Ordinance No. 9,306ORDINANCE NO: 9306 • AN ORDINANCE AUTHORIZING DEDUCT CHANGE ORDER NO. 1 TO WORK ORDER NO. 1 WITH P.M. CONSTRUCTION AND REHABILITATION, L.P., TO ADJUST THE FINAL UNIT BID QUANTITIES FOR THE ANNUAL SANITARY SEWER REHABILITATION CONTRACT 2001; AUTHORIZING FINAL PAYMENT OF THE SUM OF TWENTY THOUSAND NINETY -EIGHT AND 21/100 DOLLARS ($20,098.21) TO P.M. CONSTRUCTION AND REHABILITATION, L.P., FOR SAID PROJECT; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. WHEREAS, the City of Baytown contracted with P.M. Construction and Rehabilitation, L.P., for the Annual Sanitary Sewer Rehabilitation Contract 2001 (the "Project "); and WHEREAS, a deduct change order in the amount of FIFTY -SIX THOUSAND TWO HUNDRED FORTY -EIGHT AND 60/100 DOLLARS ($56,248.60) to adjust the final unit bid quantities is necessary to reflect the actual quantities used in the Project as well as the arnount remaining due to P.M. Construction and Rehabilitation, L.P.; and WHEREAS, all of the said improvements, as provided in the plans and specifications heretofore prepared by the City's Engineer and as approved and adopted by the City Council have been performed and completed in full accordance with all of the terms and conditions of the aforesaid contract; and WHEREAS, the City's Engineer in the manner provided by the terms of the said contract and the plans and specifications thereof, has approved and accepted the work and improvements and has heretofore issued his Certificate of Final Acceptance and has certified same to the City Council and recommended that it accept and receive said work and improvements as constructed and completed by Contractor; and WHEREAS, there remains due and owing to P.M. Construction and Rehabilitation, L.P., the sum of TWENTY THOUSAND NINETY -EIGHT AND 21/100-DOLLARS ($20,098.21); NOW THEREFORE BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City C06nciI does hereby authorize: deduct Change Order No. 1 to Work Order No. 1 with P.M. Construction and Rehabilitation, L'.P., to adjust the final unit bid quantities for the. Annual Sanitary Sewer Rehabilitation Contrad 2001. A copy of said deduct change order is attached hereto, marked Exhibit "A," and made a part hereof for all intents and purposes. Section 2: That the City Council hereby accepts and approves the above - described work and improvements, and finds and determines that all of said improvements have been completed as 0 provided in the plans and specifications thereof, and in full accordance with all of the terms and provisions of the aforesaid contract. Section 3: That the Certificate of Final Acceptance heretofore issued by the City's Engineer and certified to the City Council is hereby accepted and received. Section 4: That final payment to P.M. Construction and Rehabilitation, L.P., in the amount of TWENTY THOUSAND NINETY -EIGHT AND 21/100 DOLLARS ($20,098.21) is hereby authorized. Section 5: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 24`h day of January, 2002. PETE C. ALFARO, ?Mayor ATTEST: GAY . SMfTH, City Clerk APPROVED AS TO FORM: 4r-ooz /g ACIO RAMIREZ, W, City Attorney F:Ueanenc\My Documents \Council \01- 02UanuaryVinalPay01 AnnualSSRehabContract.doc P.M. Construction and is Rehabilitation, L.P. 7704 East Erath Houston, Texas 77012 • CITY OF BAYTOWN, z ,ii. Project: 2001 ANNl1AL SANITARY SEINER REHABILITATION CONTRACT Pay Estimate No. 2 (Final) Pay Estimate Cut-off date: December 28, 2001 Work Order #1, Total Time Allowed: 20 Days Total Time Used: 17 Days Work Order 1 - Pay Est. 2 EMIT A pagel Estimate Estimate Total Item Description Unit Original No.1 No.2 Quantities Unit Total Quant. Quantities Quantities To Date Price This Estimate 1 Pipe bursting 6" & 8" with 8" HDPE min. SDR 17, 0' -8' deep LF 3850 2011 201 $ 40.00 $80,400.0 2 Pipe bursting 6" & 8" with 8" HDPE min. SDR 17, 8'-1 5'deep LF 0 $ 42,00 $0.0 3 Pipe bursting 6" & 8" with 8" HDPE min, SDR 17, over 15' deep LF 0 $ 45.00 $0.0 4 Pipe bursting 8" & 10" with 10" HDPE min. SDR 17, 0'-8' deep LF 100 82 826 $ 42.00 $34,692.0 Pipe bursting 8" & 10" with 10" HDPE min. SDR 17,8'-15'deep LF 729 959 95 $ 45.00 $43,155.0 6 Pipe bursting 8" & 10" with 10" HDPE min. SDR 17, over 15' deep LF 0 $ 50.00 $0.0 7 Pipe bursting 10" & 12" with 12" HDPE min. SDR 17, 0'-8' deep LF 0 $ 55.00 $0.0 Pipe bursting 10" & 12" with 12" HDPE min. SDR 17,8'-15'deep LF 0 $ 60.00 $0.0 9 Pipe bursting 10" & 12" with 12" HDPE min. SDR 17, over 15' deep LF 0 $ 70.00 $0.0 1C Pipe bursting 12" & 15" with 15" HDPE min. SDR 17, min, PVC SDR 26, 0'-8' deep LF 0 $ 75.00 $0.0 11 Pipe bursting 12" & 15" with 15" HDPE min. SDR V. min, PVC SDR 26, 8'-15' deep LF 0 $ 75.00 $0.0 12 Pipe bursting 12" & 15" with 15" HDPE min. SDR 17, min, PVC SDR 26, over 15' deep LF 0 $ 95.00 $0.0 13 Remove existing slipliner, all sizes and depths LF 3289 297 297 $ 7.00 $20,790.0 14 Reconnect service - short side, 0'-S' deep EA 122 46 4 $ 550.00 $25,300.0 15 Reconnect service - snort side, over8'deep EA 9 5 5 $ 700.00 $3,500.0 16 Reconnect service - long side, 0' O' deep EA 0 $ 1,500.00 $0.0 17 Reconnect service - long side, over8'deep EA 0 41 4 $ 1,600.00 $6,400.0 18 Manhole Wail Sealing VF 100 83.38 83.3 $ 90.00 $7,504.2 19 Repl /install new manhole, 0'-4' deep EA 2 2 2 $ 1,500.00 $3,000.0 20 Repl /install new manhole, 5' -8' deee EA 1 $ 1,600.00 $0.0 21 New Manhole , over 8' deep VF 0 $ 200.00 $0.0 2 Replace/install ring and cover EA 0 1 41 1 4 $ 400.001 $1,600.0 23 Extra cement stabilized sand backfill 2 sk. /ton TON 80 164.31 164.31 $ 20.00 $3,286.2 Work Order 1 - Pay Est. 2 EMIT A pagel 0 • CITY OF BAYTOWN Project: 2001 ANNUAL SANITARY SEWER REHABILITATION CONTRACT 24 Point Rpr /obst rmv - pipe bursting, 0' - 8' deep EA 5 2 2 $ 300.00 $600.0 25 Point Rpr /obst rmv - pipe bursting, 8'- 15' deep EA 0 $ 400.00 $0.0 26 Point Rprlobst rmv - pipe bursting, over 15' deee EA 0 $ 500.00 $0.0 27 Extra Length point repair, all depths LF 0 $ 60.00 $0.0 28 Well Point set u , up to 12 If EA 0 $ 300.00 $0.0 29 Well Point, Extra length over 12 If LF 0 $ 25.00 $0.0 30 Trench Safety, 0' to 8' deep LF 700 132 13 $ 5.00 $660.0 31 Trench Safety, 8' to 15' deep LF 150 146 14 $ 5.00 $730.0 32 Trench Safety, over 15' deep LF 0 $ 5.00 $0.0 33 Clean 6" to 12" Sewer LF 0 2292 229 $ 2.00 $4,584.0 34 Clean 15" to 21" Sewer LF 0 $ 5.00 $0.0 35 Clean 24" to 36" Sewer LF 0 $ 8.00 $0.0 36 TV Inspection of Sewer LF 0 2292 229 $ 1.50 $3,438.0 37 Bypass Pumping, 3" pump Day 0 $ 100.00 $0.0 38 Bypass Pumping, 4" pump Day 0 $ 100.00 $0.0 39 Bypass Pumping, 6" pume Day 0 $ 100.00 $0.0 40 Bypass Pumping, 8" pump Day 0 $ 100.00 $0.0 41 Pl. Repair, 6" - 12 ", 0'- 8' deep, up to 12 If EA 0 8 8 $ 1,250.00 $10,000.0 4 Pt. Repair, 6" - 12 ", 8'- 15' deep, up to 121f EA 0 $ 1,750.00 $0.0 43 Pl. Repair, 6" - 12 ", over 15' deep, up to 12 If EA 0 $ 2,500.00 $0.0 44 Pt. Repair, 15" - 18 ", 0'- B' deep, up to 12 If EA 0 $ 2,250.00 $0.0 4 Pt. Repair, 15" - 18 ", 8'- 15' deep, up to 12 If I EA 0 $ 2,900.00 $0.0 4 Pt. Repair, 15" - 18 ", over 15' deep, up to 12 If EA 0 $ 3,500.00 $0.0 47 Pt. Repair, 21" - 36 ", 0'- 8' deep, up to 121f EA 0 $ 4,000.00 $0.0 4 Pt. Repair, 21" - 36 ", 8'- 15' deep, up 12 If EA 0 $ 6,000.00 $0.0 41 Pt. Repair, 21" - 36 ", over 15' deep, up to 12 If EA 0 $ 8,000.00 $0.0 50 Extra length pt. Repair, all sizes 0'- 8' deep LF 0 $ 200.00 $0.0 51 Extra length pt. Repair, all sizes 8'- 15' deep LF 0 $ 250.00 $0.0 52 Extra length pt. Repair, all sizes over 15' deep LF 0 $ 275.00 $0.0 53 Rmv /Rplace 6" - 12 ", includes modified bedding, 0'- 8' deep, 50 L.F. min. LF 0 $ 65.00 $0.0 54 Rmv /Rplace 6" - 12 ', includes modified bedding, 8'- 15' deep, 50 L.F. min. LF 0 $ 75.00 $0.0 55 Rmv /Rplace 6" - 12 ", includes modified bedding, over 15' deep 50 L.F, min, LF 0 $ 100.00 $0.0 56 Rmv /Rplace 15" - 18 ", includes modified bedding, 0'- 8' deep, 50 L.F. min. LF 0 $ 75.00 $0.0 57 Rmv /Rplace 15" - 18 ", includes modified bedding, 8'- 15' deep, 50 L.F. min. LF 0 $ 100.00 $0.0 58 Rmv /Rplace 15" - 18 ", includes modified bedding, over 15' deep 50 L.F. min. LF 0 $ 125.00 $0.0 59 Auger & Encase 8" -10 ", all depths LF 0 $ 100.00 $0.0 60 Auger 8 Encase 12" -15 ", all depths LF 4 $ 150.00 $0.0 61 Rmvlreplace up to 5" concrete sidewalk/driveway (includes sawcutting & reinforcement ) SY 0 $ 50.00 1 $0.0 Work Order 1 - Pay Est. 2 page2 • CITY OF BAYTOWN Project: 2001 ANNUAL SANITARY SEWER REHABILITATION CONTRACT 62 Rmv /replace 8" concrete paving (includes sawcutting & reinforcement ) SY 0 3 $259,384.40 3 $ 70.00 $210.0 63 Rmv /repl up to 2" HMAC, Type D, (incl. Saw cut,tack coat, base repair) SY 10 77 77 $ 30.00 $2,310.0 64 1" rock with no fines for bedding incidental to point repaiml TON 0 $259,384.40 Total contract amount remaining $ 20.00 $0.0 6 Annular and voids ace routin CY 0 $ 100.00 $0.0 66 Flagman for direction of traffic MHR 0 $ 25.00 $0.0 67 N dromulch Seeding SY 660 750 75 $ 3.00 $2,250.0 68 Steel Casing, up to 12 ", above ground, coated and wrapped, including supports LF 0 $ 150.00 $0.0 69 Drop manhole assembly, up to 8' deep EA 0 $ 1,000.00 $0.0 70 Drop manhole assembly, over 8' deep VF 0 $ 1,500.00 $0.0 71 Emergency mobilization EA 0 $ 1,000.00 $0.0 72 Urelift Repair to manhole LS 1 1 1 $ 4,975.00 $4,975.0 Sub - total $259,381;4 Less Previous Payments $239,286.19 Payment Due - Including Retains a $20 098.2 P. M. Date Construction • Contract Summary: Asst. Director of Engineering Date A W.O. #1 Final $259,384.40 original Contract Amount $ 887,875.00 Current Contract Amount $ 887,875.0 Total Work Orders to date $259,384.40 Total contract amount remaining $ 628,490.60 Work Order 1 - Pay Est. 2 page3 • CITY OF BAYTOWN 2001 ANNUAL SANITARY SEWER REHABILITATION CONTRACT CHANGE ORDER #1 ON WORK ORDER 91 January 7, 2002 This work order included pipe bursting , service reconnections, point repair, manhole replacement, manhole rehabilitation and miscellaneous items related to work on Kentucky, Alabama, Florida, California, Oregon, Kansas, Montana and Bob Smith. CO #1 - WO #1 pagel Orig. Final Cost Item Description Unit Quant. Quant. Diff. Price Difference 1 Pipe bursting 6" & 8" with 8" HOPE min. SDR 17, 0' -8' deep LF 3850 2010 -1840 $ 40.00 $ (73,600.00) 2 Pipe bursting 6" & 8" with 8" HDPE min. SDR 17, 8'-15' deep LF 0 0 $ 42.00 $ 3 Pipe bursting 6" & 8" with 8" HDPE min. SDR 17, over 15' deep LF 0 0 $ 45.00 $ - 4 Pipe bursting 8" & 10" with 10" HDPE min. SDR 17, 0'-8' deep LF 100 826 726 $ 42.00 $ 30,492.00 5 Pipe bursting 8" & 10" with 10" HDPE min. SDR 17, 8'-1 5'deep LF 729 959 230 $ 45.00 $ 10,350.00 6 Pipe bursting 8" & 10" with 10" HDPE min. SDR 17, over 15' deep LF 0 0 $ 50.00 $ - 7 Pipe bursting 10" & 12" with 12" HDPE min. SDR 17, 0'-8' deep LF 0 0 $ 55.00 $ - 8 Pipe bursting 10" & 12" with 12" HDPE min. SDR 17, 8'-15' deep LF 0 0 $ 60.00 $ 9 Pipe bursting 10" & 12" with 12" HDPE min. SDR 17, over 15' deep LF 0 0 $ 70.00 $ 10 Pipe bursting 12" & 15" with 15" HDPE min. SDR 17, min, PVC SDR 26, 0'-8' deep LF 0 0 $ 75.00 $ 11 Pipe bursting 12" & 15" with 15" HDPE min. SDR 17, min, PVC SDR 26, 8'-15' deep LF 0 0 $ 75.00 $ - 12 Pipe bursting 12" & 15" with 15" HDPE min. SDR 17, min, PVC SDR 26, over 15' deep LF 0 0 $ 95.00 $ 13 Remove existing slipliner, all sizes and de ths LF 3289 2970 -319 $ 7.00 $ (2,233.00) 14 Reconnect service - short side, 0'- 8'deep EA 122 46 -76 $ 550.00 $ 41,800.00) 15 Reconnect service - short side, aver 8' dee EA 9 5 -4 $ 700.00 $ (2,800.00) 16 Reconnect service - long side, 0' 8'deep EA 1 0 0 $ 1,500.00 $ - 17 Reconnect service - long side, over 8' deep EA 0 4 4 $ 1,600.00 $ 6,400.00 18 Manhole Wall Sealing VF 100 83.38 -16.62 $ 90.00 $ (1,495.80) 19 Repl/install new manhole, 0'-4' deeD EA 2 2 0 $ 1,500.00 $ 20 RepUnstall new manhole, 5' -8' deep VF 1 -1 $ 1,600.00 $ (1,600.00) 21 New Manhole , over 8' dee EA 0 0 $ 200.00 $ 22 Re lacelinstall ring and cover TON 0 4 4 $ 400.00 $ 1,600.00 23 Extra cement stabilized sand backfill, 2 sk.lton EA 80 164.31 84.31 $ 20.00 $ 1,686.20 24 Point Rprlobst rmv - pipe bursting, 0' - 8' deep EA 5 2 -3 $ 300.00 $ (900.00 25 Point Rprlobst rmv - pipe bursting, 8'- 15' deep EA 1 0 0 $ 400.00 $ 26 Point Rprlobst rmv - pipe -7 bursting, over 15' deep LF 0 0 1 $ 500.00 $ CO #1 - WO #1 pagel CITY OF BAYTOWN 2001 ANNUAL SANITARY SEWER REHABILITATION CONTRACT CHANGE ORDER #1 ON WORK ORDER #1 January 7, 2002 This work order included pipe bursting , service reconnections, point repair, manhole replacement, manhole rehabilitation and miscellaneous items related to work on Kentucky, Alabama, Florida, California, Oregon, Kansas, Montana and Bob Smith. 27 Extra Length point repair, all de ths EA 0 0 $ 60.00 $ 28 Well Point set up, up to 12 If LF 0 0 $ 300.00 $ - 29 Well Point, Extra length over 12 If LF 0 0 $ 25.00 $ 30 Trench Safety, 0' to 8' deep LF 700 132 -568 $ 5.00 $ (2,840.00 31 Trench Safety, V to 15' deep LF 150 146 -4 $ 5.00 $ (20.00) 32 Trench Safety, over 15' deep LF 0 0 $ 5.00 $ - 33 Clean 6" to 12" Sewer LF 0 2292 2292 $ 2.00 $ 4,584.00 34 Clean 15" to 21" Sewer LF 0 0 $ 5.00 $ - 35 Clean 24" to 36" Sewer LF 0 0 $ 8.00 $ - 36 TV Inspection of Sewer Day 0 2292 2292 $ 1.50 $ 3,438.00 37 Bypass Pumping, 3" pump Day 0 0 $ 100.00 $ - 38 Bypass Pum in , 4" pump Day 0 0 $ 100.00 $ 39 Bypass Pumping, 6" pump Day 0 0 $ 100.00 $ 40 Bypass Pumping, 8" pump EA 0 0 $ 100.00 $ - 41 Pt. Repair, 6" - 12 ", 0'- 8' deep, up to 12 If EA 0 8 8 $ 1,250.00 $ 10,000.00 42 Pt. Repair, 6" - 12 ", 8'- 15' deep, up to 12 If EA 0 0 $ 1,750.00 $ - 43 Pt. Repair, 6"- 12 ", over 15' deep, up to 12 If EA 0 0 $ 2,500.00 $ 44 Pt. Repair, 15" - 18 ", 0'- 8' deep, up to 12 If EA 0 0 $ - 2,250.00 $ - 45 Pt. Repair, 15"- 18 ", 8'- 15' deep, up to 12 If EA 0 0 $ 2,900.00 $ 46 Pt. Repair, 15" - 18 ", over 15' deep, up to 12 If EA 0 0 $ 3,500.00 $ 47 Pt. Repair, 21" - 36 ", 0'- 8' deep, up to 12 If EA 0 0 $ 4,000.00 $ 48 Pt. Repair, 21" - 36 ", 8'- 15' deep, up to 12 If EA 0 0 $ 6,000.00 $ - 49 Pt. Repair, 21" - 36 ", over 15' dee , U0 to 12 If LF 0 0 $ 8,000.00 $ 50 Extra length pt. Repair, all sizes, 0'- 8' deep LF 0 0 $ 200.00 $ - 51 Extra length pt. Repair, all sizes, 8'- 15' deep LF 0 -0 $ 250.00 $ - 52 Extra length pt. Repair, all sizes, over 15' dee LF 0 0 $ 275.00 $ - 53 Rmv /Rplace 6" - 12 ", includes modified bedding, 0'- 8' deep, 50 L.F. min. LF 0 0 $ 65.00 $ 54 Rmv /Rplace 6" - 12 ", includes modified bedding, 8'- 15' deep, 50 L.F. min. LF 0 0 $ 75.00 $ 55 Rmv /Rplace 6" - 12 ", includes modified bedding, over 15' deep, 50 L.F. min. ' LF 0 0 $ 100.00 $ - 56 Rmv /Rplace 15"- 18 ", includes modified bedding, 0'- 8' deep, 50 L.F. min. LF 0 0 $ 75.00 $ 57 Rmv /Rplace 15" - 18 ", includes modified bedding, 8'- 15' deep, 50 L.F. min. 0 0 $ 100.00 $ 58 Rmv /Rplace 15" - 18 ", includes modified bedding, over 15' deep, 50 L.F. min. LF 0 0 $ 125.00 $ - 59 Auger & Encase 8" -10 ", all is depths LF 0 0 $ 100.00 CO #1 - WO #1 page2 0 • CITY OF BAYTOWN 2001 ANNUAL SANITARY SEWER REHABILITATION CONTRACT CHANGE ORDER #1 ON WORK ORDER #1 January 7, 2002 This work order included pipe bursting , service reconnections, point repair, manhole replacement, manhole rehabilitation and miscellaneous items related to work on Kentucky, Alabama, Florida, California, Oregon, Kansas, Montana and Bob Smith. 60 Auger & Encase 12" -15 ", all depths SY 0 0 $ 150.00 $ 61 Rmvlreplace up to 5" concrete sidewalk/driveway (includes sawcutting & reinforcement) SY 0 0 $ 50.00 $ 62 Rmv /replace 8" concrete paving (includes sawcutting & reinforcement) SY 0 3 3 $ 70.00 $ 210.00 63 Rmv /repl up to 2" HMAC, Type D, (incl. Saw cut,tack coat, base repair) TON 10 77 67 $ 30.00 $ 2,010.00 64 1" rock with no fines for bedding (incidental to oint re airs ) CY 0 0 $ 20.00 $ - 65 Annular and voids ace grouting MHR 0 0 $ 100.00 $ 66 Flagman for direction of traffic SY 0 0 $ 25.00 $ 67 H dromulch Seeding Day 660 750 90 $ 3.00 $ 270.00 68 Steel Casing, up to 12 ", above ground, coated and wrapped, including supports LF 0 0 $ 150.00 $ - 69 Drop manhole assembly, up to 8' deep LF 0 0 $ 1,000.00 $ - 70 Drop manhole assembly, over 8' deep LF 0 0 $ 1,500.00 $ - 71 Emergency mobilization EA 0 0 $ 1,000.00 $ - 72 Urelift Repair to manhole VF 1 1 0 $ 4,975.00 $ Total Change Order #1 P.M Construction Date $ (56,248.60) Director of Engineering Date Finance Date City Date manager Work Order Summary: Final Construction Cost W01 $ 259,384.40 Initial Estimate - Work Order #1 $ 315,633.00 Change Order #1 $ (56,248.60) CO #1 - WO #1 page3