Ordinance No. 10,177.5ORDINANCE NO. 10,177'/2 ® AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AUTHORIZING CHANGE ORDER NO. 1 WITH D &W CONTRACTORS, INC., FOR THE GINGER CREEK DRAINAGE IMPROVEMENTS PROJECT; AUTHORIZING PAYMENT BY THE CITY OF BAYTOWN, THE SUM OF FORTY -THREE THOUSAND FOUR HUNDRED THIRTY AND NO /100 DOLLARS ($43,430.00); MAKING OTHER PROVISIONS RELATED THERETO; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section l: That the City Council does hereby authorize Change Order No. 1 with D &W Contractors, Inc., for the Ginger Creek Drainage Improvements Project. A copy of said change order is attached hereto, marked Exhibit "A," and made a part hereof for all intents and purposes. Section 2: That the City Council of the City of Baytown hereby authorizes the payment of FORTY -THREE THOUSAND FOUR HUNDRED THIRTY AND NO /100 DOLLARS ($43,430.00) to D &W Contractors, Inc., for Change Order No. 1 to the Ginger Creek Drainage Improvements Project. Section 3: That pursuant to the provisions of Texas Local Government Code Annotated § 252.048, the City Manager is hereby granted general authority to approve any change order involving a decrease or an increase in costs of TWENTY -FIVE THOUSAND AND NO 1100 DOLLARS ($25,000.00) or less, subject to the provision that the original contract price may not be increased by more than twenty -five percent (25 %) or decreased by more than twenty -five percent (25 %) without the consent of the contractor to such decrease. Section 4: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 13`h day of October, 2005. C_51_� S_4�1 - CALVIN MUNDINGER, Mayor ATTE T: VIN kNAUF/� Interim City C APPROVED AS TO FORM: eiefqACIO RAMIREZ, SR., C' Attorney RA Karenl Fi1cs \CityCounciR0rdinances12005 \0ctober 13 MChangeordcrNolforGingerCreekDrainageImprovememsProject.doc t • - r BAYTOWN Brief Description of Changes: CITY OF BAYTOWN Change Order No. 1 Ginger Creek Drainage Improvements October 7, 2005 The City of Baytown has identified additional storm sewer repairs in the Ginger Creek Subdivision that need to be performed. The additional repairs extend the limits of the work by replacing approximately 65 liner feet of the 54 -inch diameter storm sewer main and completely replacing a storm inlet. The additional work includes replacing driveways, sidewalks, pavement and sod that has to removed or replaced because of the storm sewer repairs. The bid items below have been adjusted to reflect the expected work. The new items of work shown below are added to the contract to completely accomplish the repairs. Add to Existino Bid Items: Bid Item # Description Unit Quantity Unit Price Total 6 Remove and Replace Concrete Flume SY 40 $40.00 $ 1,600.00 15 Block Sod in Damaged Yards SY 376 $6.00 $ 2,256.00 20 Remove Additional 54" CMP LF 65 $30.00 $ 1,950.00 21 Furnish & Install Add'I 54" CMP LF 65 $262.00 $ 17,030.00 22 Remove & Replace Sidewalk SY 30 $40.00 $ 1,200.00 23 Remove & Replace 5" Concrete Driveways SY 310 $54.00 $ 16,740.00 26 OSHA Trench Safety System LF 138 $4.00 $ 552.00 I otal Aaa to txisting Items: Zb 41,sZt3.UU New Items: Bid Item # Description Unit Quantity Unit Price Total 28 6" Saw Cut LF 200 $8.00 $ 1,600.00 29 Remove & Replace 6" Curb LF 60 $8.50 $ 510.00 30 Remove & Replace 24" RCP LF 16 $119.50 $ 1,912.00 31 Furnish & Install 1.5 Sack Cement Stabilized Sand TONS 20 $28.00 $ 560.00 32 Remove &Replace 6" Concrete Pavement SY 60 $65.00 $ 3,900.00 33 Drill & Epoxy #4 Powels LF 165 $4.00 $ 660.00 34 Furnish & Install Brick Type C Inlet EACH 1 $6,460.00 $ 6,460.00 I otal New Items: Zb 15,bUL.UU Delete Items: Bid Item # Description Unit Quantity Unit Price Total 7 18" Thick Concrete Rip Rap SY 200 $60.00 $ 12,000.00 1 24 Repair Existing Curb Inlet LS 1 1 $1,500.00 $ 1,500.00 Iotal Delete Items: $ i3,500.00 Total New & Additional Items: $ 56,930.00 Total Deleted: $ 13,500.00 Net This Change Order: $ 43,430.00 Contract Sum ma : Ori inal Contract Price $206,757.00 Previous Change Orders This Change Order Revised Contract Price $ 250,187.00 Original Contract Duration - Calendar Days 60 Previous Time Extensions 0 This Change Order Revised Contract Duration - Calendar Days 75 Contractor Date Director of Finance Date Director of Engineering Date City Manager Date