Ordinance No. 9,163ORDINANCE NO. 9163 ® AN ORDINANCE AUTHORIZING CHANGE ORDER NO. 2 AND FINAL PAYMENT ON WORK ORDER NO. 8 WITH P.M. CONSTRUCTION AND REHABILITATION, L.P., TO ADJUST THE FINAL UNIT BID QUANTITIES FOR THE ANNUAL SANITARY SEWER REHABILITATION CONTRACT - YEAR 2000; AUTHORIZING FINAL PAYMENT OF THE SUM OF NINETY -SIX THOUSAND THREE HUNDRED FORTY -THREE AND 40/100 DOLLARS ($96,343.40) TO P.M. CONSTRUCTION AND REHABILITATION, L.P., FOR SAID PROJECT; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. WHEREAS, the City of Baytown contracted with P.M. Construction and Rehabilitation, L.P for the Annual Sanitary Sewer Rehabilitation Contract - Year 2000 (the "Project "); and WHEREAS, a change order in the amount of SIXTEEN THOUSAND NINETY AND 65/100 DOLLARS ($16,090.65) to adjust the final unit bid quantities is necessary to reflect the actual quantities used in the Project as well as the amount remaining due to P.M. Construction and Rehabilitation, L.P.; and WHEREAS, all of the said improvements, as provided in the plans and specifications heretofore prepared by the City's Engineer and as approved and adopted by the City Council have been performed and completed in full accordance with all of the terms and conditions of the aforesaid contract; and WHEREAS, the City's Engineer in the manner provided by the terms of the said contract and the plans and specifications thereof, has approved and accepted the Annual Sanitary Sewer Rehabilitation Contract - Year 2000 and improvements and has heretofore issued his Certificate of Final Acceptance and has certified same to the City Council and recommended that it accept and receive said work and improvements as constructed and completed by Contractor; and WHEREAS, there remains due and owing to P.M. Construction and Rehabilitation, L.P., the sum ofNINETY -SIX THOUSAND THREE HUNDRED FORTY -THREE AND 40/100 DOLLARS ($96,343.40); NOW THEREFORE BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 2 and final payment on Work Order No. 8 with P.M. Construction and Rehabilitation, L.P., to adjust the final unit bid quantities for the Annual Sanitary Sewer Rehabilitation Contract - Year 2000. A copy of said change order is attached hereto, marked Exhibit "A," and made a part hereof for all intents and purposes. ® Section 2: That the City Council hereby accepts and approves the above - described work and improvements, and finds and determines that all of said improvements have been completed as provided in the plans and specifications thereof, and in full accordance with all of the terms and provisions of the aforesaid contract. Section 3: That the Certificate of Final Acceptance heretofore issued by the City's Engineer and certified to the City Council is hereby accepted and received. Section 4: That final payment to P.M. Construction and Rehabilitation, L.P., in the amount of NINETY -SIX THOUSAND THREE HUNDRED FORTY -THREE AND 40/100 DOLLARS ($96,343.40) is hereby authorized. Section 5: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 24th day of May, 2 00 1. dr-4, C PETE C. ALFAR , Mayor ATTEST: GAlik W. MITH, City Clerk APPROVED AS TO FORM: ACIO RAMIREZ, ., City Attorney d AMyDocuments\ Council\ 00 -01 \ May \ChOrd2FinalPayOn WkOrd8AnnualSanitarySewerRehab2000 2 CITY OF BAYTOWN Project: ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 ®P.M. Construction and Rehabilitation, L.P. 7704 East Erath Houston, Texas 77012 Pay Estimate No. 1 (final) Pay Estimate Cut -off date May 5, 2001 (Invoice Date) Work Order #8, Total Time Allowed: 10 Working Days Total Time Used: 6 Working Days Item Description Unit Est. W07 Quant. P.E.1 Quantities Unit Price Total this Estimate 1 Pipe bursting 6" & 8" with 8" HDPE min. SDR 17, 0' -8' deep LF 0 0 1 $ 38.00 $0.00 2 Pipe bursting 6" & 8" with 8" HDPE min. SDR 17, 8' -15' deep LF 0 0 $ 40.00 $0.00 3 Pipe bursting 6" & 8" with 8" HDPE min. SDR 17, over 15' deep LF 0 0 $ 45.00 $0.00 4 Pipe bursting 8" & 10" with 10" HDPE min. SDR 17, 0' -8' deep LF 0 0 1 $ 42.00 $0.00 5 Pipe bursting 8" & 10" with 10" HDPE min. SDR 17, 8' -15' deep LF 0 0 $ 45.00 $0.00 6 Pipe bursting 8" & 10" with 10" HDPE min. SDR 17, over 158' deep LF 0 0 $ 50.00 $0.00 7 Pipe bursting 10" & 12" with 12" HDPE min. SDR 17, 0' -8' deep LF 0 0 1 $ 55.00 $0.00 8 Pipe bursting 10" & 12" with 12" HDPE min. SDR 17, 8' -15' deep LF 0 0 $ 60.00 $0.00 9 Pipe bursting 10" & 12" with 12" HDPE min. SDR 17, over 15' deep LF 0 0 $ 75.00 $0.00 10 Pipe bursting 12" & 15" with 15" HDPE min. SDR 17, min, PVC SDR 26, 0' -8' deep LF 0 0 1 $ 75.00 $0.00 11 Pipe bursting 12" & 15" with 15" HDPE min. SDR 17, min, PVC SDR 26, 8' -15' deep LF 0 0 $ 85.00 $0.00 12 Pipe bursting 12" & 15" with 15" HDPE min. SDR 17, min, PVC SDR 26, over 15' deep LF 0 0 $ 100.00 $0.00 13 Remove existing slipliner, all sizes and depths LF 0 0 1 $ 5.00 $0.00 14 Reconnect service - short side, 0' -8' deep EA 0 0 $ 500.00 $0.00 15 Reconnect service - short side, over 8' deep EA 0 0 $ 700.00 $0.00 16 Reconnect service - long side, 0' -8' deep EA 0 0 $ 1,200.00 $0.00 17 Reconnect service - long side, over 8' deep EA 0 0 $ 1,500.00 $0.00 18 Manhole Wall Sealing VF 26.5 17 $ 85.00 $1,445.00 19 Repl /install new manhole, 0' -8' deep EA 0 0 $ 1,500.00 $0.00 20 New Manhole, over 8' deep VF 0 0 $ 200.00 $0.00 21 Replace /install ring and cover EA 0 0 $ 300.00 $0.00 22 Extra cement stabilized sand backfill, 2 sk. /ton TON 200 234.42 $ 20.00 $4,688.40 23 Point Rpr /obst rmv - pipe bursting, 0'- 8' deep EA 0 0 1 $ 300.00 $0.00 24 Point Rpr /obst rmv - pipe bursting, 8'- 15' deep EA 0 0 $ 400.00 $0.00 25 Point Rpr /obst rmv - pipe bursting, over 15' deep EA 0 0 $ 500.00 $0.00 26 Extra Length point repair, all depths LF 0 0 $ 60.00 $0.00 27 Well Point set up, up to 12 If EA 0 0 $ 2,800.00 $0.00 28 Well Point, Extra length over 12 If LF 0 0 $ 20.00 $0.00 29 Trench Safety, 0' to 8' deep LF 0 0 $ 1.00 $0.00 30 Trench Safety, 8' to 15' deep LF 200 150 $ 1.00 $150.00 31 Trench Safety, 8' to 15' deep LF 0 0 $ 1.00 $0.00 4 32 Clean 6" to 12" Sewer LF 0 1 -600 $ 3.00 ($1,800.00) pelwo8final.As EMU A CITY OF BAYTOWN Project: ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 P.M. Construction and Rehabilitation, L.P. 7704 East Erath Houston, Texas 77012 Pay Estimate No. 1 (final) Pay Estimate Cut -off date May 5, 2001 (Invoice Date) Work Order #8, Total Time Allowed: 10 Working Days Total Time Used: 6 Working Days Item Description Unit Est. W07 Quant. P.E.1 Quantities Unit Price Total this Estimate 33 Clean 15" to 21" Sewer LF 0 0 $ 5.00 $0.00 34 Clean 24" to 36" Sewer LF 0 0 $ 10.00 $0.00 35 TV Inspection of Sewer ' LF 0 -600 $ 1.00 ($600.00) 36 Bypass Pumping, 3" pump Day 0 0 $ 1.00 $0.00 37 Bypass Pumping, 4" pump Day 0 0 $ 1.00 $0.00 38 Bypass Pumping, 6" pump Day 0 0 $ - $0.00 39 Bypass Pumping, 8" pump Day 0 0 $ - $0.00 40 Pt. Repair, 6" - 12 ", 0'- 8' deep, up to 12 If EA 0 0 $ 1,250.00 $0.00 41 Pt. Repair, 6" - 12 ", 8'- 15' deep, up to 12 If EA 0 0 $ 1,750.00 $0.00 42 Pt. Repair, 6" - 12 ", over 15' deep, up to 12 If EA 0 0 $ 2,500.00 $0.00 43 Pt. Repair, 15" - 18 ", 0'- 8' deep, up to 12 If EA 0 0 $ 2,250.00 $0.00 44 Pt. Repair, 15" - 18 ", 8'- 15' deep, up to 12 If EA 0 0 $ 2,900.00 $0.00 45 Pt. Repair, 15" - 18 ", over 15' deep, up to 12 If EA 0 0 1 $ 3,500.00 $0.00 46 Pt. Repair, 21" - 36 ", 0' - 8' deep, up to 12 If EA 0 0 $ 4,000.00 $0.00 47 Pt. Repair, 21" - 36 ", 8'- 15' deep, up to 12 If EA 0 0 $ 6,000.00 $0.00 48 Pt. Repair, 21" - 36 ", over 15' deep, up to 12 If EA 0 1 0 $ 8,000.00 $0.00 49 Extra length pt. Repair, all sizes, 0' - 8' deep LF 0 0 $ 80.00 $0.00 50 Extra length pt. Repair, all sizes, 8' - 15' deep LF 0 0 $ 120.00 $0.00 51 Extra length pt. Repair, all sizes, over15' deep LF 0 0 $ 160.00 $0.00 52 Rmv /Rplace 6" - 12 ", includes modified bedding, 0'- 8' deep, 50 L.F. min. LF 0 0 $ 65.00 $0.00 53 Rmv /Rplace 6" - 12 ", includes modified bedding, 8'- 15' deep, 50 L.F. min. LF 0 0 $ 75.00 $0.00 54 Rmv /Rplace 6" - 12 ", includes modified bedding, over 15' deep, 50 L.F. min. LF 0 0 $ 1,000.00 $0.00 55 Rmv /Rplace 15" - 18 ", includes modified bedding, 0'- 8' deep, 50 L.F. min. LF 0 0 $ 75.00 $0.00 56 Rmv /Rplace 15" - 18 ", includes modified bedding, 8'- 15' deep, 50 L.F. min. LF 0 0 $ 100.00 $0.00 57 Rmv /Rplace 15" - 18 ", includes modified bedding, over 15' deep, 50 L.F. min. 0 0 $ 125.00 $0.00 58 Auger & Encase 8" -10 ", all depths LF 0 0 $ 100.00 $0.00 59 Auger & Encase 12" -15 ", all depths LF 0 0 $ 150.00 $0.00 60 Rmv /replace up to5" concrete sidewalk/driveway (includes sawcutting & reinforcement) SY 0 0 $ 45.00 $0.00 61 Rmv /replace up to5" concrete sidewalk/driveway (includes sawcutting & reinforcement) SY 25 135 $ 60.00 $8,100.00 62 Rmv /repl up to 2" HMAC, Type D, (incl. Saw cut,tack coat, base repair) SY 0 . 0 $ 30.00 $0.00 63 1" rock with no fines for bedding (incidental to point repairs) TON 0 0 $ 20.00 $0.00 64 Annular and void space grouting CY 0 0 $ 100.00 $0.00 65 Flagman for direction of traffic MHR 25 18 $ 20.00 $360.00 66 1 Hydromulch Seeding SY 0 0 $ 3.00 $0.00 pet wo8final.xls CITY OF BAYTOWN Project: ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 P.M. Construction and Rehabilitation, L.P. 7704 East Erath Houston, Texas 77012 Pay Estimate No. 1 (final) Pay Estimate Cut-off date May 5, 2001 (Invoice Date) Work Order #8, Total Time Allowed: 10 Working Days Total Time Used: 6 Working Days Item Description Unit Est. W07 Quant. P.E.1 Quantities Unit Price Total this Estimate 67 Bypass Pumping, 6" or greater Day 0 0 $ 1.00 $0.00 68 Root & tuberculation removal, 6" - 12" LF 0 0 $ 10.00 $0.00 69 Root & tuberculation removal, 12" - 24" LF 0 0 $ 20.00 $0.00 70 Steel Casing, up to 12 ", above ground, coated and wrapped, including supports LF 0 1 0 $ 100.00 $0.00 71 Drop manhole assembly, up to 8' deep EA 0 0 $ 2,500.00 $0.00 72 Drop manhole assembly, over 8' deep VF 0 0 $ 500.00 $0.00 73 Emergency mobilization EA 0 0 $ 1,000.00 $0.00 74 Pipe Bursting 12" to 22" SDR 19, 0' to 8' deep LF 464 464 1 $ 140.00 $64,960.00 75 Pipe Bursting 12" to 21" SDR 26, 0' to 8' deep LF 131 131 $ 140.00 $18,340.00 76 Rmv /Rplace 15" - 21" SDR 26, includes modified bedding, 0' to8' deep LF 5 5 $ 140.00 $700.00 Total $96,343.40 Less 5% Retainage 2,35,.N,���.�.. Less Total Previous Payments on WO8 Payment Due This Estimate i j4 $96,343.40 P.M. Construction Date Contract Summary: Current Work Order #8 Amount Less 5% Retainage Less Previous Payments Current Amount Due C, $96,343.40 96,343.40 pet wo8final.xls Asst. Director of Engineering Date ILI v CITY OF BAYTOWN ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 Change Order #2 on Annual Sanitary Sewer Rehabilitatioin Contract - Year 2000 05/18/2001 This Change Order is to increase the total contract amount in order to close the contract . Work Order #8 was in compliance with the TNRCC's order to eliminate the sewer overflows on Huggins Street and included pipe bursting, manhole rehabilitation and miscellaneous items related to work on Missouri Street and the Missouri Street Lift Station. The increase was due to unanticipated pavement removal, replacement and stabilized sand required to complete Work Order No. 8. Contract award amount $ 848,800.00 Change order #1 amount $ 14,000.00 Change order #2 amount $ 16,090.65 Revised Contract Amount $ 878,890.65 CO2Con tract. As Director of Engineering Date City Manager Date ,page1