Loading...
Ordinance No. 11,368()RDINANCE N(), 11,368 AN ORDINANCE OF I`1 -II OF TI II CITY OFBAYTOWN,TFXAS, AUT110RIZING CIIANCK ORD10 NA), 4 WITH IIASSFLL CONSTRLICTION SUNI (Ml 11HIRTYUG11T wKWANJI) SIX HUNDRI",J) SIXTY AND N0,11100 LXWLARS ($38,660,00): AND PROVIDING FUT 11113 lea I l:C;`rivi, wall WEREOF. 131`; ITORDAINEI) BA"THE UTY COUNCIL OF "ITIF', CITY OF BAYTOW'N.TEXAS. Section 1: That die City Council does hereby atilhorize Clumge Order No� 4 with I lassell Inc., for the Wayne Way SponsComplex FwuilyAqti,,.tticsC'eiitei°ili(,,)ject, Acopyof" said cluinge order A altachal herew. mated Fxhibh -A" aml nude as part hereoflorcall intents and purposes. Scuion 2: 'Hwt We City Cmmcil of the City of Baytown hereby authorizes the payn'ient of 'I'l IIRTY-1'-'. IU IT'll RJUSAND SIX I I(,JNDRF.*D SIXTY AND NOI 00 DOLLARS (S38,600,00) to I lassell CcYlistruction C"onaparly, laic;.., for change ("'h-der No. 4 Or the Ahqne Gmy SMwB Cimplex I'amily Aqwaics Ce rater ProjeW, Section 3: This ordinance shall take effect miniediately, from and alier its passag y the City ,e 1) C'ouncil ofthe City ofBaylown. PN"I'R0DtJCED. READ and PASSED by die a0knatkc vmc of the Q lhytmvn I& the 270 day ofhA, 2010. APPIO)VIA) AS T() Ft: RlvL —tt o I AN4114 SR- t. Attorney 31,4911 It Kaus Idn Coy Cmawd I Wnw=s 2MUMq 27 hQ Council of the City of N C A R, I . 0 S, NI,, i) ,r r, BAWOM Brief Description of Changes: Exhibit "A" CITY OF BAYTOWN Change Order No. 4 Wayne Gray Sports Complex Family Aquatic Center May 19, 2010 This Change Order is created to have Hassell Construction Co., Inc. perform the following work that is outside of the Current Contract: CPR #27 to furnish and install Variable Frequency Drives for two 50 HP Pumps. Add or Delete Items: Item I Description Unit Quantity Unit Price Total 1 ICPR # 27 VFDs LS 1 S 38.660.00 $ 38,660.00 Total S 38,660.00 Contract Summary: Original Contract Price S 10,240,900.00 Previous Change Orders non - Allowance S 234.598.44 This Change Order (non - Allowance) $ 38,660.00 Revised Contract Price S 10,514,158.44 Ori inal Contract Duration - Calendar Days 425 Previous Time Extensions 30 This Change Order lv��iy�a�.� 'U""""' - vaicnua� vaya Contractor Name Date Director of Finance Date enllo Co ultant Nam Da e Director of Engineering Date City Manager Date 455