Ordinance No. 10,614ORDINANCE NO. 10,614
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN,
TEXAS, APPROVING THE BAYTOWN AREA WATER AUTHORITY'S
CHANGE ORDER NO. 4 WITH REYTEC CONSTRUCTION RESOURCES,
INC., FOR THE BAWA 30" WATER TRANSMISSION LINE PROJECT; AND
PROVIDING FOR THE EFFECTIVE DATE THEREOF.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN,
TEXAS:
Section 1: That the City Council of the City of Baytown, Texas, hereby approves the
Baytown Area Water Authority's Change Order No. 4 with Reytec Construction Resources, Inc.,
for the BAWA 30" Water Transmission Line Project. A copy of such change order is attached
hereto as Exhibit "A," and incorporated herein for all intents and purposes.
Section 2: This ordinance shall take effect immediately from and after its passage by
the City Council of the City of Baytown.
INTRODUCED, READ and PASSED by the affirmative va,fe of the City Council of the
City of Baytown this the 22nd day of May, 2007.
STEPHEN-HrDONCARLOS, Mayor
LORRICOODY, City Clerk
\i
APPROVED AS TO FORM:
NACIO RAMIREZ, SR/ffiity Attorney
R:\Karen\Files\CityCouncil\Ordinances\2007\May22\ApprovingBAWAChangeOrderNo4withٍ
Exhibit "A" I'age I of I
PATE <#> ENGINEERS
CONTRACT CIIANGK OKDKU
I'rujcci: Jl)"/16" Water Transmission Main
(liciil: Haytown Area \\ ali-r Aiithorily
Contractor: Re) tec Construciiun Resources, Inc.
Date: 4/24/2007
Change Order No.: 4
Job No.: 1329-003-00
Contract No.: I
RECEIVED APR 2 7 2007
I tillNIKAI. STATEMKN1 Ol CIIAMii::
I his chanties modifies the point of connection between the 30" line and the HAW A Distribution Header. The point of connection
will be at the north end of the header in lieu of the wet connection (ilid Item «2.?( at the existing 36" line. I lie purpose of this
change is to provide for conlinous water service to the City of liny town in case of line failures in either direction.
V TIMI-: 30 days
I he work covered bv this change order shall be performed under the same terms and conditions as included in the original construction
contract.
lU-coinmendcd:
Kiiiiinci-r -I'ale Engineers. Inc.
\
cs Approved:
Hiiytinvn Area W'alcr Aulhorily
Owner
hv
(Date)
Ktylec Cuiislniclion Resources. Inc.
I 'mil ractor
ADDITIONAL HUMS
.'» CONIKACI DRAWINCi Kl VISIONS: NONI I lo l>e aclilrc»e<l on As-Uuills)
i. contract documents kkvisions-. noni;
>. CONTRACT I'RICI-: REVISIONS:
Modification to the point of tie-in to the evistiu.i: IIAWA plant
header sjMem in lieu of wet connection them "2.»» S V7.95I
TOTAL AMOr.NT OF CIIAM.'K OKDKR NO. 4 S
I Date 1
')7.95I
•QI-H-2005 OliSIPU FMU-PATE ENGINEERS +713-462-1631 T-95O P0II/0Z4 F-313
Ittm Section Description of Item with Unit Toed
Wet Connection to Bxfadng 36" Waterlm
36"x30" Cnt-inTeo with Split Butt 8baps, Complete
24 0251! 1
02525 and Valve, Complete in Pisces
12-inch Tapping 81eeve
PerEacb
25 01578 6,000 LF. Fundib and Insttfl Well PolntfaeSywein, Complete m
Place:
S 7. ooo-
S IS
Per Lifiev Foot
26 02260 31,300 L.P. Fomiih and Install Trench Sitey Syram ftr Water Line
S /.* $ 7/.Jo«»-
PerLmearFoot
27 01160 1 L.S. Preparatory Woric Including Mobilization and
Monitoring Asiootaed wi± Potentially Continsnated
Sou7Oroundwater pet flnccificntfftni. Complete in Place:
Per Lump Sum
28 0U60 1,500 C.Y. Hawfling,Tranipoitattai,TJeaoii«aiul Disposal of
linpieted Soil and Graund Water from Open Cut or
Including All Mateiialf EatRpmns,aw>* T**""*i Cttnplete
fa Place:
S 3o.oo*>-
Per Cubic Yard
Bid Sheet Must Be Initialed By Same Penan Ai Prapotal itto**lv 6 of IS ADDENDUM NO. 1
Reytec Construction Resources, Inc.
1901 Hollistor
Houston. Toxas 77080
Offlc* 713.9S7.4003
March 30,2007
Pate Engineers
13333 Northwest Freeway. Sle. 300
Houston. TX 77040
Attn: Paul C.Wallick P.E
Re: Subject:Cost Proposal for the 30" Waterline to the Pump Station Header
Project: 2076 -30~/l6" Water Transmission Man [BAWA}
PateProj*: 1329-003-00
Mr. Wallick:
Proposal to connect the proposed 30" Waterline to the Pump Station Header is as follows:
Stenl:
Remove and Salvage as follows:
30" Waterline -68 If
Access Manhole -I ea
Air Release Manhole -I ea
Butterfly Valve Manhole -1 ea
30" Butterfly Valve w/Fittings-1 ea
Step 2:
Installation of the following:
30" Waterline w/Restrained Joints -ll)0 If
Access Manhole -1 eu
Air Release Manhole -1 ea
Butterfly Valve Manholes -I ea
30" Butterfly Valve \v'related fittings and thrust blocking
Step 3:
Removal of the following:
• Remove concrete thrust block at the end of the 48" header
• Remove 48" Blind Flange and install 48" x 30" Reducer Fittingsfrequires pump
station shut down]
Remove existing Valves and Access Manholes
Subtotal $ 10,665.00
Credit:
Total $97,951.00