Loading...
Ordinance No. 11,426ORDINANCE NO. 11.426 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN. TEXAS, AUTHORIZING CHANGE ORDER NO. 2 FOR THE CRYSTAL BAY FISHING PIER PROJECT TO INCREASE THE QUANTITY OF CONCRETE RIP -RAP NECESSARY TO PREVENT FURTHER EROSION FROM STORM SURGE OR LOCALIZED FLOODING, AUTHORIZING PAYMENT BY THE CITY OF BAYTOWN. IN THE AMOUNT OF FORTY -EIGHT THOUSAND ONE HUNDRED NINETY -NINE AND 20 /100 DOLLARS ($=48,199.20) FOR SUCII CHANGE ORDER: ACCEPTING THE CRYSTAL BAY FISHING PIER PROJECT AUTHORIZING FINAL PAYMENT OF THE SUM OF TWELVE THOUSAND ONE HUNDRED FIFTY -TWO AND NO /100 DOLLARS ($12.152.00) TO CRAWLEY'S SHORELINE CONSTRUCTION, INC.. FOR SAID PROJECT; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. WHEREAS, the City of Baytown contracted with Crawley's Shoreline Construction. Inc., for the Crystal Bay Fishing Pier Project (the "Project "): and WHEREAS. the City authorized administratively a change order totaling EIGHT THOUSAND TWO HUNDRED AND NO /100 DOLLARS ($8.200.00) to add additional length to the ramp to meet ADA requirements and to prevent erosion under the walkway: and WHEREAS, a final change order totaling FORTY -EIGHT THOUSAND ONE HUNDRED NINETY -NINE AND 20 /100 DOLLARS ($48.199.20) is necessary for the increase in the quantity of concrete rip -rap to prevent further erosion from storm surge or localized flooding: and WHEREAS, all of the said improvements, as provided in the plans and specifications heretofore prepared by the City's engineer and as approved and adopted by the City Council have been performed and completed in full accordance with all of the terms and conditions of the aforesaid contract: and WHEREAS. the City's engineer in the manner provided by the terms of the said contract and the plans and specifications thereof, has approved and accepted the Crystal Bay Fishing Pier Project, has heretofore issued his Certificate of Final Acceptance. has certified same to the City Council, and has recommended that it accept and receive said work and improvements as constructed and completed by Contractor: and WHEREAS, after payment of Change Order No. 2. there remains due and owing to Crawley's Shoreline Construction. Inc., the sum of TWELVE THOUSAND ONE HUNDRED FIFTY -TWO AND NO /100 DOLLARS ($12,12.00): NOW THEREFORE BE IT ORDAINED BY THE CITY COUNCIL OF TI IE CITY OF BAYTOWN, TEXAS: Section 1: That pursuant to Texas Local Government Code Annotated § 252.048, the City Council does hereby authorize Change Order No. 2 with Crawley's Shoreline Construction. Inc.. for the Crystal Bay Fishing Pier Project hereof in order to increase the quantity of concrete rip -rap necessary to prevent further erosion from storm surge or localized flooding. A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. Section 2: That the City Council of the City of Baytown hereby authorizes the payment of FORTY - EIGHT THOUSAND ONE HUNDRED NINETY -NINE AND 20 /100 DOLLARS ($48,199.20) to Crawley's Shoreline Construction, Inc., for Change Order No. 2 authorized in section 1 hereof. Section 3: That the City Council hereby accepts and approves the above - described work and improvements, and finds and determines that all of said improvements have been completed as provided in the plans and specifications thereof. and in full accordance with all of the terms and provisions of the aforesaid contract. Section 4: That the Certificate of Final Acceptance heretofore issued by the City's engineer and certified to the City Council is hereby accepted and received. Section 5: That final payment to Crawley's Shoreline Construction. Inc.. in the amount of TWELVE THOUSAND ONE I- DRED FIFTY -TWO AND NO /100 DOLLARS ($12.152.00) is hereby authorized. Section 6: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote cyfl he CityCouncil of the City of Baytown this the 26th day of August, 2010. STEPATq*F -9 INCARLOS, Mayor R `Karcn\File_'City CouncilkOrdinanccs'2010'Augwt 261FinalPay4FishingPierProject .doc BaYTOUnv Brief Description of Changes: Exhibit "A" CITY OF BAYTOWN Change Order No. 2 Crystal Bay Fishing Pier Project 8/13/2010 This change order is to increase the amount of rip -rap per the contract due to unforseen erosion around the shoreline of the pier. This will better stabilize the area for possible storm surge or localized flooding. Add or Delete Items: Item Description Unit Quantity Unit Price Total CO3 Additional clean rip-rap rip-rap and placement CY 240 $200.83 $ 48,199.20 $ - $ - $ - $ - Total $ 48,199.20 Contract Summary: Original Contract Price $ 234,840.00 Previous Change Orders $ 8,200.00 This Change Order 48,199.20 Revised Contract Price 291,239.20 Original Contract Duration - Calendar Days 75 Previous Time Extensions 0 This Change Order 0 Revised Contract Duration - Calendar Days Crawley's Shoreline construction, Inc. Date Director of Finance Date Randall - Porterfield Architects, Inc. Date Director of Engineering Date City Manager Date 75