Ordinance No. 10,544ORDINANCE NO. 10,554
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS,
AUTHORIZING CHANGE ORDER NO. 1 WITH PLAA ASPHALT, PIC., FOR THE
WAYNE GRAY SPORTS COMPLEX PAVING IMPROVE- PROJECT,
AUTHORIZING (I) THE ADDITION OF TWO LINE ITEMS FOR EXCAVATION
AND CEMENT STABILIZED SAND, (IT) A DEDUCTION IN THE QUANTITY OF
CONCRETE OVERLAY, AND (In) THE EXTENSION OF CONTRkCT DURATION
BY 120 CALENDAR DAYS; AND PROVIDING FOR THE EFFECTIVE DATE
THEREOF.
Section 1: That the City Council does hereby authorize Change Oder No. I with AAA
Asphalt, Inc., for the Wayne Gray Spoa Complex Paving Improvements hoject to auhorize (i) the
addition of two Eie items far excavation and cement stabifized sand, (ii) a deduction in the quantity of
concrete overlay, and (iii) the extension of contract duration by 120 calendar dirys. A copy of said change
odar is attached hereto, marked Exhibit "8" and made a part hereof far all inteats wd purpwes.
///
Section 2: This ordinance shall take effect immedmtdy its passage by the
City Council of the City of Baytown,
D and PASSED
k the 2~~ day of February. 2007.
by the affimatlve vote mil of the City of
-
erk
L
APPROVED AS TO FORM:
CITY OF BAYTOWN
Change Order No. 1
Wayne Gray Sports Complex Parking Lot lmprovements
February 15,2006
Brief Description of Changes:
This Change Order is created to add two new line items to the Wayne Gray Sports Complex Parking Improvements
Project contract with AAA Asphalt, Inc. The contractor encountered locations on the south parking lot where the
base under the existing pavement needs to be excavated and cement stabilized sand put in its place. The proposed
work for the North Parking lot is hereby reduced in terms of quantity of asphalt to be overlayed.
Add or Delete Items:
Total
Contract Summary:
Total
$ 4,200.00
$ 12,690.00
S (16,890.00)
$
$
9
Original Contract Duration - Calendar Days I 120
Previous Time Extensions
Unit Price
4.20
12.69
69.00
Original Contract Price
Previous Change Orders
This Change Order
I
This Change Order I
Revised Contract Duration - Calendar Days 1
120
Item
l6
17
20
$ 247,540.00
$
5 0.00
AAA Asphalt Paving. Inc. Director of Engineering Date
Unit
Sy
SY
TON
Description
Excavation to a min 8" depth and stockpile
onsite
Place and compact 2.0 SK cement stabilized
sand
Deduct from alternate bid
Hot asphaltic concrete overlay
Revised Contract Price $ 247,540.00