Ordinance No. 11,388ORDINANCE NO. 11,388 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, DECLARING AN EMERGENCY: AUTHORIZING CHANGE ORDER NO. 1 WITH REYNOLD INLiNER, LLC.. FOR THE GOOSE CREEK TRUNK LINE PROJECT: AUTHORIZING PAYMENT BY THE CITY OF BAYTOWN, "1 -HE SUM OF SIXTY -NINE THOUSAND FIVE HUNDRED AND NO /I 00 DOLLARS ($69.500.00); AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. WHEREAS. the existing Goose Creek sewer line has separated: and WHEREAS, such separation has caused the following: (i) sink hole immediately adjacent to the Goose Creek bank; (ii) infiltration of water from Goose Creek into separated sewer line: and (iii) raw sewage to leak out of the line: and WHEREAS, sink hole and infiltration of the sewer line could potentially cause an overflow condition at the Gulf Coast Lift Station and Texas Ave. Lift Station: and %k'I IEREAS, the infiltration of the sewer line has resulted in the pump systems at the above - referenced lift stations running at full capacity to keep up with the flow and continued use at frill capacity could cause pump failures; and WHEREAS. immediate repairs are imperative to minimize raw sewage leaking into the environment and to reduce the potential failures of the lift stations: and WHEREAS, to preserve the health. safety and well -being of the City's residents, immediate repairs are necessary: NOW THEREFORE BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council of the City of Baytown. Texas, hereby finds that the recitals contained hereinabove are true and correct and are the findings of the City Council of the City of Baytown, Texas. As such, the City Council hereby declares an emergency because of the existence of an imminentthreat to public health and safety and /or a reasonably unforeseeable situation due to the findings contained in the recitals. Section ?: That the City Council does hereby authorize Change Order No. 1 with Reynold Inliner, LLC., for the Goose Creek Trunk Line Project. A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. Section 3: That the City Council of the City of Baytown hereby authorizes the payment of SiXTY- NINE THOUSAND FIVE HUNDRED AND NO /100 DOLLARS ($69,500.00) to Reynold Inliner, LLC., for Change Order No. 1 for the Goose Creek Trunk Line Project. Section 4: This ordinance shall take effect immediately from and al* ' passage by the City Council of the City of Baytown. INTRODUCED. READ and PASSED by the affirmative vote ofthe C' Coucil ofthe City of Baytown this the 30'f' day of June, ?010. J, DONCARLOS. ATT�S TQI LE I A A P PQ VF-D AS ACIO RAN11REZ, SR.. CA ]Attorney R K: enFlei City- Cwncil Ordm es2OIOJane24Chargt0r&rICo uC.ree:irunki- t Pru)atdu ttl% savTownr t Brief Description of Changes: Exhibit "A" CITY OF BAYTOWN Change Order No. 1 Goose Creek Trunk Line Project June 30, 2010 This change order is to repair a separation in the existing sewer trunkline that runs adjacent to Goose Creek. The contractor will install a new manhole and approximately 230 LF of PVC pipe using the open cut method to relocate the sewer line out of the erosion zone of Goose Creek. This will prevent sewer leakage into Goose Creek and infiltration of creek water into the sewage system further taxing the downstream lift stations. Add or Delete Items: Item Description Unit Quantity Unit Price Total C01 Install new manhole and approx. 230 LF of 21" PVC pipe. LS 1 $69,500.00 $ 69,500.00 $ - Total $ 69,500.00 Contract Summary: Original Contract Price $ 1,591,535.00 Previous Change Orders $ - This Change Order 69,500.00 Revised Contract Price 1,661,035.00 Original Contract Duration - Calendar Days 180 Previous Time Extensions 0 This Change Order 0 Revised Contract Duration - Calendar Days Reynolds Inliner, LLC Date Director of Finance Date Claunch & Miller /HDR, Inc. Date Director of Engineering Date City Manager Date 180