Ordinance No. 11,335ORDINANCE NO. 11,335 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS. AUTIORIZING CHANGE ORDER NO. 1 WITH HASSELL CONSTRUCTION COMPANY. INC., FOR THE FIRE STATION NO. 6 PROJECT, AUTHORIZING PAYMENT BY THE CITY OF BAYTOWN, AN AMOUNT NOT TO EXCEED ONE HUNDRED NINETY-FOUR. THOUSAND NINE HUNDRED FOUR AND NO /100 DOLLARS ($194,904.00); AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 1 with Hassell Construction Company, Inc.. for the Fire Station No. 6 Project. A copy of said change order is attached hereto, marked Exhibit "A" and made apart hereof for all intents and purposes. Section 2: That the City Council of the City of Baytown hereby authorizes the payment of an amount not to exceed ONE HUNDRED NINETY -FOUR THOUSAND NINE HUNDRED FOUR AND NO /I 00 DOLLARS ($194,90=1.00) to Hassell Construction Company, Inc., for Change Order No. I for the Fire Station No. 6 Project. Section 3: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. , INTRODUCED, READ and PASSED by the affirmative vote ofrtli City Council of the City of Baytown this the I" day of April, 2010. APPROVED AS TO FORM: NACIO RAMIREZ. SR.. C- ttorney R'Kareiffiles`Cq CowuilArdinanc,�sL010t, \pril l' ChangcOrdcrlFirestati onNo6Projcctdoc TEPI- IEN-H. DONCARLOS, Mayor BAYTOM Brief Description of Changes: Exhibit "A" CITY OF BAYTOWN Change Order No.1 Fire Station # 6 March 29, 2010 This Change Order Is created to have Hassell Construction Co., Inc. perform the following work that is outside of the current contract: CPR#03 W Worst Case(Guaranteed Max.) is necessary due to the unexpected soil conditions encountered during pier - drilling operations. This Change Order reduces the depth of the bell footings and allows for a worst case scenario, given the existing soil conditions. Every effort will be made to drill and place the concrete piers according to revised drawings, provided by the Architect of record, which represents the most cost effective alternative. However, given the soil conditions, the alternative solution representing the worst -case scenario may be implemented, partially or entirely. The final cost will be In between the best and worst case scenarios depending on the number of pier shafts that collapse during drilling operations. Add or Delete Items: Item I Description Unit Quantity Unit Price Total 1 1 CPR #03W Worst Case Guaranteed Max. GM 1 $ 194 904.00 $ 194,904.00 Total $ 194 904.00 Contract Summary: Ori final Contract Price $ 1,993,300.00 Previous Change Orders non - Allowance $ - This Change Order non - Allowance $ 194,904.00 Revised Contract Price 2,188,204.00 Ori inal Contract Duration - Calendar Days 290 Previous Time Extensions 0 This Change Order Revis Contract Duration - Calendar Days Con cto ame Date Director of Finance Date Consul Name Date Director of Engineering Date City Manager Date 327 CITY OF BAYTOWN Change Order No. 1 BAYTOM Fire Station # 6 March 29, 2010 Brief Description of Changes: This Change Order is created to have Hassell Construction Co., Inc. perform the following work that is outside of the current contract: CPR#03 W Worst Case(Guaranteed Max.) is necessary due to the unexpected soil conditions encountered during pier-drilling operations. This Change Order reduces the depth of the bell footings and allows for a worst case scenario, given the existing soil conditions. Every effort will be made to drill and place the concrete piers according to revised drawings, provided by the Architect of record,which represents the most cost effective alternative. However, given the soil conditions,the alternative solution representing the worst-case scenario may be implemented, partially or entirely. The final cost will be in between the best and worst case scenarios depending on the number of pier shafts that collapse during drilling operations. Add or Delete Items: Item Description Unit Quantity Unit Price Total 1 CPR#03W Worst Case, Guaranteed Max. GM 1 $ 194,904.00 $ 194,904.00 Total $ 194,904.00 Contract Summary: Original Contract Price $ 1,993,300.00 Previous Change Orders non-Allowance $ - This Change Order (non-Allowance) $ 194,904.00 Revised Contract Price $ 2,188,204.00 Ori inal Contract Duration -Calendar Days 290 Previous Time Extensions 0 his Change Order 37 RViseontract Duration -Calendar Days 327 C rat o e Date Dire r o ng' a ring Date w _ Dir t r o Financ Date City Mana Date 41& 3--q 4 Cons I ant Name Date HASSELLCONSTRUCTION COMPANY, INC.. ................................. ............................................................................................................................................................................................ P.O.BOX 20487 Houston,TX.77225-0487 Phone 713-665-2442 Fax 713-665-0369 terrvt��rhassell.cora PROPOSAL REQUEST#03W Worst Case , Guaranteed Max Brown Reynolds Watford Architects,Inc. Date: 3/25/10 2700 Earl Rudder Frwy South,#4000 Project: Fire Station#6 College Station,TX 77845 10166 Pinehurst Dr. Baytown,TX 77521 Owner: City of Baytown Attention: Matt Faulkner NOTICE OF CHANGE PROPOSAL REQUEST WITH QUOTATION Description of The Work: To revise foundation drilled bell bottom piers shown on design documents at 9'-0"below bottom of grade beams to drilled shafts at a depth of 13'-0"below natural grade per revised schedule. We have included casing all piers to a depth of 13'-0" below natural grade. Please note that the casing will be removed once the piers are poured. We have included two mobilizations for the drill rig. We have included minor dewatering of cased piers. With this proposal,we are requesting an additional 37 calendar day contract extension. This price is a guaranteed maximum price for the work above. We exclude any unknown soil conditions,well pointing, or any unusual soil failures below the pier bearing area. Please review the attached cost break down&sub quotation. Lump Sum in the amount of$ 194,904.00 broken down as follows: Quotation Attached: $ 1729864.00 GC Fee(10%): $ 179286.00 Bond Fee: $ 4.754.00 Total: $ 194,904.00 C1 BY: Architects Response: Terry K. auriell Date: Signature: Attachment(s): Backup documentation ON 133HS ��. : /i'�-� ��; ���;�-� V1t311 Av � 90f 'SId101 1A S Z x Z' 51�W` 6 f.Y ol OVY k�b o r • pto i �s he 9� � ' o Zg b/ - ;7fd-/2 ocv/ s� l IV !J z/ �aG Q/) 2iOSvl 51b'I2i3lbw 2109v1 '1t/K 1Ii�f1 1 kLLLNvn0 NOI18MS�]G OUVD01 -IV-Lo Td1G_!. JjN n JJN n f 1 I - UNIT UNIT TOTAL ►OTAL__ LOCA-FIGN DESCRIPTION QUANTri Y UNIT MAT. LABOR MATERIALS LABOR 4 4 .04 X d-ol/C .4&A 9 C X N JX\ xOVI oz L X -lit //-o,, Y. e� r • rr cfie�l Ww5� Z2__A /�buv 25 raj /� /�—• -�`""/cry /o�:5 r' �... ..�w� �,,' .. jfu T,U Z5 215 ) .. C: � .... • �/'�� ��� �t^•/ � •.1. / . �... �/�/%� .YW. I /�`I Mlle wom— J • i r +� /j.)./�fyA/�M \a.. 11 .v.~+ �.i\/.�1l S'•r yX, � I.�•. G �r1� s.7 �! i" �C�d 7i��fr ���.✓ ��►V t1 �ctI/ ��L/�J TOTALS. JOB �(�1-rtJ •-�-� ITEM �?%'"`�'�'`' � SHEET NO i ' W oN JMHs J��y�� I� /yy� �G•��I�j/ w311 ��.o�G.�•1y ' eor '67 Pilo a. r-71 w .. / r, d� ,.iV Co 00 agIOL QV 8091v1 S lvmRidiAl I 809v-1 n A J-Nvnb 140ILVD0-1 7VIOl "1V1o1 nqn ijignIL