Loading...
Ordinance No. 10,268 r 1 ORDINANCE NO. 10,268 • AN ORDINANCE AUTHORIZING AND DIRECTING THE CITY MANAGER • AND THE CITY CLERK OF THE CITY OF BAYTOWN TO EXECUTE AND ATTEST TO A CONTRACT AMENDMENT WITH TEXAS DEPARTMENT OF • TRANSPORTATION FOR SUPPLEMENTAL FUNDING FOR PHASE III OF THE GOOSE CREEK STREAM GREENBELT TRAIL;AUTHORIZING A CASH MATCH FOR THE CONGESTION MITIGATION AND AIR. QUALITY SUPPLEMENTAL FUNDING IN THE AMOUNT OF FIFTY THOUSAND AND " NO/100 DOLLARS ($50,000.00); AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. • ********************************** ************************************ ******* BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN,TEXAS: Section 1: That the City Council of the City of Baytown,Texas,hereby authorizes and directs the City Manager and the City Clerk of the City of Baytown to execute and attest to..a contract amendment with Texas Department of Transportation for supplemental funding for Phase III of the Goose Creek Stream Greenbelt Trail. A copy of said amendment is attached hereto, marked Exhibit "A," and made a part hereof for all,intents and purposes. Section 2: That for the supplemental Congestion Mitigation and Air Quality funds to be received for the Phase III of the Goose Creek Stream Greenbelt Trail Project,the City Council of the City of Baytown authorizes a cash match not to exceed FIFTY THOUSAND AND NO/100 DOLLARS ($50,000.00). Section 3: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. • INTRODUCED,READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 23rd day of February, 2006. ES --- CALVIN MUNDINGER,Mayo • ATT L. , City Clerk APPROVED AS TO FORM: ACID RAMIREZ, SR., Attorney R:\Karen\Files\City Council\Ordinances\2006\February 23\TxDOTcontract4PhaseIIIGSSGreenbeltTrailAmendment3.doc Aalk Jok CSJ: 0912 -71 -507 Project: From SH 146 to the end of Arizona Street in Baytown CSJ: 0912 -71 -429 CSJ: 0912 -71 -698 Project: Baytown Goose Creek Hike and Bike Trail From the end of Arizona Street to Decker Drive in Baytown District: Houston Code Chart 64: 03150 AMENDMENT THREE TO THE AGREEMENT (TRANSPORTATION ENHANCEMENT AND CONGESTION MITIGATION AND AIR QUALITY PROGRAMS) THIS AMENDMENT IS MADE BY AND BETWEEN the State of Texas, acting through the Texas Department of Transportation hereinafter called the "State ", and the City of Baytown, Texas, hereinafter called the "City. WITNESSETH WHEREAS, the State and the City executed an agreement on the 15th day of February 1995 concerning the construction of a multipurpose bicycle /pedestrian facility with landscaping and historic preservation from SH 146 to Decker Drive along Goose Creek in Baytown; and WHEREAS, the State and the City executed Amendment One to the agreement on the 31St day of March 2000 which added supplemental Congestion Mitigation and Air Quality (CMAQ) funds to the original enhancement funds; and WHEREAS, the State and the City executed Amendment Two to the agreement, increasing Federal funds available for the project on the 5th day of January 2004; and WHEREAS, on the 27`h day of January 2006 the Metropolitan Planning Organization passed Amendment 70 to the Transportation Improvement Program, which is attached to this Amendment as "Exhibit I" providing additional funds to the project; and WHEREAS, it has become necessary to amend that contract; Amendment 3 AFA — AFAAmend Page 1 of 3 2121/2006 11li,t A'' NOW THEREFORE, in consideration of the premises and of the mutual covenants and agreements of the parties hereto, the State and the Local Government do agree as follows: AGREEMENT Article 1. Description of Amended Items Paragraphs A and B of Section 5 of the Agreement are voided in their entirety and replaced with the following: A. The estimated total cost of all phases of the Project, including construction engineering and testing services, is $2,810,750. Congestion Mitigation and Air Quality funding will total $1,406,250 and Enhancement funding will total $1,404,500. B. The State will be responsible to secure the federal share of funding required for the development and construction of all phases of the Project. The federal share for the development and construction of all phases of the Project is eighty percent (80 %) of the total estimated cost of all phases of the Project, not to exceed $2,248,600. The Federal portion of the Congestion Mitigation and Air Quality funding will total $1,125,000 and Enhancement funding will total $1,123,600. The City will be responsible to comply with the cost principles established in OMB Circular A -87, "Cost Principles for State and Local Governments" and for any non - federal participation costs associated with all phases of the Project. 2. The 2006 -2008 Transportation Improvement Program Amendment Number 70 is attached to Amendment Three and labeled "Exhibit I ". All other provisions of the original contract are unchanged and remain in full force and effect. Article 2. Signatory Warranty The signatories to this amendment warrant that each has the authority to enter into this agreement on behalf of the organization they represent. aw Amendment 3 AFA — AFAAmend Page 2 of 3 2/21/2006 gook IN WITNESS WHEREOF, THE STATE AND THE LOCAL GOVERNMENT have executed duplicate counterparts to effectuate this agreement. THE STATE OF TEXAS Executed for the Executive Director and approved for the Texas Transportation Commission for the purpose and effect of activating and /or carrying out the orders, established policies or work programs heretofore approved and authorized by the Texas Transportation Commission. Janice Mullenix Director of Contract Services Section Office of General Counsel Texas Department of Transportation Date: CITY OF BAYTOWN, TEXAS Name Printed Name and Title ATTEST: City Clerk City of Baytown AW Amendment 3 AFA — AFAAmend Page 3 of 3 2/21/2006 r� 2006 -2008 TRA,NSPORTATION I- IPROVEMEN'T PROGRAM ABLE- iDt,IEIN'T NL7-YIBER 70 CSJ 0912 -31 -143 Oyster Creek Trail From N. Dixie Drive to SH 2232 Construct Hike & Bike Trail CSJ 0912 -71 -698 VA Goose Creek Trail (Phase 2) S. of Market Street to W. of Texas Avenue Construct hike/bike trail CSJ 0271 -05 -023 IH 10 West From Waller County Line to Hams County Line Install Computerized Transportation Management System CONGESTION NaTIGATION AIND AIR QUALITY- (CNIAO) — CATEGORY ;. Project CSJ 0912 -71 -698 is on page A -47, project CSJ 0271 -05 -023 is on page 2 -10, and project CSJ 0912 -31 -143 is on page 2 -11 of the 2006 -2008 Transportation Improvement Program (TIP); project CSJ 0912 -31 -143 was amended via Amendment T37 in October 2005. All three projects are funded with Category 5 Clv1AQ funds. Project CSJ 091'2-31 -143 has been rescheduled for letting in February 2006. The project is intended to helt) fulfill the TCM. SIP commitment in the new conformity plan. On January 10, 2006 the City of Lake Jackson requested additional funds for the project due to the fact that the price of concrete is still rising and the current allocation for the Oyster Creek Bikeway is expected to prove insufficient. Project CSJ 0912 -71 -698 let in September 2004 and is about 70% complete. However, the cost of supplies, fuel, and some complications and changes have caused the project to exceed its budget. There have been site conditions discovered during construction and railroad issues at heir crossings that have required several large change orders. Therefore, the City of Baytown has requested that project CSJ 09122-71 -698 be provided with additional funds in the amount of 5250.000. Project CSJ 0 1.71- 05 -0 23 let in Septembe- 2005 for less than the authorized amount of 51.931.850. Therefore, at this time, TxDOT is requesting to transfer funds from CSJ 0271- 05 -0 ^3 to CSJ 0912 -71- 698 and CSJ 0912 -31 -143. EXHIBIT I Page 1 of 3 P 2 006 -2008 TRA\SPORTATION EMPROVENIENT PROGRAIAI District: Houston Type of Amendment: Administrative TPC X STIP Revision X Program: CINIAQ X STP TRANSIT OTI3ER X Highway: II: 10 W. VA TIP Number: '100' .1. 99 4 CSJ: 0271 -05 -023. 0912 -71 -698 Limits: See table. below Type of Work: See table. below Requested Amendment: Transfer funds from CSJ 071 -05 -023 to CSJ 0912 -71 -698 and CSJ 0912 -31 -143, as shown in the table below: AMENDED CsJ NAME OR DESIGNATION APPN CAT 1 COST I FEDERAL PROJ M DISTRICT LOCATION (FROM) APPN CAT 2 COST'_' STATE LET DATE COUNT` LOCATION CM) APPN CAT 3 COST 3 LOCAL RVN DATE CrrY DESCRIPTION OF WORK APPN CAT a COST 4 LCL COIN'TRIB PHASE COMMENTS TOTAL APPENDIX A 0917-71-198 CO05E Z=. TRAIL C RASE' -) CMAQ S1,406.250 S1,1.5,000 9954 YOUSTON S OF MARK T ST SO SO 0912004 HARRIS W OF TEXAS AVE SO SO 0212006 BAYTOW*1 CONSTRUCT HDCFJBIICE TRAIL SO S ?81.250 C.E.R 5 CMAQ 51.406.250 FY 2006 0912- 31 -1 -3 OYSTER CREEK TRAIL CMAQ Si.: 86,040 51.028.332 3033 HOUSTON N. DIXIE DRILL 50 $O 02/2006 BRAZORIA SH 332 SO 5:57.208 0 212006 L?KE JACKSON CONSTRUCT HIKE & BIKE TRAIL 50 SO C?;,R !CMAQ S1386,040 0271 -05-023 IH 10 W CVIAQ 51591,3'0 51.273,480 300; HOUSTON WALI.ER CL SO 5313.370 092005 TOR T BEND HARRIS CIL 50 50 0212006 U: ,I a IN S: ALL C0% iFL rfERIZEDT- RA:4SP0RM%T1CN SO SO C .E,R SYSTEM 5 CMAQ 51,:91,350 Comments: 2006 -2008 TIP ArnendmentNumber: 70 Appf-oyed By Alan Clark MPO Director Houston - Galveston Area Council Tom Reid Secretary Transportation Policy Council Date EXHIBIT I Page 2 of 3 Date Carol W. Nixon. P.E. Date Director of District Transportation Planning TxDOT, Houston District Date EXHIBIT I Page 2 of 3 TABLE PAGE 1 I or Ito 5 2006 -2005 TRkNSPORT ATION LVIPROVENMINI' PROGRAM ANIENDIN ENT 70 /Al HOUSTON- GALVESTON INIPO ORIGINAL CSJ NAME OR DESIGNATION APPN CAT l COST 1 FEDERAL. PROJID DISTRICT LOCATION (FR0",1) APPN CAT 2 COST'_ STATE LET DATE COUNTY LOCAATION (TO) 1 APPN CAT 3 COST 3 LOCAL RVN DATE CITY DESCRIPTION OF WORK APPN CAT 4 COST 4 LCL CONTRIB PHASE COMMENTS TOTAL. FY 2005 0917- 71.699 GOOSE CREEK TRAIL. (PHASE 2) CMAQ 51,:56.350 SM,000 9954 HOUSTON S OFMAR —I ST SO SO 09P- -7000 HARRIS W OF TEXAS AVE SO S231 2fo M006 BAYTOWN CONSTRUCT HIKEBIK:ETRAIL I So SO C,E,R CONSTRUCT HIKFJBlI ETRAIL SOMA 51.156. 0 FY 2006 0271 -05 -023 T i0 W CMAQ 51,931,350 S1.545ASO 3003 HOUSTON WALLER CIL SO 5386310 09r-Im FORT BEAD HARRIS CIL SO 50 03,2005 OTHER INSTALS. COMPUTERIZED TRANSPORT ATIONMANAGEN SO SO CE,R LAIC: JACKSON SYSTEM 5 CMAQ 51 931.350 C,E,R 0912.31 -143 OYSTER CREEK TRAIL CMAQ 51,196,040 S956,332 3033 HOUSTON N. DDM DRIVE SO SO 11/2005 BRAZORIA SH 332 So S239,208 11/2005 LAKE JACKSON CONSTRUCT 111KE & BI:C=- TR LT 50 SO C�E F OTHER INSTALL COMPUTERIZED TRANSPORTATION MANAGEMENT, S CIAAQ 51.196.040 ' AMENDED CSJ NAME OR DESIGNATION APPN CAT i COST 1 FEDERAL PROJ ID DISTRICT LOCATION (FROM) APPN CAT 2 COST 2 STATE LET DATE COUNTY LOCATION (TO) I APPN CAT 3 COST 3 I LOCAL RVN DATL CITY DESCRUTION OF WORK APPN CAT 4 COST s LCL CONTRM I PHAS'e. COMMENTS TOTAL FY 200: 091 = -71 -698 GOOSE CREEK TRAIL (PHASE 2) CMAQ 51.406,250 51,125.000 9954 HOUSTON S OF MARKET ST So SO 0912004 HARRIS W OF TEXAS AVE 50 5231,250 02/2006 BAYTOWN CONSTRUCT HIKFJBlI ETRAIL 50 SO C.E,R 5 CMAQ 51,406.250 FY 2006 091 -!3 OYS T .—A CREEK T?-:, . CMAQ $1.286.040 51.023,33. 3033 g43 HOUSTON N. DIXIEE DRIVE SD SO 02/2006 ERAZORIA SF 33_ &D 5257: CE 02rm LAIC: JACKSON CONSTRUC HIT:= g BIKE 50 50 C,E,R S CNIAQ SI.2B6.040 0271.05 -023 Ili 10 W CMAQ 51.591,350 51,273,410 3003 HOUSTON `NALLER CIL SO S313,370 091^005 FORT BEND HARRIS CIL so $O 0212006 OTHER INSTALL COMPUTERIZED TRANSPORTATION MANAGEMENT, SO 50 C.E.R SYS1 5 CMAQ S1.=9:,350 EXHIBIT I Page 3 of 3 CSJ: 0912-71-507 Project: From SH 146 to the end of Arizona Street in Baytown CSJ: 0912-71-429 CSJ: 0912-71-698 Project: Baytown Goose Creek Hike and Bike Trail From the end of Arizona Street to Decker Drive in Baytown District: Houston Code Chart 64: 03150 AMENDMENT THREE TO THE AGREEMENT TRANSPORTATION ENHANCEMENT AND CONGESTION MITIGATION AND AIR QUALITY PROGRAMS) THIS AMENDMENT IS MADE BY AND BETWEEN the State of Texas, acting through the Texas Department of Transportation hereinafter called the "State", and the City of Baytown, Texas, hereinafter called the "City. WITNESSETH WHEREAS, the State and the City executed an agreement on the 15th day of February 1995 concerning the construction of a multipurpose bicycle/pedestrian facility with landscaping and historic preservation from SH 146 to Decker Drive along Goose Creek in Baytown; and WHEREAS, the State and the City executed Amendment One to the agreement on the 31st day of March 2000 which added supplemental Congestion Mitigation and Air Quality (CMAQ) funds to the original enhancement funds; and WHEREAS, the State and the City executed Amendment Two to the agreement, increasing Federal funds available for the project on the 5th day of January 2004; and WHEREAS, on the 27th day of January 2006 the Metropolitan Planning Organization passed Amendment 70 to the Transportation Improvement Program, which is attached to this Amendment as "Exhibit I" providing additional funds to the project; and WHEREAS, it has become necessary to amend that contract; Amendment 3 AFA — AFAAmend Page 1 of 3 2/21/2006 NOW THEREFORE, in consideration of the premises and of the mutual covenants and agreements of the parties hereto, the State and the Local Government do agree as follows: AGREEMENT Article 1. Description of Amended Items 1. Paragraphs A and B of Section 5 of the Agreement are voided in their entirety and replaced with the following: A. The estimated total cost of all phases of the Project, including construction engineering and testing services, is $2,810,750. Congestion Mitigation and Air Quality funding will total $1,406,250 and Enhancement funding will total 1,404,500. B. The State will be responsible to secure the federal share of funding required for the development and construction of all phases of the Project. The federal share for the development and construction of all phases of the Project is eighty percent (80%) of the total estimated cost of all phases of the Project, not to exceed $2,248,600. The Federal portion of the Congestion Mitigation and Air Quality funding will total $1,125,000 and Enhancement funding will total $1,123,600. The City will be responsible to comply with the cost principles established in OMB Circular A-87, "Cost Principles for State and Local Governments" and for any non-federal participation costs associated with all phases of the Project. 2. The 2006-2008 Transportation Improvement Program Amendment Number 70 is attached to Amendment Three and labeled "Exhibit I". All other provisions of the original contract are unchanged and remain in full force and effect. Article 2. Signatory Warranty The signatories to this amendment warrant that each has the authority to enter into this agreement on behalf of the organization they represent. Amendment 3 AFA —AFAAmend Page 2 of 3 2/21/2006 IN WITNESS WHEREOF, THE STATE AND THE LOCAL GOVERNMENT have executed duplicate counterparts to effectuate this agreement. THE STATE OF TEXAS Executed for the Executive Director and approved for the Texas Transportation Commission for the purpose and effect of activating and/or carrying out the orders, established policies or work programs heretofore approved and authorized by the Texas Transportation Commission. By: Ja ice ullenix ector of Contrac ervices Section Office of General Counsel Texas Department of Transportation Date: CITY OF BAYTOWN, TEXAS Name Gary Jackson, City Manager Printed Nam ATTEST: k City Clerk City of Baytown Amendment 3 AFA —AFAAmend Page 3 of 3 2/21/2006 2006-2008 TRANSPORTATION IMPROVEMENT PROGRAM AMENDMENT NUMBER 70 CSJ 0912-31-143 Oyster Creek Trail From N. Dixie Drive to SH 332 Construct Hike &Bike Trail CSJ 0912-71-698 VA Goose Creek Trail (Phase 2) S. of Market Street to W. of Texas Avenue Construct hike/bike trail CSJ 0271-05-023 IH 10 West From Waller County Line to Harris County Line Install Computerized Transportation Management System CONGESTION MITIGATION AND AIR QUALITY (CMAQ) —CATEGORY 5 Project CSJ 0912-71-698 is on page A-47, project CSJ 0271-05-023 is on page 2-10, and project CSJ 0912-31-143 is on page 2-11 of the 2006-2008 Transportation Improvement Program (TIP); project CSJ 0912-31-143 was amended via Amendment #37 in October 2005. All three projects are funded with Category 5 CMAQ funds. Project CSJ 0912-31-143 has been rescheduled for letting in February 2006. The project is intended to help fulfill the TCM.SIP commitment in the new conformity plan. On January 10, 2006 the City of Lake Jackson requested additional funds for the project due to the fact that the price of concrete is still rising and the current allocation for the Oyster Creek Bikeway is expected to prove insufficient. Project CSJ 0912-71-698 let in September 2004 and is about 70% complete. However, the cost of supplies, fuel, and some complications and changes have caused the project to exceed its budget. There have been site conditions discovered during construction and railroad issues at their crossings that have required several large chance orders. Therefore, the City of Baytown has requested that project CSJ 0912-71-698 be provided with additional funds in the amount of$250,000. Project CSJ 0271-05-023 let in September 2005 for less than the authorized amount of $1,931,850. Therefore, at this time, TxDOT is requesting to transfer funds from CSJ 0271-05-023 to CSJ 0912-71- 698 and CSJ 0912-31-143. EXHIBIT 1 Page 1 of 3 2006-2008 TRANSPORTATION IMPROVEMENT PROGRAM District: Houston Type of Amendment: Administrative TPC X STIP Revision Program: CVIAQ X STP TRANSIT OTHER X Highway: IH 10 W. VA TIP Number: 3003. 9954 CSJ: 0271-05-023. 0912-71-698 Limits: See table.below Type of Work: See table. below Requested Amendment: Transfer funds from CSJ 0271-05-023 to CSJ 0912-71-698 and CSJ 0912-31-143, as shown in the table below: AMENDED CSJ NAME OR DESIGNATION APPN CAT 1 COST I FEDERAL PROD ID DISTRICT LOCATION(FROM) APPN CAT 2 COST 2 STATE LET DATE. COUNTY LOCATION(TO)APPN CAT 3 COST 3 LOCAL RVN DATE CITY DESCRIPTION OF WORK APPN CAT 4 COST 4 LCL CONTRIB PHASE COMMENTS TOTAL APPENDIX A 0912-71-698 GOOSE CREEK TRAIL(PHASE 2) CVIAQ 1,406,250 1.125,000 9954 HOUSTON S OF MARKET ST SO 0 0912004 HARRIS W OF TEXAS AVE 0 0 02/2006 BAYTOWN CONSTRUCT RUCFJBIKETRAIL 0 281250 C,E,R 5 CMAQ 1,406,250 FY 2006 0912-31.143 OYSTER CREEK TRAIL CMAQ 1,286,040 1,028,832 3033 HOUSTON N.DIXIE DRIVE 0 0 OV2006 BRAZORIA SH 332 0 57,208 02/2006 LAKE JACKSON CONSTRUCT HIKE&BIKE TRAIL 0 0 C,E,R 5 CMAQ 1,286,040 0271-05-023 1H 10 W CMAQ 1;5911850 1,273,480 3003 HOUSTON WALLER CIL 0 318,370 09/2005 FORT BEND HARRIS CIL 0 0 02/2006 OTHER INSTALL COMPUTERIZED TRANSPORTATION MANAGEMENT 0 0 C,E,R SYSTEM 5 CMAQ 1,591,850 Comments: 2006-2008 TIP Amendment Number: 70 Ap oyed B Alan Clark Date Carol W. Nixon,P.E. Date MPO Director Director of District Houston-Galveston Area Council Transportation Planning, TxDOT, Houston District Tom Reid Date Secretary Transportation Policy Council EXHIBIT I Page 2 of 3 TABLE PAGE 1 10/21/05 2006-200S TRANSPORTATION IMPROVEMENT PROGRAM AMENDMENT 70 HOUSTON-GALVESTON WO ORIGINAL CSJ NAME OR DESIGNATION APPN CAT 1 COST 1 FEDERAL PROJ ID DISTRICT LOCATION(FROM) APPN CAT 2 COST'_' STATE LET DATE COUNTY LOCATION(TO) APPN CAT 3 COST 3 LOCAL RVN DATE CITY DESCRIPTION OF WORK APPN CAT 4 COST 4 LCL CONTRD3 PHASE COMMENTS TOTAL FY 2005 0912-71-698 GOOSE CREEK TRAIL(PHASE 2) CMAQ 1,156,250 925,000 9954 HOUSTON S OF MARKET ST 0 SO 0912004 HARRIS W OF TEXAS AVE SO 231,250 022006 BAYTOWN CONSTRUCT HIKEBIIKE TRAIL 0 SO C,E R 5 CMAQ S1,156.250 FY 2006 0271.05-023 Hi IOW CMAQ 1,931,850 1,545,480 3003 HOUSTON WALLER CIL 0 386,370 092005 FORT BEND HARRIS CIL SO 0 022006 OTHER INSTALL COMPUTERIZED TRANSPORTATION MANAGEMENT 0 0 C E R SYSTEM 5 CMAQ 1,931,850 0912-31-143 OYSTER CREEK TRAIL CMAQ 1,196,040 S956,832 3033 HOUSTON N.DIXIE DRIVE 0 SO 112005 BRAZORIA SH 332 SO 239,209 112005 LAKE JACKSON CONSTRUCT HIKE&BUM TRAIL 0 0 C,E,R 5 CMAQ S1,196,040 AMENDED CSJ NAME OR DESIGNATION APPN CAT I COST 1 FEDERAL PROJ ID DISTRICT LOCATION(FROM) APPN CAT 2 COST 2 STATE LET DATE COUNTY LOCATION(TO) APPN CAT 3 COST 3 LOCAL RVN DATE CITY DESCRIPTION OF WORK APPN CAT 4 COST 4 LCL CONTRIB PHASE COMMENTS TOTAL FY 200-5 0912-71-698 GOOSE CREEK TRAIL(PHASE 2) CIVIAQ 1,406,250 Sl,i25,000. 9954 HOUSTON S OF MARKET ST 0 0 092004 HARRIS W OF TEXAS AVE SO S281,250 02/2006 BAYTOWN CONSTRUCT HUMBEKE TRAIL 0 SO C,ZR 5 CM. AQ 1,406,250 FY 2006 0912-31-143 OYSTER CREEK TRAIL CMAQ 1,286,040 1,028,932 3033 HOUSTON N.DIXJE DRIVE SO SO 022006 BRAZORIA SH 332 0 257 208 022006 LAKE JACKSON CONSTRUCT HIKE&BIKE TRAIL O SO C,E,R 5 CMAQ S1.286.040 0271.05-023 IH low CMAQ 1,591,850 1,273,480 3003 HOUSTON WALLER C/L SO 318,370 092005 FORT BEND HARRIS CIL 0 0 02/2006 OTHER INSTALL COMPUTERIZED TRANSPORTATION MANAGEMENT 0 SO C,H,R SYSTEM 5 CMAQ S1,591,850 I I n I T IICh1-I I I I Page 3 of 3