Ordinance No. 9,138ORDINANCE NO. 9138 ® AN ORDINANCE AUTHORIZING CHANGE ORDER NO. 1 TO WORK ORDER NO. 7 WITH P.M. CONSTRUCTION AND REHABILITATION, L.P., TO ADJUST THE FINAL UNIT BID QUANTITIES FOR THE ANNUAL SANITARY SEWER REHABILITATION PROJECT - YEAR 2000; AUTHORIZING FINAL PAYMENT OF THE SUM OF TEN THOUSAND NINE HUNDRED SEVEN AND 80/100 DOLLARS ($10,907.80) TO P.M. CONSTRUCTION AND REHABILITATION, L.P., FOR SAID PROJECT; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. ************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** WHEREAS, the City of Baytown contracted with P.M. Construction and Rehabilitation, L.P., for the Annual Sanitary Sewer Rehabilitation Project - Year 2000 (the "Project "); and WHEREAS, a change order in the amount of THREE THOUSAND THREE HUNDRED NINETY -FIVE AND NO /100 DOLLARS ($3,395.00) to adjust the final unit bid quantities is necessary to reflect the actual quantities used in the Project as well as the amount remaining due to P.M. Construction and Rehabilitation, L.P.; and WHEREAS, all of the said improvements, as provided in the plans and specifications heretofore prepared by the City's Engineer and as approved and adopted by the City Council have been performed and completed in full accordance with all of the terms and conditions of the aforesaid contract; and WHEREAS, the City's Engineer in the manner provided by the terms of the said contract and the plans and specifications thereof, has approved and accepted the Annual Sanitary Sewer Rehabilitation Project — Year 2000 and improvements and has heretofore issued his Certificate of Final Acceptance and has certified same to the City Council and recommended that it accept and receive said work and improvements as constructed and completed by Contractor; and WHEREAS, there remains due and owing to P.M. Construction and Rehabilitation, L.P., the sum of TEN THOUSAND NINE HUNDRED SEVEN AND 80 /100 DOLLARS ($10,907.80); NOW THEREFORE BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 1 to Work Order No. 7 with P.M. Construction and Rehabilitation, L.P., to adjust the final unit bid quantities for the Annual Sanitary Sewer Rehabilitation Project - Year 2000. A copy of said change order is attached hereto, marked Exhibit "A," and made a part hereof for all intents and purposes. Section 2: That the City Council hereby accepts and approves the above - described work and improvements, and finds and determines that all of said improvements have been completed as ® provided in the plans and specifications thereof, and in full accordance with all of the terms and provisions of the aforesaid contract. ® Section 3: That the Certificate of Final Acceptance heretofore issued by the City's Engineer and certified to the City Council is hereby accepted and received. Section 4: That final payment to P.M. Construction and Rehabilitation, L.P., in the amount of TEN THOUSAND NINE HUNDRED SEVEN AND 80/100 DOLLARS ($10,907.80) is hereby authorized. Section 5: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 12`h day of April, 2001. ATTEST: GAkY W. SMITH, City Clerk APPROVED AS TO FORM: ACIO RAMIREZ, W., City Attorney d: \MyDocuments\ Council\ 00 -011 April \CO &FinalPayAnnualSSRehab2000 2 /j4 e. PETE C. ALFAR , Mayor CITY OF BAYTOWN ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 Change Order #1 on Work Order #7 01/02/2001 ® This work order included pipe bursting , manhole replacement and miscellaneous items related to work, clean & TV on Civic Drive,Ontario Street and Missouri Street. C Co1wo7 pagel Orig. Final Cost Item Description Unit Quant. Quant. Diff. Price Difference 1 Pipe bursting 6" & 8" with 8" HOPE min. SDR 17, 0' -8' deep LF 1150 1142 -8 $ 38.00 $ (304.00) 2 Pipe bursting 6" & 8" with 8" HOPE min. SDR 17, 8' -15' deep LF 0 0 0 $ 40.00 $ 3 Pipe bursting 6" & 8" with 8" HOPE min. SDR 17, over 15' deep LF 0 0 0 $ 45.00 $ 4 Pipe bursting 8" & 10" with 10" HOPE min. SDR 17, 0' -8' deep LF 0 0 0 $ 42.00 $ 5 Pipe bursting 8" & 10" with 10" HOPE min. SDR 17, 8' -15' deep LF 0 0 0 $ 45.00 $ 6 Pipe bursting 8" & 10" with 10" HOPE min. SDR 17, over 158' deep LF 0 0 0 $ 50.00 $ 7 Pipe bursting 10" & 12" with 12" HOPE min. SDR 17, 0' -8' deep LF 0 0 0 $ 55.00 $ Pipe bursting 10" & 12" with 12" HOPE min. SDR 17, 8' -15' deep LF 0 0 0 $ 60.00 $ E 98 Pipe bursting 10" & 12" with 12" HDPE min. SDR 17, over 15' deep LF 0 0 0 $ 75.00 $ 10 Pipe bursting 12" & 15" with 15" HOPE min. SOR 17, min, PVC SDR 26, 0' -8' deep LF 0 0 0 $ 75.00 $ 11 Pipe bursting 12" & 15" with 15" HOPE min. SDR 17, min, PVC SDR 26, 8' -15' deep LF 0 0 0 $ 85.00 $ 12 Pipe bursting 12" & 15" with 15" HOPE min. SDR 17, min, PVC SDR 26, over 15' deep LF 0 0 0 $ 100.00 $ - 13 Remove existing slipliner, all sizes and depths LF 0 0 0 $ 5.00 $ - 14 Reconnect service - short side, 0 8' deep EA 28 30 2 $ 500.00 $ 1,000.00 15 Reconnect service - short side, over 8' deep EA 0 0 0 $ 700.00 $ - 16 Reconnect service - long side, 0' 8' deep EA 0 0 0 $ 1,200.00 $ 17 Reconnect service - long side, over 8' deep EA 0 0 0 $ 1,500.00 $ - 18 Manhole Wall Sealing VF 20 22 2 $ 85.00 $ 170.00 19 Repl/install new manhole, 0' -8' deep EA 1 1 0 $ 1,500.00 $ - 20 New Manhole, over 8' deep VF 0 0 0 $ 200.00 $ - 21 ReplaceAnstall ring and cover EA 0 1 1 $ 300.00 $ 300.00 22 Extra cement stabilized sand backfill, 2 skJton TON 0 13 13 $ 20.00 $ 260.00 23 Point Rprlobst rmv - pipe bursting, 0'- 8' deep EA 2 3 1 $ 300.00 $ 300.00 24 Point Rprlobst rmv - pipe bursting, 8'- 15' deep EA 0 0 0 $ 400.00 $ - 25 Point Rprlobst rmv - pipe bursting, over 15' deep EA 0 0 0 $ 500.00 $ - 26 Extra Length point repair, all depths LF 0 0 0 $ 60.00 $ - 27 Well Point set up, up to 12 If EA 0 0 0 $ 2,800.00 $ - Co1wo7 pagel CITY OF BAYTOWN ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 Change Order #1 on Work Order #7 ® 01/02/2001 This work order included pipe bursting , manhole replacement and miscellaneous items related to work, clean & TV on Civic Drive,Ontario Street and Missouri Street. 28 Well Point, Extra length over 12 If LF 0 0 0 $ 20.00 $ 29 Trench Safety, 0' to 8' deep LF 100 150 50 $ 1.00 $ 50.00 30 Trench Safety, 8' to 15' deep LF 0 0 0 $ 1.00 $ - 31 Trench Safety, 8' to 15' deep LF 0 0 0 $ 1.00 $ - 32 Clean 6" to 12" Sewer LF 491 491 0 $ 3.00 $ - 33 Clean 15" to 21" Sewer LF 1454 1308 -146 $ 5.00 $ (730.00) 34 Clean 24" to 36" Sewer LF 0 0 0 $ 10.00 $ - 35 TV Inspection of Sewer LF 1945 1799 -146 $ 1.00 $ (146.00) 36 Bypass Pumping, 3" pump Day 0 0 0 $ 1.00 $ 37 Bypass Pumping, 4" pump Day 0 0 0 $ 1.00 $ 38 Bypass Pumping, 6" pump Day 0 0 0 $ - $ 39 Bypass Pumping, 8" pump Day 0 0 0 $ - $ 40 Pt. Repair, 6" - 12 ", 0'- 8' deep, up to 12 If EA 0 0 0 $ 1,250.00 $ - 41 Pt. Repair, 6" - 12 ", 8'- 15' deep, up to 12 If EA 0 0 0 $ 1,750.00 $ - 42 Pt. Repair, 6" - 12 ", over 15' deep, up to 12 If EA 0 0 0 $ 2,500.00 $ 43 Pt. Repair, 15" - 18 ", 0' - 8' deep, up to 12 If EA 0 0 0 $ 2,250.00 $ 44 Pt. Repair, 15" - 18 ", 8'- 15' deep, up to 12 If EA 0 0 0 $ 2,900.00 $ 45 Pt. Repair, 15" - 18 ", over 15' deep, up to 12 If EA 0 0 0 $ 3,500.00 $ - 46 Pt. Repair, 21" - 36 ", 0'- 8' deep, up to 12 If EA 0 0 0 $ 4,000.00 $ - 47 Pt. Repair, 21" - 36 ", 8'- 15' deep, up to 12 If EA 0 0 0 $ 6,000.00 $ - 48 Pt. Repair, 21" - 36 ", over 15 deep, up to 12 If EA 0 0 0 $ 8,000.00 $ - 49 Extra length pt. Repair, all sizes, 0'- 8' deep LF 0 0 0 $ 80.00 $ - 50 Extra length pt. Repair, all sizes, 8'- 15' deep LF 0 0 0 $ 120.00 $ - 51 Extra length pt. Repair, all sizes, overl5' deep LF 0 0 0 $ 160.00 $ - 52 Rmv /Rplace 6" - 12 ", includes modified bedding, 0'- 8' deep, 50 L.F. min. LF 0 37 37 $ 65.00 $ 2,405.00 53 Rmv /Rplace 6" - 12 ", includes modified bedding, 8'- 15' deep, 50 L.F. min. LF 0 0 0 $ 75.00 $ - 54 Rmv /Rplace 6" - 12 ", includes modified bedding, over 15' deep, 50 L.F. min. LF 0 0 0 $ 1,000.00 $ 55 Rmv /Rplace 15" - 18 ", includes modified bedding, 0'- 8' deep, 50 L.F. min. LF 0 0 0 $ 75.00 $ 56 Rmv /Rplace 15" - 18 ", includes modified bedding, 8'- 15' deep, 50 L.F. min. LF 0 0 0 $ 100.00 $ 57 Rmv /Rplace 15" - 18 ", includes modified bedding, over 15' deep, 50 L.F. min. 1 0 0 0 $ 125.00 $ 58 Auger & Encase 8" -10 ", all depths LF 0 0 0 $ 100.00 $ - Co1wo7 page2 CITY OF BAYTOWN ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 Change Order #1 on Work Order #7 01/02/2001 This work order included pipe bursting , manhole replacement and miscellaneous items related to work, clean & TV on Civic Drive,Ontario Street and Missouri Street. 59 Auger & Encase 12" -15 ", all depths LF 0 0 0 $ 150.00 $ 60 Rmv /replace up to5" concrete sidewalk/driveway (includes sawcutting & reinforcement) SY 0 2 2 $ 45.00 $ 90.00 61 Rmv /replace up to5" concrete sidewalk/driveway (includes sawcutting & reinforcement) SY 0 0 0 $ 60.00 $ - 62 Rmv /repl up to 2" HMAC, Type D, (incl. Saw cut,tack coat, base repair) SY 0 0 0 $ 30.00 $ - 63 1" rock with no fines for bedding (incidental to point repairs) TON 0 0 0 $ 20.00 $ - 64 Annular and void space grouting CY 0 0 0 $ 100.00 $ - 651 Flagman for direction of traffic MHR 0 0 0 $ 20.00 $ - 66 Hydromulch Seeding SY 200 200 0 $ 3.00 $ - 671 Bypass Pumping, 6" or greater Day 0 0 0 $ 1.00 $ - 68 Root & tuberculation removal, 6" 12" LF 0 0 0 $ 10.00 $ - 69 Root & tuberculation removal, 12" - 24" LF 0 0 0 $ 20.00 $ - 70 Steel Casing, up to 12 ", above ground, coated and wrapped, including supports LF 0.1, _ 0 0 $ 100.00 $ - 71 Drop manhole assembly, up to 8' deep EA 0 0 0 $ 2,500.00 $ - 72 Drop manhole assembly, over 8' deep VF 0 0 0 $ 500.00 $ - 73 Emergency mobilization EA 0 0 0 $ 1,000.00 $ - Total Change Order #1 . P.M Construction Date Finance Date Co1wo7 Work Order Summary: Final Construction Cost W06 $ 76,283.00 Initial Work Order #6 $ 72,888.00 Change Order #1 $ 3,395.00 Director of Engineering Date City manager Date page3 CITY OF BAYTOWN Project: ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 ®P.M. Construction and Rehabilitation, LP. 7704 East Erath Houston, Texas 77012 Pay Estimate No. 2 (final) revised 2/28 /01 Pay Estimate Cut-off date March 30, 2001 (Invoice Date) Work Order #7, Total Time Allowed: 15 Working Days Total Time Used: 14 Working Days pe2wo7final Est. W07 P.E.1 P.E.2 Total Unit Final Item Description Unit Quant. Quantities Quantities Quantities Price Amount Pipe bursting 6" & 8" with 8" HOPE 1 min. SDR 17, 0' -8' deep LF 1150 1142 0 1142 $ 38.00 $43,396.00 Pipe bursting 6" & 8" with 8" HOPE 2 min. SDR 17, 8' -15' deep LF 0 0 0 0 $ 40.00 $0.00 Pipe bursting 6" & 8" with 8" HOPE 3 min. SDR 17, over 15' deep LF 0 0 0 0 $ 45.00 $0.00 Pipe bursting 8" & 10" with 10" 4 HOPE min. SDR 17, 0' -8' deep LF 0 0 0 0-$ 42.00 $0.00 Pipe bursting 8" & 10" with 10" 5 HOPE min. SDR 17, 8' -15' deep LF 0 0 0 0 $ 45.00 $0.00 Pipe bursting 8" & 10" with 10" 6 HOPE min. SDR 17, over 158' deep LF 0 0 0 0 $ 50.00 $0.00 Pipe bursting 10" & 12" with 12" 7 HOPE min. SDR 17, 0' -8' deep LF 0 0 0 0 $ 55.00 $0.00 Pipe bursting 10" & 12" with 12" 8 HOPE min. SOR 17, 8' -15' deep LF 0 0 0 0 $ 60.00 $0.00 Pipe bursting 10 "A 12" with 12" 9 HOPE min. SDR 17, over 15' deep LF 0 0 0 0 $ 75.00 $0.00 Pipe bursting 12" & 15" with 15" HOPE min. SDR 17, min, PVC SDR 10 26, 0' -8' deep LF 0 0 0 0 $ 75.00 $0.00 Pipe bursting 12" & 15" with 15" HOPE min. SOR 17, min, PVC SDR 11 26, 8' -15' deep LF 0 0 0 0 $ 85.00 $0.00 Pipe bursting 12" & 15" with 15" HOPE min. SDR 17, min, PVC SDR 12 26, over 15' deep LF 0 0 0 0 $ 100.00 $0.00 Remove existing slipliner, all sizes 13 and depths LF 0 0 0 0 S 5.00 1 $0.00 Reconnect service - short side, 0' -8' 14 deep EA 28 30 0 30 $ 500.00 $15,000.00 Reconnect service - short side, ove 15 8' deep EA 0 0 0 0 $ 700.00 $0.00 Reconnect service - long side, 0' -8' 16 deep EA 0 0 0 0 $ 1,200.00 $0.00 Reconnect service - long side, over 17 B' deep EA 0 0 0 0 $ 1,500.00 $0.00 18 Manhole Wall Sealing VF 20 0 22 22 $ 85.00 $1,870.00 19 Repl /install new manhole, 0'-8' deep EA 1 1 0 1 $ 1,500.00 $1,500.00 20 New Manhole , over 8' deep VF 0 0 0 0 $ 200.00 $0.00 21 Replace /install ring and cover EA 0 1 0 1 $ 300.00 $300.00 Extra cement stabilized sand 22 backfill, 2 sk. /ton TON 0 13 0 13 $ 20.00 $260.00 Point Rpr /obst rmv - pipe bursting, 23 0'- 8' deep EA 2 3 0 3 $ 300.00 $900.00 Point Rpr /obst rmv - pipe bursting, 24 8'- 15' deep EA 0 0 0 0 $ 400.00 $0.00 Point Rpr /obst rmv - pipe bursting, 25 over 15' deep EA 0 0 0 0 $ 500.00 $0.00 26 Extra Length point repair, all depth LF 0 0 0 0 $ 60.00 $0.00 27 Well Point set up, up to 12 If EA 0 0 0 0 $ 2,800.00 $0.00 28 Well Point, Extra length over 12 If LF 0 0 0 0 $ 20.00 $0.00 29 Trench Safety, 0' to 8' deep LF 100 150 0 150 $ 1.00 $150.00 30 Trench Safety, 8' to 15' deep LF 0 0 0 0 $ 1.00 $0.00 pe2wo7final CITY OF BAYTOWN Project: ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 P.M. Construction and Rehabilitation, L.P. 7704 East Erath Houston, Texas 77012 Pay Estimate No. 2 (final) revised 2128101 Pay Estimate Cut -off date March 30, 2001 (Invoice Date) Work Order #7, Total Time Allowed: 15 Working Days Total Time Used: 14 Working Days pe2wo7final Est. WO7 P.E.1 P.E.2 Total Unit Final Item Description Unit Quant. Quantities Quantities Quantities Price Amount 31 Trench Safety, 8' to 15' deep LF 0 0 0 0 $ 1.00 $0.00 32 Clean 6" to 12" Sewer LF 491 491 0 491 $ 3.00 $1,473.00 33 Clean 15" to 21" Sewer LF 1545 776 532 1308 $ 5.00 $6,540.00 34 Clean 24" to 36" Sewer LF 0 0 0 0 $ 10.00 $0.00 35 TV Inspection of Sewer LF 1945 1267 532 1799 $ 1.00 $1,799.00 36 Bypass Pumping, 3" pump Day 0 0 0 0 $ 1.00 $0.00 37 Bypass Pumping, 4" pump Day 0 0 0 0 $ 1.00 $0.00 38 Bypass Pumping, 6" pump Day 0 0 0 0 $ - $0.00 39 Bypass Pumping, 8" pump Day 0 0 0 0 $ $0.00 - Pt. Repair, 6" - 12 ", 0'- 8' deep, up 40 to 12 If EA 0 0 0 0 $1,250.00 $0.00 Pt. Repair, 6"- 12 ", 8'- 15' deep, u 41 to 12 If EA 0 0 0 0 $ 1,750.00 $0.00 Pt. Repair, 6" - 12 ", over 15' deep, 42 up to 12 If EA 0 0 0 0 $ 2,500.00 $0.00 Pt. Repair, 15" - 18 ", 0'- 8' deep, u 43 to 12 If EA 0 0 0 0 $ 2,250.00 $0.00 Pt. Repair, 15" - 18 ", 8'- 15' deep, 44 up to 12 If EA 0 0 0 0 $ 2,900.00. $0.00 Pt. Repair, 15" - 18 ", over 15' deep, 45 up to 12 If EA 0 0 0 $ 3,500.00 $0.00 Pt. Repair, 21" : 36 ", 0'- 8' deep, u 46 to 12 If EA 0 0 0 0 $ 4,000.00 $0.00 Pt. Repair, 21" - 36 ", 8'- 15' deep, 47 up to 12 If EA 0 0 0 0 $ 6,000.00 $0.00 Pt. Repair, 21" - 36 ", over 15' deep, 48 up to 12 If EA 0 0 0 0 $ 8,000.00 $0.00 Extra length pt. Repair, all sizes, 0' 49 8' deep LF 0 0 0 0 $ 80.00 $0.00 Extra length pt. Repair, all sizes, 8' 50 15' deep LF 0 0 0. $ 120.00 $0.00 Extra length pt. Repair, all sizes, 51 overl5' deep LF 0 0 0 0 $ 160.00 $0.00 Rmv /Rplace 6" - 12 ", includes modified bedding, 0'- 8' deep, 50 52 L.F. min. LF 0 0 37 37 $ 65.00 $2,405.00 Rmv /Rplace 6" - 12 ", includes modified bedding, 8'- 15' deep, 50 53 L.F. min. LF 0 0 0 0 $ 75.00 $0.00 Rmv /Rplace 6" - 12 ", includes modified bedding, over 15' deep, 50 54 L.F. min. LF 0 0 0 0 $1,000.00 $0.00 Rmv /Rplace 15" - 18 ", includes modified bedding, 0' - 8' deep, 50 55 L.F. min. LF 0 0 0 $ 75.00 $0.00 Rmv /Rplace 15" - 18 ", includes modified bedding, 8'- 15' deep, 50 56 L.F. min. LF 0 0 0 0 $ 100.00 $0.00 Rmv /Rplace 15" - 18 ", includes modified bedding, over 15' deep, 50 57 L.F. min. 0 0 0 0 $ 125.00 $0.00 58 Auger & Encase 8" -10 ", all depths LF 0 0 0 0 $ 100.00 $0.00 59 Auger & Encase 12" -15 ", all depths LF 0 0 0 0-$ 150.00 $0.00 Rmv /replace up toy" concrete sidewalk/driveway (includes 60 sawcutting & reinforcement) SY 0 2 0 2 $ 45.00 $90.00 pe2wo7final • CITY OF BAYTOWN Project: ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 P.M. Construction and Rehabilitation, L.P. 7704 East Erath Houston, Texas 77012 Pay Estimate No. 2 (final) revised 2/28101 Pay Estimate Cut-off date March 30, 2001 (Invoice Date) Work Order #7, Total Time Allowed: 15 Working Days Total Time Used: 14 Working Days P.M. Construction Date Contract Summary: Current Work Order #7 Amount Less 0% Retainage Less Previous Payments Current Amount Due $76,283.00 (65,375.20) 10,907.80 Asst. Director of Engineering Date pe2wo7final Est. W07 P.E.1 P.E.2 Total Unit Final Item Description Unit Quant. Quantities Quantities Quantities Price Amount Rmv /replace up to5" concrete sidewalk/ddveway (includes 61 sawcutting & reinforcement) SY 0 0 0 0 $ 60.00 $0.00 Rmv /repl up to 2" HMAC, Type D, (incl. Saw cut,tack coat, base 62 repair) SY 0 0 0 0 $ 30.00 $0.00 1" rock with no fines for bedding 63 (incidental to point repairs) TON 0 0 0 0 $ 20.00 $0.00 64 Annular and void space grouting CY 0 0 0 0 $ 100.00 $0.00 65 Flagman for direction of traffic MHR 0 0 0 0 $ 20.00 $0.00 66 Hydromulch Seeding SY 200 200 0 200 $ 3.00 $600.00 67 Bypass Pumping, 6" or greater Day 0 0 0 0 $ 1.00 $0.00 Root & tuberculation removal, 6" - 68 12" LF 0 1 0 0 0 $ 10.00 $0.00 Root & tuberculation removal, 12" - 69 24" LF 0 0 0 0 $ 20.00 $0.00 Steel Casing, up to 12 ", above ground, coated and wrapped, 70 including supports LF 0 0 0 0 $ 100.00 $0.00 Drop manhole assembly, up to 8' 71 deep EA 0 0 0 0 $ 2,500.00 $0.00 Drop manhole assembly, over 8' 72 deep VF 0 0 0 0 $ 500.00 $0.00 73 Emergency mobilization EA 0 0 01 0 $ 1,000.00 $0.00 Total Less 0% Retainage Less Total Previous Payments on WO 7 $76,283.00 $ - $ (65,375.20) Payment Due This Estimate $ 10,907.80 P.M. Construction Date Contract Summary: Current Work Order #7 Amount Less 0% Retainage Less Previous Payments Current Amount Due $76,283.00 (65,375.20) 10,907.80 Asst. Director of Engineering Date pe2wo7final