Loading...
Ordinance No. 11,060ORDINANCE NO. 11,060 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AUTI- IORIZINO CHANGE ORDER NO. 4 WITH CSA CONSTRUCTION, INC.. FOR THE NORTHEAST WASTEWATER TREATMENT PLANT PROJECT: AUTHORiZINCY PAYMENT BY THE CITY OF BAYTOWN IN THE AMOUNT OF SEVENTEEN THOUSAND SEVEN HUNDRED NINETY AND NO /100 DOLLARS ($17,790.00); MAKING OTHER PROVISIONS RELATED THERETO; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. BE 1T ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 4 with CSA Construction. Inc.. for the Northeast Wastewater Treatment Plant Project. A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. Section 2: That the City Council of the City of Baytown hereby authorizes the payment of SEVENTEEN THOUSAND SEVEN HUNDRED NINETY AND NO /I 00 DOLLARS ($17,790.00) to CSA Construction, Inc._ for the change order authorized in Section I hereof. Section 3: That pursuant to the provisions of Texas Local Government Code Annotated §252.048. the City Manager is hereby granted general authority to approve any change order involving a decrease or an increase in costs of TWENTY -FIVE THOUSAND AND NO/] 00 DOLLARS ($25.000.00) or less, subject to the provision that the original contract price may not be increased by more than t%venty -five percent (25 %) or decreased by more than twenty-five percent (25 %) without the consent of the contractor to such decrease. Section 4: This ordinance shall take effect inurrediately from and after its passage by the City Council of the City of Baytown. INTRODUCED. READ and PASSED by the affirniative vote of the Council of the City of Baytown this the 22nd day of January, 2009- 1 v v_ S kYT DARNEL rtv Clerk APPROVED AS TO FORM: ACID RAMIREZ, SR., Ce Attorney '.�cobsry l \I .cE.ar \Iv areMF i!<s'.0 ity Counci lLOrdi n ances•?009 Jan uary 22 Chan geord -4 N E W WTP doe ST 1IE . DONCARLOS N,41ayor CITY OF BAYTOWN 01 Change Order No. 4 Northeast Wastewater Treatment Plant BAMWN January 8, 2009 Brief Description of Changes: This Change Order is created to have CSA Construction, Inc. perform the following work that is outside of the current Contract: 1) install drain line for blowoff from air release valves, 2) add landing at stairwell for access to aeration basins, and 3) modify walkway and install guardrails at Headworks facility. Add or Delete Items: Item Description - Unit I Duantit +� Unit Price Total COR #016 — Add drains for ARVs LS j 1 S 1.980.00_ S 1.980 00 COR #017 i Add stairwell landing LS t-1 _ — S 4.152 00 S 4,15200 COR #018 1 Walkway and guardrail LS J1 S 11,658 00 S 11.658.00 modifications Total S 17.790.00 Contract Summary: Original Contract Price _ 1 S 17,500.000.00 Previous Change Orders - S 121,382.00 This Change Order j S 17,790.00 Revised Contract Price S 17.639.172.00 Original Contract Duration — Calendar Days 730 Previous Time Extensions 159 This Change Order j 0 Revised Contract Duration — Calendar Days XA/0 889 CSA Con coon. Inc. Date Dire -tor of En neerin Date CDM Date LjA Engineering & 8urveying, Inc. D e Director of Finance Date City Manager Date MOU A Fron:•CSA CONSTRUCTION INC 7136888889 U /t5 /kUUd l ;UU "4u% r.uuwuu%* CSA Construction, Inc. MkNGE ORDER REQUEST 2314 McAllister Road NO. 00016 Phone: 713 - 686 -8868 Houston, Texas 77092 Fax: 713 - 6864889 TITLE: Air Release Valve Piping DATE: 11/20/2008 PROJECT: Baytown NE WWTP JOB: TO: Attn: Donald Cutler CONTRACT NO: 13 Camp Dresser* McKee, Inc. 3050 Post Oak Boulevard Suite 300 Houston, TEXAS 77056 Phone: 713 -423 -7309 Fax: 713-840-0173 RE: To: From: Number: DE8(;RM IOI4OF'PROVOSAL Reference RM #32 This proposal is for the air release valve discharge, piping which was not show at the following locations: 1) WAS pumps (0 1/1/4" PVC discharge lino connecting the thme pumps run to the manhole. 2) SCUM pumps (1) 1 1/4" PVC discharge line connecting the duet pumps nm to the manhole. 3) Sludgc pumps (t) 1/1/4" PVC discharge line connecting to a 6" aye off of the drain cleanout. Add S1y80 item Deseriptlots swo Qbarttity units Onle Price Tax Rate TaaAZ%6umt-P(ct Amount 00001 1.000 $1,980.00 0.00% $0.00 $11080.00 Unit Cost: $1,980.00 Unit Tax: $0.00 Total: $1,980.00 APPROVAL: By: C� � )— By: tt Onnald Cutler Ric ay eld Date: 1l LQ�i Date: // o From:CSA CONSTRUCTION INC 7136888889 12/15/2008 09:08 4404 P.003/004 CSA Construction, Inc. CF ANGF. ORDER REQUEST 2314 McAllister Road N0. 00017 Phone: 713.686 -8868 Houston. Texas 77092 Fax: 713. 686 -8889 TITLE: Stair Platform & Knee Brace DATE: 11/20/2008 PROJECT: Baytown NE WWTP JOB: TO: Attn: Donald Cutler CONTRACT NO: 13 Camp Dresser & McKee, Inc. 3050 Post Oak Boulevard Suite 300 Houston, TEXAS 77056 Phone: 713 -423 -7309 Fax: 713- 840 -0173 IRE: To: From: Number: DZS(.' V-n-QN OF P90POSAL Reference RFl 1131 Tho aeration basin stair near the blower building conflicts with the WAS 8t Scum piping which runs along the aeration basin wall to the digester. Their is also a knee bravo pipe support which is needed along the same location on the soratign basin wall to support the WAS and Scam pipes. This change adds a landing ror the stair, including pipe columns to support the landing and the stair will attach to tho edge or the landing. A galvanized pipe support will be added for the WAS and Scum Piping. Add 54,152 item Deserlptlob Srtookm Quantity Units Unit Priest Tar RAte Tav Amount Net-Awouat ONO 1 1.090 $4,152.00 0.00% SO.QO $4,162-00 Unit Cost: $4,152.00 Unit Tax: $0.00 Total: $4,152.00 APPROVAL: By: C By: Donald Cutler Ri ayfeld Date: l at l t�q Data: ♦ a o goo �mv Frorr:CSA CONSTRUCTION INC 7136868889 12/15/2008 09:06 #404 P.002/004 CSA Construction, Inc. MANGE ORDER REQUEST 2314 McAllister Road No. 00018 Pbona 713.686 -8868 Houston, Texas 77092 Fax: 713.6186 -8889 TITLE: Headworks Platform & handrail DATE: 12/15/2008 PROJECT: Baytown NE WWTP JOB: TO: Attn: Donald Cutler CONTRACT NO: 13 Camp Dresscr & McKee, Inc. 3050 Pust Oak Boulevard Suite 300 Houston, TEXAS 77056 Phonc:713 -423 -7309 Fax: 713-840-0173 RF: To: From: Number: nEscWrVOM OF PSOPO$At, CSA proposes to Nmish and install the headworks raised walkway adjacent to the barsemen channels as per the sketch by LJA.'1'his work also inlcudes the following: 1) Installing 2' -6" high precast concrete walls into the piviot gate frames where the gates were deleted. 2) Modifying the handrail between the headworks downward opening weir gates to close the gaps. 3) lnaW ling galvanized fence rail and clamps to be installed between the downward opening weir gate ttaraes. This will add a center horizontal rail on each weir gate opening ax per 1JA's letter. Add 3 11,658 (tent. Dnerlptlon Stnek# Qanntity Volts Unit 'Price, 'fax Jl Aie 'Tar Ahtotint Net Amount - 00U01 1.000 !11,658.00 0.00% $0.00 311,850.00 Unit Cost: $11,658.00 Unit Tax: $0.00 Total: $11,658.00 APPROVAL: By: (�_ / By: Donald Cutler Date: I I ot I Qc, Date: h;e..e