Loading...
Ordinance No. 9,980ORDINANCE NO. 9980 . • AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AUTHORIZING CHANGE ORDER NO. 2 WITH FROST CONSTRUCTORS, INC., FOR THE EMERGENCY OPERATIONS CENTER AND POLICE ACADEMY CONSTRUCTION PROJECT; AUTHORIZING PAYMENT BY THE CITY OF BAYTOWN, THE SUM OF FIFTY -SEVEN THOUSAND EIGHT HUNDRED SIXTY -FIVE AND NO /100 DOLLARS ($57,865.00); MAKING OTHER PROVISIONS RELATED THERETO; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 2 with Frost Constructors, Inc., for the Emergency Operations Center and Police Academy Construction Project. A copy of said change order is attached hereto, marked Exhibit "A," and made a part hereof for all intents and purposes. Section 2: That the City Council of the City of Baytown hereby authorizes the payment of FIFTY -SEVEN THOUSAND EIGHT HUNDRED SIXTY -FIVE AND NO 1100 DOLLARS ($57,865.00) to Frost Constructors, Inc., for Change Order No. 2 for the Emergency Operations Center and Police Academy Construction Project. Section 3: That pursuant to the provisions of Texas Local Government Code Annotated §252.048, the City Manager is hereby granted general authority to approve any change order involving a decrease or an increase in costs of TWENTY -FIVE THOUSAND AND NO /100 DOLLARS ($25,000.00) or less, subject to the provision that the original contract price may not be increased by more than twenty -five percent (25 %) or decreased by more than twenty-five percent (25 %) without the consent of the contractor to such decrease. Section 4: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 13th day of January, 2005. ATTEST: G W. SMITH; City Clerk APP OWID AS TO FORM: ACIO RAMIREZ, SRUity Attorney i2: Ueanenel MyDocuments\Council104- 05Uanuary 1stl Changc0rder2EOC &PoliceAcademy.doc r -1 LJ CITY OF BAYTOWN - Change Order No. 2 BA� �rfo� � -� T Emergency Operations Center Y 1 �1�Jj� & Police Academy January 5, 2005 Brief Description of Changes: This change order is necessitated due to variations in quantities and added items of work. Some of the items are a result of errors and omissions on the plans and specifications prepared by the consultant, which they are disputing. Add or Dplptp Itpms- Item # Description Unit Quantity Unit Price Total 1 Back Splash for Gas Stove at the EOC LS 1 248.00 $ 248.00 2 Relocate Electrical Panel and Add Conduit for New Meter Location LS 1 1,828.00 $ 1,828.00 3 Revised Retaining Wall and Add Handrails for ADA Compliance LS 1 26,767.00 $ 26,767.00 4 Add Ductbank to Power Pole at the EOC to Ensure Compliance with the Codes LS 1 1 1,292.00 $ 1,292.00 5 Install an Additional Fire Hydrant at the Police Academy LS 1 4,757.00 $ 4,757.00 6 New Electrical Service from the Power Pole at the EOC LS 1 6,402.00 $ 6,402.00 7 Additional 7 -inch Reinforced Concrete Pavement at the EOC SY 5 53.00 $ 265.00 8 Additional 6 -inch Reinforced Concrete Pavement at the EOC SY 81 50.00 $ 4,050.00 9 Additional 6 -inch Reinforced Concrete Pavement at the Police Academy SY 120 50.00 $ 6,000.00 10 Additional Reinforced Concrete Sidewalks SY 93 40.00 $ 3,720.00 11 Waterproofing for the Police Academy LS 1 5,537.00 $ 5,537.00 12 Flashing for the Door Frames at the Police Academy LS 1 791.00 $ 791.00 13 Credit for Changing Underground Piping at the EOC from Cast Iron to PVC LS 1 984.00 $ (984.00) 14 Credit to Change the Slab Configuration at the EOC LS 1 839.00 $ (839.00) 15 Credit for Changing All Piping Above the Slab at the EOC from Cast Iron to PVC LS 1 (1,969.00 ) $ (1,969.00) I otal Contract Summary: $ 57,865.00 )ri inal Contract Price $2,711,266.3`. Irevious Change Orders 'his Change Order tevised Contract Price $ 2,825,214.9` )ri inal Contract Duration - Calendar Days 30 'revious Time Extensions 'his Change Order tevised Contract Duration - Calendar Days 31 Contractor Date Director of Finance Date Director of Engineering Date City Manager Date EMIT A