Loading...
Ordinance No. 11,209ORDINANCE NO. 11.209 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, "TEXAS. AUTHORIZING CHANGE ORDER NO. 2 WITH HASSELL CONSTRUCTION COMPANY, INC.. FOR THE WAYNE GRAY FAMILY AQUATICS CENTER PROJECT; AUTHORIZING PAYMENT 13Y THE CITY OF BAYTOWN, THE SUM OF TWENTY - EIGHT THOUSAND FIVE I IUNDRED SEVENTY AND 29/100 DOLLARS ($28,570.29); AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN. TEXAS: Section I: That the City Council does hereby authorize Change Order No. 2 with I- lassell Construction Company. Inc., for the Wayne Gray Family Aquatics Center Project. A copy of said change order is attached hereto. marked Exhibit "A" and made a part hereof for all intents and purposes. Section 2: That the City Council of the City of Baytown hereby authorizes the payment of TW'ENTY- EIGHT THOUSAND FIVE HUNDRED SEVENTY AND 29/100 DOLLARS ($28.570.29) to Hassell Construction Company. Inc.. for Change Order No. 2 for the Wayne Gray Family Aquatics Center Project. Section 3: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED. READ and PASSED by the affirmative vote of the / 1 Council of the City of Baytown this the 2=10' day of September, 2009. STC .-f 11EN- i- DONCARLOS.Payor I rl 4 r3t; V- ROVED AS TO FORM: ACIO RAMIREZ. Sg.,Vity Attorney R:' K ucn\Filcs.Ciry CounciliOrdinance s\2009'Septembxr 24 ChanieOrdcr2 Wa \M:Gra\ AquancsCenterProject.doc Brief Description of Changes: Exhibit "A" CITY OF BAYTOWN Change Order No. 2 Wayne GraV Sports Complex FamilV Aquatic Center September 9, 2009 This Change Order is created to have R. Hassell Builders, Inc._ perform the followng work that is ouside of the Current Contract: 1) Add American Locker Slope Tops; 2) Safety Block Wall & Door @Pavilion Exposed Electrical Panel; 3) Pavilion Restroom Changes; 4) Add Metal Facia; 5) Fill Break Metal Voids @ Pavilion; 6) Upgrade window glazing at pump house and bath house. Add or Delete Items: Item Description Unit Quantity Unit Price Total 1 CPR It 2 Add American Locker Slope Tops LS 1 $ 1,009.80 $ 1,009.80 2 CPR It 7 Safety Block Wall & Door @ Pavillion Ex Posed Elec. Panel LS 1 S 3,999.93 S 3,999.93 3 CPR # 8 Pavillion Restroom Changes LS 1 S 3,622.62 S 3,622.62 4 CPR It 10 Add Metal Facia LS 1 S 3,590.40 S 3,590.40 5 CPR 11 11 Fill Break Metal Voids @ Pavillion LS 1 S 3,107.94 S 3,107.94 6 CPR h 12 Upgrade Window Glazing LS 1 S 13,239.60 S 13,239.60 Total $ 28,570.29 Contract Summary: Original Contract Price S 10,240,900.00 Previous Change Orders (non - Allowance) S 34,500.00 This Change Order (non - Allowance) -28,577F Revised Contract Price S 10,303,970.29 Original Contract Duration - Calendar Days 425 Previous Time Extensions 0 This Change Order Re sed Contr ct Duration - Calendar Days L\ lv Contra to Name Date Director of Finance Date 71d 0 C ultant Name Date Director of Engineering Date City Manager Date 425