Ordinance No. 10,073Ordinance No. 10,073
^ AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN,
v TEXAS, AUTHORIZING CHANGE ORDER NO. 1 WITH RWL
CONSTRUCTION, INC., FOR THE STEINMAN SANITARY SEWER
REHABILITATION -PHASE I PROJECT; AUTHORIZING PAYMENT BY THE
CITY OF BAYTOWN, THE SUM OF FIFTY-NINE THOUSAND THREE AND
NO/100 DOLLARS ($59,003.00); MAKING OTHER PROVISIONS RELATED
THERETO; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS:
Section 1: That the City Council does hereby authorize Change Order No. 1 with RWL
Construction, Inc., for the Steinman Sanitary Sewer Rehabilitation -Phase I Project. A copy of said
change order is attached hereto, marked Exhibit "A," and made a part hereof for all intents and
purposes.
Section 2: That the City Council of the City of Baytown hereby authorizes the payment
of FIFTY-NINE THOUSAND THREE AND NO/100 DOLLARS ($59,003.00) to RWL
Construction, Inc., for Change Order No. 1 to the Steinman Sanitary Sewer Rehabilitation -Phase I
Project.
Section 3: That pursuant to the provisions of Texas Local Government Code Annotated
§ 252.048, the City Manager is hereby granted general authority to approve any change order
involving a decrease or an increase in costs of TWENTY-FIVE THOUSAND AND NO/100
DOLLARS ($25,000.00) or less, subject to the provision that the original contract price may not be
increased by more than twenty-five percent (25%) or decreased by more than twenty-five percent
(25%) without the consent of the contractor to such decrease.
Section 4: This ordinance shall take effect immediately from and after its passage by the
City Council of the City of Baytown.
INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City
of Baytown this the 26th day of May, 2005.
CALVIN MUNDINGER,
ATTEST:
GAR^W. SMITH, City Clerk
APPROVED AS TO FORM:
lACIO RAMIREZ, SR., Citj(3ttorney
R:\Karen\Files\Cily Council\Onlinanccs\2005\May 26\C>ungcOrdcrNol forSteinmanLiftStalion.doc
CHANGE ORDER NO. 1
May 20, 2005
Honorable Calvin Mundinger
and City Council
City of Baytown
P. 0. Box 424
Baytown, Texas 77522-0424
Subject: Request for approval of rates on labor and/or materials and/or
equipment.
Contractor: RWL Construction
Project: District Sanitary Sewer Improvements Steinman Lift Station Service Area
LEI Job No. 044-066, Contract No. 1
Original Contract Amount as Executed: $681,715.00
Dear Mayor and City Council:
Your approval is requested on the following adjustment of contract price and completion
time.
EXHIBIT A
044-066, #1 May 20, 2005
Change Order No. 1 Page 2
Total Change Order No. 1 $ 59,003.00
Original Contract Amount $681,715.00
Adjusted Contract Amount $740,718.00
Original Contract Time 200 Calendar Days
Extension of Time This Change Order No. 1 15 Calendar Davs
Adjusted Contract Time 215 Calendar Days
Except as setforth hereinbefore, no conditions or covenants of the Contract are changed
and/or waived hereby.
EACurrent ProJ\Baytown\044066 tn\044-0M 01 Change Order Mo. I.doc
044-066, m
Change Order No. 1
May 20, 2005
Page 3
SUBMITTED FOR APPROVAL:
LANGFORD ENGINEERING, INC.
ACCEPTED:
RWL CONSTRUCTION
By:
Timothy B. Hardin, P.E.
Vice President
By:
Dwayne Schroeder
General Manager
Date Date
APPROVED: CITY OF BAYTOWN
By:.
Director of Engineering
Date
By:.
City Manager
Date
By:.
City Finance Director
Date
E:\Current Proj\Boytovm\044 066 »1\OM-O66 cri Change Order No. I.doc
CHANGE ORDER NO. 1
May 20, 2005
Honorable Calvin Mundinger
and City Council
City of Baytown
P. 0. Box 424
Baytown, Texas 77522-0424
Subject: Request for approval of rates on labor and/or materials and/or
equipment.
Contractor: RWL Construction
Project: District Sanitary Sewer Improvements Steinman Lift Station Service Area
LEI Job No. 044-066, Contract No. 1
Original Contract Amount as Executed: $681,715.00
Dear Mayor and City Council:
Your approval is requested on the following adjustment of contract price and completion
time.
Item Description Cost
1 Lump sum cost for all surface restoration work $59,003.00
associated with "open cut" installation of proposed
15" gravity sewer at the Baytown Nature Center.
Lump sum cost includes removal and replacement of •
all surface improvements disturbed as a result of
construction by the Contractor in this area (included
but not limited to site grading, concrete paving to
existing expansion joints and subgrade preparation,
brick sidewalk pavers and subgrade preparation,
crushed granite walk paths, block sodding, irrigation
system, trees and flowerbeds). Lump sum price
includes all costs for labor, material and supervision
incurred by the contractor to complete the work as
described herein, including expenses resulting from
initial attempt to install sewer by auger method.
044-066, #1 May 20, 2005
Change Order No. 1 Page 2
Total Change Order No. 1 $ 59 003.00
Original Contract Amount $6819715.00
Adjusted Contract Amount $740,718.00
Original Contract Time 200 Calendar Days
Extension of Time This Change Order No. 1 15 Calendar Dam
Adjusted Contract Time 215 Calendar Days
Except as setforth hereinbefore, no conditions or covenants of the Contract are changed
and/or waived hereby.
EACurrent Proj\Baytown\044-066 a1\044-066#1 Change Order No.1.doc
044-066, #1 May 20, 2005
Change Order No. 1 Page 3
SUBMITTED FOR APPROVAL: ACCEPTED:
LANGFORD ENGINEERING, INC. RWL CONSTRUCTION
Y By:
Timot y B. Hardin, P.E. Jeff He lin
Vice President
�
Date vo Date 2; 2 '
APPROVED: CITY OF BAYTOWN
By: Date O5�
Director of Engineering
By: ZL Date /G-5
City Mana r
By: ��1 V�(� �i ( �- Date �J l
City Finance Dire or
ec---
E:\Current Proj\Baytown\044-066 k1\044-066 Ni Change Order No.1.doc