Loading...
Ordinance No. 10,069Ordinance No. 10,069 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AUTHORIZING CHANGE ORDER NO. I WITH PAULA CONSTRUCTION, INC., TO ADJUST THE FINAL UNIT BID QUANTITIES FOR THE CEDAR BAYOU ROAD DRAINAGE PROJECT; AUTHORIZING FINAL PAYMENT OF THE SUM OF SIX THOUSAND FOUR HUNDRED FIFTY -FOUR AND 94/100 DOLLARS ($6,454.94) TO PAULA CONSTRUCTION, INC., FOR SAID PROJECT; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. WHEREAS, the City of Baytown contracted with Paula Construction, Inc., for the Cedar Bayou Road Drainage Project (the "Project "); and WHEREAS, a deduct change order in the amount of TWO THOUSAND THREE HUNDRED EIGHTY -FOUR AND 65/100 DOLLARS ($2,384.65) to adjust the final unit bid quantities is necessary to reflect the actual quantities used in the Project; and WHEREAS, all of the said improvements, as provided in the plans and specifications heretofore prepared by the City's Engineer and as approved and adopted by the City Council have been performed and completed in full accordance with all of the terms and conditions of the aforesaid contract; and WHEREAS, the City's Engineer in the manner provided by the terms of the said contract and the plans and specifications thereof, has approved and accepted the Cedar Bayou Road Drainage Project and improvements and has heretofore issued his Certificate of Final Acceptance and has certified same to the City Council and recommended that it accept and receive said work and improvements as constructed and completed by Contractor; and WHEREAS, there remains due and owing to Paula Construction, Inc., the sum of SIX THOUSAND FOUR HUNDRED FIFTY -FOUR AND 94/100 DOLLARS ($6,454.94); NOW THEREFORE BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 1 with Paula Construction, Inc., to adjust the final unit bid quantities for the Cedar Bayou Road Drainage Project. A copy of said change order is attached hereto, marked Exhibit "A," and made a part hereof for all intents and purposes. Section 2: That the City Council hereby accepts and approves the above - described work and improvements, and finds and determines that all of said improvements have been completed as provided in the plans and specifications thereof, and in full accordance with all of the terms and provisions of the aforesaid contract. ® Section 3: That the Certificate of Final Acceptance heretofore issued by the City's Engineer and certified to the City Council is hereby accepted and received. Section 4: That final payment to. Paula Construction, Inc., in the amount of SIX THOUSAND FOUR HUNDRED FIFTY -FOUR AND 94/100 DOLLARS ($6,454.94) is hereby authorized. Section 5: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 26th day of May, 2005. CALVIN MUNDINGER, Mayor ATTEST: Ll y., t4 P JJft7 u GWt W..9 ITH, City Clerk APPROVED AS TO FORM: GNACIO RAMIREZ, SR., &)y Attorney 0 RAKaren\Files\City Counci1\0rdinances\2005\May 26 \ChangeOrder &Final PayCedarBayouRoadDrainageProject .doc 2 •- Brief Description: CITY OF BAYTOWN Cedar Bayou Road Drainage Project CHANGE ORDER NO. 1 - BALANCE SHEET May 16, 2005 This change order is requested to balance the difference of the originally estimated quantities and the actual quantities used to complete the project. The scope of work for this project included installation of approximately 700 LF of storm sewer pipe and inlets to help prevent localized flooding during rainfall events in the vicinity of Cedar Bayou Junior High School. The contractor was allotted 60 calendar days to complete the project and finished it in 23 calendar days. Item 1 Description 18" HDPEs Unit LF Orig. Quant. 635 Final Quant. 614 Diff. 21 Price 40.55 Cost Difference 851.55 2 18" RCP LF 60 68 -8 40.55 324.40 3 18" CMP LF 20 15 5 40.55 202.75 4 15" HDPE LF 47 42 5 40.55 202.75 5 Storm Sewer Manholes EA 3 3 0 4,185.00 - 6 5' Curb Inlet EA 1 1 0 5,025.00 - 7 Grate Inlet EA 1 1 1,485.00 1,485.00 8 Rip Rap for Outfall Ditch SY 30 30 0 25.00 - 9 Cement Stabilized Sand TON 30 30 0 22.00 - 10 11 Saw Cut Asphalt Grade Roadside Ditch LS LS 1 1 1 1 0 0 2,500.00 600.00 - - 12 Trench Safety,-5'-10' Deep LF 260 271 -11 1.00 11.00 13 Trench Safety, Over 10' Deep LF 400 411 -11 2.00 22.00 14 15 Traffic Control Rmv /R I Aggregate Parkin Area LS LS 1 1 1 1 =0 1 0 2,800.00 8,600.00 - - n ')CA CG Total Change Order #1 Change Order Summary: Original Contract Amount $ 66,934.10 Amended Contract Amount $ 66,934.10 Final Construction Cost $ 64,549.45 Change Order No. 1 $ 2,384.65 Paula Construction, Inc. Finance Director Date Date Busch, Hutchison & Associates, Inc. Date GtJUY. V J Original Contract Time: 60 Cal Days Change Order No. N/A Amended Contract Time 60 Cal Days Director of Engineering Date City Manager Date F,XtUBff A 1� Pay Estimate May 16, 2005 PROJECT NAME: Cedar Bayou Road Drainage Project PROJECT NO.: 30309 - 85001- DRGBO214 -85001 CONTRACTOR: Paula Construction, Inc. ADDRESS: 318 CR 2196 PO Box 2067 Cleveland, TX 77327 PAY ESTIMATE NO: 2 (Final) From: 4114/2005 To: 5/6/2005 CONTRACT TIME: 60 CALENDER DAYS EXTENSIONS: 0 DAYS EXTENSIONS BY CHANGE ORDER: 0 DAYS TIME USED: 23 DAYS ADJUSTED CONTRACT TIME: 60 DAYS WORK ORDER DATED: N/A START WORK DATE: April 14, 2005 PERCENT WORK COMPLETED: 100 % PERCENT TIME USED: 38 % ANALYSIS OF CONTRACT AMOUNT :....:.:.:.. OnnaE. CgnEract,AmounV'. .. ....:......... ........ :: $ 66,934.10 Phis Additions .:Chan e4raer ; :::.. :..:: _ _ .: :..,.. :..:... :...,.. :.: $ - D:educts.:Cttan e.:........:_.:,. ....................... ............................... :$ - qd usted:ContractArxtaunt ;.. :.. $ 66,934.10 ` > > ><` ><< ><�� < < <_<;< ............ _. �::... > > >» 64 54 9.45 , Less 10.. °lo.:Retatrta a ..: .. ..:...... _ $ - �fet Amoui t.Earned to.E]ate '... .....:::::: <`:::.... :,..... :...... ... .:: `:> :: $ 64,549.45 Add materials.Stored :e tained: on Nfatena .........:... _. >: $ - $ 64,549.45 : ..: Less.Prev�ous Pa..: rnerrts ... 58,094.51 fiAA ... A .... RRRR A_MOLitVT DUE THI5 ESTIMATE M. ::::::;::S.:::.:':::: :: `: 6,454.94 : APPROVED: City of Baytown By: Director of Engineering Date: ® By. Busch, Hutchison &Associates, Inc. Date: AGREED: Paula Construction, Inc. By: Paula Construction, Inc. Date: 0 0I CL J 2E ae aR ;p ;e at a'e a 3E de 0 O O O O t�O Of CL OA1 r O P O O O 10 O U z °A y N° o S g 8 8 8 8 8 S 8 a Q W f� 1� M vi A 1n N � O O O N O O Q N O O O N Q 00 10 O O A 10 1� I O A 10 w a0 a7 l!1 a7 N N N N W Q N a° H H H H H N H H H H H H H H N H O m 1+) N ric, Lo y N 0 O O p p p O O O O O S S O N y Q O A A ao 1'1 Vl Vl C4 W OA N 4 O P O O N O O 0 o Go A N O O 1, 140 1�i b N W a0 10 Ol TTT Z O O c0 t. N ^ N U1 nj N 00 O N $ W a x W ° CL N H H H H H H H H H H Vl H H H H to y } Q 7j 7 Cl) f0.) N 5 W W 10 C [iaa V) 2 r O r _ Z 7 W O a H H H H H H H H H H H H H H H H } O ~coo O a ON O O N O O O S a0 O O O O O O O $ O O S O O O O O O O O 01 lrf to N N � O O pOo O O O O O ac 10 N F`--o T N O 10 ? A 10 100 O N m N N N H H H H H H H H H H H H H H H H W N t0 � t0 O O u1 10 10 N O O O O O O O O O O O S O O S S O U O O O O 1n w K O V a0 NO N 10 N O O N O G N N a00_ Iq a CL uj N N a0 r Z r 0 O N V m W 10 N v 7 Q O J J J J J J Z J J J J W W W IA ~ 7 O O N to � O V r O m CV O O m Lo IL O Z u a N0 « a CL ° c C cr o .- 0 u� ° W 3 O O V o c° Oh-- i C �,� w W N 5` >, O Z O Z m O U i O U= `o U u O �i � ` is .p m r N In a c O m m E o � O N PI V y O A a0 UUdLiGm = 0 0I CL