Ordinance No. 11,060ORDINANCE NO. 11,060
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS,
AUTI- IORIZINO CHANGE ORDER NO. 4 WITH CSA CONSTRUCTION, INC.. FOR
THE NORTHEAST WASTEWATER TREATMENT PLANT PROJECT: AUTHORiZINCY
PAYMENT BY THE CITY OF BAYTOWN IN THE AMOUNT OF SEVENTEEN
THOUSAND SEVEN HUNDRED NINETY AND NO /100 DOLLARS ($17,790.00);
MAKING OTHER PROVISIONS RELATED THERETO; AND PROVIDING FOR THE
EFFECTIVE DATE THEREOF.
BE 1T ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS:
Section 1: That the City Council does hereby authorize Change Order No. 4 with CSA
Construction. Inc.. for the Northeast Wastewater Treatment Plant Project. A copy of said change order is
attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes.
Section 2: That the City Council of the City of Baytown hereby authorizes the payment of
SEVENTEEN THOUSAND SEVEN HUNDRED NINETY AND NO /I 00 DOLLARS ($17,790.00) to CSA
Construction, Inc._ for the change order authorized in Section I hereof.
Section 3: That pursuant to the provisions of Texas Local Government Code Annotated
§252.048. the City Manager is hereby granted general authority to approve any change order involving a
decrease or an increase in costs of TWENTY -FIVE THOUSAND AND NO/] 00 DOLLARS ($25.000.00) or
less, subject to the provision that the original contract price may not be increased by more than t%venty -five
percent (25 %) or decreased by more than twenty-five percent (25 %) without the consent of the contractor to
such decrease.
Section 4: This ordinance shall take effect inurrediately from and after its passage by the City
Council of the City of Baytown.
INTRODUCED. READ and PASSED by the affirniative vote of the Council of the City of
Baytown this the 22nd day of January, 2009- 1
v v_
S
kYT DARNEL rtv Clerk
APPROVED AS TO FORM:
ACID RAMIREZ, SR., Ce Attorney
'.�cobsry l \I .cE.ar \Iv areMF i!<s'.0 ity Counci lLOrdi n ances•?009 Jan uary 22 Chan geord -4 N E W WTP doe
ST 1IE . DONCARLOS N,41ayor
CITY OF BAYTOWN
01 Change Order No. 4
Northeast Wastewater Treatment Plant
BAMWN January 8, 2009
Brief Description of Changes:
This Change Order is created to have CSA Construction, Inc. perform the following work that is
outside of the current Contract: 1) install drain line for blowoff from air release valves, 2) add
landing at stairwell for access to aeration basins, and 3) modify walkway and install guardrails at
Headworks facility.
Add or Delete Items:
Item Description - Unit I Duantit +� Unit Price Total
COR #016 — Add drains for ARVs LS j 1 S 1.980.00_ S 1.980 00
COR #017 i Add stairwell landing LS t-1 _ — S 4.152 00 S 4,15200
COR #018 1 Walkway and guardrail LS J1 S 11,658 00 S 11.658.00
modifications
Total S 17.790.00
Contract Summary:
Original Contract Price _ 1 S 17,500.000.00
Previous Change Orders - S 121,382.00
This Change Order j S 17,790.00
Revised Contract Price S 17.639.172.00
Original Contract Duration — Calendar Days 730
Previous Time Extensions 159
This Change Order j 0
Revised Contract Duration — Calendar Days
XA/0
889
CSA Con coon. Inc. Date Dire -tor of En neerin Date
CDM Date LjA Engineering & 8urveying, Inc. D e
Director of Finance Date City Manager Date
MOU A
Fron:•CSA CONSTRUCTION INC 7136888889 U /t5 /kUUd l ;UU "4u% r.uuwuu%*
CSA Construction, Inc. MkNGE ORDER REQUEST
2314 McAllister Road NO. 00016
Phone: 713 - 686 -8868
Houston, Texas 77092 Fax: 713 - 6864889
TITLE: Air Release Valve Piping DATE: 11/20/2008
PROJECT: Baytown NE WWTP JOB:
TO: Attn: Donald Cutler CONTRACT NO: 13
Camp Dresser* McKee, Inc.
3050 Post Oak Boulevard
Suite 300
Houston, TEXAS 77056
Phone: 713 -423 -7309 Fax: 713-840-0173
RE: To: From: Number:
DE8(;RM IOI4OF'PROVOSAL
Reference RM #32
This proposal is for the air release valve discharge, piping which was not show at the following locations:
1) WAS pumps (0 1/1/4" PVC discharge lino connecting the thme pumps run to the manhole.
2) SCUM pumps (1) 1 1/4" PVC discharge line connecting the duet pumps nm to the manhole.
3) Sludgc pumps (t) 1/1/4" PVC discharge line connecting to a 6" aye off of the drain cleanout.
Add S1y80
item Deseriptlots swo Qbarttity units Onle Price Tax Rate TaaAZ%6umt-P(ct Amount
00001 1.000 $1,980.00 0.00% $0.00 $11080.00
Unit Cost: $1,980.00
Unit Tax: $0.00
Total: $1,980.00
APPROVAL:
By: C� � )— By:
tt Onnald Cutler Ric ay eld
Date: 1l LQ�i Date: // o
From:CSA CONSTRUCTION INC 7136888889 12/15/2008 09:08 4404 P.003/004
CSA Construction, Inc. CF ANGF. ORDER REQUEST
2314 McAllister Road N0. 00017
Phone: 713.686 -8868
Houston. Texas 77092 Fax: 713. 686 -8889
TITLE: Stair Platform & Knee Brace DATE: 11/20/2008
PROJECT: Baytown NE WWTP JOB:
TO: Attn: Donald Cutler CONTRACT NO: 13
Camp Dresser & McKee, Inc.
3050 Post Oak Boulevard
Suite 300
Houston, TEXAS 77056
Phone: 713 -423 -7309 Fax: 713- 840 -0173
IRE: To: From: Number:
DZS(.' V-n-QN OF P90POSAL
Reference RFl 1131
Tho aeration basin stair near the blower building conflicts with the WAS 8t Scum piping which runs along the aeration basin wall to
the digester. Their is also a knee bravo pipe support which is needed along the same location on the soratign basin wall to support the
WAS and Scam pipes. This change adds a landing ror the stair, including pipe columns to support the landing and the stair will attach
to tho edge or the landing. A galvanized pipe support will be added for the WAS and Scum Piping.
Add 54,152
item Deserlptlob Srtookm Quantity Units Unit Priest Tar RAte Tav Amount Net-Awouat
ONO 1 1.090 $4,152.00 0.00% SO.QO $4,162-00
Unit Cost: $4,152.00
Unit Tax: $0.00
Total: $4,152.00
APPROVAL:
By: C By:
Donald Cutler Ri ayfeld
Date: l at l t�q Data: ♦ a o goo
�mv
Frorr:CSA CONSTRUCTION INC 7136868889 12/15/2008 09:06 #404 P.002/004
CSA Construction, Inc. MANGE ORDER REQUEST
2314 McAllister Road No. 00018
Pbona 713.686 -8868
Houston, Texas 77092 Fax: 713.6186 -8889
TITLE: Headworks Platform & handrail DATE: 12/15/2008
PROJECT: Baytown NE WWTP JOB:
TO: Attn: Donald Cutler CONTRACT NO: 13
Camp Dresscr & McKee, Inc.
3050 Pust Oak Boulevard
Suite 300
Houston, TEXAS 77056
Phonc:713 -423 -7309 Fax: 713-840-0173
RF: To: From: Number:
nEscWrVOM OF PSOPO$At,
CSA proposes to Nmish and install the headworks raised walkway adjacent to the barsemen channels as per the sketch by LJA.'1'his
work also inlcudes the following:
1) Installing 2' -6" high precast concrete walls into the piviot gate frames where the gates were deleted.
2) Modifying the handrail between the headworks downward opening weir gates to close the gaps.
3) lnaW ling galvanized fence rail and clamps to be installed between the downward opening weir gate ttaraes. This will add a center
horizontal rail on each weir gate opening ax per 1JA's letter.
Add 3 11,658
(tent. Dnerlptlon Stnek# Qanntity Volts Unit 'Price, 'fax Jl Aie 'Tar Ahtotint Net Amount -
00U01 1.000 !11,658.00 0.00% $0.00 311,850.00
Unit Cost: $11,658.00
Unit Tax: $0.00
Total: $11,658.00
APPROVAL:
By: (�_ / By:
Donald Cutler
Date: I I ot I Qc, Date: