Loading...
Ordinance No. 10,123ORDINANCE NO. 10,123 • AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AUTHORIZING CHANGE ORDER NO. 3 WITH LEM CONSTRUCTION CO., INC., FOR THE EAST DISTRICT WASTEWATER TREATMENT PLANT RENOVATION PROJECT; AUTHORIZING PAYMENT BY THE CITY OF BAYTOWN, THE SUM OF FORTY -THREE THOUSAND SIX HUNDRED EIGHTY -TWO AND 04/100 DOLLARS ($43,682.04); MAKING OTHER PROVISIONS RELATED THERETO; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. • BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section l: That the City Council does hereby authorize Change Order No. 3 with LEM Construction Co., Inc., for the East District Wastewater Treatment Plant Renovation Project. A copy of said change order is attached hereto, marked Exhibit "A," and made a part hereof for all intents and purposes. Section 2: That the City Council of the City of Baytown hereby authorizes the payment of FORTY -THREE THOUSAND SIX HUNDRED EIGHTY -TWO AND 04 /100 DOLLARS ($43,682.04) to LEM Construction Co., Inc., for Change Order No. 3 to the East District Wastewater Plant Renovation Project. Section 3: That pursuant to the provisions of Texas Local Government Code Annotated 5 252.048, the City Manager is hereby granted general authority to approve any change order involving a decrease or an increase in costs of TWENTY -FIVE THOUSAND AND NO /100 DOLLARS ($25,000.00) or less, subject to the provision that the original contract price may not be increased by more than twenty -five percent (25 %) or decreased by more than twenty -five percent (25 %) without the consent of the contractor to such decrease. Section 4: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 1 I th day of August, 2005. i CALVIN MUNDINGER, Mayor ATTEST: t• GARleuW. SMITH, = ity Clerk APPROV1rC► ASu70 FORM: CL06�42_ - - T7 ACIO RAMIREZ, SA,,tity Attorney RA KarcMFi1es\ Ciry Counci1l0rdinances12005\August II\ ChangeOrderNoIforEestDistrictWastcwaterTreatmentPlant .doc 0 Brief Description of Changes: CITY OF BAYTOWN Change Order No. 3 East District WWTP Rehabilitation of Influent Lift Station No. 1, Treatment Train No.1, and Miscellaneous Facilities August 5, 2005 Item No. 1 The existing air headers at Treatment Trains No. 2 and No. 3 are connected and only Treatment Train No. 3 can be isolated based on the current air header arrangement. In order to complete the work in the treatment trains and to provide needed operational capabilities at the plant, ball valves will need to be installed on the two hundred and twenty (220) air drops at Treatment Tran No. 2. Attached is the cost breakdown from the contractor. Item No. 2 The four (4) new airlift pumps that will be installed at Treatment Trains No. 2 and No. 3 will require a method of measurement of the return activated sludge coming from Clarifiers No. 2 and No. 3, per Chapter 217/317, Part 217.136 of the Texas Commission on Environmental Quality: Design Criteria for Sewage System. In order to accomplish this rotometers will be installed on the air feed lines. Attached is the cost breakdown from the contractor. Add or Delete Items: Item Description Unit Quantity Unit Price Total 1 Installation of 1 -inch Ball Valves EA 220 100.37 $ 22,081.40 2 Installation of 2 -inch Rotometers (0 tion 1) EA 4 1 5,400.161 $ 21,600.64 Total Contract Summary: 43,682.04 Original Contract Price $ 1,870,300.00 Previous Change Orders 23,656.95 This Change Order 43,682.74— Revised Contract Price 1,93 ,6 38,99 Original Contract Duration - Calendar Days 385 Previous Time Extensions 30 This Change Order 140 Revised Contract Duration - Calendar Days Owner's pr ntative D to on ra or DatE 555 Director of Engineering Date Director of Finance Date EXHIBIT CAy Manager Datc • May 20, 2005 Keith Powell Camp Dresser and McKee 1800 West Loop South, Suite #1550 Houston, Texas 77027 Re: City of Baytown East District WWTP Rehabilitation Dear Mr. Powell, MAY ? 201- LEM is pleased to offer the following pricing for installing rotometers with associated piping and supports. Pricing is as follows: Option 1 Without by -pass: $21,600.65 Option 2 With by -pass: $27,904.70 Thank you, and if I can be of any further assistance, please feel free to contact me. Sincerely, ? uliu dber g o ction Manager Construction Co., Inc. Cc: Sean Tenney, CDM Kert May, CDM File: B -3 • LEM CONSTRUCTION CO., INC. I; X49 AI.(;�11�RST. MATE 151) 1 IRIt :9'lf )1,'fX 771Ml4 ]HI /�'JS!Ij III 'm�oowu!) $OM 1u0 so -so -zo )!r0 OUO uoildO - n05 O d O .fd _R 7o! IYL,3AIb130 er.w .! m .o o clI V „ b T `u I d' d il d d n S a i V 6O7 -C7 Zlt l7:•� a4 .0a0! 09 •u-;lrafn9 Y (ilG) x ` n r. 0)$n p! ION $1 pNY No p)1 j!!j!$)N Y NQ OOL aC ^$ 'a.yp a+Wl ^JJ IOri 011 :NN.Y!!p �` su X@,L •uAt Ol cus )NON :)ros a)o oue sl nw SlN! dlAiAi lse3 uAtolCClCeg 0Ll TC l O i!AU m Q9 C-H ii u y ? u 6- � a d D V N M � Q• ^ q U Ji �p 91lS 6 t= 0 R ^ - U N r Ji 1 G _R L11 PLAMM ii u y ? u 6- � a d D V N M � Q• ^ q U Ji �p 91lS 6 t= 0 R ^ - U N r Ji 1 ,! o 4 .91/S v•.I .Q /S I •.L Q Q r.. O V N in r� C 7 1 �.J C (L O � 0 rJ � n m a ;go,?Yi L11 PLAMM t �plil7 o —ss ,! o 4 .91/S v•.I .Q /S I •.L Q Q r.. O V N in r� C 7 1 �.J C (L O � 0 rJ � n m a ;go,?Yi '3n+'ono0awl Jo IS30 tl' 10 of 1- 3.W130 so -so -io :31 r0 Om UOT�d� p�SOdO.id d'1V SVU jl — 2lU1dld XjddnS _nV - 6K09 -rK7 (t+f) COI 0009 -rKV (ZIS) 0S i91 •al 'wµ•'r r .5 rig 6 :03H3310 ' Ara' x++++ k+ - S. 3B UI ION SI d S+Sro 0313+a 153a r n0 OOZ -1!ns N.O wpintl a0ai R i q1 :HMraO /('' _ sexaJ, +UhLOIAeg 030NOaa SI Ylro Sim 3.0. :31r3S Cl d.LMM 1SU3 umolSeg .oul In OJTAU , 0 I IL �m ... v 4 Q1 CA 1 N� r v .Va m m 3 v 11 > 6 O V p 2! N � V r• n r r .815 1 -.G 1 T - - - - h— v J .91/5 6-.I s s ro V3- o ], rA- m E � L Q E ^• O O CV � O 2 Q �— vk- , t 1D O QO 1p C 0 v a� os ; un ur l r .5 rig 6 n. n u d V V fl. U v 4 N A d M H1 V .815 1 -.G 1 T - - - - h— v J .91/5 6-.I s s ro V3- o ], rA- m E � L Q E ^• O O CV � O 2 Q �— vk- , t 1D O QO 1p C 0 v a� os ; un ur l • • May 20, 2005 Keith Powell Camp Dresser and McKee 1800 West Loop South, Suite #1550 Houston, Texas 77027 Re: City of Baytown East District WWTP Rehabilitation Dear Mr. Powell, D "/ /• J7 i,V - - -- MAY ? " ?009 LEM is pleased to offer the following pricing for removing the existing 1" stainless steel piping and installing a 1" 316 SS ball valve, union and required nipples (all 316 ss) at the air drops in aeration trains 2 & 3. The cost for this work is $100.38 per drop. Thank you, and if I can be of any further assistance, please feel free to contact me. Sincerely, Ndd g ruc ticn )ar ager Construction Co., Inc. Cc: Sean Tenney, CDM Kert May, CDM File: B -3 LEM CONSTRUCTION CO., INC. H1m4 FI�GIII'HtiT,tiCl'1'F: 1511 11 ll'ti'rox.'rx 770" ]NI /J'15.45511 1� JW CERTIFICATION 10113 10 �or � D S ��- 7� L009761L3 $68.00 I, KELVIN KNAUF, the duly appointed and acting Iterim City Clerk of the City of Baytown, Harris County, Texas, do hereby certify and attest that as part of my duties, I do supervise and act as lawful custodian of the records of the City of Baytown; that the attached document is a true and correct copy of Ordinance No. 10,122 ORDINANCE NO. 10,122 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, i.;?_0 TEXAS, PROVIDING FOR THE EXTENSION OF CERTAIN BOUNDARY LIMITS OF THE CITY OF BAYTOWN, TEXAS, AND THE ANNEXATION OF 8.3957 ACRES OF LAND IN THE ED T. SCHAFFER SURVEY (W.C. & R.R.), ABSTRACT 1224, A PART OF LOTS 11 AND 12, BLOCK 21, HIGHLAND FARMS ADDITION, AND A PART OF LOTS 14,15 AND 16, BLOCK 7, EAST END ADDITION TO HIGHLAND FARMS, HARRIS COUNTY, TEXAS, LOCATED EAST OF GARTH ROAD BETWEEN LYNCHBURG -CEDAR BAYOU ROAD AND SOUTH ROAD, HARRIS COUNTY, TEXAS; WHICH SAID TERRITORIES LIE ADJACENT TO AND ADJOIN THE PRESENT BOUNDARY LIMITS FOR THE CITY OF BAYTOWN, TEXAS. Adopted by the City Council at its meeting held on September 27, 2005. WITNESS MY HAND AND SEAL of the City on September 30, 2005. o� �p,YTOWN.T U i % Ln ® RETURN TO. CITY CLERK CITY OF BAYTOWN POST OFFICE BOX 424 BAYTOWN, TX 77522 -0424