'IIOUSAND'I'FIR,l;E HUNDRED SEVl`N`l'Y-NINL`. AND NO/I 00 DOLL,ARS ($134,379,00) to Montgomery Building Services, LU fior Change Order No. I for the City Ila] I South Renovation Project. Section 3: This ordinance shall take effect immediately from and after its passage by tile City Council ofthe City of Baytown. IN'riwi)UCED, READ and PASSED by the affirmative vote the City Council ofthe City of Baytown this the I ]'u'day of October, 2011. 1 APPROVED AS TO' FORM: Id&ACIO RAMIREZ, SR-, Ci 3>,- ttorney DONCARLOS, Nllll E This change order is created to have MontgomM Building Services, LLC perform the following work that is outside of the current contract: 1); upgrade the lobby area upper windows to be impact resistant and meet the 13iO mph wind loads, 2) remodel the lobby area public restrooms. Contract Summary: Hi DOW Contract Duration - Calendar IIM66ntnmery Bultding Services, LL C Date P(jAL, Date Ur7rf Engineedng Date City Manager M �IOi1tQ eupuiog seruICes, ue City of Baytown September 26, 2011 City Hall Renovations Change Request # 23Rev 2 P 1 of 2 Removetreplace upper windows in lobby area. Total 15 openings per attached quote. NOTE: based on the way installation is now we recommend a new treated wood curb at each window. Price Includes roof work, rem roofing from glass ,extend over new curb. Also Includes structural repairs : remove interior piaster 2'6x window width. Build support wall from bot of beam to top of window, add 3x3 angle.4' o c from new angle spanning joists to wood header. Weld all angles to bar joists and/ or angle to angle. Cover wood wall w/ densglass and waterproof membrane. Patch/replace plaster. Note this work will mostly be performed after hours and on weekends. Sub Windowsfframes $41464.00 Demo existing(15) 3mhrsx35xl5= 5245.00 New curbs 2x matls 5001f 500.00 Labor 3mhrsx35xl5 w /demo Temp close windows Matls(plywd,2x,ice 1wtr shld 600.00 Labor(10mhrsx35) 350.00 Patch stucco ext 3041fx6 "= 154sfx12/sf= 1848.00 Patch plaster int 700sfx8= 5600.00 Angle3201fx2.50 800.00 Welder24hrsx75 = 1800.00 Primer coat plaster 750.00 Lab /matis new wood wall w /demo Densglasslinsul w /demo Waterproof matis 300.00 Labor16 mhrs x 35 = 560.00 Lift rental 1000.00 Modify roof to new curbs 2300.00 Clean /haul 500.00 PO Box 187 9 Montgomery. Texas 77356 • Tel: 936 - 662 -2517 . Fax: 832- 201 -0491 • MontgomeryBui tcSingServices(&nisn.com MONIVOM62ly Building Seniices, ue Subtotal $63617.00 Markup 6362.00 Bond 1400.00 Total $71379.00 Schedule change: 4 wks after dwg approval ( "AQ14s) ARCH /OWNERComments: PO Box 187 . Montgomery, Texas 77356 • Tel: 936 -662 -2517 • Fax: 832 -201 -0491 . MontgomeryBuilding Services @msn.com T. A. Construction Services LLC 21912 Mueschke Rd Bldg A Tomball. TX 77377 Phone: 281-255-9590 Far: 281 -255 -9671 Attn: Bill Mc Comas From: Bradley Rayburn brad @taconstructionservices.com RE: City of Baytown City Hall South Renovations 2401 Market St Baytown, TX 77520 Rework at lobby windows: $5245 Included: September 23, 2011 • Demo plaster ceiling for structural steel installation • Infill walls above ceilings with 3 5/8" 20g studs 16" o.c. • Frame 6" curb under windows out of treated wood • Hang 5/8" Densglass • Insulate walls with R13 unfaced insulation Excluded: Adds: • Level 5 finish • Temporary partitions • Dumpster for trash • Reframe and replaster ceiling and patch plaster areas: add $3250 We look forward to an opportunity to work with you on this project. �o Non . BWtMNG,UO City of Baytown September 27, 2011 City Hall Renovations P1of5 Change Request # 26Rev 1 Remodel restrooms per Arch sketchlinfo(See att for backup) Sub Pibr Demo, new shtrok Toilet part, accessories Tile Patch, paint ceiling. elect Matls ( drs, frets,) G Cs, clean, dumstr Subtotal Markup Bond Total Schedule change: 45 Days $23000.00(excl flush valves,changed by 6185.00 City)(4O% labor) 11118.00 7379.00 2750.00 2500.00 4300.00 $57232.00 4723.00 1260.00 $63000.00 PO Box 187 • Montgomery, Texas 77356 • Tel: 936- 662.2517 . Fax: 832 -201- 0491 • MontgomeryStdldingservkmomsn,com t f �Iont� Baadiug Service& we COR# 26Rev 1 ARCH /OWNERComments: P2 W-,pvW "V A- fP/WAt-I APPReyw— .�_ Date 9 go l PO Box 187 • Montgomery, Texas 77356 • Tel: 936.662 -2517 • Fax 832- 201-0491. MontgomeryBuildingSen n.00m T. A. Construction Services LLC 21912 Mueschke Rd Bldg A Tomball, TX 77377 Phone: 281 -255 -9590 Fax: 281-255-9671 September 13, 2011 Atin: Bill Mc Comas From: Bradley Rayburn brad @taeo u 6onservices.com RE: City of Baytown City Hall South Renovations 2401 Market St Baytown, TX 77520 Restroom Remodel Demo the tile walls, tile floors, doors, door frames, and restroom accessories. Install new 518" Permabase, new door fimmes (supplied by O.C.1 and new doors (supplied by G.C.). This excludes MEP demo. No work to existing sheetrock ceiling. Malarial — $1469 Labor — $4711 Total - $6180 We look forward to an opporhmity to work with you on this project. 2611 COUCH HOUSTON, TEXAS 77088 AOOMUMB NOTED: NONE 7 SPECfALTtEB DIRECT, INC. QUOTATION u 114064 SHEET 1 OF 1 ALTERNATES NOTED: NONE SALES TAX: BONDSINWIDED: NO PROJECT NAIItE: BAYTOWN CITY HALL LOCATION: BAYTOWN, TX BASE BID: $ 8,268.00 FURNISHED & INSTALLED GLOBAL PER FAXED REQUEST PHONE: 7134MI- 3 PAX' 713-8814471 EST. BY: BONNIE KNSEL DATE: Mimi QUAUFICAMONS: BIDDING: (7) COLOR THRU SOLID PHENOLIC, OVERHEAD BRACED TOILET PARTITIONS. (2) Zr WALL HUNG URINAL SCREENS, ALL WITH SIS BRACKETS, SM HINGES S 818 DOOR HARDWARE. MFO'8 STANDARD CLASS B COLORS. NOTES: BID AS QUALIFIED ABOVE ONLYI EXCLUSIONS: PRICE EXCLUDES CLASS A FIRE RATING AS IT IS NOT AVAILABLE ON COLOR THRU PHENOLIC. LEAD TIME'S TO 9 WEEKS awwN. • ACC BASE BID: $ 29376.00 FURNISHED & INSTALLED AMERICAN sPEclALTIEs PER FAXED REQUEST QUALIFICATIONS: BIDDING: (2) 0469 PAPER TOWEL DISPENSER & WASTE RECEPTACLE (4) 0800.24"x 38" MIRROR (2) 3801.36" GRAB BAR (2) 380142" GRAS BAR (7) 7402 -BD PAPER TOWEL DISPENSER (4) 0832 SANITARY NAPKIN DISPOSAL (4) 0300 SOAP DISPENSER (2) 0408 WASTE RECEPTACLE (1) 8488.29 SANITARY NAPKIN VENDOR (2) 0210 PAPER TOWEL DISPENSER (2) 06804rx 18" SIS SHELF NOTES: BID AS QUALIFIED ABOVE CNLYI EXCLUs1on PRICE EXCLUDES ALL MIRRORS OVER 24" x 36 ". LEAD TGIE: 3 TO 4 WEEKS CUT OUTS WALL BLOCKING DEMOLITION ELECTRICAL HOOK -UPS STRUCTURAL SUPPORTS OF ANY TYPE ANY WORK ABOVE THE RNISIiED CEILING APPROVED: DATE: COMPANY NAME: AFTERAPPROVALSUB,IECTTO CANCELLATION PEE TERMS: C.O.D. UNLESS OPEN CREDIT ACCOUNT HAS BEEN ESTABLISHED PRIOR TO IPLACING ORDER. C.O.D. TERMS ARE 80% DOWN AND 60% BEFORE INSTALLATION. CREDITTERMS ARE NET 30 DAYS. TION WILL BE HONORED FOR 30 DAYS FROM DATE BAYTOWN CITY HALL RESTROOMS PULL.BBIMTWALL 2ZH MONI+G MMY BUILDING SERVICES, Poe 2 qJ 2 cakrNme Swwm-w—bw TAOBSa1.SVB1EM rd EXUA PT - - i Cr- 1 CERAMC FLOOR TILE SUPPLIED AND INSTALLED - STYLE: BRIXTON U X n -COLOR BAND INSTALLED AT RESTROOM FLOORS ONLY. DAL 71LE AS NOTED 330A0 SP AS NOTED AS NOTED 2 CWr d C WALL TILE PROVIDE AND INSTALL - STYLE: BRDLTON 6 X 6. COLOR SAM INSTALLBD�,ffMGHT WITS BULL NOSE TOP AND NO BASE. DAL•TIILS AS NOTED 850.00 SP AS NOTED AS NOTED 3 CERAbUC BULL NOSE EDGE TI.E SUPPLIED AND IP WTAILED- 2 X6 BULL NOSE. BRIXTON, COLOR. SAND. DAL-TILE AS NOTED 6740 EA AS NOTED AS NOTED 4 THINSET LATEX MODLiIRD SUPPLIED AND INSTALLED - BOX2R COAL. FLOORS N/A 27.00 FA SBT1M MATMtIALS MA 3 GROUT POLIAIMMODIFLED SUPPLIED AND INSTALLED - SO= COMMERCIAL FLOORS TBD 6.00 EA GOUT - SANDED __ TIM TOTAL (JZ=LINB1TZW TAXBXWM PAM$ Bomar Coommw Floor, I= sommk MONTGOMERY BUILDING SERVICR4 LLC �^0�d Iw S�f Deers 9Ykwl I"" Bid sr 1888 A4rsq/?