Ordinance No. 11,345ORDINANU'i NO. 11345 AN ORDINANC]"' OF—ITIE CITNCOUNCIL, 0FT11l.`.CI`1'Y OF BAYTOWN, TEXAS, AUTHORIZING' CI ANG11' ORDER NO, 2 WITI-I HASSELL C ONSTRU C110 N COMPANY, INC., FOR, THL�l FIRE STATION NO. 6 I1ROJI-- , CT; AUTHORIZING THE RF-DUCT IN THE PAYMEXI'BY-1`111", CITY OF BAYTOWN IN 1*111," ANIOUNT01"ONE, I IUNDRED FORTY-SIX THOUSAND NINI HUNDRED SIXTY-FOUR AND NO/100 1 0t,,LARS ($146,964.00); AND PROVIDING I'ORTHE EI`I`T.`.CTJVE DATE T11E'1 I"01". BE IT CSI 13"x' "I CITY C01,JN(.1L OFTI-If" CITY OFI3AYTOWN,TF.XAS: Section 1: That the C " ity Council does hereb)l authorize Change Order No. 2 with l-hassell Construction Company, [tic., for the Fire Station No. 6 Protect. A copy of' said change order is attached hereto, marked f"'xilibit - A"alld made a part hereof for all intents and purposes. Section 2: That the City Counci I ofthe City, cal` Baytown hereby aLlth0riZeS the reduction ill payment to Hassell Construction Company, Inc., for Change Oi-dej-No. 2, for the I"ire Station No. 6 Pro.ject in the amount ol'ONF, I UJNDRED FORTY-SIX THOUSAND NINE HUNDRED SIXTY- FOUR AND NO/tOO DOLLARS ($146,964,00). Section 3: This ordinance shall take effect immediately from and alter its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASS1'. Dby the aft i rinal i ve vote of th ot'llaytown this the 22"' alai. y ol'April, 2010. A Uj� T qk I W, mmm At:- APP'ZOVED AS TO I"ORNI., 5N CIO RAMIREZ, Si k , lty , tton-ley R K=n Hcn C)�,% CCA3m 11'0 dmam;w, 2WO Avid 22 don,� ST1,011F,'fM DONCARLOS, Mayor BAYTOM Brief Description of Changes: Exhibit "A" CITY OF BAYTOWN Change Order No. 2 Fire Station # 6 April 16, 2010 This Change Order is created to have Hassell Construction Co., Inc. deduct an amount associated with the pier drilling operations. The worst case scenario was presented in Change Order Number 1 In the amount of $194,904.00. The actual additonal cost of the pier drilling operations amount is $47,940.00. This deductive change order represents the cost savings in the amount of $146,964.00. Add or Delete Items: Item Description Unit Quantity Unit Price Total 1 Change Order Number 1 ICPR# GM I I 1 $ 194,904.00 $ 194,904.00 2 4 Actual Pier Drilling Operations LS 1 $ 47 940.00 $ 47,940.00 Total $ 146,964.00 Contract Summary: Ori inal Contract Price $ 1,993,300.00 Previous Change Orders non - Allowance $ 194,904.00 This Change Order (non - Allowance) $ 46,964.00) Revised Contract Price $ 2,041,240.00 Original Contract Duration - Calendar Days 290 Previous Time Extensions 37 This Chan a Order 0 C_ evis 7 ntract Duration - Calendar Days Contractor Name Date Director of Finance Date Consultant Name Date Director of Engineering Date City Manager Date 327 �WAOk CITY OF BAYTOWN Change Order No. 2 BAWOWNFire Station # 6 April 15, 2010 Brief Description of Changes: This Change Order is created to have Hassell Construction Co., Inc.deduct an amount associated with the pier drilling operations. The worst case scenario was presented in Change Order Number 1 in the amount of $194,904.00. The actual additonal cost of the pier drilling operations amount is$47,940.00. This deductive change order represents the cost savings in the amount of$146,964.00. Add or Delete Items: Item Description I Unit Quanti ty Unit Price Total 1 Change Order Number 1 GM 1 $ 194,904.00 $ 194,904.00 2 CPR#4 Actual Pier Drilling Operations LS 1 $ 47,940.00 $ 47,940.00) Total $ 146,964.00 Contract Summary: Original Contract Price 1 $ 1,993,300.00 Previous Change Orders non-Allowance $ 194,904.00 This Change Order(non-Allowance) $ (145,964.00) Revised Contract Price $ 2,041,240.00 Ori in Contract Duration-Calendar Days 290 Previous Time Extensions {c V,,, 37 This Change Order 0 R ise/C ntract Duration-Calendar Days 327 Contractor Name Date Dire f n rin Date Directbr of Finance Date City Manager" Date G 41W �o Consultant Name ate