Loading...
Ordinance No. 11,760ORDINANCI,-,-" NO, 11,760 AN ORDINANCE OFTFIE CITY COUNCIL OFTHE CITY OFBAYTOWN, TEXAS, AUTHORIZING CHANGE ORDER NO. 2 WITH E.P, BRADY, LTD, FOR THE NORTH MAIN /I -10 UTILITY PROJECT; AUTHORIZING PAYN11'.NT BY THE CITY ffl BAY TOWN, THE SUM Ol,S[,"VENTY-NfNE'1'1-10LJSAND FIVE HUNDRI,`J) t"Izia-rry-ONE AND 73/100 DOLLARS ($79,581.73); AND PROVIDING FORTHL ElFECTIVE DATE `'I BE IT ORDAINI'D ICY THIECITY COLTNCIL CITY OF BAYTOWNTEXAS: Section 1: That the City Council does hereby authorize Change Order No. 2 with E.P. Brady, LTD, for the North Main /1 -10 Utility Project, A copy of said change order is attached hereto, niarkcd Exhibit "A" and made a part hercor for all illtCWS acrd IlUrPOSCS. Section 2: That the City Council of the City of Baytown hereby authorizes the payment of SEVENTY-NINE THOUSAND FIVE HUNDRED E]GI ITY-ONE AND 73/100 DOLLARS ($79,581.73) to E.P. Brady, L'I'D, for Change Order No. 2 for the North Main /1-10 Utility Project. Section 3- This ordinance shall take effect immediately from and alter its passage by the City Council of the City ofBaytown. INTRODUCF�'D, IZL,.AD and PASSED by the affirmative vote City Council ofthe City of Baytown this the 22"d day of September,, 2011 STVPIJE�N 1-1, DONCARLOS, Mayor T -EST: /A 1"I"ITICIA y B 1-1, Z,'Icrk � APPROVED AS TO l"ORM: ACIO RAMIIR421:;/, SR., C ity Attorney C"ImIA'Ordir6amcs,201 ]'Sq)lember 22 CliaiwgeOiderN�rp-li•l'i is a41,� :M,Liplii0t.)tilit)Jlr(.rjL cI dot O Iff UA September 0 Description of This change carder is for the modifications necessary: 1, to comply with the Harris County Flood Plain Requirements. true to revised 100 year base flood elevations at this location. 2. Revised 1-10 Crossing dune to unstable sail conditions., 3« Revised North Main crossing due to conflicts with existing conduits. 4. Revised Hunt mead crossing due to conflict with Hunt Road proposed drainage Infrastructure. S. Additional Sanitary Sewer Stacie for Republic of Texas Park, Add or Delete items: Contract Summary: Director of Engineering 'Date Directcnr n e Date city Manager Date Langford Engineering, In bate U a i ♦ „ Station Ifft « « ♦ 1 N i N� • e� evised w Crossin • u. �� A iW i '. ,.i iii w ■I. M « . w . « «WII Contract Summary: Director of Engineering 'Date Directcnr n e Date city Manager Date Langford Engineering, In bate U