BAWA Resolution No. 2020-04RESOLUTION NO. 2020-04 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE BAYTOWN AREA WATER AUTHORITY AUTHORIZING CHANGE ORDER NO. 8 WITH PEPPER LAWSON WATERWORKS, LLC, FOR THE BAWA 6 MGD SURFACE WATER TREATMENT PLANT PROJECT IN THE AMOUNT OF FORTY THOUSAND NINE HUNDRED EIGHTY-NINE AND 07/100 DOLLARS ($40,989.07); AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE BAYTOWN AREA WATER AUTHORITY: Section 1: That the Board of Directors of the Baytown Area Water Authority does hereby authorize Change Order No. 8 with Pepper Lawson Waterworks, LLC, for the BAWA 6 MGD Surface Water Treatment Plant Project. A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. Section 2: That the Board of Directors of the Baytown Area Water Authority hereby authorizes the payment of an amount not to exceed FORTY THOUSAND NINE HUNDRED EIGHTY-NINE AND 07/100 DOLLARS ($40,989.07) to Pepper Lawson Waterworks, LLC, consistent with the change order authorized in Section 1. Section 3: This resolution shall take effect immediately from and after its passage by the Board of Directors of the Baytown Area Water Authority. INTRODUCED, READ and PASSED by the affirmative vote of the Board of Directors of the Baytown Area Water Authority this the 181h day of March, 2020. BRENDA BRADLEY SMITH, President ATT LETICIA BRYSCH, A'ss—mRnt Secretary APPROVED AS TO FORM: /U e'MNACIO RAMIREZ, S ., en ral Counsel R:\Karen\Piles\BAWA\Resolution\2020\March 18\ChangeOrderNo84BAWAEASi.docx Exhibit "A" BAYTOWN AREA WATER AUTHORITY Change Order No. 8 6.0 MGD SURFACE WATER TREATMENTPLAN'l PO: 18M021 Dale: 12-Mor-20 Bdcf Dcecrloll Do of Changes: CO 8.1 Is for the additional cost fnr tie revised raw water amv meter and additional requirements including backup battery power mid encrypted signal per City of Houston. CO 8.2 Is for the additional costs for the temporary doom and door and hardware schedule modifications at Operations Building, Primary Electrical Building, LILPS Blectrical Building and HSPS Electrical Building. C0831s for additional rode for the collular auto -duller as required by the rive Maraltall. CO 8A is to provide IIVAC for elevator mechanical room. CO 85 is a request for extra cost due to the modifications of the fiber optics for SCADA to the process equipment, Ilia gale access and sonrrity per BAWA and the City s security requirements. CO 8.61s for electrical, hW mmentalion and HVAC mmlificatioss at the Operations Building server room. CO 8.71s to olleviole "whales" In the forebay geomembrane bottom liner. ,(70 A A Ramnval of a nndtnn of tho rium,d h ildlno nornih allnwa,vw and fnr nff- In nininy Inatalinlim, r,.mnvwl from area Add or Delete Items: Item Description Unit Quantity Unlit Price Total 8.1 Raw Water Meter Enhancomenls C044 1 IS 13,891.16 i 13,89116 8.2 Door Hardware and Material Change PCO 029A) 1 1S 31,21651 31,21651 83 Cellular Auto Diller CO 056 1 IS 3,750.72 3,750.72 8.4 Qlevalor Mechanical Room HVAC PCO053 1 IS 11,977.00 11,977A0 85 fgbcr0 Ilca Change PCO 043 1 IS 17,78559 17,78559 8.6 Daro)Server Room Modifications PCO 054) 1 LS 17,63957 $ 1763957 g,7 Foreboy Uner Modlficatiotu P00047 1 is 244,72852 244,72852 8.8 Removal of Unused Permit Allowance I7, PCO 058 1 IS J0 mili2D $ 300,00050 ($25D,000) and Removal of Scope for Olfslle Piping (PCO 1046) Did Item 1009-6'Sewer PM S50,0W Total Contact ;urnunmv, 40,989.07 Orl tml Revised I Officinal Cmnraet Price 552,186,WOM 2 Owner Contingency $0.00 Previous Chan eOrdem 71da Change Order Remalnin Conlin an 3 Clumile Orden Previous Change Orders $ ,464,186.04 This change order $ 40,989.07 4 Revised Contrast Price $52,186,000.00 $48,76ZBM.03 Ori inal Contract Duration 10% PfCVIOW B%IeNions 0 Thla Clan C Order 0 Revised Duration -Calendar Days 1095 Contractor: PL Vaterworlu6LLC Date Neddent � Ouhy 5 th, attu�n:.Yla 0%: x=� 3 la d0a0 Calsultanh johosIcarter, Inc. Date ladrard I_ Davls, ICMA-CM 3'2A Z O