Loading...
Ordinance No. 9,881ORDINANCE NO. 9,881 i AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AUTHORIZING DEDUCT CHANGE ORDER NO. 1 WITH DAN'S PLUMBING, INC., TO ADJUST THE FINAL UNIT BID QUANTITIES FOR THE EAST GREENWOOD DRIVE WATER AND SEWER EXTENSION PROJECT AT CEDAR CROSSING INDUSTRIAL PARK; AUTHORIZING FINAL PAYMENT OF THE SUM OF SEVEN THOUSAND EIGHT HUNDRED NINETY -TWO AND N01100 DOLLARS ($7,892.00) TO DAN'S PLUMBING, INC., FOR SAID PROJECT; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. WHEREAS, the City of Baytown contracted with Dan's Plumbing, Inc., for the East Greenwood Drive Water and Sewer Extension Project at Cedar Crossing Industrial Park (the "Project "); and WHEREAS, a deduct change order in the amount of EIGHTEEN THOUSAND SEVEN HUNDRED THIRTY AND NO /100 DOLLARS ($18,730.00) to adjust the final unit bid quantities is necessary to reflect the actual quantities used in the Project; and WHEREAS, all of the said improvements, as provided in the plans and specifications heretofore prepared by the City Engineer and as approved and adopted by the City Council have been performed and completed in full accordance with all of the terms and conditions of the aforesaid contract; and WHEREAS, the City Engineer in the manner provided by the terms of the said contract and the plans and specifications thereof, has approved and accepted the East Greenwood Drive Water and Sewer Extension Project at Cedar Crossing Industrial Park and improvements and has heretofore issued his Certificate of Final Acceptance and has certified same to the City Council and recommended that it accept and receive said work and improvements as constructed and completed by Contractor; and WHEREAS, there remains due and owing to Dan's Plumbing, Inc., the sum of SEVEN THOUSAND EIGHT HUNDRED NINETY -TWO AND N011 00 DOLLARS ($7,892.00); NOW THEREFORE BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize deduct Change Order No. 1 with Dan's Plumbing, Inc.-, to adjust the final unit bid quantities for the East Greenwood Drive Water and Sewer Extension Project at Cedar Crossing Industrial Park. A copy of said deduct change order is attached hereto, marked Exhibit "A," and made a part hereof for all intents and purposes. Section 2: That the City Council hereby accepts and approves the above - described work and improvements, and finds and determines that all of said improvements have been completed as provided in the plans and specifications thereof, and in full accordance with all of the terms and provisions of the aforesaid contract. ® Section 3: That the Certificate of Final Acceptance heretofore issued by the City Engineer and certified to the City Council is hereby accepted and received. Section 4: That final payment to Dan's Plumbing, Inc., in the amount of SEVEN THOUSAND EIGHT HUNDRED NINETY -TWO AND NO /I00 DOLLARS ($7,892.00) is hereby authorized. Section 5: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 9`h day of September, 2004. CALVIN MUNDINGER, Mayo ATTEST: �;�. zt.YJ�nziq�_ GAR SMITH, City Clerk APPROVED AS TO FORM: NACIO RAMIREZ ., City Attorney 0 F:Ueanene\MyDocuments \Council \03- 04\September Ist\ WalMartWaterSewerExtensionChangeOrderl &FinalPay.doc E • CITY OF BAYTOWN East Greenwood Dr. Water & Sewer Extension Project at Cedar Crossing Industrial Park CHANGE ORDER NO. 1 - BALANCE SHEET August 25, 200.4 This change order is requested to balance the difference of the originally estimated quantities and the actual quantities used to complete the project. The scope of work for this project included the installation of approximately 1,090 linear feet of 12 -inch water main and 1,050 linear feet of 12 -inch sanitary sewer main for the East Greenwood Drive Water and Sewer Extension Project at Cedar Crossing Industrial Park. The original contract duration was 45 calendar days. An additional 8 days were added for rain delays for an adjusted contract time of 53 calendar days. The contractor finished installing the water and sewer lines in the allotted time. Item Description Unit Orig. Quant. Final Quant. Diff. Price Cost Difference 1 Pollution Prevention Implementation LS 1 1 $ 1,940.00 1,940.00 2 12" C -900 Water Line, including fittings LF 1030 1010 20 $ 15.00 300.00 3 Bore and Jack or Auger 12" C -900 Water Line LF 20 80 -60 $ 75.00 (4,500.00) 4 12" Gate Valve With Box EA 1 1 0 $ 1,600.00 5 Fire Hydrant EA 2 2 0 $ 2,000.00 6 Trench Safety LF 1050 1050 0 $ 5.00 - 7 12" SDR 35 Sanitary Sewer, 0' -8' Deep LF 45 5 40 $ 16.00 640.00 8 12" SDR 35 Sanitary Sewer, 8' -10' Deep LF 460 460 0 $ 18.00 - 9 12" SDR 35 Sanitary Sewer, 10' -12' Deep LF 540 540 0 1 $ 20.00 10 12" SDR 35 Sanitary Sewer, 12' -14' Deep LF 40 40 0 $ 24.00 11 Sewer Manhole, 0' -8' Deep EA 3 3 0 $ 2,200.00 - 12 Extra Depth Manhole, 8' -12' Deep VF 22 8 14 $ 250.00 3,500.00 13 Trench Safety LF 1080 1080 0 $ 15.00 - 14 Remove and Replace Rip -Rap LS 1 1 0 $ 1,000.00 15 Clearing and Grubbing AC 0.5 0.5 0 $ 2,000.00 - 16 Seeding for Erosion Control AC 0.5 0.5 $ 6,500.00 3,250.00 17 Sanitary Sewer Bedding and Backfill for Wet Conditions LF 150 150 $ 15.00 2,250.00 18 Furnish and Install Sanitary Sewer Bedding and Initial Backfill for Wet Sand Conditions LF 150 150 $ 15.00 2,250.00 19 Crushed Stone Manhole Foundation For Wet Sand Conditions EA 1 1 $ 100.00 100.00 �k Well Pointing System LF 150 150 $ 60.00 9,000.00 Total Change Order #1 Change Order Summary: 18,730.00 Original Contract Amount $ 97,650.00 Amended Contract Amount $ 97,650.00 Original Contract Time: 45 Cat Days Final Construction Cost $ 78,920.00 Rain Day Extensions 8 Cat Days Change Order No. 1 $ 18,730.00 Amended Contract Time 53 Cal Days Dan's Plumbing, Inc. Date Director of Engineering Date Finance Date City Manager Date EMIT A