Ordinance No. 14,360ORDINANCE NO. 14,360 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AUTHORIZING CHANGE ORDER NO. 1 FOR THE PARK SERVICE CENTER FACILITY PROJECT WITH KRAFTSMAN, L.P, INCREASING THE CONTRACT AMOUNT BY ONE HUNDRED SEVENTY-SEVEN THOUSAND TWENTY-SEVEN AND NO ' 100 DOLLARS ($177,027.00); AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. ****************************************************************************** BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council of the City of Baytown, Texas, does hereby authorize Change Order No. 1 for the Park Service Center Facility Project with Kraftsman, L.P, increasing the contract amount by ONE HUNDRED SEVENTY-SEVEN THOUSAND TWENTY-SEVEN AND NO,100 DOLLARS ($177,027.00). A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. Section 2: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 26th day of March, 2020. C, . - c4i—OA BRANDON CAPETILLO, NNyor ATT T: LETICIA BRYSCH, Clerk APPROVED AS TO FORM: At� CI NACIO RAMIREZ, SR., Pty Attorney cobfs0l IegahKarenTiles City Council .Ordinances\2020\March 26.ChangeOrderNo I forParksServiceCenterProject.doc Exhibit "A" CITY OF BAYTOWN - CHANGE ORDER No. 1 Parks Service Center (BuyBoard Contract A 592-19) PO: Date: 1900420 18-Mar-20 Iffm LI V • A recessed front entry to meet building articulation per code requirements, • Changes to interior of office based on future space planning and multi -use space for training and staff access to computers, • Fire sprinkler installation, fire extinguishers and Knox Box as required by code, • Installation of a natural gas line into the building and stub out into warehouse area for future use for heating of building warehouse side, • Upgrade the wall panels from the galvalume color to a standard color, • Upgrade the roof panels to a standing seam roof, (all other costs less the other 2 items), • Performance and payment surety bond, and processing of the bond documentation, Placement of a select fill building pad for the building foundation per the engineer's recommendations (via sub contractor) Item L3; • Credit for the deduction of decorative stone veneer from two sides the building exterior, with the decorative stone veneer treatment remaining on the front face of the building Add orpelete Items 1.1 Modifications to re -en ineered building. 1.2 Select fill foundation. _ 1.3 Credit for stone veneer brick. Total SLnit4$$E(�42,920.00) - ynit Price 1 $6,177.00 S 166_j77.00 l 3,770.00 S 53,770.00 - 1 S (42,920.00) $ 177,027.00 MAWA Ori ial 1 Original Contract Price _ - .� g894,516.00 2 Owner Contingency Previous Change Orders This Change Order 00 U. $ 0 -- Remaining Contingency _ $000 -' 3 Change Orden _ Previous Change Orders! _ ��T_ - S S 177,027.00 �^ This change order _ - _ Revised Contract Price _. _ -.__- .— 4 $894,516.00 $1,071,543.00 Original Contract Duration (days) 0 Previous Extensions 0 This Change Order (30 days included for punch list) 150 Revised Duration - Calendar Days 150 JAJJI 6 Azj�r 2. / 1'r L - I Contracto - Kraftsman,l..P. D to I Director of Public Works & En neering Date Mark Reynolds Frank O Simoneaux Jr. P.E. AA&,_ Y��4z 3.Ia- 2W Asst. Director of Public Works 6r Eng eering Date Andrea Brinkley City Manager Date Richard L Davis, ICMA-CM 1 BOND1 Kraftsman Proposal #Q65324-5 COMMERCIAL PLAYGROUNDS & Page: 2 WATER PARKS 19535 Haude Road Date: 3/17/2020 Spring, TX 77388 404 Phone: (281) 353-9599 Fax: (281) 353-2265 Project: ark By: Mark Reynolds Performance & Payment Surety Bond, and processing of the bond documentation. Select fill for foundation per the soil engineer recommendations of excavation of 2 ft and placement of 5 ft of select fill for building pad. $53,770 Credit for Stone veneer on exterior 2 sides of exterior wall 4' in height and EIFS 8' high on 2 sides of office building to top of garage doors on 2 sides of warehouse exterior walls. (The only exterior stone and EIFS finish will be on the front of building, around columns and entry way inset.)-$42,920.00 Total: $177,027.00 PFITZNER ENTERPRISES INC. General Contractors 3843 SOUTH FM 565 Baytown, Texas 77523 Cell (281) 384-1311 Office (281) 383-3194 EMAIL gepftzner@aol.com Customer KRAFTSMAN COMMERCIAL / CITY OF BAYTOWN Date Address 1210 PARK STREET 2-18-2020 :ity, State, Zip BAYTOWN TEXAS 77520 Punccase Order# Phone # MARK REYNOLDS / GORDON CORNELL 8719 REWORK BUILDING PAD PROPOSAL #1 Remove the entire building pad and stock pile on site the top 1 1/2 feet in 1 pile & the rest in anouther pile. #2 Excavate a additional foot to reach subgrade of 14.25 and a overall 155 feet x 90 feet of building pad #3 Install bag lime 13 Ids per cubic yard and mix in with excavator and compact subgrade. #4 Bring in 3 1/2 feet of select fill and mix with 11/2 feet of stockpiled fill and compact in 6 inch lifts NOTES Material needs to be gathered from pit and pre tested before delivery starts to ensure proper moisture and to have a proctor on hand. Baytown Sand & Clay is material supplier. TOTAL $ 53,770.00 Deposit Paid Amount Due