Ordinance No. 11,518ORIANANCt', NO. 11,518
AN ORDINANCE (11" ,.1.I HT 011" COUNCIL. (01"I'l R-,, CH "Y OFBAYTOWN, TEXAS,
Al,"THORIZING CHANCH! ORDER M. 3 WIT[IT&C COT,��STRU','CTION, LTD., FOR
TH'-, GULF COAST UFF STATION PROJEkyr; AUTI 101WING PAYN,1F.NTB)"PII--',
CITY OF 13 A YTO W N,T 11 1",,yMJ N1 ()FTWl-',N'l'Y-SEVF,N "H-K.WSAND NINE I RJNDRI�D
I'V 1,N"1°1''-TWO AN 1) 11''100 DOMARS §27,2111)w AND PROVIDING i FOR T1JE
EFFL-,CTIVE' DATE TH ER EOF
BE rr ORDAINFD BY' 'ITIF. CITYCO(JNCH., OF THE CITY 01," 13AYT0WN,'1'1.`.XAS:
Section I That the (,,ity Council does hereby authorize Change Order No, 3 with T&C
g
Construction, 1.1d, For the Gull'CoaSt Lill Station PrOjeet. A copy of saki chwge ouler K uwwhW humto,
marked Exhibh.W and made as part hereoff'or all intents and purposes.
SO% 2: That iiie City councu or we coy or Baytown hereby aUthorDes the payment of
']'WL-',N'FY Sl?Vl?N]'IIOLJSANI)NINI'-.1-111NDI�l,-,,'],)'FWI,',N'I'Y-']"NVOA,NI)11/100 )(�)1.1�A[ S($27,922.11)
to T&C Congructhn, Lt?, Wr Change Order 14L 3 Or the Gulf'Coast Lill Station Prqject,
Swiln 3: Ilk oMhunce shall wke effect immediately froiti and aBer its pwage by the City
COLHICH 0011C City Of BaY10"'11.
INTRODUCI`.]"'.), RF'.Al) and PASSFA) by the affirmative votQ or the V "Y coutwil of we City of'
Baytown th;,i the 9'�'day Of December, 20 10. 1
AP11ROVI'1) AS TO FORW
C I
RAMIREZ, SR., City t wne.y
WIM W001"; COMWIM&MMallo M DMUAO 9 c6nd h Moo &MOM "UM VC
HF.7771. DONCARLOS,
Brief Description of Changes:
Exhibit "A"
CITY OF BAYTOWN
Change Order No. 3
Gulf Coast Lift Station Project
11/22/2010
This change order is for the remobillzation of boring operations under HWY 146 due to an unforseen obstruction
encountered during the initial bore. The contractor ultimately located and removed the obstruction which was a chunk of
concrete debris approximately 20 ft below natural ground. However, due to Its location under the SH146 overpass, an
additional bore pit with dewatering needed to be constructed In order to resume the initial boring operations.
Add or Delete Items:
Item
Description
Unit
Quantity
Unit Price
Total
CO3
Boring remobilization and new bore pit
setup including dowatering of now bore
pit.
LS
1
$27,922.11
S 27,922.11
S -
S
S
S -
S
5 -
S -
S -
S -
S -
S -
Total
S 27.922.11
Contract Summary:
Original Contract Price
S 2,021,390.00
Previous Change Orders
S 20,672.00
This Change Order
S 27.92
Revised Contract Price
S 2,069,984.11
Original Contract Duration - Calendar Days 270
Previous Time Extensions 0
This Change Order
Revised Contract Duration - Calendar Days 270
T &C Construction, Ltd. Date
Director of Finance Date
WA Engineering & Surveying, Inc. Date
Director of Engineering Date
City Manager Date